Loading...
HomeMy WebLinkAboutSS3 - City Hall Facilties Needs AssessmentCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Study Session Item No. SS3 April 8, 2003 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Director 949 -644 -3311 Sbadum@city.newport-beach.ca.us SUBJECT: CITY HALL FACILITIES NEEDS ASSESSMENT ISSUE: Based upon the results of the City Hall Facilities Needs Assessment, should the City Council explore options to reconstruct or replace City Hall facilities? RECOMMENDATION: Provide direction to staff on whether to proceed with the next steps necessary to further explore City Hall facilities modification or replacement options. DISCUSSION: In July 2001, Council directed staff to pursue a long -term strategic plan in the form of a City Hall Facilities Master Plan, that would map our facility requirements in order to better serve the public. At the January 8, 2001 City Council meeting, Griffin Advisors, Inc. was hired to develop a City Hall Facility Needs Assessment as Phase I of the City Hall Facilities Master Plan process. The City Hall Facility Needs Assessment (See attachment) incorporates a long -term, integrated approach, addressing current and long -term workspace needs with respect to staffing, facilities access, mobility, storage, parking and customer service. In general, the report states that the current City Hall campus is seriously deficent in serving the current and future needs of the City. The existing buildings range in age from 23 to over 60 years old and have exceeded their useful life. Current deficiencies in the following areas were investigated and documented in the report : • Customer Service interface — Poor circulation and lack of a central lobby or entry point is confusing to the public. For example; Public counter is disjointed with key functions such as the Cashier and Building permit issuance separated in different buildings. SUBJECT: City Hall Facilities Needs Assessment April 8,2003 Page 2 • Employee Workspace — Many employees share workspace or have workspace in areas that were once conference rooms or even hallways. There is no room for expansion to accompodate future public needs. • Records Storage — Some records are currently stored offsite. With the inflow of Newport Coast plans and potential future annexations, we are using storage container bins within the City Hall parking lot. • Meeting Rooms - Existing spaces are cramped and some have been converted to office space. • Seismic building code compliance — None of the City Hall buildings including the Fire Station would survive a major seismic event without significant structural damage. • ADA compliance — There are widespread problems requiring costly improvements. • Parking — Many employees currently park off site. Customer parking is very difficult at various times of the day. Griffin Advisors recommends that an appropriately sized City Hall that would accommodate current and future needs is estimated at 62,000 square feet (current size is approx. 44,000 sqft ). The following Powerpoint presentation by Griffin Advisors explores various scenarios to modify and replace various portions or all of the City Hall campus to achieve the recommended expansion. Griffin's recommended solution is to construct an entirely new facility including the replacement of Fire Station #3 and the construction of a 350 space parking structure. The estimated cost of such a project is estimated at 28 million dollars. Taking advantage of the current interest rates, the City could finance the project over 30 years at an annual cost of approximately two million dollars. The annual costs could be offset by the savings in capital maintenance and improvement costs, operational efficiencies due to centralization of employees and records, and potential parking revenues from adjacent uses which badly need additional parking. The next step, or Phase II, in the Master Plan process would be to establish schematic plans that would provide a detailed concept of the proposed City Hall replacement project. Staff would also encourage an economic analysis that would review potential offsetting cost factors such as parking revenue, building maintenance savings, and operating efficiencies. This project phase would provide enough information in the areas of space allocation and cost so that a decision could be made to proceed with Phase III which is the preparation of construction plans and specifications. Prepared by: Step G. Badum Pu Works Director Attachments: Exhibits CZ 0 Ail o� IL 0 ' o U� a I S444 .o 57- CO) C) CL 00 N O O C 2 4.� U v U v 0 a c O O to C d E y" O i cr Q U a E o U E O O N ECG N 'V N ,Er N m o C 'NG M 0 O ONN '++N U- ON NN CL " O)dti ti d O � m y �K E �. cvc ?� ca CD Q Q 0 0 Q S = 0 0 U) Q W U CO ' LL 4, Q U v U v 0 a N U ,U U v O a LO a) ca c � 0 co o O ch w (4) E T" m ?, m Lh -a o 4t o o V .21 'v r' E c c -a p '� R 4) d°� N +�+ 0 c 0.- v m _ co � •_ _ .� Q m V •- N N o O m N C 0) .L N :accE m C ,..i t4 = 2 L IL 1 a LU .s L L rn o y =OOUa C = +� ca t� m CD m .y C �E •�., U c c c ,r U x '� •� •� •� d '> p °r° N C UmmMu. U Wm N U ,U U v O a `Fv to 'ry ,v blo Cn U O C Q Cn Cl C •— E U C 20 C � O � Y C 3 ca O � � Q cn O E Y O U O C Cu U (0 U a U 'p 4- O Cu O U ~ (0 (0 (L U) 0 L 'a' d e C U Co o 02 Z c0 Co Cn 0) C (0 L Cn Cn C Cu (0 J, U O Cn C Cu 0 C O 4- Y U Cu Co L 0 U O C � U 0Q X C O CD O7 � O O � 3 U � E O) C C T .23 U C U -0 U O Cn U > U > C � � O � � U U -0 U) U) O E O Z �L Cn O C C 'm .� Co (� .N C V C O E (0 O E Co 0 U Cn Cn Cn .0 E L Q' Co L CU L E O C y Cn O +' O C -0 Cu U C 0— Co -- U CO LL � 0 U I— c0 U- M C Cn CQ C N O W Co a) F L 0) C Q U O) � � O .0 — C O � U Q � O L �J1 Co U -a L_ O) � C (0 > C � 0 C: + _O O E L Q q a� (0 -0 6)(0 E Cu O -00 C .— cn O � U (0 > (n Cn ' C Cn (0 - a) U U U •U W j "O (0 >, a O >% C CO 0 O _ C U =3 .— >+ Co � - O U � W Cu 41 N Mr; U U 0 �aT N A v •N U N O a i O 0 E ~I _ , V^ J V O co ^' U +-. U _W U L- C ` U C U C cn C Q C co 0 U O U U O- m v •N 0 E .� blo C LL C E co O 0 ~ (6 O OU a) ry • � � O (B E •OD •0 c� U � � C U co 3 U U U � >, 0 C �� u) E _ N cz a) cn �C a W O•N UO C V (0 C � a fn (0 U Co Q d -O O Co a N C C V E O O O • ry O (0 :3 d C C U C' 0.0 ,> � S OU cn cn �4 0 =�-0 L>a�_ O C W 0- ► U U Z Rf 0 U a) U = C _U • N C �� N .0 E=p00 E W L o Ea,QU � CO 0 O a Q Q' O O U to U �aT N A v •N U N O a i xi 3 O NO 0 ti 4- E 0 d U •a C � a M O + a c C = Q pa N �x O N •O � d � O O p n � +m O �+ N y 0 J C .E C co PL cn iE co U O 0 J L N C = � O � � L +r L O c� O _ 00 cC � +L+ o N 0 o ++ C Y ao m >� o� O)w Q � N d 3 O 4a E L U O 42 N + c N 0 Sm U J 0) coC C cu U E a w U cs U v O U a) c > .2 O ~ E 0) U v_ .c ci to ca -p OU a)� =� 70-0 O a) O U) c C a) cn .0) Cl) C " (J) .� 7 �0 Cl) > a) � N C c 0 = r U r 00 V c G LO -,e O M N (0 U :z—; -0 U � L QJ N E cn O c cu N v (D cn O O a) ri C O O v N -0 L Q O 0� Oa) O _ 0 CL (a C y cn O O O co U E >' Q d d!�2 O Mn U C d U1 to y cn d O M O N Q c c N O U U i r 0 O � O � 3 0 o L 0 CV 0 CJ N cn cn — 4- — � N (n N U) % cm O � O ._ L � � •m r L N Y d T" N m N rte+ d @ Q N > Q _0 C J� J v cm '> c '> c C p C -p a) 'p FL O' d a O'' d O O +�+ CO O d •L co Z Z F— O c (B 0 m (0 C U) U O L ,cn E+I U C v? O 'L O "6 Cu Lo (D CL Lri (n E Zo O , fn i O O 0 T) Co Co U O O .� Q O m ca a) >U � `- C= i L c a) (n 0) L L cu a) =3 Qom' a U U v ^V 0 .1 O �V V �V �V rr�1 V \ tz (D co co CD ... (D U N Q cri U U LT- z 0 Ate: U � 0 Q- w,+ U r LO LO h M LO CND co COO (.- N N N N M M M M It V O O O O LO O O O O m CT LO 114' LO O M O C LL OO LOO N °0 N LO (O 0 M LO LO ( O+) N N C N A O S W i O O Lo w LO N Ln N N M M N , , .- (D t} .- 't LO . O CO O LO i ' c = (R o O- a u Q d c a (u c (L) c a) c (L) c L a c ZT rn m L w U p N o, N p (6 a (6 a (CO a U O N o Q N N U d E m U V E£ (o U v w U V E= m U (� D m c c � N i E m = U U v cb °. 0 > U) C E ` E m r U U V E m U U v N U U) Tu- o (If U .XO.. C Q _ 0 ° n 0 ° cMD CD ° O ° m° °° (� .M-- CD Q 0 ° (MD 0°° o OD °° M °° c N 0 0) m O c z=� .o N CL m N > G c c N Q CO It O a 3 Z (a 0 Y c (6 m= .� L Q � Y c o m O _ > C o �_ O) (6 O U O � c x pa N Q N N j N Q 2 m N v„ U C.1 v Q� n t i_ i z a -t low qv �► $ s. 4 r,[ [ 1 m do it .Y x hy7 "? a Y z 1 _o � 6R WZ Zn�ca , 1 � E w lo��� IX Ln u 1 !I y , i u I N 1- I � r 1 4 lV L � f - - - -- '4a V r�r ` ^^V W O 7 d IL N V aL V/ A� O� a °a z° LL I — I F E / �o � w� 1w . x , g- _ ' v m m ' N I I 1i U ,v U MMN "�i +1 4— vi N (D 0 CL I 11 1 tAIAN NN I 11 1 a Esc rc -- ----- - -- Hill blo NN a Esc rc -- ----- - -- Hill blo wCot H 7,7171, cl I •q �� —gyp( f[c — .lQ I j � \ `. =1 I N f I• i _ e it 41 v U N O d 4- vi 0 0 °0 m v a R L E ui >, it w (D d U v a L :LC C) as C R Q m � CD x � 1 CD to wCot H 7,7171, cl I •q �� —gyp( f[c — .lQ I j � \ `. =1 I N f I• i _ e it 41 v U N O d w y O O .�. 00 V Lf) R Ch to ayi O to -- V i R (n Lf) co 6 cn a tr a 0 ell IY .,;.: l e. <M Ii o W gm � �ry a grvn i to W vl u7 N O N R U7 — v r m rn C Q. IM o C En I I 0 CD s a: tl O L i Y"( i N Ln z ' I cc T T lL o V T in a a i f A. qW _ � 0 U ^ VnCS C / N -------- _ �j W U O w vi 0 0 ,-. 00 iT V � R T � vl u7 N O N R U7 — v r m rn C Q. IM o C En I I 0 CD s a: tl O L i Y"( i N Ln z ' I cc T T lL o V T in a a i f A. qW _ � 0 U ^ VnCS C / N -------- _ �j W U O O A slik Ix 101 CO O A slik Ix 101 NO O r o NO fn blo O 411 QL� ai , N LL "71 C;vA U) co (D W . LO N m X % ai , N LL "71 i i'1 Tj I C;vA i i'1 Tj I y cn � cVC R F t, • a d L Q Ri C \ N ��C rm o e LJJ N M d LL x 6 I, < n � 1. (n 'D cn 0 .. - 1 -­11 (D 4) CC E 6) r- (n 16- CL coo 0 CD U) (n Im o +1 co Ln 0 ci cD C) m " C-si w I': , 9 -_ I LL X >, Ql wo ii *ftwAeo (00 51 ------- - ------ Aq O cn cn En IL cn Cl) (1) (n 'D cn 0 .. - 1 -­11 (D 4) CC E 6) r- (n 16- CL coo 0 CD U) (n Im o +1 co Ln 0 ci cD C) m " C-si w I': , 9 -_ I LL X >, Ql wo ii *ftwAeo (00 51 ------- - ------ Aq O v y-. m �r ao _ _ c L � � a c�a o •� °1 �°' � - 1 r N ld co i •cr � o � M CO N a to Q ti LL E I Op Q V G1 U� /ww y ui Uew�egie ovneuSC � �� \ / L I ga�6!ssnm vm� bp I . _I `- � � � z .�. .� � � � � � � f � � � � � � � � � G| }) I#4 /§)!»• f\\ A ƒ{ \/ /o\o\o y&2 §Q � � � z .�. .� � � � � � � f � � � � � � � � 0!8CdO VIA \� \ 2k§ � ) )$��) ` ^ � \ � \ � � K � 2 _ U .% .\ � � u _ � m m § /)« }) 0!8CdO VIA \� \ 2k§ � ) )$��) ` ^ � \ � \ � � K � 2 _ U .% .\ � � u _ � m m � � � � • � � � � � � � l+-.4 � � � � \{ � |� !! I t . � � � § V ,2 : A � § � � 0 m � !!!, # :!(k!•!w !!!lr;m ; § 2..,...- «}, =mfZfl� f - » <• � § V ,2 : A � § � � 0 m � O `Iv ` l \U - Vim! €g Sgt AR soapg �nA w Z Q O U N W U fl y F Q m Q O ~z 2 Q 0160d0 VIA 3AN34V leodm?N y I I I a 4. `Iv L M, J U 'N U U o.� 0 \7 N-14� Q) (Z � � 0 s � ON .� � � � It *+-.4 FZ4 � � � \j \{ � � � � _ U .g. .E U � % Q � k 0 m _!§ !�,■!!!�!i !_ „ !, ■K «., ,, \ !l. -- � � _ U .g. .E U � % Q � k 0 m O W ai 1 `l \V I OL8030 VIA W� ^fir i g y ggxg� 'P ei $ (j N %s 3{ g C3@ Nay jig OL8030 VIA W� ^fir i g 30H3AV 15'O3M31P a U c.i r� ]]Vyy ^V W t� M O o !� 30H3AV 15'O3M31P a U c.i r� ]]Vyy ^V W t� M O � � � � � � � � � � rn � � � � � � \{ /\ } §) !! � / § U .% .® ME -Z Q� §` �. k 0 m � §!;r # ■��•, , « / \ }I « \( \ §/ \ 2 \ ) }(, � � / § U .% .® ME -Z Q� §` �. k 0 m � � � �. � � � � � � � � � � 4t � � U � � a � \ � � / U .\ >_ U � Q / m � m , } ! _ / {.(r.(/ \ !�\ z' \ ! .!, a � \ � � / U .\ >_ U � Q / m � m �i L 0 U 0 C O O U U •� � O O co _CD U O C > N c� > o � O 0 CD E E ca O U "- U O Co N _O N � L 0 c � c� o > O o E CL (n O it a c E 0 U M U U v O c O O c M 00 � 0 Q m U � — �_ CO (Li a) U LL •� 0 a) (� O m U- Q LL m _0 O 70 m m ( � O) a 0 N O C E = E _C (0 O 2 E U U) 0 >1 O U N cam' m V •L O Q O m v (D O G O 0 V V c U _ c o O d Z •� co +r X C C O E O al N O O cm N 1 i d _ 'x a OU > O _ x Y° c� O o Q) o O C7�fl.a) "� =L- a) r a� Q cu h- o m E F— IZ O o �i L 0 U 0 C O O U U •� � O O co _CD U O C > N c� > o � O 0 CD E E ca O U "- U O Co N _O N � L 0 c � c� o > O o E CL (n O it a c E 0 U M U U v O pal • 7-; Li ME U C N N V d L it L L N v U N d N O ++ c� c i N i i 0 O U 0 U N Qi co co co c -Z O a cif a� o a O � U U O i cB Q z� U cp N U co �qF a O N � a �- O Qi a� c O � � o O o Q � o U � O 4 N � CO Q) a) c a w U .No U �7 E �= E N V 0 O �O Q +�+ N N _ Q) O � �C U al 0 c=o p Q U N m a i od Q 3 d � � � V U cp N U co �qF a O N � a �- O Qi a� c O � � o O o Q � o U � O 4 N � CO Q) a) c a w U .No U �7 U a t7 O Q d N ':'z) O i 4 O CU Nom. 4�Z U. L � )co 1,°°' U- Q) o cC U O O m p O i Q) O L O ' 3 o vi ° �N p a -0p � m i >, m c'-' �a j z � �o �o CD S Q) a > cB N p-9Z m N E a N ) N m 0- oLu 00 p u) 1 N O O O7 p co L =vim" a�i-Q' U' -0 O`Z N U:Y CS sQ `��`�o Vy -9Z zi cz ca + :tt a — U �' _ �.. O p p U ti -Z3 v = CL H V 1.� u V C t C Rf 0 m 3 3 N N 0 N t mod+ L Q. ' d Z t 7 C C 3 C m 0 N � o Q O � V d N O is Q C Q � Y N a� CU Q C/) C O � O ao N Cp O U O � O �a � O O � .� .O Uc° a c C �L N C A .a N L 0 r. .a 0 C 7 d t C m 0 L Eq N CO C/) c 0 c _o N N oQ �4E Rm T� y .a ,> 0 Q N o.. CD V � 'o 'u. aCD m N 06 O 2 a>% 0 N 0 d d d C V C 0 � L .0 N � 0 i V Q i a� U •j -OQ U fB � U O o a N U N M � O C� N Q Co U � a O CZ �-Q cL �O N b i co c Q OU U U Z O O N L� U v O �7 P o .y N C L O m .y am .X N (D E w w 0 N U O L a DO O 0 3�.. -� � z O N N U Q) O1 O -9Z (0 za)CO O Q. O O U � c X N � 3�.. -� � C5 N i U za)CO C c C/) -rj O CO N co Q �O CO 4Q0•Q) w O co N a�aaz oa O�ti Q a�OCQ�'�� co 4 OU i O N Co a) �..�� c Q O Co O CL 0 co � U.� QCO C; O L Q t L x as t d .O 3 t -L a+ O 4-. C Q) U � Cp N N � U U c N O N co co a Z.0 �a U O QX C iz U co Q Q X O �a)� co Q b U -: U v M� O �7 U O �N `Iv .NN !hi^ 0 U CD W T LO c Q 0 d 3UE Z0 .� co 4- U > O U) V C N y _ E ° CL U N 0 w o) -d C o C C c ^C6 0 LL N L N 0 (0 � c m C6 = a U C o N O U N N Z p In U = c Y E v C/) E 2 l0 N C ~ O iF- E U 'L 7 Ipi U > L U X (6 fn W C a) U (6 m U o E a � o cu cr o c � V O U N 0) C-6 Y C N 8 9 C m N E'0� y r d . QX LL a C O w N O N C `m D n m O �E o~� m V° N w N N fA J U C o N O U N N Z p In U = c Y E v C/) E 2 l0 N C ~ O iF- E U 'L 7 Ipi U > L U X (6 fn W C a) U (6 m U o E a � o cu cr o c � V C N c E C 0 a) Y U d O co w o 0 i m l0 Li CL O. U C C C L a` 0- d CO C U O d l0 Y L .0 U U Q a) E � 0 ORL U U U W O ,4 O > - N N C C O U N O N C `m O C Qp yCj rn m V° N w cW°U> � m N UJ y o '6 U co > U N j m C N O LL L � 7 (7 Y C N c E C 0 a) Y U d O co w o 0 i m l0 Li CL O. U C C C L a` 0- d CO C U O d l0 Y L .0 U U Q a) E � 0 ORL U U U W O ,4 wl , 4w K oli -4w NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • We have performed a review of the drawings made available by the City of Newport Beach (1945 City Hall, 1975 Counsel Chambers, 1984 Community Services building and miscellaneous other additions). We also conducted a site observation tour of the referenced project on March 7, 2002. This review consisted of an overview of each building's shell as well as a walk -thru of the interior spaces. The buildings' assessment is one of the first steps in the Griffin /LPA team's scope of services to understand what improvements need to be made to the City Hall Campus to better serve the citizens of Newport Beach. No testing of materials or removal of finished materials for observation of concealed construction was done. GENERAL BUILDING ASSESSMENT CONCLUSIONS • Overall the complex has responded to short -term needs without a master plan to guide the expansion and changing needs of the City. Many of the current problems with the work environments, space allocations, lack of adequate parking, and inefficiency in systems are caused by this lack of planning. • Confused circulation and a lack of a central lobby or entry point make many departments too accessible to the public. Lack of control and security are an issue with all buildings. • No building meets current practices for seismic design. Of the four • buildings where seismic systems could be reviewed all buildings would experience varying degrees of structural damage in a major seismic event. • The existing Fire Station very likely does not meet the requirements of an essential facility and would likely sustain significant structural damage in a major seismic event. • ADA violations are widespread with no building complying with ADA requirements leaving the City expose to litigation. • HVAC systems and Electrical systems are all individual building based which causes energy inefficiency while being costly to maintain and service. This evaluation represents our opinion of the conditions of the construction based on our general review of the drawings and our site observation. It is not in the scope of this report to extensively evaluate code compliance, or determine probable damage and losses caused by seismic activity. In making a general review, it should be recognized that conditions and deficiencies might exist which we have not been able to identify specifically. This review is not intended to preempt the technical or professional responsibility of the project design consultants in any way, and does not represent a warranty or guarantee on our part that other problems may not exist. Please find herein a building -by- building review. • Z 0 U O O 1' F NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • BUILDING A- COUNCIL CHAMBERS General Building Data Building area: 3,578 s.f. Numbers of floors: One Construction type: V N Occupancy Group: B -3 Architect: Kermit Dorius Structural Engineer: Floyd Weaver Construction Date: Circa 1975 Building Function: Council Chambers, Conference Room and Restrooms Does Not Number of Restrooms: Does Not Men 3 W/C 1 Urinal 2 Lavatories Women 2 W/C 2 Lavatories Building type: Single- story, wood framed. Roof construction: Tapered steel girders supporting 4x16 purlins, Comply 2x6 Sub - purlins and plywood Exterior wall construction: Wood studs with 4" thick masonry veneer Foundations: Spread footing (no piles) Lateral system: Plywood shear walls hitecture The lobby space is adequate for the size of the existing council chambers. The finishes are worn and dated. Audiovisual /television broadcasting capabilities are well below current standards for Council Chambers. The existing electronic voting system is adequate, but could be incorporated into a future audiovisual system. ADA /Access Compliance Building Threshold Door Restrooms Drinking Wheelchair Door Access Clearance Fountains Seating Hardware Comply Does Not Does Not Does Not Does Not Does Not Does Not Comply I Comply I Comply I Comply Comply Comply Structural The drawings do not indicate mechanical anchorage of the 4" thick masonry veneer to the supporting wood stud walls. Current codes require much larger design anchorage forces and mechanical anchorage to the supporting walls. It is possible that the veneer could sustain significant damage in a major seismic event. E a z O J_ m NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • The design force for the out of plane connection of walls to wood diaphragms in current codes is as much as 3.8 times higher than what was used in the original design. A major seismic event could cause the walls to separate from the roof diaphragm and cause substantial damage to the structure. The overall building lateral design forces have changed substantially since 1975. Current code lateral forces are based on geological information that is unknown at this time, but using information from a near by site produces design forces as much as 30% larger than the forces used in the original design. The majority of the front of the building is glass with a small shear wall on the east side. Architectural features of the building create an unusual load path for lateral force delivery to the shear wall. These features coupled with the lower design lateral forces described in the previous paragraph could lead to significant damage in a major seismic event. Mechanical There are six (6) AC units serving the building. Three (3) gas /electric units and one (1) cooling only unit serve the Council Chambers, one (1) gas /electric unit serves the Entry Lobby and one (1) gas/electric unit serves 0 Meeting Room. The restrooms are ventilated with ceiling mounted aust fans. The AC units are at the end of their service life and are scheduled for replacement in the next year. When replacement is considered the existing mechanical well does not provide adequate space for all units with proper service clearances. Plumbing Since most plumbing piping is concealed, detailed evaluation of existing conditions was not possible. However based upon discussions with building engineering staff, the following is noted: All domestic water piping in all buildings has been retrofitted to copper pipe, and is in serviceable condition. Toilet fixture count is not up to current code. All below grade sewer piping is original installed. While no specific leakage or stoppage was noted, based on previous experiences in the area, the sewer piping serving Buildings A, B, and D is most likely not in a serviceable condition. Video forensics of the waste piping can be conducted to determine specific conditions. However again based on previous experience it would be prudent to replace the below slab waste piping in these buildings. All roof drainage was observed to be sheet flow to roof gutters. L J a v z 0 J_ m NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • Electrical The electrical panel is located in a small room behind the Council Person's Bench. The panel appears to be fed from the Main complex and while old appears to be in operating condition. The lighting, while recently upgraded to T -8 fluorescent lamps, is inadequate. We would recommend adding fixtures and controls to provide more light and more flexibility. The space has little lighting control and flexibility to properly display and feature presentation to the citizens and staff. F- I L a co z 0 J_ m NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • BUILDING B — MAIN BUILDING General Buildinq Data Building area: Number of stories: Construction type: Occupancy Group: Architect: Structural Engineer: Construction Date: Building Function: Number of Restrooms: Men Women Building type: Roof construction: Exterior wall construction: Foundations: Lateral system: hitecture 12,803 s.f. One not available assumed B Ralph Flewelling Ralph Flewelling Circa 1945 Office space 2 W/C 2 Urinal 2 Lavatories 3 W/C 2 Lavatories Single -story (with a small mechanical mezzanine) reinforced concrete Reinforced concrete pan joists Predominantly reinforced concrete with brick in some locations. Pile foundations Reinforced concrete shear walls Historic 1945 Main Complex is board formed concrete and brick structure and has a strong relationship to Newport Beach Boulevard with a large formal entry park. Mature manicured landscaping enhances the building aesthetic. New exposed electrical panel and roof top mechanical equipment visible from the entry speak to the age of the building. These elements also point out the need for the building to be modernized for they detract from the overall building appeal, especially at a front door. The width of the building is not ideal for an interior double loaded corridor office layout and tends to make departments spread out and very inefficient. The building depth dimension would be more appropriate as a single - loaded building from the exterior. There are no common office furniture components. Many configurations, colors and sizes create an inefficient and confusing working environment. ADA /Access Compliance Building Threshold Door Restrooms Drinking Wheelchair Dr Access Clearance Fountains Seating Haroodware Comply Does Not Does Not I Does Not Does Not N/A Does Not Comply Comply Comply Comply Comply Structural Although the quality of the construction appears to be good, significant changes have taken place in recent building code requirements for concrete *ctures. Current design lateral forces could be as much as 60% higher n those used in the original design. Also, new code requirements for ductile seismic performance of concrete has increased the amount of reinforcement required and changed the way it is detailed and installed. 8 m (I .z nU �I IF NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • Calculations have not been performed to determine if the building would be overstressed based on current building code standards, but based on the comments provided in the previous paragraph, it is quite likely that overstressing would take place. Also, seismic performance would be negatively affected based on the lack of ductile reinforcement now required in the code. Mechanical This is the oldest building in the complex and has operable windows throughout. Until recently, the building was conditioned with a forced air heating system only, along with natural ventilation. New rooftop package AC units and split- system heat pumps with variable volume variable temperature controls (VVT) were installed in this building last year. The units are generally in good repair and have not been operated extensively due to recent efforts to minimize energy consumption. The split system heat pump system does not incorporate airside economizers for free cooling making this an inefficient system to operate for the City. Plumbing �ce most plumbing piping is concealed, detailed evaluation of existing ditions was not possible. However, based upon discussions with building engineering staff, the following is noted: All domestic water piping in all buildings has been retrofitted to copper pipe, and is in serviceable condition. All below grade sewer piping is original installed. While no specific leakage or stoppage was noted, based on previous experiences in the area, the sewer piping serving Buildings A, B, and D is most likely not in serviceable condition. Video forensics of the waste piping can be conducted to determine specific conditions. However again, based on previous experience, it would be prudent to replace the below slab waste piping in these buildings. All roof drainage was observed to be sheet flow to roof gutters. Electrical The main electrical system for this building is very new and appears to be in the best condition of all the buildings in the complex. The Main Electrical Service is located on the west side of the building on an outside wall along with a transfer switch for connection to a generator for select loads within the facility. All building subelectrical panels are new with plenty of spare capacity. The lighting has been upgraded to T -8 lighting and appears adequate throughout. 0 J_ m NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • BUILDING C - PROFESSIONAL SERVICES BUILDING General Building Data Building area: Number of stories: Construction type: Occupancy Group: Architect: Structural Engineer: Construction Date: Building Function: Number of Restrooms: Men Women Building type: Roof construction: Floor construction Exterior wall construction: Foundation: Lateral system: Ohitecture 13,489 s.f. Two 5 -N B -2 Wilson Woodman Faisal Jurdi Circa 1985 Office space 3 W/C 1 Urinal 3 Lavatories 4 W/C 3 Lavatories Two -story steel frame with wood in -fill Steel beams supporting manufacturer web [- joists and plywood Steel beams supporting manufactured web [- joists and plywood Studs and plaster Pre -cast, pre- stressed concrete piles Steel braced frames plywood plywood The Professional Services building is the most recent addition to the campus (1985) with the entry hidden behind the existing buildings. The interior space is organized around a second floor overlook /skylight that feeds the ground floor with light and connects the interior spaces. Public access is limited to the service counters at the Building Department, Planning and Public Works. The area allotted for waiting is too small and needs more provision for seating. It also appears that there is a need for conferencing space. Overall the personnel spaces are too tight to be efficient working environments. ADA/Access Compliance Building T, hreshold Door Restrooms Drinking Wheelchair Door Access I Clearance I Fountains I Seating Hardware Does Not Does Not Look Does Not Does Not Does Not Daes Not Comply* I Comply Comply Comply Comply Comply *No elevator to the second floor Structural The drawings appeared to be well detailed and consistent with engineering practices used at that time. Current building lateral design forces are actually slightly less than those lWd in the original design, however, individual member design has changed ificantly as discussed below. U U 2 A m NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • Z 0 J 7 m The poor performance of braced frames and drag struts in recent earthquakes have brought about significant changes In the design of members and connection in the seismic system of braced frame buildings. Braces, struts and connections must now be designed for forces that are more than two times what they were in 1984. In a major seismic event, it is possible that members or connections in the lateral system could be damaged leading to significant damage to the structure. Mechanical This is newest building in the complex constructed in 1984. The mechanical system consists of fourteen (14) split- system heat pump units. The units are nearing the end of their expected service life and three (3) units have recently been replaced. Incremental unit replacement is expected in the near future. The split system heat pump system does not incorporate airside economizers for free cooling making this an inefficient system to operate for the City. Plumbing ce most plumbing piping is concealed, detailed evaluation of existing ditions was not possible. However, based upon discussions with building engineering staff, the following is noted: All domestic water piping in all buildings has been retrofitted to copper pipe, and is in serviceable condition. All below grade sewer piping is original installed. While no specific leakage or stoppage was noted, based on previous experiences in the area, the sewer piping serving Buildings A, B, and D is most likely not in a serviceable condition. Video forensics of the waste piping can be conducted to determine specific conditions. However again based on previous experience it would be prudent to replace the below slab waste piping in these buildings. All roof drainage was observed to be sheet flow to roof gutters. Electrical As the newest building in the complex, it appears to be in relatively good shape. In speaking with the electrical staff, the building is apparently served by the Building D electrical service /generator system. The staff believes the Southern California Edison transformer located outside Building C to be disconnected from the Building C electrical service. Additionally, very few spare circuit breakers remain in the existing electrical panels. The lighting in this facility is generally good and has been upgraded to T -8 lamp technology. NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • BUILDING D/E —ANNEX BUILDINGS General Building Data Building area: 13,489 s.f. Number of stories: Two Construction type: 5 -N Occupancy Group: B -2 Architect: Wilson Woodman- Unknown Structural Engineer: Unknown Construction Date: Circa 1945 -1960 Building Function: Print Shop, Computer technology, Central phone server, Fire Department and the office of the City Attorney Number of Restrooms: Men 2 W/C 3 Urinal 4 Lavatories Women 5 W/C 0 Lavatories Building type: Two - story, wood framed Roof construction: Wood joist and plywood Floor construction: Wood joist and plywood. It is unknown if the wood joists are sawn lumber or manufactured joists Exterior wall construction: Unknown, but the exterior finish is stucco so based on the age of the building and other • features it is assumed that the walls are wood studs Foundations: Unknown Lateral system: Unknown but probably plywood shear walls Additions: There have been some additions to this building and some structural drawings were reviewed. The addition construction is consistent with that described for the original building Architecture The annex building is a compilation of buildings. The original police and jail facilities plus numerous other additions have created a less than functional structure. The building has points of entry on all sides. There is also an exit courtyard that has only one exit that could be a hazard in an emergency situation. Because of the number of changes and their random nature, the spaces are not well planned and do not function at a high level. The office spaces have been adapted as well as possible but are below current standards for office environments. • 0 m jr r K 1 F ti NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • ADA /Access Compliance Building Threshold Door Restrooms Drinking Wheelchair Door Access Clearance Fountains Seating Hardware Does Not Does Not Does Not Does Not Does Not N/A Does Not Comply Comply Comply Comply Comply Comply Structural Seismic design forces, required by current building codes, are as much as 30% higher as discussed in the comments for the Council Chambers building. The seismic performance of this building is unknown at this time and depends on whether the lateral forces are resisted by plywood shear walls or by other means. The code in force at the time allowed lateral forces to be resisted by gyp board and stucco. Since that time, buildings using stucco or gyp board shear walls have experienced poor performance in major seismic events, consequently recent codes have eliminated the use of these systems for lateral bracing. In order to determine how this building might perform in a major seismic event, drawings would have to be made available for review or finish material could be removed to reveal the concealed type of construction. chanical Two (2) split- system heat pump units serve the two sides of the original 1st floor Community Annex. A rooftop package unit serves the Telecom Room, and a window mounted package terminal AC unit serves the Computer Services room, both located in the original 1st floor Community Annex. Three (3) rooftop package AC units serve the 1st and 2nd floor Fire Department Services area and the 2nd floor Fire Department Services Conference Room. Two (2) rooftop package AC units serve the 1st and 2nd floor MIS, City Attorney and Print Shop areas. A dedicated 7.5 TR packaged AC unit located on grade serves the MIS Computer Room. The split-system heat pump system does not incorporate airside economizers for free cooling making this an inefficient system to operate for the City. In addition, if existing functions were to remain, new systems should address functional and zoning requirements of specific areas, such as the MIS Computer Room and Print Room. • 0 _J 7 CI i NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • Plumbing Since most plumbing piping is concealed, detailed evaluation of existing conditions was not possible. However based upon discussions with building engineering staff, the following is noted: All domestic water piping in all buildings has been retrofitted to copper pipe, and is in a serviceable condition. All below grade sewer piping is original installed. While no specific leakage or stoppage was noted, based on previous experiences in the area, the sewer piping serving Buildings A, B, and D is most likely not in a serviceable condition. Video forensics of the waste piping can be conducted to determine specific conditions. However, again based on previous experience it would be prudent to replace the below slab waste piping in these buildings. All roof drainage was observed to be sheet flow to roof gutters. Electrical This building appears to have the oldest electrical system in use at the complex coupled with a relatively new generator system. This facility houses the data center, PBX room and print room among others functions. We G mmend replacing as much of the electrical backbone as possible during enovation of the facility. The lighting in the facility is still being upgraded to T -8 lamp technology and appears adequate throughout. • Z S 5 m NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • FIRE STATION The following observations and comments are based on a site visit. No drawings have been made available for review. General Building Data Building type Date of construction Roof construction: Floor construction: Exterior wall construction: Foundations: Lateral system: aratus room Two - story, wood framed with some masonry walls Estimated to be mid- 1950's with a remodel /addition in the mid - 1980'5. A weight room was added over the Apparatus Room in the mid- 1990's Wood Wood Living Areas: Masonry for the first six feet with wood stud walls and plaster above Apparatus Room: Masonry walls Additions: Wood stud walls and plaster Unknown, but it appears that the additions used spread footings due to saw cuts in the existing slab at various locations Shear walls. Since no drawings were available for review and finish materials conceal most of the structure, the following comments are based on judgment only and would require more investigation to completely confirm. The east exterior wall is masonry and extends from the ground level to the roof /floor over the Apparatus Room. It appears that the masonry wall stops slightly below the finish ceiling, and the only connection to the roof /floor is with a single bolt to the roof /floor beams spaced at about 15 feet on center. The type of connection observed has not performed well in major seismic events and would be significantly overstressed based on current codes. In a worse case scenario, a failure of this connection could lead to the wall pulling away from the roof /floor allowing it to collapse on the fire trucks and equipment below. Lateral bracing of the new weight room over the Apparatus Room seems questionable since it does not appear that additional lateral bracing was added to the existing structure when the room was added. The tower previously used for hose drying has questionable lateral bracing on the north side. Current codes would require a lateral bracing force as much as five times greater than the design force used at the time. J _-J' u r4" :fie i s 0 a F- N W NEWPORT BEACH CITY HALL BUILDING ASSESSMENT • Main Fire Station In many areas of the building, the exterior wall has an 8 inch -thick masonry base wall about 6 feet high. On top of that, a wood stud wall extends to the roof. It is unusual to change construction types of a wall at a location that is not braced by a floor or roof, and without more information and study it is not known how this condition will perform in an earthquake; but it Is irregular and seems to have an increased potential for damage. The rear (north) wall lateral capacity is questionable due to the number and random alignment of window and door openings. Damage to this wall in a major seismic event is likely. The front (south) elevation has five different roof /floor elevations with a masonry shear wall located at the west end. The method of directing the lateral loads from the different levels to the shear wall is concealed and unknown. The irregularity of the structure coupled with current design forces that are significantly higher than those originally used suggest the possibility for structural damage in a major seismic event. Overall Fire Station Ise original structure with its numerous remodels and additions, has evolved o a very irregular structure. In plan, there are jogs, re- entrant corners and non - stacking shear walls. In elevation, there are numerous levels creating a series of structural diaphragms that may or may not be adequately tied together and braced. Based on the observations and comments listed above it is quite possible that this building would sustain structural damage in a major seismic event, with the areas of biggest concern being the connection of the east wall of the Apparatus Room to the roof /floor and the lateral stability of the tower. The amount of work required to bring this building into conformance with the current building code requirements for an essential facility is likely to be substantial and very costly. z 0 a N W a LL • j f ' " fir. ix IL ; a .y J �,.,,i.. �iv;9, - 'x'�� a .•�p • = ar .gyp„ � v RR �'.F'l I�•a. y ^+C f,- 1..."x•2• 'r rr 0 w NEWPORT BEACH CIVIC CENTER CITY HALL FACILITIES NEEDS ASSESSMENT • REPORT ON SPACE UTILIZATION ASSESSMENT 9 August 2002 Griffin Advisors 38S Second Street • Laguna Beach, CA 9265 I • 949- 497 -9000 • • • TABLE OF CONTENTS I. INTRODUCTION ................ Whatis in This Report ............................................................................................................................................... ............................... I Objectives............................................................................................................................................................... ............................... I Methodology........... .............................................................................................................................................. ............................... I Reviewof This Report by the Cit y ............................_................................................................................. ..............................2 Findings................... ............................................................................................... ........................................................... ......................._......2 2. SPACE ALLOCATIONS ....................................................... ............................... SitePlan _ ......................................................... ........ ......................................................................................................................................... 3 Buildings............................... . ....................... . ........... . .............................................................................................................................. 3 Parking._._._____..._...._....._.._..__._........_........_._..... m...._.._._. _.__..___.._._..__.._.__._.___. ...____..__._ 3 Plansof Individual Buildings ......................................................._................................................................................ ..............................5 TotalBuilding Space Allocated ................................................................................................................................. ..............................5 HowAreas Are Measured._ ................................................ _ ............. ......................................................................................... 5 Summaryof Space by Department and Building.............. ............................................................................................ ....... 6 Tableof Detailed Existing Space Allocations ....................................................................................................... ..............................8 3. ANALYSIS OF SPACE ALLOCATIONS ............................................................. ............................... 9 WorkstationCounts and Sizes ......................................................... .......... .......... ........................................................................ ....... 9 IdentifyingWorkstations and Equipment Areas............ ........................................................................ ..............................9 Total Workstations and Distribution by Size ......... ................................................................................ ..............................9 GroupingWorkstations by Position .......................................................................................................... .............................10 Department -Level Comparisons .................. ...................... ............ ....................................................................................... 13 Benchmarksof Space Utilization ..................... .......... ................ ........................................................................................................ 15 General Services Administration Guidelines ........................................................................................ ............................... 15 Local Government Workstation Standards by Position .............................. .................................... ............................ 17 Qualityof Workst ations ..................................................................................__....................................................... .............................19 OtherAreas ................................................................................................................................................................... .............................19 Conferenceand Meeting Rooms ............................................................................................................. .............................19 PublicAreas ................................... ............. ... .................................................................. ............................................................ .20 Conclusions..................................................... ................ ................................... ....................................................................................... 22 4. EXISTING BUILDING CONDITIONS ................................................................ .............................23 Approach........................................................................................................................................................................ ............................... 23 General Building Assessment Conclusions ......................................... ............................................................................................ 23 S. PROPOSED SPACE STANDARDS ........................... ............................... .......... 24 Introduction........... ............................ ................................... ...... ...................... ....................................................................................... 24 Workstation Standards — Private Offices ........... _......... .................................................................................. .............................26 Workstation Standards — Traditional Open Workstations ....................................................................... ..........................31 Workstation Standards — System Work Stations Open Area Equipment and Related Standards........ Conference Room St andards ......... ............................... Standards for Other APPENDIX A — FLOOR PLANS OF EXISTING BUILDINGS APPENDIX B — DETAILED EXISTING ALLOCATION OF SPACE APPENDIX C — DEFINITION OF TERMS APPENDIX D — EVALUATION OF EXISTING BUILDINGS Table of Contents 33 39 40 51 Page i Space Utilization Assessment Report • I. INTRODUCTION WHAT IS IN THIS REPORT Objectives This is the first report requested by the City regarding possible improvements to the existing Civic Center. The objectives of this report are 1. To illustrate how space is used in the City Hall today, especially for staff areas, visitors and customer service operations, shared areas, specialized equipment areas, and site area. These illustrations, in particular, show areas of constraint and inefficiency. 2. To analyze and describe the space allocations today, and, for each functional area, discuss the amount of space, the quality of space, points of constraint and inefficiency, and unit averages which can be used in benchmark comparisons. 3. To identify proposed and recommended space standards which can be used for assessing space requirements for improved City Hall facility planning. 4. To identity benchmark criteria and use them for comparison of existing space allocations in a range of measurements, including space per work station, usable space per person, space per capita, and the like. 5. To identify the existing physical conditions of the separate buildings making up the Civic Center complex, and discuss the apparent constraints and opportunities for long term use of • these buildings for City operations. Methodology Our approach and methodology for accomplishing these objectives is outlined in the statement of work which was approved by the City and in which scope this work is undertaken. To identify the spaces in use, we have undertaken a comprehensive survey of operations and space utilization, accompanied by interviews with many staff occupying space in City Hall regarding the adequacy of space assignments, workstations, conference areas, counters and public meeting areas, and the other components which make up City Hall operational areas. Benchmarks were obtained from Federal and local sources, and space allocations were also compared to a selection of other Civic Center facilities. One key source for space allocation benchmarks has been an ongoing program of office space review conducted by the U.S. General Services Administra- tion, Office of Govemment -wide Policy, Office or Real Property. This program has evaluated current practices of space use nationwide (and some sources in Canada), both in the public sector and in pri- vate enterprise. The latter is important, because when examining City Halls as a whole, there are many elements in the operations of City Government which align to the private sector, especially when Council areas and other spaces are included. Existing physical conditions of the City Hall buildings was undertaken by examination of existing building documents and plans, discussions with City building management and maintenance person- nel, and physical survey and observation by engineers, designers, and experts with experience in City Hall design and reuse. Report to the City of Newport Beach Page I Space Utilization Assessment Report • Review of This Report by the City • Several reviews are required by the City to maintain project schedules and progress of work. The re- view and approval of space standards is important to the next phase of work, and it is incumbent on the City to review and approve these standards for use in computing space requirements. Also, it is important to review the evaluation of physical conditions inasmuch as these findings will contribute to possible recommendations regarding reuse, replacement, and reconfiguration of existing buildings on the Civic Center campus for meeting future space requirements. FINDINGS 1. The Civic Center occupies over 44,000 gross sq. ft. of space in 5 buildings. Using definitions taken from the Building Owners and Managers Association (BOMA definitions), these buildings contain about 37,880 usable sq. ft. of space or about 41, 460 rentable sq. ft. of space. 2. The survey found a total of 189 workstations in the Civic Center. There is a total of 206 persons working out of the Civic Center, but this includes interns which may work split shifts, and some persons for whom no unique designated workstation is allocated (including some staff also with field -based workstations, general Council Members, and others). 3. The space allocations in the Newport Beach Civic Center are smaller than the benchmarks of comparable jurisdictions by between 11% and 25 %, and space conditions are functionally and qualitatively below desirable levels. It is also the opinion of the survey team that the nature of workstations in use do not allow for adequate flexibility to meet technological, operational, or or- ganizational changes and advancements that typically occur over time. 4. Standards have been proposed for use in estimating space requirements for the functions in the Civic Center (the needs requirements will be the subject of the next report). These standards compare favorably with other jurisdictions, and are tailored to reduce the space shortfalls that oc- cur today. The actual person -by- person assignment of standards will be discussed with City pro- ject staff in the course of review of this report. 5. A physical survey of buildings has been completed by the architect and consulting team working on this project. The results show specific code deficiencies, especially relating to accessibility and to seismic requirements. This is the subject of a separately bound survey document which accompanies this report. Report to the City of Newport Beach Page 2 Space Utilization Assessment Report 2. SPACE ALLOCATIONS SITE PLAN Buildings The City supplied base drawings of the Civic Center to our project team and we have used these as a starting point to examine both the site conditions and the specific spaces within each of the buildings. Exhibit I shows the site as a whole, including parking areas, building footprints, walkways, and gen- eral landscaping. The buildings are shown in relative scale, with parking areas shown in light -gray. The total building sizes, again taken from the plans provided to us, are measured as follows: Building First Floor GSF Second Floor GSF Total Gross Sq. Ft. Building 3,622 — 3,622 Building B 12,242 —* 12.242 Building C 6,300 7,277 13,577 Building D 9,222 4,283 13,505 Building E 1,078 — 1,078 Total 44,029 * There is a small storage area which also serves as mechanical (HVAC) space on an up- per level of Building B. The area was not shown on the City plans. Unconfirmed esti- mate of room size is about 600 sq. ft. • Parking According to the plans, there are about 160 parking Civic Center spaces on -site. This excludes the Fire Station and its parking, and also excludes the metered parking on 32nd Street, even that amount which is adjacent to the Civic Center itself. The parking on the plan provided us by the City shows the 160 stalls divided into the following types of parking areas: Type of Parking Area Total Stalls Designated Public Visitors 10 Reserved Employee (by named position or by group) 73* Reserved for General Employees (un- designated) 65 Reserved for Electric Vehicles 9 Reserved for Disabled Persons 3 * I 1 of these are available to Public Visitors on a limited basis. Also, two of these are lo- cated inside Building E. The gross building space of 44,000 gsf is divided into conference rooms, assembly space (Primarily Council Chambers), office areas, storage, and other functional areas, as described elsewhere in this report. Based only on total undifferentiated GSF, at 4 parking stalls per 1000 gsf, an on -site parking requirement of 176 stalls is computed. But this fails to account for times when the public assembly spaces are in use, for the special demand for visitor parking which is always higher at City offices than at commercial offices (for which the 4- per -1000 rule was developed), and fails to account for City vehicles which are parked at the site (including electric vehicles) which effectively doubles the • parking required for those employees who drive City vehicles in the course of their work day. Report to the City of Newport Beach Page 3 Space Utilization Assessment Report • b o j u m I m c � D L o$ m a N� T. m ho++Om AVB+ ....m r \ I I 4"yYw��Yw�.awle u. u v T T ll•F -` u •a .a . N m NN'_ . e m F�g \ m islif m Ae ❑❑❑❑❑❑ n� y i z nNn N i (D m m 6 ml 00 3 N 7 O m � N m m NN j" F 0 D 1 n D° = d 'r a.0 JVI N m?o vu rnarto Ae ❑❑❑❑❑❑ n� y i z nNn N i (D m m 6 ml 00 3 N 7 O N N m m j" F 0 D 1 n D° = d cpD pj pN N N � 6 • PLANS OF INDIVIDUAL BUILDINGS As shown on the site plan, there are 5 buildings on the Civic Center site. The headquarters fire sta- tion is also located there, adjacent to the Civic Center, but this is not part of this project. The exhibits in Appendix A show the layouts of these buildings, with the illustrations presented in the following order: Building A and the south end of Building B,' Building B, central section. Building B, north end. Building C, first floor. Building C, second floor. Building D, first floor, and Building E (in proximity), Building D, second floor. The plans are all in scale (1116" = 1' -0 "), and are color coded to illustrate functional and department areas. Colors are reused for various departments where the separation of department areas is clear, but colors for core and circulation areas are consistent across all sheets. TOTAL BUILDING SPACE ALLOCATED How Areas Are Measured • Boundary Lines for Rooms and Measurable Areas Our approach has been to measure smallest areas first and then to aggregate these into various totals for comparison and analysis. We measure all areas to the centerline of the bounding partition (whether an office or a panel -based workstation), or in the case of thick exterior walls we use a typi- cal wall thickness to measure that side of the room involved. This provides that each room be meas- ured consistently, and also provides that the sum of the areas equals the total, less a measured strip of wall thickness around the perimeter of the building. Generally, this is similar to the BOMA' guidelines for measuring floor area in office buildings, but in some ways our approach deviates from the BOMA guidelines. It should be noted that the BOMA guidelines are very specific and allow for a method to compute building rentable space in manner which is consistent across buildings and across various user types. The American National Standards Institute, Inc., has accepted this standard in its ANSI guidelines and the U.S. General Services Ad- ministration also uses the BOMA method for computing and comparing space utilization by the Fed- eral Government. A Small Difference from the BOMA Measurement Method BOMA method entails several definitions, which are presented in Appendix C of this report. Mainly, there are three or four key concepts involved, Most importantly, BOMA allows for measurements on the outside perimeter to be to the "dominant portion" of the exterior wall, which (in most cases) may be either the glass line or the inside surface of that wall. The glass line is approximately the center- ' The plan sections for Building B are arranged so that they can be cut and pasted together along the invisible • match lines on each sides of the continuing plan. z Building Owners and Managers Association. The guidelines are published in "Standard Method for Measur- ing Floor Area in Office Buildings," ANSI/BOMA Z65.1 -1966. See www.boma.org for details. Report to the City of Newport Beach Page 5 Space Utilization Assessment Report • • • Department/Are; Administration Administrative S Building Dept. City Attorney City Clerk Community Sen Fire Department General Service Human Resourc Planning Dept Public Works De General Buildinc Unassigned B Major Circulat Stairwells Atrium Openir Other Vert. Pe Mechanical R� Lavatories Lunch Room I Parking /Garac Totals (Measure Added remaining Grand Total Bu Exhibit 2 Summary of Space Allocations by Building and Department Bldg A Bldg B 1st A Bldg C 2nd A Bldg C 1st Fl Bldg D 2nd A Bldg D Bldg E Total 3,191 1,636 - - - - - 4,8271 ;rvices Dept. - 3,491 - 4,555 311 8.357 - - 1,013 2,975 - - - 3,988 - - - 1,466 - 1,466 - 824 - - - - - 8241 ices Dept. - 1,029 - - 1,047 - - 2,076 (Admin) - - - - 957 2,218 2, 3,417 Dept. - - - - 155 - - 155 :s Dept. 1,200 1,200 - - 474 3,001 - - - 3,475 pt. - 1,572 4,151 - - - - 5,7221 Areas wilding Lobby - 532 - - - - - 532 on Corridors - 768 - 407 1,172 131 61 2,539 - - 216 - 32 100 - 3481 g - 395 - - - 395 netrations /Shafts - - - 87 - 14 - 101 )oms 12 195 55 13 291 23 - 5891 292 404 292 247 266 251 - 1,752 Storage Rooms - - - - 540 - - 540 e - - - - - - 427 4271 id Gross SF) 3,495 11,651 6,201 7,125 9,015 4,203 1,041 42,730 I wall thicknesses 127 591 99 152 212 80 37 1 299 Iding Gross Sq. Ft. 3,622 12,242 6,300 7,277 9,227 4,283 1,078 44,029 9,000 6,000 7.000 6,000 5.000 4,000 3,DDD 2.000 1,000 0 Summary of Space Allocated to the Department (omits Building A) Oapy Ompy 000, �`p\ cp"0, Report to the Clry of Newport Beach Page 7 Oe4�. oc 4 0a eQI 0& �. a d`� o Q U� t'W Space Utilization Assessment Report • In the above table, all areas except the General Building Areas have been allocated to one department or another. In particular, all conference rooms appear in one of the departments (Council areas in Building A are listed with Administration here, but are omitted from the graph), and smaller circula- tion pathways within department areas also are allocated with the associated department. BOMA Usable and Rentable Approximations Because the BOMA standards are used for many benchmarks, it is necessary to estimate the existing BOMA usable and rentable space allocations. Definitions of these and other terms appear in Appen- dix C to this report. It should be noted, too, that the size of the existing General Building Area is misleading since so much access space is outside the buildings themselves; this may make the "ren- table efficiency appear higher than otherwise in some cases. We generally treat the entire complex as "the building" for applying BOMA rules;' this approach is suggested as a useful alternative in the clarifying notes in the case of building campus complexes, and seems particularly appropriate where the buildings are all low -rise and function in such and integrated manner. Referring to the table above, we have taken the following approach: 1. We add the (a) department areas (equivalent to BOMA Tenant areas'), (b) unassigned lobby, and (c) lunchroom and its storage areas to obtain BOMA Usable. We exclude the mechanical spaces because they appear to fit the BOMA definition of "Floor 2. We add Major Circulation, Mechanical Rooms (which includes janitor rooms in this calculation), and Lavatories to obtain the BOMA Rentable 3. We use our measured totals for the BOMA Measured Gross, even though this is slightly too • large. BOMA would not add any wall thicknesses where windows are not dominant, for exam- ple. We do exclude parking (in Building E) in accord with the BOMA guideline. The results of the calculations are as follows: TABLE OF DETAILED EXISTING SPACE ALLOCATIONS A detailed listing of space allocations by room, workstation, position, file and equipment area, and other component of the space -in -use is presented in Appendix B. This information in this table is analyzed in the next section of this report, and is used along with the summary data above in com- parisons with benchmark standards and space allocated at other City civic centers. "In particular, most of the mechanical and support areas are treated as "Floor Common Areas." • 5 This is overstated slightly, since we have measured the Tenant areas in all cases to the middle of the bounding wall, and BOMA would not do this for rooms on the exterior which had less than 50% window area (among other things). Report to the City of Newport Beach Page 8 Space Utilization Assessment Report 1st A 2nd FI 1st A 2nd A Department/Area Bldg A Bldg B I Bldg C Bldg C I Bldg D Bldg D Bldg E Total BOMA Usable (see text) 3,318 10,875 5,737 6,128 7,466 3,764 590 37,878 BOMA Rentable 3,495 11,651 5,985 6,643 8,983 4,089 614 41,459 BOMA Measured Gross Sq. Ft. 3,495 11,651 6,201 7,125 9,015 4,203 614 42,303 TABLE OF DETAILED EXISTING SPACE ALLOCATIONS A detailed listing of space allocations by room, workstation, position, file and equipment area, and other component of the space -in -use is presented in Appendix B. This information in this table is analyzed in the next section of this report, and is used along with the summary data above in com- parisons with benchmark standards and space allocated at other City civic centers. "In particular, most of the mechanical and support areas are treated as "Floor Common Areas." • 5 This is overstated slightly, since we have measured the Tenant areas in all cases to the middle of the bounding wall, and BOMA would not do this for rooms on the exterior which had less than 50% window area (among other things). Report to the City of Newport Beach Page 8 Space Utilization Assessment Report • 3. ANALYSIS OF SPACE ALLOCATIONS WORKSTATION COUNTS AND SIZES Identifying Workstations and Equipment Areas The plans presented in Appendix A illustrate the areas we have used in identifying space allocated to each office and open -area work station. The table in Appendix B shows the sizes of these areas as indicated by the CAD system used to make the drawings. Note that we used City - supplied drawings as the basis for these computations, but have modified the base drawings in some cases to reflect updated partition relocations and otherwise to show the loca- tions of movable partitions, cabinetry, and furnishings where this was necessary. In some cases, the shown sizes and locations are only approximate, so that our workstation boundaries are reasonably close estimates that may be off by several inches one way or the other. Similarly, the equipment and file areas are estimated, and especially where passageways and equip- ment areas meet we have had to make some judgment as to where the boundary is drawn. Our objec- tive was to allocate all areas to one function or another so that these could be totaled without overlap. Total Workstations and Distribution by Size We found a total of 189 workstations, for a total of 206 persons. The staff count includes interns and part -time persons, and does not match the number of "authorized" budgeted fte positions. Some staff • are not shown with Civic Center workstations (such as 6 Council Members, some persons also with field offices, and others), even though we included the person in the count of people working there. The workstations include all stations even if unassigned, as well as four positions which are in "shop" areas and were not separately measured as workstation areas on the drawings. These "shops" are the print shop (two work stations) and the mail room (two work stations), and in the analysis of space per workstation and other benchmark results, we subtract these four so as not to report incorrect averages. As a result, we have the following summary of workstations: Total Persons Identified 206 Total Workstations 189 Total Workstations excluding Shop -based 185 Largest Workstation 294 sf Smallest Workstation 16 sf Average Size of Workstation (excl. shop - based) 95.4 sf Standard Deviation 57.1 sf Median Size of Workstation (excl. shop - based) 82.0 sf Report to the City of Newport Beach Page 9 Space Utilization Assessment Report • • The chart below plots the 185 workstations by size. The smallest workstation (16 sf) is first on the left, and the largest workstation (294 sf) is last on the right. Each workstation is included, so hori- zontal segments of the graph indicate that there is more than one station of that size. The median workstation (the half -way point on the horizontal x -axis) is clearly less than 100 sq. ft. In fact, this median is computed (in the tablejust above) to be about 82 sq. ft. The somewhat horizontal or small -slope shape at the beginning of the graph means that more work- stations have the indicated smaller size. The scoop up at the end of the graph means that only a few workstations are of the larger sizes. Very few workstations are above 250 sq. ft. but visually about 20% of them are below 50 sq. ft. Distribution of Workstation Sizes 300 250 200 LL V N O 150 �i O rn 100 50 0 Each Workstation Grouping Workstations by Position The above counts each workstation separately, so that if eight Fiscal Clerk positions have eight dif- ferent workstation sizes ranging from 16 sf to 64 sf, then they are each are shown in the chart. We also have grouped workstations into clusters of similar job position, in order to begin analysis of workstation standards which would be assigned on a position basis. The first level of grouping by positions resulted in 54 categories, as shown in the table below, for the 185 different persons noted above. After grouping the positions, we totaled the space for the grouped workstations and averaged them for each category; to arrive at the average workstation size for a given position group. The total of the resulting 54 averaged workstation sizes is 6,180.8 sq. ft., for an Report to the City of Newport Beach Page 10 Space Utilization Assessment Report • average size for all 54 (grouped) workstations of 114.5 sq. ft. This effectively smoothes out the raw 185 workstation sizes into 54 grouped sizes. Even so, it is necessary that the total number of workstation standards be reduced to many fewer, ei- ther for computing proper needs or eventually for providing required facilities. Workstation stan- dards should number about 10 for a typical City government. Also, we note that many positions have average workstation sizes that are below the expected size for similar positions. This disparity is dis- cussed under the "Benchmark" heading later in this section of the report. • The data in this chart are shown graphically on the following page. In the chart, the positions are or- dered by average workstation size. Note that the dark red bars indicate the size of the average workstation for the indicated job category, and the blue bars indicate the number of positions which were found to make up that category and are used to make the average size. Report to the City of Newport Beach Page I I Space Utilization Assessment Report Grouped Workstations by Category of Similar fob Titles No. Tot. Avg No. Tot. Avg. Position WS SF SF Position Ws SF SF Accountant 2 175 87.5 Director 8 1769 221.1 Aide, Engineering 1 39 39 Engr., Assoc. CE 5 496 99.2 AnalystfTrainer 5 567 113.4 Engr., CE 4 430 107.5 Analyst, GIS Syst. 1 148 148 Engr., City Engr 1 185 185 Analyst, HR 2 134 67 Engr., Development 1 148 148 Asst., Administrative 1 93 93 Engr., Jr. CE 3 137 45.7 Asst., Clerical (pt) 1 45 45 Engr., Princ. CE 5 697 139.4 Asst., Department 10 693.6 69.4 Exec. Asst. to City Mgr. 1 186 186 Asst., HR 2 162 81 Field Staff (Insps, etc.) 18 722 40.1 Asst., Management 8 767 95.9 Field, Insp, Pr. Bldg. 2 130 65 Asst., Mapping 2 160 80 Film Liaison 1 36 36 Ass., Office 5 325 65 Finance Officer 1 121 121 Chief Bldg. Insp. 1 180 180 Hearing Officer 1 35 35 Chief, Training 1 163 163 Insp., Fire Dept 1 108.6 108.6 City Atty., Asst. • 1 208 208 Intern (may incl file area) 6 365 60.8 City Atty. 1 273 273 Manager (all types) 12 1778 148.2 City Clerk 1 125 125 Mayor 1 144 144 City Manager 1 294 294 Mayor, Asst. to 1 58 58 City Mgr., Asst. 2 391 195.5 Officer -Code Enf 1 91 91 Clerk, Fiscal 8 384 48 PIO 1 152 152 Clerk, Fiscal, Sr. 5 259 51.8 Planner, Associate 2 225 112.5 Community Relations Ofcr. 1 100 100 Planner, Asst. 4 322 80.5 Coordinator (all types) 9 922 102.4 Planner, Sr. 5 557 111.4 Deputy Bldg. Official 1 168 168 Specialist (all) 11 645 58.6 Deputy City Atty. 1 153 153 Superintendent 1 168 168 Deputy City Clerk 2 152 76 Supervisor 1 91 91 Deputy Fire Marshal 1 108.6 108.6 Technician (all) 11 668 60.7 • The data in this chart are shown graphically on the following page. In the chart, the positions are or- dered by average workstation size. Note that the dark red bars indicate the size of the average workstation for the indicated job category, and the blue bars indicate the number of positions which were found to make up that category and are used to make the average size. Report to the City of Newport Beach Page I I Space Utilization Assessment Report City Manage City At!! Direct( City Ally. Ass City Mgr., Ass Ease Asst to City Mg EngnCily Eric, Chief Bldg. Insl Superinlendei Deputy Bldg. OHici, Chief- Tramin Deputy City AR, PI Manage Engr-Devalopmer Ana".MS Sys Mayc EngrPdna.L City Clcr Finance Office AnalystlTraine PWnner- Associat Planners Inap, Fire Dep Deputy Fire Marsha • EngoCl LoortlinaW Community Relations Ofca Engr.ASSOC Cl Asst- Managemen Asst- Adminisorathn Superviso Officer4Code En Accountant Asst -HF Planner�ASs AssbMappint Deputy City Cled Asst -0epartmenl Analys4RR Fielddnsp, Pr. BWg Asst-Office Intern (may [net rile areal Technician (all) Specialist (all] Mayor, Asd. W Clerk -Final. Sr. Clerk -Fiscal EngrJr. LE Ass4Cledul(pt) W Staff (Inspa. etc.) AidnEngineering Film Liaison Nearing Officer All Workstations by Type of Staff Position Sq. Ft. per Workstation 0.0 50.0 100.0 150.0 200.0 250.0 300.0 • 0 2 4 6 8 10 12 14 16 18 20 No. of Workstations of Type E • Department -Level Comparisons The space occupied by the various Departments is summarized as follows: No. of No. of Total Sq. Ft. per Persons Workstations So. Ft. Workstation City Clerk 3 3 824 274.7 City Attorney 5 6 1,466 244.3 Fire Department (Admin) 16 15 3,417 227.8 Administration 14 8 1,636 204.5 Planning Dept 21 20 3,475 173.8 PWD 38 33 5,722 173.4 Administrative Svcs. Dept. 57 54 8,357 154.8 Community Services Dept. 18 14 2,076 148.3 Building Department 25 27 3,988 147.7 Human Resources Dept 9 9 1,200 133.3 General Services Dept.s 0 0 155 0.0 These figures omit Building A, and also omit non - department ( "General Building ") areas, so no grand totals are given here. These figures allow comparison of workstations "densities" across de- partments, and show, among other things, that on the average smaller departments have higher amounts of space per workstation on the average. This is due mainly to the fact that support spaces (such as the vault and counter space in the City Clerk's office) are distributed across fewer staff (in the case of the City Clerk, there are only 3 staff), so that the averages get larger. The following three charts show, respectively, the following: 1. Chart 1 shows the total net sq. ft. for each Department and the total number of workstations in each. The scale to the left applies to the vertical bars; the scale to the right applies tot he line. 2. Chart 2 shows the total number of workstations (vertical bars) and the average square footage per workstation ( "density "). Note that all the larger Departments are well under 200 sq. ft. per work- station. The Departments are ordered by number of workstations in this chart. 3. Chart 3 shows the total space per workstation and the total space allocated to each Department. The Departments are ordered by space per workstation, from high to low. The key observations are (a) the larger departments are all below 200 sq. ft. per workstation, (b) small departments may deceptively appear to have larger space per workstation„ (c) on balance, density, when used as a measure of efficient space use, does not take special needs for public counters, store- rooms, and other non -staff areas into account, even though it is commonly used as a benchmark. b The General Services Department space consists solely of a building maintenance room, and no "workstation" as such. Report to the City of Newport Beach Page 13 Space Utilization Assessment Report 0 0 9.000 6.000 *.000 6,000 N 5.000 1.000 3 3.000 2.000 1.000 0 Adllurvseative POW Works 6ui e,e, Copt. Planning Dept Fie CwmeunM CM CM AOUrney Human Svcs. Dept. Dept. DepaNnent Svcs Dept Meeiniseetion Resources (Morin) Dew Total Net Sq. Ft and Total Workstations aISF —�• WS Total Workstations and Avg. SFIWorkstation 16" t6s t SFWVkG 60 50 40 `o 30 3 20 d 2 10 0 CM CICk General senlcas not. 60.0 300 0 50 0 250.0 a 10.0 200.0 9 9 C a 30.0 Me 0 3 `g i 20.0 too o '�� 100 500 0.0 00 MlnnistlaOve Pudic Works 6uileirg Dept FleMllg Dew FOB CommunM City City Momey Human CM Clerk Gmmral sv Dew. Dew. Department Svn. Dept Admiwstratnn ReSe..' Servims Dew. (Admen) Dept. Ti C E a Avg. SI'Morkstation and Total Net Sq. Ft. ®SFhVkstn —�— To1 SF� CM Clerlt co money FFB CM Men" Dew pudb Woks Mretre five C,e n erly 9upwng Dew. Hu—n General De,vUeent AdRnnlwrtten new Svcs, Dept 6 ' Dew. Resources Services Dew. (Admen) Dept. Report to the City of Newport Beach Page 14 Space Utilization Assessment Report LL a • BENCHMARKS OF SPACE UTILIZATION General Services Administration Guidelines Beginning in the mid- 1990's and continuing into the present, the U.S. General Services Administra- tion's Office of Governmentwide Policy began to adapt the approach taken in allocating Federal of- fice space to the practices and experiences which were occurring in the private sector as well as in other quadrants of the public sector. This came about as the Federal Real Property Asset Manage- ment Principles were examined and as recommendations for improvements and the adoption of "best practices" into the Federal community. The result has been movement toward an approach that emphasizes flexibility, individual agency re- sponsibility, strategic planning for real property needs, and adoption of space -use efficiency standards as measured in private sector terms. Ultimately, there are several measures of space utilization that can come into play, depending upon the criteria or factors which are to be tested. Space per person, space per workstation, cost of space per person, and others all are the kinds of measures that have been examined. While the principles are easy to express, the details are very difficult to implement. For example, it is difficult to agree on common definitions of "workstation," "person," "cost," "space -in -use;' and other factors. Are part -time persons counted as fractions or as whole numbers, are dual - assignment work- stations (as for interns in Newport Beach) counted only once, and when costs' are considered, how are they computed? Is space measured as gross space, workstation space, rentable space, or other mix? • The basic approach has been to move toward the BOMA definitions and to use measures common in the private sector for most benchmarking. This is not universal, since there are some extreme situa- tions which just do not fit into the private sector model. Moreover, it is important to take care that the measures used for benchmarking do not drive policies to the wrong conclusions: efficient space use does not mean making workstations small, at least not to the point of lost functionality, and it is fruitless to compare the space needed by attorneys, say, and clerk- interns. Benchmarks have to be taken as averages over large numbers of operations, and where possible similar operations should be used in comparison. An important benchmark document for space standards produced by the U.S. GSA is Office Space Use Review: Current Practices and Emerging Trends, printed in 1979 by the Office of Real Property. This document surveys numerous private and public sector sources for space standards and utilization ratios. In it they also observe: 1. The workspace is changing, and evaluating space use is more complex as a result. 2. All organizations surveyed look at some type of square feet per person measure. 3. The U.S. Government average for space use is 200 usable s.f. per person, as compared to the U.S. private sector average of 250 usable s.f. per person. ' For example, costs may include operating costs, costs of equipment and furnishings, costs of original con- struction, cost of replacement facilities, cost of special equipment associated with the functions examined, and so on, and these may or may not be useful in examining space utilization effectiveness, efficiency, or produc- tivity. Report to the City of Newport Beach Page 15 Space Utilization Assessment Report • • • The following table is a summary of selected office space utilization rates which were obtained by the U.S. study team and reported in the referenced document: Source Group /Component/Measure Usable SF /Person BOMA Experience Report U.S. Private Sector 245` Bldg E U.S. Government Sector 204` Arthur Anderson LLP Private Sector Target Value 250 6,128 Technology Finns (Sample) 206 Lucent Technologies Occupancy Density Targets (depends on types) 174 -190 Mobil Corporation Overall Density Target 225 Dun & Bradstreet Corp n Headquarters Density Standard 190 -200 State of Virginia Maximum per Person 250 State of Texas Statewide Average 234 State of Missouri Statewide Average 200 State of Oregon Maximum Allocation (average) 200 U.S. Government Overall Average (GSA) 200 `Converted from BOMA Rentable where reported, but using the BOMA definition for Usable The GSA Document goes to lengths to point out that these numbers are specific in what they refer to and may not be valid comparisons for different agencies that have a different mix of functions, needs, and support components. Among the caveats: (a) this applies only to "office type buildings," (b) us- able sq. ft. is measured using the BOMA method ( "the space where a tenant normally houses person- nel or furniture "), and (c) the persons used are the persons housed during a peak 8 -hour shift, includ- ing temporary, part-time , other - agency, budgeted vacancies, and other persons who are intended to be officed in the area. The space utilization at Newport Civic Center is repeated in the table below, based on using the BOMA methods for space use calculations. See the earlier discussions for how BOMA Usable is computed in Newport Beach. Also, note that we have used workstations as a measure of persons since this seems to capture the intent of the measures above, by including some field staff where they use the Civic Center offices and otherwise omit persons who are housed off -site. Department/Area Bldg A Bldg B 1st Fl Bldg C 2nd Fl Bldg C 1st Fl Bldg D 2nd Fl Bldg D Bldg E Total B /C /D /E Total All BOMA Usable (see text) 3,318 10,875 5,737 6,128 7,466 3,764 590 34,560 37,878 BOMA Rentable 3,495 11,651 5,985 6,643 8,983 4,089 614 37,964 41,459 Total Persons (workstations) 0 68 32 39 34 17 0 189 189 Usable SF/Workstation n/a 159.9 179.3 157.1 219.6 221.4 n/a 179.7 200.4 The following chart illustrates these figures. Note that the average for all buildings is about 200 sf per workstation, and when Building A is omitted, the number is about 180 sf per workstation. Report to the City of Newport Beach Page 16 Space Utilization Assessment Report u E 250.0 200.0 C 0 i 150.0 `0 3 v n 100.0 LL D- N 50.0 0.0 Usable Sq. Ft. per Person (workstation) Newport Beach Civic Center Bldg CA Bldg C.2 Bldg D.1 Bldg D.2 B /C /D /E All Bldgs. There are two ways to compare Newport Beach Civic Center to the GSA benchmarks. Either com- pare the figure for all buildings to the commercial office (private sector) measure of 250 sq. ft. per person, or if the Council Chambers facility (Building A) is omitted, compare the result to standard of- fice average of 200 sq. ft. per person. In either case, the City is significantly below the benchmark. The GSA points out, further, that older facilities typically show inflated averages, which may signify a greater present need than do the above ratios. Local Government Workstation Standards by Position The GSA report referenced above contains a number of example standards at the State level, and also notes that local and other government standards have been developed according to their needs. Most space standards apply to individual positions, and not to overall densities. We made a survey of local governments, and while some of this data is old, it is still in use in various jurisdictions. In any event, the following table of standards represents an example of comparison lo- cal governments and the approach they take at allocating offices. We have not yet assigned persons to these standards, but will ask the City's help in identifying the appropriate job description categories to go with the associated workstation space standard. This process will be part of the review of this report with the City. Report to the City of Newport Beach Page 17 Space Utilization Assessment Report 0 • • Selected Aqencies GSA (Typical)" LA County (Social Svc) LA County (General) Orange County Riverside County San Bernardino County San Diego County LA City... Selected Publications Open Office Architect's Journal Summary Avg of Other Sources Proposed Standards Private Office I Typical Open Systems Exec' Mana- Super- er visor Other Ofc Basic Ofc I Drafting Supv. I Gen I 300 -400 225 -300 225 150 100 100 60-75 250 150 -225 130 -150 - 80 -130 - 65 -90 56 -85 250 -350 250 120 -160 - 80 79 -90 - 50 270 180 144 - 108 - - - 300 -375 225 150 - 144 69 - 57 150 -200 150 120 120 70 -90 50-85 - 50 -80 300 250 120 - - n/a 120 50-100 250 140 -180 140 -180 140 120 85 -110 100 60 -85 200 -350 100 -250 100 -150 - 80 -150 80 -150 - 50-90 247 -452 194 -247 151 -194 - 86 -118 75 97 48 -75 304 208 151 137 108 86 99 65 300 -240 210 150 150 120 75 -90- 96 60 -75 120 Compares to City Manager and Department Heads, as well as higher positions in some agencies. " Old standard for individual office assignments. Various office enhancement provisions are also described for various job classifications. The proposed drafting stations are 75 sf for a basic table /user- chair; 90 sf for table, user - chair, and drafting - sized back - table; and 120 sf for table, chair, back -table (drafting size), guest seating, and file space. Enclosed area is 96 sf; the allocation may also include circulation which adds to this allowance. Note: Sources for some entries are from materials of a wide range of dates, and are available on request Illustration of Proposed Standards Compared to Other jurisdictions 350 300 250 200 150 100 50 Executive' Manager Supervisor Other Oro Basic Ok crafting Supv. Gmwral O Average of listed Otner SOUM6S ■ Proposed StacdarM1e Report to the City of Newport Beach Page 18 Space Utilization Assessment Report • QUALITY OF WORKSTATIONS In all the above review of quantity of existing space allocations, we have not addressed the quality and functionality of the workstations. Generally, from our experience as well as from the reports of the users, the existing staff workstations are generally not well designed and do not make for more efficient office functioning. This is not true in all cases, however, and some workstations are ex- tremely efficient in how they function as well as how they utilize space. Part of this situation comes from the fact that many workstations are custom - built, in some cases for the persons who are now in those workstation and in some cases for persons who are no longer there. While technology, organization, and operational procedures are generally slower to change in Gov- ernment office spaces, in time hard -built workstations become less convenient or appropriate to their originally designed function. There is another class of workstation in the Civic Center which is not so custom -made as it is assem- bled from available materials and equipment. And this is not so much for efficiency as for the avail- ability of components. There are examples in the Planning and Building Department staff areas espe- cially, where individuals make do with all sorts of odd collections of equipment or ad hoc furnishings. There is also an issue of design and quality from an aesthetic viewpoint. This is not discussed much here, since our purpose is to focus on amount and functionality of spaces, but it is a real Overall, it is clear that some part of the crowding, inefficiency, and functional overhead is due to im- proper or inadequate workstation design, layout or use. OTHER AREAS Conference and Meeting Rooms There are several conference and meeting spaces in City Hall, but even so these are inadequate to meet the routine needs there. The conference spaces which exist are listed as follows. Building /Conference Area Sq. Ft. Building A Council Chambers (meeting area only`) 11819 Council Conference Room 400 Building B Lobby Conference Room 244 Building C Public Works Conference Room 176 Building Department Conference Room 178 Planning Conference Cubicle 84 Building D Fire Department Conference Room 555 Legal Department Conference Room 258 ` Council Chambers (storage, vestibule, etc.) adds 865 sq. ft. Excluding the Council Chambers, this amounts to a total space of 1,895 sq. ft. for conference areas, • serving 189 workstations, or about 10 sq. ft. per workstation. Report to the City of Newport Beach Page 19 Space Utilization Assessment Report • The basic planning guide we use is minimally 15 sq. ft. per workstation, with between 5 -10 sq. ft. ad- ditional space for "special" meeting areas, such as interview rooms, plan check meeting rooms, de- partment libraries, and the like. This partly accounts for more space per seat than the existing spaces now allow, and partly accounts for more meeting rooms in general. One major problem today is that there are few rooms big enough for mid -size meetings. It should also be noted that the location of the existing rooms is also very inconvenient. For example, the conference room in Building A might be even better used if it were not so remote from most de- partments. A group meeting there can "cost" an extra 10 or 20 minutes in logistic overhead, allowing for walking both ways, getting materials there, and the occasional unexpected need to go back to one's office for some information. Disability access is a related issue which is addressed more fully in the review of existing building conditions and code deficiencies. It is enough to say here that of the conference areas listed above, half the rooms are inaccessible, accounting for even more than half the total meeting space aside from the Council Chambers. It is also important to stress the need for some specialized meeting spaces which serve unique pur- poses. For example, most One -Stop Shops provide for at least one meeting room equipped to allow visitors to review plans in a private (or semi - private) space, away from the main public counter. These rooms may be equipped with typical tables and chairs, so that the room can be used for differ- ent purposes when available, or may be equipped with a standing- height table (or counter) and no seating. Most departments have some special meeting needs, none of which are provided today, except for the City Attorney office area which is provided with a small (and ill - fumished) law library. Other typi- • cally needed special - purpose areas include meeting space for labor negotiations and hearings, auditor workrooms, workrooms that provide space for packet assembly or for special project team meetings, and department libraries which may contain meeting and reading areas. Public Areas The public areas at the Civic Center include (a) the main building lobby, (b) the access -ways between and reception points at each building and Department, (c) all public counters, (d) waiting areas at each Department, (e) the Council Chambers vestibule and main meeting room. These can be evalu- ated in terms of amount of space, functionality of space, and design of space. We leave the last of these to a later report on implementation strategies, design guidelines, and other design considera- tions. Main Building Lobby The building lobby appears adequately sized, but this is partly due to the fact that there are so many entry points to the Civic Center that this area serves only the first -time Civic Center visitor and those visitors who are coming to an adjacent department. Uses are mixed, with Revenue functions and Administrative functions merged, so that the visitors using the lobby are not very well segregated by purpose of visit. Ile area also does not serve informational purposes well, since signage is limited and the take -away materials are not very well organized or displayed according to the visitors' needs. Ile adjacent conference room, being open to the lobby, allows both areas to function less well than they should. Access Paths and Building Entry Points • It is difficult for visitors new to the Civic Center (or new to a different Department than they usually visit) to find their way from the parking areas to the function they are seeking, assuming that they are able to park near the building in the first place. Visitor parking is deficient, as noted elsewhere, and it Report to the City of Newport Beach Page 20 Space Utilization Assessment Report • is dispersed between three or four primary areas' none of which are signed as to what functions are best reached from any location. The general signage in the passage areas is also not very good, espe- cially in directing persons both according to function and to Department name. E • While the weather allows for less discomfort in the outside passages most of the year, it is at other times not so pleasant. All movement between buildings is open at least to the side, and the number of entry points to the campus are as numerous as there are spaces between buildings. There are, fur- thermore, awkward passages through Departments (such as through City Clerk offices to get to Hu- man Resources, or to access the upper floor areas) which are disruptive and confusing. Most of the visitors are not first - timers, of course, and so the problems apply mainly to those who come once, or those who come rarely, but for these persons the visit is not easy. Public Counters and Related There are a number of public counter areas and department reception points: Building Area Description Building B' Community Svcs. Dept. Counter /Lobby 16 Counter with 2 built -in workstations Admin. Services Dept. /Revenue 11 Counter with 2 workstations Main Lobby /Asst. to Mayor 6 -1/2 Counter at workstation Main Lobby /Exec. Asst. to City Mgr. 18 Counter at workstation Administrative Svcs. Dept. /Cashier 13 3- station Counter City Clerk 11 Counter /limited waiting Human Resources 12 Counter at workstation + display Building C Public Works Department Counter 18-1/2 Counter+ 6 seats Building Department Counter 24 Counter + 6 seats Planning Department Counter (included) Planning/Building Dept. Waiting 6 seats + others near Director Building D Print Shop Workstation Mail Room Workstation Fire Department/Prevention 6 -1/2 Counter Fire Department/Admin. Workstation MIS (no clear reception point) City Attorney Counter at workstation + 1 seat `Omits a non - public area for Payroll, consisting of 1 guest seat at workstation Note: all dimensions are approximate, from plans supplied by City. At quiet times, these amounts of space are generally adequate, but this is not often the case. Espe- cially City Clerk and Human Resources areas are crowded, not just because of counter length but also due to the absence of space for waiting and passing on the visitor side. All counters are crowded on the staff side, including those serving the development functions, and the existing counter space could be doubled (that is, doubled in depth) merely to provide the same counter length in an adequate work space. As to required counter "stations" (which is to mean counter length), all Departments report significant problems at many times. For development - related functions, we generally assume a 5' counter length as equal to one "station." For other functions we usually assume a counter length of 4' although in s There is a dedicated area on the north side, for about 10 persons, a time - limited area for about 1 I more persons on the back side of the Civic Center, metered parking behind the Council Chambers, and on- street parking along 32' Street and nearby. Report to the City of Newport Beach Page 21 Space Utilization Assessment Report • some cases, when there are suitable separations for visitor privacy and security, as well as suitable equipment for staff to conduct business, it is possible to reduce a counter station to 3' of length. Staff space deficiencies have in part led to building staff workstations into the counters in an effort to create more efficient work areas. This limits the use of the counter even when business is heavy to the few workstations which are constructed (as at Human Resources), but does allow for staff to al- ternate from their work surface to the visitor more easily. This is fine for those situations where (a) future growth in work volume, (b) changes due to new equipment and technology, (c) staff work functions, and (d) seasonal and workday visitor peak volumes are all generally unchanging. Hexibil- ity over time is provided, however, when the staff workstations are not integrated into the counters themselves. Department Waiting Areas The above table also indicates the character of Department waiting areas other than counters. As shown, these are in almost all cases minimal, and Departments report a general need for more space and accommodation (as at the offices of the City Attorney, where visitors cannot wait comfortably at the point of reception). This is all part of the general conversion of available space into staff and op- erations work areas, whether for desks, storage, or other uses, and contributes in no small part to the sense of crowding and limitation of office space. In particular, there is limited space for departments to display informational materials and to conduct reception -area business (such as space for applicants in Human Resources). Most of these reception points seem, at least to us, not so much to convey a sense of efficiency in government and space use, which is appropriate, as a sense of clutter, constriction, and inefficiency, which is not. • CONCLUSIONS L_J The space allocations in the Newport Beach Civic Center are smaller than the benchmarks of compa- rable jurisdictions by between 11% and 25 %, and space conditions are functionally and qualitatively below desirable levels. It is also the opinion of the survey team that the nature of workstations in use do not allow for adequate flexibility to meet technological, operational, or organizational changes and advancements that typically occur over time. Report to the City of Newport Beach Page 22 Space Utilization Assessment Report 4. EXISTING BUILDING CONDITIONS APPROACH LPA, Inc., and its consultants have reviewed the existing Civic Center drawings made available by the City of Newport Beach. These drawings include 1945 City Hall, 1975 Council Chambers, 1984 Community Services building, and miscellaneous other additions. They also conducted a site observation tour of the project area on March 7, 2002. This tour and re- sulting review consisted of a overview of the building shell as well as a walk -thru of the interior spaces. The buildings assessment is one of the first steps in the scope of services of this project to understand what improvements need to be made to the City Hall Campus which will better serve the citizens of Newport Beach. No testing of materials or removal of finished materials for observation of concealed construction was undertaken. GENERAL BUILDING ASSESSMENT CONCLUSIONS The evaluation of the buildings by LPA and its consultants is presented under separate cover in a document accompanying this report. This evaluation represents the survey team's opinion of the conditions of the construction based on a general review of the drawings and on personal site observation. It is not in the scope of this report to evaluate code compliance extensively , or to determine probable damage and losses caused by seis- • mic activity. In making a general review, it should be recognized that conditions and deficiencies might exist which the team has not been able to identify specifically. This review is not intended to preempt the technical or professional responsibility of the project design consultants in any way, and does not represent a warranty or guarantee on our part that other problems may not exist. The findings are summarized generally as follows: • Overall, the complex has responded to short -term needs without a master plan to guide the expansion and changing needs of the City. Many of the current problems with the work envi- ronments, space allocations, lack of adequate parking, and inefficiency in systems are related to this lack of planning. • Confused circulation and a lack of a central lobby or entry point make many departments ei- ther too accessible to the public or difficult to find. Lack of control and security are an issue with all buildings. • No building meets current practices for seismic design. Of the four buildings where seismic systems could be reviewed, all building would experience varying degrees of structural dam- age in a major seismic event. • The existing Fire Station very likely does not meet the requirements of an essential facility and would likely sustain significant structural damage in a major seismic event. • ADA violations are widespread with none of the buildings complying with ADA require- ments. • HVAC systems and Electrical systems are all individual - building - based. This causes energy inefficiency and is costly to maintain and service. • Report to the City of Newport Beach Page 23 Space Utilization Assessment Report S. PROPOSED SPACE STANDARDS INTRODUCTION A space standard is defined as a specific square footage allocation for an operation, an item of equip- ment, or a functional area, to which is added a description of what functions can be performed in that area. Thus, for example, once the functions and activities of a person are known, it is possible to se- lect a workstation and a square footage allowance that are appropriate for that person. The following pages contain a description of the proposed workstation and private office standards, and also related definitions. Development of Space Standards What is Included in the Standard Equipment standards are based on the item footprint, workspace for operating the equipment (opening drawers, for example, and access to or around the equipment. Workstation standards are based on the work surface needs (equipment, papers, writing space, reference space, and so on, on the desk or work plane), on filing needs, on bookshelf requirements, and on guest seating. There is a distinction between enclosed (office) workstations and stations in "an open area." • For enclosed offices, our standards are measured to the center line of the boundary walls of the room, and include no access space outside. It is assumed either that access will be directly off major circulation networks or that it will be off unit circulation areas provided with other open work rooms. • • For elements in an open area, an allowance for access is added to the workstation footprint in the space standard. Similarly, for panel - enclosed stations, we include an allowance for access in the standard (to account for inner circulation). • Access Around Workstations and Equipment Access is the space around the footprint of the item of equipment and open workstations, and it is used to create side aisles into a cluster of desks, or to allow for opening file drawers, cabinet door swings, and so on. As noted, we include this in the standard allowance for panel - enclosed or for open workstations. The item allowance and access comprise the equipment or workstation standard, as il- lustrated in Exhibit 1. EXHIBIT I An Open Workstation FA 1 L - -i B J - -- C A = Item Footprint; B = Access; C = A +B = Standard Report to the City of Newport Beach Page 24 Space Utilization Assessment Report • Unit Circulation and Layout Factor Unit circulation is a network of main aisles, generally passing in front of offices or to shared work ar- eas. An additional factor sometimes must be added to account for layout variances, which in the amount of space required to account for non - rectilinear design, design features which are peculiar to a given plan or existing facility, including such factors as disproportionate number of offices, column placements, design flexibility, extra sense of openness, and so on. Generally, however, we include the layout factor in the unit circulation allowance rather than accounting for it separately. • \J Exhibit 2 illustrates these separate concepts: item space allowance, access, total standard, circulation, and layout. It shows a series of workstations, an area for "circulation," and an extra need for 'layout" contingency due, in this case, to the location of a building column. EXHIBIT 2 Unit Circulation And Layout Inner Circulation D C = Standard D = Layout Allowance (due to column) Computing Building Circulation, Core, and "Gross" Square Footage The estimated net square footage needed equals the sum of the required standard areas, the unit cir- culation, and the other factors described above. To estimate the size of (gross) building floors, it is necessary to add further allowances for the major circulation areas, mechanical areas, and building core. These additions are based on typical percent- ages encountered in actual building experience, and the ratio of total net to total gross square footage on an entire floor (or entire building) is the assumed "efficiency" of that floor (or building). See Ap- pendix C for definitions. Space Standards Presented Here Space standards are presented for the following types of areas: Workstations — Private Offices Workstations — Traditional Open Stations Workstations — Systems Furnishings Open Area Equipment Conference Rooms Other Rooms and Areas Report to the City of Newport Beach Page 25 Space Utilization Assessment Report • WORKSTATION STANDARDS— PRIVATE OFFICES Private office standards are designated by the letters "PO" and are in most cases defined as having floor -to- ceiling walls and a door. The walls may be partially glass or may be equipped with pass - through openings, but such refinement considerations are noted in the program notations and not in the standard allowance itself. We also provide for some private offices to be shared by two or more persons, and adapt the private office allocations to "shared" private office standards where needed. In this case we generally use the symbol "SPO" rather than "PO." EXHIBIT Private Office Standards • Report to the City of Newport Beach Page 26 Space Utilization Assessment Report Space Std Typical Typical Symbol f-tp't/Acc'srrot'I Assignment Furnishings PO -1 90 — 90 Cubicle Once Desk and chair, file, seating for 1 -2 guest Often may not be a full height office. This standard is rarely allocated, and is included for completeness in these standards. PO -2 120 — 120 Supervisor Desk and chair, credenza or back table, file, seating for up to 2 guests. PO -3 150 -- 150 Special cases Desk and chair, credenza, 2 guests at desk, side seating for up to two persons. PO-4 180 — 180 Manager Executive desk and chair, credenza, 2 guests at desk plus side seating for 2. PO -5 210 -- 210 Special cases Executive desk and chair, credenza, 2 guests at desk plus side • seating for 2 or small conference table. PO -6 240 — 240 Division Head Executive desk and chair, credenza, 2 guests at desk plus side seating for 4 or small conference table. PO -7 300 — 300 Department Head; Executive desk and chair, credenza, 2 guests at desk, club seating City Manager for 4 -6 or conference table. PO-8 360 — 360 Unassigned Executive desk and chair, credenza, 2 guests at desk, club seating for 4 plus small conference table. PO -9 400 -- 400 Unassigned Executive desk and chair, credenza, 2 guests at desk, club seating for 4 plus conference able. • Report to the City of Newport Beach Page 26 Space Utilization Assessment Report 0 • • Illustration - Private Office Standards ...-- Fr _— El ri n U PO -3 150 sf Private Office FJ LM DEA PO -4 180 sf Private Office Report to the City of Newport Beach Page 27 Space Utilization Assessment Report • • • Illustration — Private Office Standards PO -5 210 sf Private Office i El Ll 5^tiss� 2 0 sf Private Office , \ Report to the City of Newport Beach Page 28 Space Utiliution Assessment Report 11 • • Illustration — Private Office Standards u \ IEI O UU a� 3 PO -7 `\ 300 sf Private Office Report to the City of Newport Beach Page 29 Space Utilization Assessment Report • • • Illustration — Private Office Standards — Shared Offices SPO-3 150 sf Shared Office SPO -4 180 sf Shared Office S PO-2 120 sf Shared Office �� -fi .1/ Shared E71office SPO -5 210 sf Shared Office Report to the City of Newport Beach Page 30 Space Utilization Assessment Report • • WORKSTATION STANDARDS — TRADITIONAL OPEN WORKSTATIONS Traditional open stations are defined as having no integral panels as part of the stations, but are desks and work units which are found in traditional offices. These stations may have surrounding panels, for privacy or acoustic reasons, but traditional furniture is assumed. Open stations usually occur in groups of several stations or in conjunction with a block of filing or other unit equipment items. In some cases, the program may designate two (or more) open stations to be located in a room, as in a shared office. The following Exhibit summarizes the space standards allocated to traditional open area workstations. Standards for System Work Stations are presented following. EXHIBIT Traditional Open Workstation Standards Space Std Typical Typical Symbol Ftp't/Acc'srFot'I Assignment Furnishings cws 30 30 60 Staff with std. desk ews 30 30 60 Staff with std. desk /r 10 5 15 as required /s 5 10 15 as required ews /r 40 35 75 Staff with exec. desk sws 20 25 45 Staff with small desk dws 40 35 75 Staff with drafting stn dws/r 60 30 90 Staff with large drafting station uws 60 30 90 "U "- workstation Report to the City of Newport Beach Page 31 Clerical work station (cws), with lowered side return for termi- nal or typewriter. May include desks without a return, in some cases. Work station (executive work station) without a typing or equipment return (double pedestal desk) or else with a return at executive height. Indicates the addition of a reference unit (back table or lateral file) behind and as part of a work station. Indicates the addition of a guest side -chair beside and as part of a work station. Executive work station (see "ews ") with back unit Small work station (desk 36" - 48" wide); may be a single - pedestal desk Drafting table and chair. Drafting table, reference unit or work desk, and staff chair. Some plan storage at the station may be included. "U "- station for Records Clerks, including a desk, computer work station, and side surface for reference materials, radio, etc. Space Utilization Assessment Report • Illustration Traditional Open Workstation Standards 10,-0, 8.-0. 101-01 81-0. i o I io 75 sf 60 sf 90 sf 75 sf cws /s cws cws/r /s cws /r 12'- 6'( *) 9'- 6' I 9'- 6'( *) a � m i 0 • 75 sf 120 sf 90 sf dws (drafting station) dws/r /s dws/r 6--0- 101-01 4--0- J public side I 0 0 o In of F — aD OP O 12Ffi * service side 60 sf 100 sf 120 sf Seating (sm group) Seating (Ig group) Public Counter - 12' f� J (allow 10 sf ea, lin. ft.) or 3 stations @ 40 sf each Report to the City of Newport Beach Page 32 Space Utilization Assessment Report • WORKSTATION STANDARDS— SYSTEM WORK STATIONS The enclosures in an open furniture system are generally structural; that is, the panels carry the weight of surfaces, storage modules hung on the wall, and so on. The panels usually also have built - in chase -ways for electrical and communications lines (data and telephone), as part of an integrated wire management design. System work stations are designated by "en" which begins the symbol for the standard. The "en" is followed by a letter, which indicates the general size category for the work- station. The space provides for the possible inclusion of one or more back tables, lateral files, ex- tended side reference surfaces, side chairs, or other components as shown. • Therefore, there are alternative configurations that a given space standard can have, so that, for ex- ample, an "en -c" space allowance can accommodate different work requirements. Also note that these allowances are generic, in that no one vendor is used. Different vendors may have various di- mensions and components available in a system line. The following Exhibit identifies the range of features that each of these standards [[tight have, noting total surface size, length of shelving and fil- ing, and so on. This is followed by additional illustrations showing conference spaces and reception stations developed with systems furnishings, and other possible allocations. EXHIBIT Analysis Of Open System Standards (Showing Various Alternative Configurations) Symbol Used Total SF' Encl. SF Surf. SF Peds No. Shelf LF Files LF' Seats No. Illustration of the Standard Reference & Notes en -a 58.5 36 20 1 -2 6 — — A standard it clerical desk en -b 76.5 48 18 1 -2 4 — 1 B compare to cwsts • ' This is the total typical "cost" of space for this station, when an access aisle allowance is added. The actual station size is the "Encl. SF' in the next column. Not counting files in pedestals. Report to the City of Newport Beach Page 33 Space Utilization Assessment Report • • • Symbol Total End. Surf. Peds Shelf Files Seats Reference Used SF' SF SF No. LF LF' No. Illustration of the Standard &Notes en -b 76.5 48 17.5 1 -2 6 — I C an altema- tive config'n for B en -b 76.5 48 24 1 -2 — 6t — D shown with a data sur- face en -b 76.5 48 34 1 or 8 8 -16 — E more compare to In lieu cws/r of files optional file en -c 93.5 64 28.5 1 -2 8 8 -16 1 F ® compare to cwslr /s a return is an option en -c 93.5 64 31 1 -2 8 6 -12 1 G +top or of file more optional file Report to the City of Newport Beach Page 34 Space Utilization Assessment Report 0 • u Symbol Total End. Surf. Peds Shelf Files Seats Reference Used SF' SF SF No. LF LF- No. Illustration of the Standard & Notes en -c 94.5 60 28 1 -2 7 6 -8 1 H like D, but longer for a LI guest chair en -d 115.5 80 33 1 -2 5 roll I I file drafting sta- tions are less flexible when smaller than this en -d 115.5 80 51 1 10 0 -6 1 J +roll drafting shown with file . table data or Pas CAD sur- face cno station en -d 115.5 80 39.5 1 -2 8 6 -12 — K opt opt opt with a deeper data work sur- face than D or H Report to the City of Newport Beach Page 35 Space Utilization Assessment Report 0 • • Symbol Total Encl. Surf. Peds Shelf Files Seats Reference Used SF' SF SF No. LF LF' No. Illustration of the Standard & Notes en -e 137.5 96 43 1 -2 12 6 -12 1 L longer than K to fit the guest chair better (shown with shelv- ing) en -e 137.5 96 56.8 2 12 11 -20 — M (see L) added sur- face and files replace the guest chair en -e 137.5 96 46.5 1 -2 12 12 1 N may also re- place +roll file may also r eraRing Da nia + lar er ver- g Sion of I or side re- guest chair chair place is an option side chair en -e 137.5 96 36 2 -3 8 6 2 O smallest of- fice configu- ration (see P) Report to the City of Newport Beach Page 36 Space Utilization Assessment Report 0 • • Symbol Total Encl. Surf. Peds Shelf Files Seats Reference Used SF' SF SF No. LF LF' No. Illustration of the Standard & Notes en -f 162.5 120 42 1 -3 10 10 -12 2 P much more open than O fora small addi- tion of space en -f 162.5 120 49 1 -2 12 12 2 Q +roll small office file version of a plan- review station LI en -f 162.5 120 66 2-4 20 12 -24 — R 33 1 -2 10 6 -12 can can be as- each each each each add 2 signed to but one person cuts needing a surf large data and station files en -g 187.5 144 52.5 2 -3 12 6 -18 2 -3 S larger ver- sion of P with an added guest chair LIU Report to the City of Newport Beach Page 37 Space Utilization Assessment Report • • 0 en /reception 115 sf allowance 64 sf inside Illustration System Standards — Miscellaneous Elements en /reception 185 sf allowance (colored) 72 sf station footprint 48 sf inside en/conf -8 seats 240 sf allowance 192 sf inside Report to the City of Newport Beach Page 38 en/pinwheel 300 sf allowance 145 sf inside (total) en/conf -6 seats en/conf ---4 seats 190 sf allowance 135 sf allowance 144 sf inside 96 sf inside Space Utilization Assessment Report • OPEN AREA EQUIPMENT AND RELATED STANDARDS There are three primary considerations in determining the space requirements for a particular piece of equipment: (1) the area occupied solely by the equipment item, (2) the space required for the equip- ment user or operator, and (3) the need for access to the item. Exhibit 4 outlines the equipment dimensions and square footage allocations for frequently used items. The total space requirement of each piece of equipment of this nature is determined by increasing the actual footprint area of the item to allow for access and use. This factor has been determined from previous experience in developing layouts for similar facilities; space for non - standard equipment is calculated on an individual item basis. EXHIBIT 4 Typical Standards For Open Area Equipment • Report to the City of Newport Beach Page 39 Space Utilization Assessment Report Symbol Typical Standard Item (If Any) Item Size Base Access Total Bookcase be 36" x 12" 3 7 10 Card File 81e 18" x 28" 4 6 10 Coat Rack coat or ctrk 24" x 48" 8 12 20 File Cabinet — Traditional File file or sf 18" x 28" 4 6 10 File Cabinet —S- drawer f -S 18" x 28" 4 6 10 • File Cabinet — Lateral File 9 36" x 18" 4 6 10 42" x 18" S 10 Is 48"x 18" 6 14 20 Side Chair chair 24" x 24" 4 11 IS Storage Cabinet stg cab 36" x 18" S 10 Is Table table 60" x 30" 12 28 40 Table—Extra Access Space table 60" x 30" 12 48 60 Typewriter Stand/Cart type 12" x 24" 2 8 10 24" x 30" S 10 Is Guest Seating -4 lounge seat -2 — 80 20 100 Guest Seating -2 -3 chairs seat -I — 40 20 60 Coffee Station— counter cof -I — 10 20 30 Coffee Station­enclosable cof -2 — Is 3S - 60 • Report to the City of Newport Beach Page 39 Space Utilization Assessment Report • CONFERENCE ROOM STANDARDS The size of conference rooms depends on (a) the number of persons seated at the table, (b) the size of the table (to accommodate bulky items, for example), (c) the possible requirement for spectators seated away from the table, and (d) presentation or display space. The last may include such needs as a projector area at the back of the room as well as a screen and presentation area with podium and such at the front. The standards we have used in this report are summarized in Exhibit 5. EXHIBIT J C -1 1 720 34 Person Conference - 22 at main table - 12 at side seating C -12 800 34- Person Conference Divisible: 8 -10 person 20 -22 person Conference seating 22 at table, plus 10 -12 persons at the side, with a presentation area at the end of the room; and cabinet (pos- sibly with coffee service) at other end of room. Seats 24 at main table if no cabinet. Modular combination of C -9 and C-4 conference rooms which open into one large room using room - divider partitions. Full room seats 24 at the main table and 10 persons at the side. Cabinet at one end of room. Report to the City of Newport Beach Page 40 Space Utilization Assessment Report Summary Of Conference Room Standards SpaceCapacity and Type Typical Symbol Std of Conference Room Furnishings C -1 90 2- Person Interview Room Table, 2 or 3 chairs. C -2 120 2-4 Person Interview Table, 2 -4 chairs. C -3 180 6 Person Conference 8 ft table, 6 chairs, possible writing surface on wall. C-4 240 8 Person Conference 8 ft table, 8 chairs, possible tack boards or writing surface. Table can seat 10, but crowded. C -5 300 8 -12 Person Conference 12 ft table. 12 chairs. Can add library at one end and seats 8, or add presentation area and room seats 8. C -6 360 12 -16 Person Conference 12 ft table, 12 chairs, presentation area at end of room. Can ac- commodate 16 persons if presentation space is converted to con- ference space. C -7 420 16 -20 Person Conference 16 ft table, 16 chairs, presentation area at end of room. Can ac- • commodate 20 persons if presentation space is converted to con- ference space. C -8 480 18-22 Seat Conference Room 20 ft table, 18 chairs, presentation area at end of room; cabinet (possibly with coffee service) at other end of room. Can accom- modate 22 persons if presentation space is converted to confer- ence space. C -9 560 22 Person Conference Conference seating 14 at table, plus 6-8 persons at the side, with a - 14 at main table presentation area at the end of the room; and cabinet (possibly - 8 at side seating with coffee service) at other end of room. Seats 16 at main table if no cabinet. C -10 640 28 Person Conference Conference seating 18 at table, plus 8 -10 persons at the side, with - 18 at main table a presentation area at the end of the room; and cabinet (possibly - 10 at side seating with coffee service) at other end of room. Seats 20 at main table if no cabinet. J C -1 1 720 34 Person Conference - 22 at main table - 12 at side seating C -12 800 34- Person Conference Divisible: 8 -10 person 20 -22 person Conference seating 22 at table, plus 10 -12 persons at the side, with a presentation area at the end of the room; and cabinet (pos- sibly with coffee service) at other end of room. Seats 24 at main table if no cabinet. Modular combination of C -9 and C-4 conference rooms which open into one large room using room - divider partitions. Full room seats 24 at the main table and 10 persons at the side. Cabinet at one end of room. Report to the City of Newport Beach Page 40 Space Utilization Assessment Report • • • C -3 I80 sf • 6-8 Persons Illustration Small Conference Rooms is C -1 90 sf Interview Rm C -2 120 sf • 4- persons nnn C -4 240 sf • 8 Persons 8 Persons with Presenution Area C-5 300 sf • 8 -12 Persons Report to the City of Newport Beach Page 41 12 Persons Without Presenation Area Space Utilization Assessment Report E • C -6 360 sf • 12 -16 Persons C -7 420 sf • 16 -20 Persons Illustration Medium Conference Rooms nnnnnrin UUUUUUU 16 Persons Without Presentation Area 12 Persons With Presentation Area Report to the City of Newport Beach Page 42 16 Persons With Presentation Area 20 Persons Without Presentation Area Space Utilization Assessment Report 0 • • Illustration Large Conference Rooms I C-8 480 sf • 18-22 Persons 18 Persons With Presentation Area 22 Persons Without Presentation Area MINE in, - MIM-1M, NI il� *�** - - - - - -- C -9 560 sf • 14 Persons at Table (16 Without Built -in Cabinet); 6-8 Side Seating Report to the City of Newport Beach Page 43 Space Utilization Assessment Report ,, E — C-8 480 sf • 18-22 Persons 18 Persons With Presentation Area 22 Persons Without Presentation Area MINE in, - MIM-1M, NI il� *�** - - - - - -- C -9 560 sf • 14 Persons at Table (16 Without Built -in Cabinet); 6-8 Side Seating Report to the City of Newport Beach Page 43 Space Utilization Assessment Report 0 • u Illustration Large Conference Rooms II Report to the City of Newport Beach Page 44 Space Utilization Assessment Report 0 • • Illustration Divisible Conference Room 24 Persons at Table with 10-I I Side Seating 16 Persons at Table #I with 8 -9 Side Seating • 8 -10 Persons at Table #2 C -12 800 sf • Divisible Conference Room Report to the City of Newport Beach Page 45 Space Utilization Assessment Report ,I 1' I, 1' I I 1 2 � 16 Persons at Table #I with 8 -9 Side Seating • 8 -10 Persons at Table #2 C -12 800 sf • Divisible Conference Room Report to the City of Newport Beach Page 45 Space Utilization Assessment Report �J CJ • Illustration Training or Meeting Room 1 i i i i u - Computer Training Arrangement Fl Fl Fl FJ Fl i i Symposium Arrangement Training or Symposium Room 540 sf • 12 -15 Persons Report to the City of Newport Beach Page 46 Space Utilization Assessment Report 0 is • Illustration Training or Meeting Room 11 Symposium Seating Meeting Room 700 sf • 20.24 Persons Report to the City of Newport Beach Page 47 Presentation Seating Space Utilization Assessment Report 0 0 • Illustration Sample Assembly and Meeting Room (Flat Floor Multi-use Room) Auai"cewavng for 70 is shovm. Report to the City of Newport Beach Page 48 Space Utilization Assessment Report Video Control Booth (incl. optional Voice-over booth) (I 80sf) Hospitality/ Coffee (I 20sf) Stora el (I 20sf !'l Provide jacks for cable TV and I..— =J) I communications interface to outside -F-1 1 : � 1 .1 7 L. i j I i 0 rF- Ll LL J s� I Fi—I IF] il L, I F U..'! F. L I F' I L] L r=L J] TV J Assembly Room (1,41 Osf) Board Room/Multi-Purpose Complex (1.650sf + circulation allowance) Auai"cewavng for 70 is shovm. Report to the City of Newport Beach Page 48 Space Utilization Assessment Report • • • Illustration Sample Small Board and Commission Meeting Room (Flat Floor Multi -use Room) Audience seating for 53 is shown. Report to the City of Newport Beach Page 49 Space Utilization Assessment Report Video Control Booth (incl, optional Voice -over booth) (I80sf) Hospitality/ Coffee - (120sf) Storage; i I F F- { { Searing for 53 shovm. With front able extended, 5 Members plus 4 saff at table in basic u-z J remove 2 rows for a capacity of about 40 seats. position. Add 4 at able in extended �f position. Flat floor area required. '�i !, , jr� LI 1 -F -r -F11 - ;; I; ILIJ IF-1 Ilf 1J .G1J �1_�_I I.LJJ � r�Tl (7-1. r =, J- , I, -a� I . _. J.- �I Provide jacks for able N and Assembly y Room communications interface to outside Movable display area (1,41 Osf) Board Room /Multi- Purpose Complex (1,650sf + circulation allowance) Audience seating for 53 is shown. Report to the City of Newport Beach Page 49 Space Utilization Assessment Report • • Illustration Sample Medium Board and Commission Meeting Room (Flat Floor Multi -use Room) Control Booth ptional Voice-over booth) P.Ade jacks for cable TV and communications interface to outside _TD IF - Cr TIF is Hospitality/ Coffee (120so Storage[) (120s Assembly Room (1,410so —ter jLi 4��ALA t !L Board Room/Multi-Purpose Complex (1,650sf + circulation allowance) Audience seating for 42 is shown. Report to the City of Newport Beach page so Space Utilization Assessment Report • STANDARDS FOR OTHER ROOMS Other rooms, such as copy rooms, computer rooms, mail rooms, storage rooms, and so on are sized based on individual content needs. That is, standard requirements for the workstations, unit equip- ment, counters, and other items in the room are added together, with an allowance for extra circula- tion (when needed) and for the use of the items. The need for added circulation allowance is typically based on test layouts to assure an efficient yet workable standard is developed. As with other rooms is this project, we have generally sized the (smaller) rooms in multiples of 60 sq. ft., to allow the de- sign and layout process greater flexibility and modularity. Illustrations of standards and assumptions for selected "other rooms" appear below. Typical Break Room WOMEN: (standard cof-4 ) Report to the City of Newport Beach Page 51 Contains sink coffee, refrig, Go, trash. opel DW, MW. 60 sf Coffee (type 4) shown as an alcove Space Utilization Assessment Report 360 sf Typical Breakroom Typical Coffee /Service Counter (small area) (standard cof -2) unraim un4, coRee 20 sf Coffee (type 2) Typical Coffee /Service Counter (standard cof -3) - Content IIn4, coRee, GD, erssh 30 sf Coffee (type 3) Typical Coffee /Service Al- cove (standard cof-4 ) Report to the City of Newport Beach Page 51 Contains sink coffee, refrig, Go, trash. opel DW, MW. 60 sf Coffee (type 4) shown as an alcove Space Utilization Assessment Report 0 0 Appendices APPENDICES Space Utilization Assessment Report • APPENDIX A — FLOOR PLANS OF EXISTING BUILDINGS • The following pages present detailed CAD drawings of the existing Civic Center buildings under the scope of this project. The base outlines and major partitions represented in these drawings were ob- tained from the City and were modified in some cases according to observed field conditions at the time of our physical survey. We also identified the functions of each space, and have color -coded the areas according to depart- ment and use. Some colors are reused, so a general knowledge of the buildings and the location of occupants is needed to track the designations we have used. The area quantities shown on the draw- ings are given in square feet. Faint red lines bound the areas, so that the exact assumptions of areas, work station sizes, and allocations used in this report are discernable. In some cases, access space is included in the workstation, where this appears to be integral to it, but generally this is not the case. In applying space standards, however, some access and circulation allowances are incorporated into the standard, and so it may not be true that a direct correlation between an allocation identified in the drawing will equal the size of a comparable space standard. Appendix A Page I Space Utilization Assessment Report • • • Building A Building B (south section) 11 Community Svcs: Usable Assigned Community Svcs- Usable CiraM. i] City Man>,gemenc Councd Area& Unable A igned EjC+ry Management Council Areas: Unable Cir ,d don Building Rairwell& Corridors M&ng Ua mne& Janimr Rooms. Mechanical Rooms ® Building WeN Re.rovadom. Shafo. Oemm� 1 114 f 149 sf 90 sf 46 x 1070 it 55x 16 If Bsf 34 sf 1 3 sf 99 sf 62 sf 61 x Sx x • • Building A Building B (south section) 11 Community Svcs: Usable Assigned Community Svcs- Usable CiraM. i] City Man>,gemenc Councd Area& Unable A igned EjC+ry Management Council Areas: Unable Cir ,d don Building Rairwell& Corridors M&ng Ua mne& Janimr Rooms. Mechanical Rooms ® Building WeN Re.rovadom. Shafo. Oemm� Building B (central section) • E ❑ ❑ Admire S. .: Usable Assigned 1-1 Admin. Svcs.: Usable Circuiavon E] City Managemc Usable Assigned Building Soirwelb. Condors Building Ua Wries, foniwr Rooms. Me anial Rooms Building Vertical Pd.. Sub. FJ v wrs s 0 El i95bfi< Works; Usabl¢ Assigned 0 "u Wa Usable Orculadon EI HR: Usable A,N,n • EI HR: Usable Circubdon IM si iI Ory Oerk Usable Asaigr¢d iI Ciry Oerk Usable CircNauon EI ❑ E] Admm Svcs.. Usable As,Wp ❑ Admin. S, Usable CirN1.1On L1 Ciry Usable Assigied DBuilding Swrxeps. Corndas Building Caw[ad¢s, fanimr Rooms. Mah Nn l Rooms 36S N BON R3 Budding Vemll Penttndons, Sha(rs. Elemors 13 138,f 81 sf Trm"y'�a • }.`.� F 3795f I sf Building B (north section) I 105 N 101 N 3� 95 sf P® rM N 5IN85f e,f 7151 37 5f 138,f 81 sf Trm"y'�a • }.`.� F 3795f I sf Building B (north section) I 105 N 101 N 3� 95 sf P® rM N • • • Building CA 0 O 0 ❑ ®Publk Works Usable Assigned Mblle WorW UPWe Omuhuon ❑ Boildin$ Usable Assigned Building Usable Omulabw 563red with %nning ❑ PbnninV Usable Assigned Running WWa Cmubdon U.,d wiA Buildim pfi WSL����� L 0 5 IB 20 • • • Building C.2 ❑ Building: Usable Assigned Building Usable dreulauon ElNaming Usable Assigned Nanning: Usable Circulanon ❑ Building Suirxdk, Corridors 8WIding Lawmrio faNmr Rooms, Mechanic) Rooms Building Ve O Pe Lions, Shafu, Ele.ors 303 If Bo If >oIt 4 If —4qf 1 1 I 660 If 84 If IIOsf 115 If 104 If IN It f01 sf 138 If 'a 182 If 5 If 130 sf I IS If 175 If 135 It 283 sf .: CHER AIR 0131( 93 If 1050. 105 If D7 if 168 If 178 If 51 sf 30 sf. 14 If Bo If >oIt 4 If —4qf 1 1 I 660 If 84 If IIOsf 115 If 104 If IN It f01 sf 138 If 'a 182 If 5 If 130 sf I IS If 175 If 135 It 283 sf .: CHER AIR 0131( 108# Building DA • 132 if Building E 48 # 99„ Fir, Usable Assigned 3201 21 Fire Usable Circulation # Adm. Svcs.. MI5: Usable Assigned 4119 Adm Svt.. M15: Usable Grculatian 0' Ccrnmuniq Svcs. Usable Assigned ElAdministrative Svcs.: Usable Assigned ElGeneml Acs.: Usable Assigned ElBuilAng Shared Usable (e.g., lunchroom) Building Sobwvelb. Ca radon 719 if ' 513# Bonding tawcone %)animr Rooms, Mnc+, Rooms Building Vertical PeneUations, Shaft. Elea s 45 if 165 if 58 if < 11 if 21 if 60 if 60 if 142 s, � 121 # 42 s 22 s! 125 if 30 # BS # 75 if 78 42 s _ # • I 126 if ` 27 sf n# mi 295 # l nsf 82 61 # 403 if 3 `:33,01 1 16 if # 14 '. � 155 #' I 15901 E 32 if 21.� J, IL _ 427 # 16 01I 1 102# 25 66 if 472 if 33 # 584 if 168 if 96 # 129 if tA sf 10701 11 if 190 if 60sf 2 sf 6 sf 58 117 if 141 if 121 if 132 sf •43 # 131 if Os 70 sf � EIC • APPENDIX B — DETAILED EXISTING ALLOCATION OF SPACE • • The following table presents a detailed listing of the existing spaces in the Newport Beach Civic Center, and indicates, in particular, the space presently allocated to each person who has a worksta- tion there. Appendix B page I Space Utilization Assessment Report Y.5 t E .-0 V. Oro 46 t . 0 o 3 G -4- -4--it �- �t� -i-� I t�lll 44 AJ. t t iT t H j III }� , I, � fttli I l�� II III Ililii 0 Iiil,iill it ion of A. I A I Rd Y.5 t E .-0 V. Oro 46 t . 0 o 3 G -4- -4--it �- �t� -i-� I t�lll 44 AJ. t t iT t H j III }� , I, � fttli I l�� II III Ililii 0 • a d m V �O OV �g UZ u `o I! , I i ! I I 1 1 I I I 1 I 1 1 E , 1 1 _ d _ .L�' .oO.N E I 12 I U-0 :CI ydz m Oi NI N N ml ,N m N I = m LL 0 w 11111111 a I 11 .:;11'11 III I I ' m II IIIII I 1 111;•1 1 + I II I 111 �I III 1 � I �I1:II �I I I ! Ii III m 'I ;1i I I —j Ii,I ,III I,ttl iii I�I;iI I ,I;� iI Ill c I I nn !d d. I fl Ifl 1 1 1' Imo. m II I III �I �JI , I I � I III I t f �' i --,FFF �} yI +� j t I r+ I lili A !1 I :11. I 1 } 'T' t } # ✓• + � IIII 'I III � III i it V IIII I I I I I I I I I. I I I 7 m {p (p IVJ! INNIN N 1! {I11�I'L Imo' I ICJ'�V VJ:� Ij 1' J� 1�II i. I I It I I I't .+i I II I I +l� �I 1�IIj + ' o illlli III �I I I I i m I I IIII 1' 11111 I I ¢ E sa 3 v I N I mCo �I' o . .Im I o E 8 I.'' Ot di I C5 Jd 0 E m it mI mN. oO .acd10 m 1 ° Z 1 Ulm c L IUOp II'dNO - NN N Q�NN� I II l' U l m = m z m .W E _ aaA=' m mL oO m m L J �o ¢ e d E zl oE O o LLm C D O N im U t a ' a N _ dmN ` � _ t :m D tg c '�QN MO EIJ � 1 O FdJ Ue Fd m: m m J �L. E io T I `o 0 1 K aE V FV ._ t V d UZ 0 m d I , III I 1 Ij I i gym, III!I tl I I'�,I ' d E d d I 6 tm :di Jl em l cUIE:L V -_O IL E Z Im . i9 l i t! n g•d dl C M I M!liilill� m 111111( I ' I ili 11111!1 I IIII + -i- t } c i I I i Ii m tOIC C (0'Mn VIII I I I ! I I I �.y.. � -* ♦ .-i a l..t.` � j. }-t * � i 1 NI t ! ���- 11 l4 I U J I I I Ijtl�Illlll � I i I nl0);N n:M I "III I t + M N P:fO Y1 O O V ,01(01,0 N.P O f0 WN{ptm: N�iAig fpt N;O�M (Ot(OjtOM M M Mi W'W yI } J m 41, 1� I iNI� fjNIN i i Imin:M OeN - �I I j I B I } _ _ 11 I I i,rt � � j I t d \ C 0 N I{")ILLU N I I I I I I Iy�l I N:W Ippf� Id I I ' �l IsO cvm O l O U W do y ;LL `l11 d ° t o V E C m O 49� IE G J O Um E a J d d C d C U d �a p , d UU d m C C y.0 0d,d N_•l d V C i ' j d " d l . ' d ^� I N ( d .� N 1 2 8 0 I m N Q VC N I�N m E •W J _ ^ U ' E F } - - E E . W a T C U F .- c > m N m m LL N - I J E U U I C m U ' NU c 1 ' u - I...� N yUc I C cd i j p j p U a � l l - 1 -Q N Q qU I C odmILL,LLLL Q � - -Q . i d C p U t f 4 � 0 0 {EQE .- .I U ' } I � t - dc 1 0 , K � . . d N . ; LL'�Nj 1 I LL � LL I _ N I N �:�- N : d � � , JJLL 1 _ �— $ aQ U � l U + II . 1 ' t1 • f � N JE A_mU 'V EA -t + } I III m d • WN ;E V ti V .- OA wo 0 eY dory V m UZ u d II IiIIc Ii 1 i� �I :.IIII � ' I I III! E U m' aN iY W N mi 0. 1 Cmi �I 'dl I I °_' J d Z m I� UI I I J'm I is xIW I op� I :2 ml 2U'Ui I :m'U 10'Q ai . I I i ry I I I 11 I I I I I NI�'�t N �I I QI I I I iN • m I i I } I --t -�I I I I I' I I TI I_�.- 4 m m.� O O aJ m (D•th OI OI Ol Q Q N N OI th �I I I I._ .. 1, I. y,. 1 I -} I. NLl �• OI r m I I I O m I I I I I I I I I I I m i I I I I I I I 1 I I m � Q �I �th (D i--I� N �1�t -� � �•� 1 1 � •.E°-t I fp N j I i :I I i m a �2 od S I E m_ c m m ^ Eto d E° 'iI V C V IV :�I myIl, Er -na W mUUU{U m >,' C > I. >_IU ° W - C 0mmm '> c•tl oUa.d �' �I ml IZ K m mmO �:a: Arm —II-}I =JiU JC a 'I � m �E N 3 _11IIIS y an d mO- : oQ Ef _ .0 OE a c O ,fI -A `I f I + IU} } f i rl O IL to d 0 a m K 'S Rio Ov U V m UZ �J ° N WWI: ! 1 ' IIII' I( lil l� I �I : I I! i'' II III 1 •( I I I I I I m i I I I' E " y. of IIII ° , !mI -°_1r• iEpi� I I l 'U'i>, >'m'miu "m Id a Z LL x m: I Idol IQI� _im I ia!�m;ml m I�!il IIII i � III' IIII � i I I III III I I I I I o yiy o:o C I i I 1 I I I 1• I! i i .N �.� �I I I I I i i m JLI � -+ � -t '-'—F +'-� '- 1--V —I � "i -1 -'i i �i ' � +m1N }O� +n } � � } O. I I I fad �� '� • :(O ItO t0 tO.N iN'�i� O' n 1 i i I gi I I i I If lI I 1f .IL 1 { L ! �Ii of i i•��' �' I � j I � I i I }'l� J o I I I I l i I I I I in 41� m i I I I I I I i i I I i i I I I f 'f •f �f f � i' .. �I--{'I- m �T +f < � �T If tf ICI {- } i }fy. a I l cm n E _� � II li 0. LL 3 I ! I 0- I Iis m tim i c ° i: ` I U C E w C m 01.0 oa� FU� U,°l N yN� m I I �Um Z m m m u �m I mJ � NIi .`�f.a°m'E °° °m°l aOlc ' Ny•.Ip V_N I 4 „mL_ IUm: i � 'cm ° i3 E II� NU I 'W cc J C� 1 Q W a E. Ddd ¢o mW° Iia If_ L l ° I w 4l O•._.1y t" I 4W C a 4 Li lj u u uultim mlm m mlm m. m�,m a a_c _ a�ayac (k (Ri uy ;ivaE° l n• -,-. 1 :J. Sla' I • IE w E L °.E E. DILL Q p F 8lwi . aU 1 I I I ILL ° N d A °E V 4_ 0 N Q V m V Z • P d d I I i i l i I I I I I I i I I i I • I� ; I! I I I I I j I I j 1 I E Iw iN�t EI c 1 I`m � w'i m" I � j �N: ci L'Yilct m.m N oI Y cl !� °� Imim 1 I m_'.91m'dlm Z L mitl'E. YY IU �' D :m ml j'NV'mG"l li I I r J7. : HCI:LLN:OZ :I C Q m R' -m i ULL I '_v I I I;i li!� I III m' III V III iI i� �I ji AI r• +Hi m• OI Ol IYi' .M! COJ O Or 10 � I I .NI 'NI 1 • m I i I l i i� I I i V'1� V --a� I GY W I�t I N N' 7 tl w U I ;II i y. "!_ i ' VIII I I: -i a-1_� � t - +'�`I � -Y t Y- '� -f-'i' � i 11 oI i � i I I I o� i i, .f + � 1 -1-� • a m it II +I '�I�Iij�� IIII Ili !III. II II I � I�i� I Ii ! �Iil VIII :1 I I I I 4 I� fI I I I 1 I i • I , I i I I 1 IV'V IV�CJm N m I m g I o I I i i i I 3 ff i f I f fl vf. I I o I�I�� f � � � N �II { -�.. I•���I 1-41 t I �O ? } 1 O1 .. _tf -i'_ IIII g: IIj.LL I .m I II II III p jII1I.� >��' Ic -T - �� I -' I I I I E: O !.;I i I III ml IJE E d :U _I_ U L I I _i m mlmlo:U rn: Iy I' I I c i INI m yI� >ap 'a 'S OI�'LL @ d c• m E• `yIN E Q m C_ ;`m c' Co co; O `m `m Y C m m c m Im: j NmmNN O 'N I m. iZ CLL _ Q,W iLLI m m .` }..ym =`WI mm`Y > �I 1 y. im Ci ... 10 - C�1 d N��} C C NON W F]QQ ofS? — + tml }_4 + i I i I I I I I I I P d d 0 dl . I I i t I „ I I I I I I i PC 2 t o I I v �o O • M �u , W' ,. M . � 2g: . : I 'ffi . ! , I r, .1 i , 0 0 1 < M4 Im n mi 'Of ^tO, i NIN��V I t0 i OiO t01 1 ^ vv V tO mn N, N Cf � if1fti�l ` f�l',��. i f Tr t . I I IM in3 ]am 01 IF.I Tl i I O • d n a .ro 0 -a 0 dg V Y uZ • P m 'lij ijil jl li i'I��' II '' I I Ilii Ii Ij m I i m I IE °ml °O `ml� —1 IW 181 c. a. m I : c:m. lo olc E'� 'c z ! is m ,r,0 —.o Im Ic.�'ml�ml a 'rn Olio HIU IUm' 1 I(931�I w mlm!'Um Eml m � N W m Q I -I I j I ;- Y' } } I I i ' } 1 } .. _ -Y i �F ..� i +�� - j 4 i i.. I �. Y -'i ♦ + + t -F I j I 1 I I I I I I I •I � m I i I I I i I i I' i i I I I I I I j I I I !IIII' �i � •.I�� m , - -Y - -. m C I I m V �� 00 m f7 V }O N•O Is I I I • I i i I i I �� I I I� 1� j� l N 1� �mlm:N ♦I I F i j'�jl�� }. m�I� 1 4 1... �� --F. .� a.' m O I 1�'V OI i I I I! � ♦m.N MINI 1 m{ r'r lr �'m N ♦O O:m: }� t I N•O' NI I Iii � O.O' I I j I� I I I `! l i �►1I� !jI I 'VIII ' m m I �' l i il'i l�' ,j!I I I t t l 1 I Y t r I � I i'I'I'Irn oNi;v gi NIO)r v m i i Iml I i I mj g i' j � I I� 'I' �' N'•'I I I' , ^�'I'I ' of° 1 � IrI Ii 'Y}I IIIIII t + I �'•'j r N. I � I t��f7 �t '} I �'' } 1 1- � � ♦ r I I I ` d I'�'I + ,'� INI'IN w UO I ly mi I C I Y I I iail 1 I�: 311 m �Jy//�JN//�Jy//�yCV 3 I IcB wUmm I�Io.Um m ' I w 2C !! l i W'W F im W,r:Y m 1 10'0 g l�i I U.3I ° I Imi m m0my �C C WW mm UlUui VI �I mWj�ym 'y c oFiLLUO. amdEE'"'" 0_¢¢WW m E ¢ a I Imo..,. m NIj pWIWWtitiW'�$I c' 0;000 � m'��y'9' U,_aaa�tN�— Uw C 011 gd Gg �mw w o d m w¢ c c IyU —I OI oII- —LL �31,i, y100 wy .0 p it ylyW �mlm� NN E� o.l � �'t 113!° IF} TL i y 'w � � 7 -�LL � -1 t ' e�+ •''i- 11 t U t I } IF P m • d q °E Vy V— O n yV V > Z • P O I I I I I i I i I I i ' I i I I I I l I ' I .N mild m Io Im ! � I I i Vry� m bl N n m' •m� 'N :m. I I V.miO.m'n0 n.m.N yl N n O. �m'a• I I i a �mIV) . m 'cl!'ml :p: n �y� 1 ,y' m I E ml 1 I I I � z x�3 a` �,3 I i ' °m,�t � ,'ia 1!I m � IIII IIII �I�iIIII p I —I—L -I i OI 1 ^I In_ V t I I I� INNi � I I o NIN i C i I I I NI mI 06I I1 11 1 � 1 I PIM mlm�`�N. Vi bl�l I d I 1 �j Imo R m n mom 'NIN Q _ { O I I rN' Ini- � ..i._i ♦. i j --� -�. i- f N y m ... i� N i I Im i i a m IM ' i I I ! 3 m O m m iI I j rl c m C m m y i m L m m O Y m 5 L c m m m m c m I E: m ml E° m 5 $o m o m 3 i ruO oa mO EI W p mm Z m E 0 Q FE. t2; I l m vv t c m m m m m Y L m m m m m IE o > E mo E>o o • _�I ._ • yO ma o o O m O _w O 6 m y m U pY O� E 65 z 0 � N lC m d B N J JI D O �mf �Y 1 - ' I W-t m 0 o ' . i fm C z v E m H N v c O T J m c tm 0. S 6- O . Z N N a N m O P O • APPENDIX C— DEFINITION OF TERMS The following terms are closely related, and the definitions for these terms often vary from user to user. Care should be taken to verify the definitions when these terms are encountered in other sources. Gross Building Area BOMA does not make much use of this figure, but for us the term means the total area of the building enclosed by the bounding walls, exclusive of overhangs and areas (including docks) outside the building line. The gross square footage of a building is the sum of the gross sq. ft. on each floor, which is measured to the outside finished surface of the per- manent outer building walls. Basements, mechanical equipment areas, penthouses, etc., are all included. Note that this is sometimes referred to as the "construction area." Patios, overhangs, and similar elements are (usually) not included. Gross Measured Area BOMA defines Gross Measured Area to exclude the area outside the "dominant portion" of the bounding wall, and also excludes overhangs, areas (docks) outside the building line, and enclosed parking. The dominant portion is usually either the inside face of the wall or the glass -line of the wall, depending on whether windows make up more or less than half the wall surface. There are exceptions, however, as in the case of street -front storefronts. • For us, this area differs from the Gross Building Area (by the thickness of the wall areas which are not included in the "dominant portion" and also by parking which is included in the Gross for Building E. Vertical Penetrations BOMA defines major vertical penetrations to include elevator shafts, mechanical shafts, and other areas "without a floor," including the bounding walls of these areas. We measure to the average thickness of these bounding walls, however. Tenant Area BOMA defines the area of a tenant (the "Office Area ") to be the area where the tenant normally houses personnel, furniture, and operations under its sole control. Floor Common Area BOMA defines the Floor Common Area to be the areas on that floor available primarily for the use of tenants on that floor, such as wash- rooms, janitorial closets, electrical rooms, telephone rooms, mechanical rooms, elevator lobbies, and public corridors. The Rentable Area for a Tenant on a floor includes its prorated share of the Floor Common Area for that floor. Building Common Area BOMA defines the Building Common Area to be areas to exclude the Floor Common Areas and Vertical Penetrations, but to include areas which provide service to (all) building tenants, such as building lobbies and atria (at the floor level, not the shaft space above), building elevator lobbies, building mail rooms, and building core service rooms. The point is to identify areas servicing all tenants rather than just tenants on • one floor. Appendix C Page I Space Utilization Assessment Report • In the case of a campus setting, especially where the buildings are each low -rise as at Newport Beach, it is useful to think of each building as a "floor" in the BOMA definitions. At Newport City Hall, the lunchroom would be such an area. Usable Area BOMA defines the Usable Area as the sum of the Tenant Areas and the Building Common Areas. Floor Common Areas are omitted. Thus, typically, the usable area equals the tenant spaces plus the areas which are shared by all tenants (such as main building lobbies and corridors, but not floor corridors, for example). In the case of Newport Beach Civic Center, we are approaching this as if the entire complex were "the building" and each floor were a floor in it. Further, each department is treated as a separate tenant. Consequently, there are only a few areas which are "Building Common Areas," such as the main building lobby and information area, the lunchroom, and com- plex -wide mechanical rooms. Net Sq. Ft This is the same as usable interior area in this report, and is the space which is listed in the program tabulation. Modified Usable Area In this study, especially where needs are to be computed, it is useful to distinguish all the main circulation corridors rather than to divide this between "Building Common" and "Floor Common" allowances. Simi- larly, it is useful to identify all mechanical spaces needed by the build- ing, not to distinguish the mechanical areas for a floor from those for the building as a whole. Consequently, where we make this distinction, we • identify the Usable as being Modified accordingly. The usable space is always defined when the definition is being modified in this way. Tenant's Rentable Area BOMA defines the rentable area of a tenant to be Tenant Area (Office Area), plus the prorated share of Floor Common Area (computed on a floor -by -floor basis and added) plus the prorated share of the Building Common Area. Rentable area for a floor usually includes everything except Vertical Penetrations. Building Rentable Area BOMA defines the total rentable area of a building to be the sum of the rentable for each tenant (which equals the sum of the rentable for each floor). Rentable area usually includes everything except Vertical Pene- trations. Tenant Usable Area This is the same as the Tenant Area, above. It equals the Tenant Assig- nable Area plus the Tenant Assignable Circulation. Tenant Assignable Area This is the tenant usable area less the tenant assignable circulation. It in- cludes (a) the area of rooms or offices, (b) the open areas by or "foot- prints" of desks, equipment, and so on, (c) the access area around such furniture or equipment (unless this is part of the "unit circulation" aisle). Assignable Circulation This area is equal to the walkways and defined aisles within the tenant usable area. Access space around open -area desks and equipment is not included, unless it is overlapped with such well - defined aisles. Unit cir- • culation is included in the net sq. ft. Appendix C Page 2 Space Utilization Assessment Report • Inner Circulation This allowance is added inside rooms or areas to provide needed access to equipment or work stations that are listed there, especially when it is judged that the total allowance for access which is part of the items' space standard will otherwise be insufficient for proper layout. Inner circulation is part of the net sq. ft. of a room. Efficiency The efficiency of a building is the ratio of net sq. ft. to gross sq. ft., usu- ally expressed as a percentage. While the "gross" is usually well de- fined, there are several ways that "net" can be calculated. Major Circulation This area typically consists of stairwells and corridors defined by fire - rated partitions and in a multi - tenant building is that corridor space which is shared by all tenants. Total Building Area This may be larger than the gross sq. ft. of the building (but never less) and includes any balconies, constructed covered areas which are part of the building but exterior to it, and the like. We generally do not compute a "Total Building Area" beyond the gross sq. ft. figure, unless these ele- ments are essential to the functional requirement. Outdoor elements are usually treated as separate items in this report. • J Appendix C Page 3 Space Utilization Assessment Report • APPENDIX D — EVALUATION OF EXISTING BUILDINGS J The evaluation of existing buildings is presented as a separately bound document. A summary of se- lected findings appears in Section 4 of this report. Appendix D Page I Space Utilization Assessment Report U1i i1' a� • _ . 'K'.i m7NEWPORT BEACH CIVIG.GENTER .-' W%LrFACILITIES rf NEEDSAD'SESSMENT Ar ej4"�' a :Ckj 0fNewport Beach » ( � '. + it ♦ 6 "� PPP � '. �r w + I Irk enfs •' `may v Y • �, y !J• f t J. ' Bubble Diagram Administrative Services -pg. I • • ASD, Financial Operations & Administration Mmn Payments Public Counter for the Building Payroll functions •Primary Passage or Access Regular Access Required Access or Egress Point Access Needed Periodic (Optional Passage) Access or Egress Security . Barrier Counter Access Griffin Advisors, Inc. Newport Beach Civic Center Needs Assessment Bubble Diagram Administrative Services - pg. 2 • ASD, MIS • •Primary Access Point Primary contact Significant cs staff for access for operations support Griffin Advisors, Inc. MIS GIs 1,056 sf MIS Operations 742 sf ASD, Fiscal Svcs., Mail and Print These rooms need access to the warehouse storage faciliry. and also to loading and delivery. Convenient City staff access is also required. Access to application user departments MIS Applications 910 sf MIS secure P MIS Computer Rm 550 sf 6 Administration Access by ng and 220 sf various MIS stall Fiscal Services Mail Roomfikemittance 880 sf MIS Telecomm 896 sf tAmke,,ss to ng and rage Fiscal Services Print Shop 880 sf Passage or Access Regular Security Required Access or Egress Barrier Access Needed . . . Periodic ....> Counter —, (Optional Passage) Access or Egress Access Newport Beach Civic Center Needs Assessment Bubble Diagram Building Department • Access to parking. Also, access to public counter and 1141111 Inspection some public visitor craft Plan Check & Access to Division Permitting Department department 1,210 sf Administration 2S0 sf Plan Check & 1,431 sf Permitting Access to parking. Also, access to public counter and some public visitor craft Plan Check & Permitting Controlled Admin Public Access 2S0 sf Plan Check & Permitting Office - Plan Ch. _ 8S0 sf • Convenient Building Dept, Office Areas access to OSS 8 P areas a needed Plan Check & Permitting OSS - Plan Ch. 240 sf Plan Check & Public Counter Permitting for OSS OSS - Cust Svc. ,43S sf Integrated with •'- Building Dept, One Stop Shop other OSS S e P P P components Passage or Access Regular Security Primary Access Required Access or Egress Barrier Point Access Needed . . . Periodic ...... _ )Optional Passage) Access or Egress Access Griffin Advisors, Inc. Newport Beach Civic Center Needs Assessment Bubble Diagram City Attorney, City Clerk, Community Services E City Clerk Primary Access Point Considerable access by City Staff, Council Members, aml Others. Access to Chambers City Attorney City Clerk 1.173 sf Public Acces Community Services Department City Attorney 20S7 sf Access to Limited Public City Access Manager Public Counter (Includes Recreation Access to Parking for Services) staff movement from HQ w lleld locations � � Passage or Access Regular Security , Required Access or Egress Barrier Access Needed Periodic ......> Counter (Optional Passage) Access or Egress Access Griffin Advisors, Inc. Newport Beach Civic Center Needs Assessment Community Services Community Services Adminisvation Recreation N 1,174 sf 1,760 sf Public Counter (Includes Recreation Access to Parking for Services) staff movement from HQ w lleld locations � � Passage or Access Regular Security , Required Access or Egress Barrier Access Needed Periodic ......> Counter (Optional Passage) Access or Egress Access Griffin Advisors, Inc. Newport Beach Civic Center Needs Assessment auawSSOSS r SPOON aO; ssany uaaunoD • e , ualuue8 llunla8 • sa-i was Ie.la UaE> SWJt lleH /J!D Ile of waneeuo] 1501E a8v�ol8 uO:> oInI7 yoeOB aaodmON ssau83 uo ssany 1pouad ssau83 uo ssany ueln8aa (4essed leuondo) papaaN ssany pauinbay ssany uo 98essed •out 'SaoSlnpy ulyu!) luawuedap Aq I 1s 08Z sswle l!pouad a8wol8 ssany 1s E09 leuualul sanS Suaw3 J suopelaa auras /a!unwwo7 J Swuiz 1 u onde ay sdalgD of ssany 1s o8S J914D anj ayl to allyp aluno] a!19nd 1s bLE luawaBeueW SW3 1s 01011 saawaS ysoddnS 1s LLL'I uonuanaud and wlod ssany 6uewud p s .(q uad Juno] qnd saDanosay uewnH suolouni3lagl ueld pue mawdolanap glu^ paMonul suollslA dq ssany . luawlleda4 anj sa:mnosaa uewnH !sOOIn.+Os IBAOUOE) 'uolauana.+d wi j pue uop jslulwpd auawa vedap a.q j wea$eid algqn9 Bubble Diagram Planning Department Access to Assstant City Manager Economic Development `I Advance Planning 404 sf 420 sf Code Enforcement 360 sf • Planning Dept., Office Areas Controlled Public Access •Primary Access Point Grim Advisors, Inc. Passage or Access Required Access Needed (Optional Passage) Administration 630 sf Planning Dept., One Stop Shop Public Counter for OSS Regular Access or Egress Periodic�� Access or Egress Newport Be Current Planning Main Ofc 780 sf Convenient access to OSS areas as needed Current Planning OSS 812 sf Integrated with other OSS components Security Barrier Counter - Access ach Civic Center Needs Assessment Planning Department Access to Shared Areas parking for field I.44D sf access. Also, periodic public visitor access. • Planning Dept., Office Areas Controlled Public Access •Primary Access Point Grim Advisors, Inc. Passage or Access Required Access Needed (Optional Passage) Administration 630 sf Planning Dept., One Stop Shop Public Counter for OSS Regular Access or Egress Periodic�� Access or Egress Newport Be Current Planning Main Ofc 780 sf Convenient access to OSS areas as needed Current Planning OSS 812 sf Integrated with other OSS components Security Barrier Counter - Access ach Civic Center Needs Assessment Bubble Diagram Public Works Department • Public Works Dept, Office Areas • •Primary Access Point Trans & Dev Svcs Dev. Services 1,379 sf Trans & Dev Svcs Transportation 1,750 sf Administration 780 sf rans & Dev Svc Administration 198 sf Engineering Administration 241 sf Convenient to all parts of the department PW Shared Areas S00 sf Convenient access to OSS areas as needed Public Works Dept, One Stop Shop Passage or Access Required Access Needed (Optional Passage) Public Counter for OSS Integrated with other OSS C.Ponents Regular Access or Egress Periodic �� Access or Egress Engineering Engineering Work Areas 241 sf Engineering Engineering Work Areas 1.743 sf Administration OSS Areas I,IOS sf Security , Barrier Counter Access Griffin Advisors, Inc. Newport Beach Civic Center Needs Assessment Bubble Diagram City Hall Shared Areas • • Large Conference 560 sf Conference & "Hearing Room" 300 sf CH Lobby Access by all City Staff OSS Added Areas Integrate with waiting Access or Egress area programmed with - -- — - ------- --- the departments. ------------ ------- Access or Egress VisiCOr � i Counter Researc h i 1 ' stations for 1 200 sf ' Other Users ' Combine counters to Conf Rm i others programmed 180 s( i ' with each department ' PC Stations to be located behind department counters -- - - -- - - I and convenient for shared use PC Stations i (9 stations programmed), •Primary Access Point Griffin Advisors, Inc. Passage or Access Required Access Needed (Optional Passage) CH Lobby Main Public Access Point m the Building Lunchroom Areas Access by all Ciry Staff Lobby Allowance 1,000 sf Note that Staff listed with City Administration is to be located in and added to lobby space. Lunchroom 500 sf Storage 80 sf Warehouse Access especially to Print Shop and Mail Room, but accessible to all departments Warehouse & General Storage 690 sf Regular —3111, Security , Access or Egress Barrier Periodic .....> Counter Access or Egress Access Newport Beach Civic Center Needs Assessment 0 • u APPENDICES Report to the City of Newport Beach Appendices City Hall Space Needs Analysis • APPENDIX A — GUIDE TO READING REQUIREMENTS TABLES READING THE DATA SHEETS Layout of the Data Sheets The tabulation sheets are divided into columns which are grouped as follows: Item These columns list the personnel position, room, area, or equipment item described on that row of the data sheet. Column indents are important, and signify that the indented items are "attached" to the element out - dented just above. Space Standard • The first column identifies either a symbol for the area (such as "PO -4" for private office of type 4) or else identifies that a general allowance ( "allow ") for the item is used. The second column identifies the size of the item, such as "180° to indicate an allocation of 180 square feet. See the separate discussion of space standards for a presentation of the standards used and the symbols for them. In some cases, the standard increases in time, and "varies" may appear in the size column to call attention to this fact. • At Present • Actual Sq. Ft. — This is the existing size of the area corresponding to the programmed area. In some cases, however, the program breaks down the existing area into components, so that several program lines may have to be added to arrive at the existing sq. ft. figure • • Actual WS — This is the number of existing workstations. • Qty — This is the quantity of items which are required, and applies to the item description for this line. This is generally based on our survey of existing conditions and on interviews or question- naires. • Required Sq. Ft. — This is the required net required square footage, based on the space standards used, the quantity of items, and the other indicated assumptions, and allows a comparison to the existing actual sq. ft. Projected Future Requirements (Each PL) • WS — This is the number of workstations provided for in the Program. Qty — As at present, this is the quantity of items which are required, and applies to the item de- scription for this line. Growth over existing levels may be given as a percentage increase. Sq. Ft. — This is the required net required square footage, based on the space standards used, the quantity of items, and the other indicated assumptions. Report to the City of Newport Beach Appendix A —Page I City Hall Space Needs Analysis • Abbreviations A number of regular abbreviations may be used in the space standard column and occasionally in the item description column. The following is a list of most abbreviations which might appear on the data sheets: allow Allowance. Often used to describe the allocation of a non - standard space. be Bookcase. C Conference room of various standard sizes (C -I, C -2, etc.). clos Closet. Standards are developed for 5 closet sizes (clos -I, clos -2, etc.). cntr Counter. As in a public counter station, abbreviated "cntr stn." cof Coffee station, with cabinet and plumbing for a bar sink, water supply to a coffee maker, and (typically) a garbage disposal unit. Various coffee stations are used in this report (cof -1, cof -2, etc.). cws Clerical work station or desk, with or without return, though generally with one. dws Drafting work station. en A panel - enclosed workstation of various sizes (en -A, en -B, etc.). ews Executive work station. Same as `cws' but specifically without a return (a double ped- estal desk); or else with a return at executive height. I File cabinet, standard type, either of legal or letter size. A number following (f -4, f -5) • indicates the number of drawers. Generally these can be converted into lateral files or other filing configurations in the design process, if new furniture is to be acquired. We use this notation when it is of interest to indicate the type of file cabinets in use currently. file File cabinet or file unit. Often either a generic item, meaning the same as "f' as noted above, or a special file such as a card file or other unspecified file cabinet (possibly con- verted from a built -in unit in existence at the time of inventory) or else a non - standard item. flat plan A file unit for holding flat plans, either hanging vertically (flat plan -v) or stacked hori- zontally in drawers (flat plan -h). inner circ Inner circulation allowance. This is space added within a room or area to provide access to the items in it. It is added when a room's size is based on a listing of items, and it is determined that the allowances of space for each of those items is in the aggregate likely not to have enough access space for proper layout, lat file Lateral file cabinet, typically 42" wide or more. Standard is larger to allow for more frontal access. lav Lavatory or wash room, typically with water closet or toilet. PO Private office of various standard sizes (PO -I, PO -2, etc.). print An office printer, either on an integral cabinet or on a separate piece of furniture suited to the printer's size. Standard may be of various sizes (print -I, print -2, etc.). recept Reception area with clerical staff work stations and waiting for visitors. • sch Side chair. See also `/s'. Report to the City of Newport Beach Appendix A — Page 2 City Hall Space Needs Analysis seat Allowance for a seating area. Seat -1 represents a seating space for 2 -3 in smaller -scale • chairs, Seat -2 represents a seating space for about 4 persons in larger -scale chairs (with side table), Scat -3 allows for a larger grouping, SPO Shared private office. An office for two or three persons. stg cab Storage cabinet. May be either a metal cabinet (traditionally 36" x 18" x 72" high) or an executive cabinet of lower height, etc. The meaning should be made clear by the context of spaces in the `item description' column. sws Small work station or system work station, used for small single - pedestal desks or, when in conjunction with a 'cws' it may represent a computer system table. The item descrip- tion column entry should clarify the meaning. table A table used typically for equipment, but also as a stand -tip work table or where a chair can be pulled up on occasion. A table used as a workstation (with a desk chair at which someone is often seated) is programmed as a "tws." tws Table work station. A table and a chair. Unit Cite This is circulation required for the unit, to access between rooms and areas. It is to be added to the open spaces of the unit, as determined during design, or else provided in lat- eral corridors or access ways. A range of values may be used depending on the degree of openness and design freedom intended (angled layouts, for example, require a higher al- lowance). • Data Sheet Conventions There are a number of conventions which we have adopted in the listing of items on the space re- quirements sheets that refer to how the space is to be configured. The following refer to example I which appears below. Indents Indenting indicates that the indented items are to be with or else make up the item that they are in- dented from. In the example, each of the three major components (an `office,' a `room,' and an `area') are made up of the items that are indented and listed below. Also, within the Clerical Area, the Tub File(s) are to be located with the Secretary /Clerk. Finally, the closet listed below the `Visi- tor's Office' is to open to that office. Room or Area The words `room' and 'area' each mean slightly different things. `Room' (or `Office,' etc.) refers to an enclosed space, generally with a door. Typically, the only rooms further opening off a `room' are closets or the like, that serve that room specifically. `Area' refers to a space through which the other spaces in the unit may be accessed, and so can be termed `an open area.' Unit circulation, when added at the end to a unit's space, might typically be added, in the design process, to the space re- quirement for the `area' so as to provide for access aisles through it. Circulation Note that `Inner Circulation' differs from 'Unit Circulation.' Inner Circulation is added within a • room or area when the list of items is sufficiently complex, or otherwise when it is felt that the space will need some added access allowance for the designers to accommodate the items comfortably. Report to the City of Newport Beach Appendix A — Page 3 City Hall Space Needs Analysis • Listing of Items In the first example, the Projects Office is comprised of a list of items which make up the SPO, a shared private office. The list is unchanging in the projection, and as a short cut to listing the quanti- ties in each period, the quantities are noted in the item description column and the SPO allowance is projected as a single line. In the second example, the Clerical Area components are listed in the item description column, but the quantity of each item is listed in the quantity column. The total space (3 10 sf at present, 340 sf at PL -I) is the result of multiplying the space standard by the quantity and adding; the circulation factor is applied to the subtotal and is included. Rounding Generally, we have developed standards for room to be in multiples of 60 (which appears to fit vari- ous modules that the design may be based upon) so that the design will be more regular and the lay- out process will be easier. In order to be consistent, in computing the space requirement in a very small room by adding up the component parts (see `Work Room' in the example), we have rounded the total requirement to the nearest multiple of 60. This is may further be noted with a comment be- low the list of items explaining why the total may not match the space allocation for the room. In other cases where an inner circulation is added (which adds a percentage and therefore may arrive at a fractional or odd size for the area or larger room), then we have rounded the total to the nearest multiple of 10 square feet. • Example I — Program Tabulation • Report to the City of Newport Beach Appendix A - Page 4 City Hall Space Needs Analysis At Present Projected Existin Re 'd PL -I Space Standard Item Code SF SF Staff Qt SF Staff Q SF Project Office SPO 240 28S 2 1 240 2 1 240 Sr. Planner (1) cws 60 Planner (1) Cws 60 Files (3) file 10 Work Table (1) tws 60 Clerical Area 310 340 Sec'y /Clerk cws/r 7S I I I I Tub File file 10 2 2 Data Entry Op'r sws 4S I I I I Guest Seating seat -2 loo I 1 Filing file 10 4 7 Circ'n Allowance inner circ 10% Work Room 180 180 Card File file 10 1 1 Photo File file 10 2 2 Process Camera allow 60 1 1 Desk cws 60 1 1 Circ'n Allowance inner circ 10% (Round to nearest 60) Visitor's Office PO -2 120 I I S 1 120 1 120 Closet clos -1 30 20 1 30 1 30 Report to the City of Newport Beach Appendix A - Page 4 City Hall Space Needs Analysis • • • Example 2 — Program Tabulation Lavatory/Storage Manager Staff Field Team Clerical Area Sec'y /Clerk Clerk/Reception Seating/Guests Work Room Copier Storage Area Shelving Microfilm Station Counter (12/ -14') Circ'n Allowance (Round to nearest 60) Subtotal Unit Circulation Total Example 2 — Illustration Of Program (all figures in net sq. ft.) Allow 120 PO -3 180 PO -2 120 SPO -2 120 cws /r /s 90 cws /r 75 seat -1 60 copy 40 allow 40 shy 10 cws 60 allow 70 inner circ 10% Circ'n 20% fIO: 180 120 120 225 300 Report to the City of Newport Beach Appendix A – Page 5 City Hall Space Needs Analysis • Illustration of Unit Circulation vs. Net -to -Gross Areas The purpose of the following illustration is to show that there are other components required to arrive at the gross sq. ft. of the building, beyond the net sq. ft. which is calculated for each of the operational units. Generally, we may provide some elements in the program, where allowances may be quanti- fied, but the remainder of this space is provided by a statistical calculation. We make an assumption about the "efficiency of the building" which is the ratio of the net (programmed) sq. ft. and the gross sq. ft., and use this factor to arrive at the total building size once the net sq. ft. figure is obtained by adding the detailed program tabulations. The reader should consult the Space Standards section for a discussion of related terms, including "assignable sq. ft.," "building core," efficiency," "gross sq. ft.," "net sq. ft.," and others. u • Illustration Showing Gross SF Areas of Building and Showing Hypothetical Office Suites Report to the City of Newport Beach Appendix A — Page 6 City Hall Space Needs Analysis • APPENDIX 13— SPACE STANDARDS INTRODUCTION A space standard is defined as a specific square footage allocation for an operation, an item of equip- ment, or a functional area, to which is added a description of what functions can be performed in that area. Thus, for example, once the functions and activities of a person are known, it is possible to se- lect a workstation and a square footage allowance that are appropriate for that person. The following pages contain a description of the proposed workstation and private office standards, and also related definitions. Development of Space Standards What is Included in the Standard Equipment standards are based on the item footprint, workspace for operating the equipment (opening drawers, for example, and access to or around the equipment. Workstation standards are based on the work surface needs (equipment, papers, writing space, reference space, and so on, on the desk or work plane), on filing needs, on bookshelf requirements, and on guest seating. There is a distinction between enclosed (office) workstations and stations in "an open area" • For enclosed offices, our standards are measured to the center line of the boundary walls of the room, and include no access space outside. It is assumed either that access will be directly off major circulation networks or that it will be off unit circulation areas provided with other open • work rooms. • For elements in an open area, an allowance for access is added to the workstation footprint in the space standard. Similarly, for panel - enclosed stations, we include an allowance for access in the standard (to account for inner circulation). • Access Around Workstations and Equipment Access is the space around the footprint of the item of equipment and open workstations, and it is used to create side aisles into a cluster of desks, or to allow for opening file drawers, cabinet door swings, and so on. As noted, we include this in the standard allowance for panel - enclosed or for open workstations. The item allowance and access comprise the equipment or workstation standard, as il- lustrated in Exhibit I. EXHIBIT I An Open Workstation A B f- G A = Item Footprint; B = Access; C = A +B = Standard Report to the City of Newport Beach Appendix B — Page 1 City Hall Space Needs Analysis 0 • 0 Unit Circulation and Layout Factor Unit circulation is a network of main aisles, generally passing in front of offices or to shared work ar- eas. An additional factor sometimes must be added to account for layout variances, which in the amount of space required to account for non - rectilinear design, design features which are peculiar to a given plan or existing facility, including such factors as disproportionate number of offices, column placements, design flexibility, extra sense of openness, and so on. Generally, however, we include the layout factor in the unit circulation allowance rather than accounting for it separately. Exhibit 2 illustrates these separate concepts: item space allowance, access, total standard, circulation, and layout. It shows a series of workstations, an area for "circulation," and an extra need for "layout" contingency due, in this case, to the location of a building column. EXHIBIT 2 Unit Circulation And Layout C C ► D 1 C C = Standard D = Layout Allowance (due to column) Computing Building Circulation, Core, and "Gross" Square Footage The estimated net square footage needed equals the sum of the required standard areas, the unit cir- culation, and the other factors described above. To estimate the size of (gross) building floors, it is necessary to add further allowances for the major circulation areas, mechanical areas, and building core. These additions are based on typical percent- ages encountered in actual building experience, and the ratio of total net to total gross square footage on an entire floor (or entire building) is the assumed "efficiency" of that floor (or building). See Ap- pendix A for definitions. Space Standards Presented Here Space standards are presented for the following types of areas: Workstations — Private Offices Workstations — Traditional Open Stations Workstations — Systems Furnishings Open Area Equipment Conference Rooms Other Rooms and Areas Report to the City of Newport Beach Appendix B — Page 2 City Hall Space Needs Analysis • WORKSTATION STANDARDS — PRIVATE OF'F'ICES Private office standards are designated by the letters "PO" and are in most cases defined as having floor -to- ceiling walls and a door. The walls may be partially glass or may be equipped with pass - through openings, but such refinement considerations are noted in the program notations and not in the standard allowance itself. We also provide for some private offices to be shared by two or more persons, and adapt the private office allocations to "shared" private office standards where needed. In this case we generally use the symbol "SPO" rather than "PO." EXHIBIT Private Office Standards Symbol Space Std Fcp'ttAcc s/Tot I Typical Assignment Typical Furnishings PO -1 90 -- 90 Cubicle Office Desk and chair, file, seating for 1 -2 guest. Often may not be a full height office. This standard is rarely allocated, and is included for completeness in these standards, PO -2 120 -- 120 Supervisor Desk and chair, credenza or back table, tile, seating for up to 2 guests. PO -3 ISO -- ISO Special cases Desk and chair, credenza, 2 guests at desk, side seating for up to two persons. PDA 180 -- 180 Manager Executive desk and chair, credenza, 2 guests at desk plus side seating for 2. PO -S 210 — 210 Special cases Executive desk and chair, credenza, 2 guests at desk plus side • seating for 2 or small conference table. PO -6 240 -- 240 Division Head Executive desk and chair, credenza, 2 guests at desk plus side seating for 4 or small conference table. PO -7 300 -- 300 Department Head; Executive desk and chair, credenza, 2 guests at desk, club seating City Manager for 4 -6 or conference table. PO -8 360 -- 360 Unassigned Executive desk and chair, credenza, 2 guests at desk, club seating for 4 plus small conference table. PO -9 400 -- 400 Unassigned Executive desk and chair, credenza. 2 guests at desk, club seating for 4 plus conference table. u Report to the City of Newport Beach Appendix B — Page 3 City Hall Space Needs Analysis • I L I Illustration — Private Office Standards PO -4 180 sf Private Office Report to the City of Newport Beach Appendix B — Page 4 City Hall Space Needs Analysis • • • Illustration — Private Office Standards i PO -5 210 sf Private Office El [E] �s�30 PO -6 240 sf Private Office Report to the City of Newport Beach Appendix B — Page 5 City Hall Space Needs Analysis \_J • • Illustration — Private Office Standards ILI O PO-7 300 sf Private Office Report to the City of Newport Beach Appendix B — Page 6 City Hall Space Needs Analysis • • Illustration — Private Office Standards — Shared Offices SPO -3 150 sf Shared Office SPO -4 180 sf Shared Office SPO -2 120 sf Shared Office Shared Office E71 SPO -5 210 sf Shared Office Report to the City of Newport Beach Appendix B — Page 7 City Hall Space Needs Analysis • WORKSTATION STANDARDS — TRADITIONAL OPEN WORKSTATIONS Traditional open stations are defined as having no integral panels as part of the stations, but are desks and work units which are found in traditional offices. These stations may have surrounding panels, for privacy or acoustic reasons, but traditional furniture is assumed. Open stations usually occur in groups of several stations or in conjunction with a block of filing or other unit equipment items. In some cases, the program may designate two (or more) open stations to be located in a room, as in a shared office. The following Exhibit summarizes the space standards allocated to traditional open area workstations. Standards for System Work Stations are presented following. EXHIBIT Traditional Open Workstation Standards Symbol Space Std Ftp't/Acc's/Tot'I Typical Assignment Typical Furnishings cws 30 30 60 Staff with std. desk Clerical work station (cws), with lowered side return for termi- nal or typewriter. May include desks without a return, in some cases. ews 30 30 60 Staff with std. desk Work station (executive work station) without a typing or equipment return (double pedestal desk) or else with a return at executive height /r 10 S IS as required Indicates the addition of a reference unit (back table or lateral file) behind and as part of a work station. • A S 10 IS as required Indicates the addition of a guest side -chair beside and as part of a work station. ews /r 40 35 75 Staff with exec. desk Executive work station (see "ews") with back unit. sws 20 2S 4S Staff with small desk Small work station (desk 36" - 48" wide); may be a single- pedestal desk dws 40 3S 7S Staff with drafting stn Drafting table and chair. dws/r 60 30 90 Staff with large Drafting table, reference unit or work desk, and staff chair. drafting station Some plan storage at the station may be included. uws 60 30 90 "U "- workstation "U "- station for Records Clerks, including a desk, computer work station, and side surface for reference materials, radio, etc. LJ Report to the City of Newport Beach Appendix B — Page 8 City Hall Space Needs Analysis • ILLUSTRATION Traditional Open Workstation Standards 101-01 81-01 101-01 81- 0" o m � 75 sf 60 sf 90 sf 75 sf cws/s cws cws/r/s cws/r 12'- 6 '(f) 9'- 6" 9'- 6'(t) \ \ r �n —J o iD o • t 75 sf 120 sf 90 sf dws (drafting station) dws/r/s dws/r 6'-0* 101-0* 4'- 0' public side o ® o o ® o O 000 service side 60 sf 100 sf 120 sf Seating (sm group) Seating (Ig group) Public Counter - 12' (allow 10 sf ea. lin. ft.) or 3 stations @ 40 sf each • Report to the City of Newport Beach Appendix B – Page 9 City Hall Space Needs Analysis • WORKSTATION STANDARDS — SYSTEM WORKSTATIONS The enclosures in an open furniture system are generally structural; that is, the panels carry the weight of surfaces, storage modules hung on the wall, and so on. The panels usually also have built - in chase -ways for electrical and communications lines (data and telephone), as part of an integrated wire management design. System work stations are designated by "en" which begins the symbol for the standard. The "en" is followed by a letter, which indicates the general size category for the workstation. In this report, the standard size is based on the enclosed footage of the station. We generally have based the standards on a 2 -foot grid ( 6x6, 6x8, 8x10, 10x10, and so on). The specific standard provides for various configurations: possible inclusion of one or more back tables, lateral files, extended side ref- erence surfaces, side chairs, or other components as shown in the examples below. In a few situations, for different proportions on this grid, the enclosed size is essentially the same and we use the same standard in each case. Using en -C as an example, we allocate 100 sq. ft. for either a 12 x 8 dimension (98 sq. ft.) or a 10 x 10 dimension (100 sq. ft.). Furthermore, note that these allow- ances are generic, in that no one vendor is assumed. Different vendors may have dimensions and components available in a system line that deviate from these generic standards in some small degree. The following Exhibit illustrates a range of features that each of these standards might have, noting total surface size, length of shelving and filing, and so on. • The 1" column indicates the symbol used for the standard and the square footage allocated. Note that the standard (en -C, for example) provides an amount of space (100 sq. ft. in this example) • into which a number of different configurations may be provided. • The 2 " column indicates the enclosed square footage for the illustration. Note that this may dif- fer slightly from the allocated square footage for the standard. • The 3' column indicates the "real' space required for the station when panel thickness and a 30- inch aisleway on the open side are added. This is accommodated by a programmed "inner circu- lation' allowance. • The 4' column indicates the sq. ft. of worksurface provided in the illustrated layout. • The 5" — 8" columns identify the feasible number of desk pedestals, feet of overhead shelving, linear feet of lateral files (this can be traded off against pedestals), and added side seating, all as suggested by the associated illustration. • The 9'" column presents an illustration for this particular variation of the standard. • The 10" column supplies some notes and comparisons. • This table is followed by a page of illustrations showing conference spaces and reception stations de- veloped with systems furnishings. The interior of the station excludes the panel thickness and the ac- cess space required in front of it. Report to the City of Newport Beach Appendix 8 — Page 10 City Hall Space Needs Analysis u • EXHIBIT Analysis Of Open System Standards (Showing Various Alternative Configurations) Symbol Encl. Total Surf. Peds Shelf Files Seats Reference Used SF SF' SF No. LF LF' No. Illustration of the Standard & Notes en -A 6x6 58.5 20 1 -2 6 — — a (36) 36 standard clerical desk en -B 6x6 76.5 IB 1 -2 4 — I b (48) 48 compare to cws /s El en -B 6x8 76.5 17.5 1 -2 6 — 1 c (48) 48 an alterna- tive config'n for b en -B 6x8 76.5 24 1 -2 — 63 — d (48) 48 shown with a data sur- face ' This is the total typical "cost" of space for this station, when an access aisle allowance is added. The actual station size is the "Encl. SF' in the next column. Not counting files in pedestals. Report to the City of Newport Beach Appendix B — Page I I City Hall Space Needs Analysis • • • Symbol Encl. Total Surf. Peds Shelf Files Seats Reference Used SF SF' SF No. LF LF' No. Illustration of the Standard & Notes en -B 6x8 76.5 34 1 or 8 8 -16 — e (48) 48 more compare to in lieu cws /r of files optional file en -C 8x8 93.5 28.5 1 -2 8 8 -16 1 f (64) 64 compare to cws/r /S a return is an option en -C 8x8 93.5 31 1 -2 8 6 -12 1 9 (64) 64 +top or of file more optional ne_ en -C 6x10 94.5 28 1 -2 7 6 -8 1 h (64) 60 like d. but longer for a guest chair en -D 8x10 115.5 33 1 -2 5 roll I i (80) 80 file drafting drafting sta- table lions are less flexible when smaller than this Report to the City of Newport Beach Appendix B – Page 12 City Hall Space Needs Analysis 0 • • Symbol Used Encl. SF Total SF' Surf. SF Peds No. Shelf LF Files LF' Seats No. Illustration of the Standard Reference & Notes en -D 8x10 115.5 51 1 IO 0 -6 1 j (80) 80 +roll file le T7d ing shown with data or cad surface CAD station en -D 8x10 115.5 39.5 1 -2 8 6 -12 — k (80) 80 opt opt opt. with a deeper data work sur- face than d or h en -E 8x12 137.5 93 1 -2 12 6 -12 1 1 (100) 96 longer than k to fit the guest chair better (shown with op- tional angle to allow pathway variation) en -E 8x12 137.5 56.8 2 12 11 -20 — m (100) 96 (see 1) added sur- face and files replace the guest chair Report to the City of Newport Beach Appendix B – Page 13 City Hall Space Needs Analysis • • • Symbol End. Total Surf. Peds Shelf Files Seats Reference Used SF SF' SF No. LF LF' No. Illustration of the Standard & Notes en -E 8x12 137.5 46.5 1 -2 12 12 1 n (100) 96 +roll drafting largerver - table slon of i or May -- guest also File chair is an re- option place may side also chair re- place side chair en -E 8x12 137.5 36 2 -3 8 6 2 0 (100) 96 smallest configura- tion with opposing guest chairs en -E IWO 133.9 61 2 6 6 -12 p (100) 100 d.b, larger ver- lion of n. +roll �� with cad option CkD c =don en -E IWO 133.9 61 2 6 6 -12 1 q (100) 100 - dnron5 variant of n �y showing a File guest chair may re place many op- side tions are chair possible. meows Report to the City of Newport Beach Appendix B — Page 14 City Hall Space Needs Analysis 0 • • Symbol Used Encl. SF Total SF' Surf. SF Peds No. Shelf LF Files LF' Seats No. Illustration of the Standard Reference & Notes en -E IOx10 133.9 37 2 -3 6 18 -20 1 r (100) 100 +file larger ver- tops sion of m with guest chair and files en -E IOx10 133.9 47 3 -6 17 6 -12 s (100) 100 +pads similar to r but illus- trating 2 ft De- desk depth pends and more on mix overhead Of shelving p MIS ale units and file draw ers Report to the City of Newport Beach Appendix B —Page IS City Hall Space Needs Analysis 0 • • en /reception -1 64 sf inside 80 sf station footprint (with counter, panels) 115 sf allowance (shaded area) Illustration System Standards — Other Configurations en /reception -2 48 sf inside 72 sf station footprint (with counters & panels) 185 sf allowance (shaded area) en /conf -8 seats 240 sf allowance 192 sf inside enfpinwheel 300 sf allowance 145 sf inside (total) MMIN en /conf -6 seats en/conf--- 4seats 190 sf allowance 135 sfallcwance 144 sf inside % sf inside Report to the City of Newport Beach Appendix B — Page 16 City Hall Space Needs Analysis • OPEN AREA EQUIPMENT AND RELATED STANDARDS There are three primary considerations in determining the space requirements for a particular piece of equipment: (1) the area occupied solely by the equipment item, (2) the space required for the equip- ment user or operator, and (3) the need for access to the item. The exhibit below outlines the equipment dimensions and square footage allocations for frequently used items. The total space requirement of each piece of equipment of this nature is determined by increasing the actual footprint area of the item to allow for access and use. This factor has been de- termined from previous experience in developing layouts for similar facilities; space for non - standard equipment is calculated on an individual item basis. EXHIBIT Typical Standards For Open Area Equipment l J Report to the City of Newport Beach Appendix B - Page 17 City Hall Space Needs Analysis Symbol Typical Standard Item (If Any) Item Size Base Access Total Bookcase be 36" x 12" 3 7 10 Card File file 18" x 28" 4 6 10 Coat Rack coat or ctrk 24" x 48" 8 12 20 File Cabinet — Traditional File file or sf 18" x 28" 4 6 10 File Cabinet -5- drawer f -S 18" x 28" 4 6 10 File Cabinet — Lateral File If 36" x 18" 4 6 10 • 42" x 18" S 10 Is 48" x 18'* 6 14 20 Side Chair chair 24" x 24" 4 11 is Storage Cabinet stg cab 36" x 18" S 10 IS Table table 60" x 30" 12 28 40 Table Extra Access Space table 60" x 30" 12 48 60 Typewriter Stand /Cart type 12" x 24" 2 8 10 24" x 30" S 10 Is Guest Seating -4 lounge seat -2 — 80 20 100 Guest Seating -2 -3 chairs seat -I — 40 20 60 Coffee Station- counter cof -I — 10 20 30 Coffee Station -- enclosable cof -2 — IS 3S 60 l J Report to the City of Newport Beach Appendix B - Page 17 City Hall Space Needs Analysis • CONFERENCE ROOM STANDARDS The size of conference rooms depends on (a) the number of persons seated at the table, (b) the size of the table (to accommodate bulky items, for example), (c) the possible requirement for spectators seated away from the table, and (d) presentation or display space. The last may include such needs as a projector area at the back of the room as well as a screen and presentation area with podium and such at the front. The standards we have used in this report are summarized in the following exhibit. • • EXHIBIT Summary Of Conference Room Standards Space Capacity and Type Typical Symbol Std of Conference Room Furnishings C -1 90 2- Person Interview Room Table, 2 or 3 chain. C -2 120 2-4 Person Interview Table, 2 -4 chairs. C -3 180 6 Person Conference 8 ft table, 6 chairs, possible writing surface on wall. C-4 240 8 Person Conference 8 ft table, 8 chairs, possible tack boards or writing surface. Table can seat 10, but crowded. C -5 300 8 -12 Person Conference 12 ft table, 12 chairs. Can add library at one end and seats 8, or add presentation area and room seats 8. C -6 360 12 -16 Person Conference 12 ft table, 12 chairs, presentation area at end of room. Can ac- commodate 16 persons if presentation space is converted to con- ference space. C -7 420 16 -20 Person Conference 16 ft table, 16 chairs, presentation area at end of room. Can ac- commodate 20 persons if presentation space is converted to con- ference space. C -8 480 18 -22 Seat Conference Room 20 It table, 18 chairs, presentation area at end of room; cabinet (possibly with coffee service) at other end of room. Can accom- modate 22 persons if presentation space is converted to confer- ence space. C -9 560 22 Person Conference Conference seating 14 at table, plus 6 -8 persons at the side, with a - 14 at main table presentation area at the end of the room; and cabinet (possibly - 8 at side seating with coffee service) at other end of room. Seats 16 at main table if no cabinet. C -10 640 28 Person Conference Conference seating 18 at table, plus 8 -10 persons at the side, with - 18 at main table a presentation area at the end of the room; and cabinet (possibly - I Oat side seating with coffee service) at other end of room. Seats 20 at main table if no cabinet C -11 720 34 Person Conference Conference seating 22 at table, plus 10 -12 persons at the side, - 22 at main table with a presentation area at the end of the room; and cabinet (pos- - 12 at side seating sibly with coffee service) at other end of room. Seats 24 at main table if no cabinet C -12 800 34- Person Conference Modular combination of C -9 and C-4 conference rooms which Divisible : 8-10 person open into one large room using room - divider partitions. Full room 20 -22 person seats 24 at the main table and 10 persons at the side. Cabinet at one end of room. Report to the City of Newport Beach Appendix 8 — Page 18 City Hall Space Needs Analysis • E • Illustration Small Conference Rooms C- I 90 sf Interview Rm C -3 180 sf • 6 -8 Persons 8 Persons with Presentation Area C-5 LIDO sl • 8 -12 Persons C -2 120 sf • 4- persons C -4 240 sf • 8 Persons i Report to the City of Newport Beach Appendix B —Page 19 FIrIvIrIrl Q_r:iUUUU 12 Persons Without Presentation Area City Hall Space Needs Analysis • • Illustation Medium Conference Rooms 16 Persons Without Presentation Area MEXXXI ILI C -b 360 sf 12 -I6 Persons 12 Persons With Presentation Area 0 nnnmnnn i 16 Persons With Presentation Area C-7 20 Persons Without Presentation Area 420 sf 16 -20 Persons Report to the City of Newport Beach Appendix 8 — Page 20 City Hall Space Needs Analysis u • C -8 980 sf- 18 -22 Persons Illustration Large Conference Rooms 1 D! 18 Persons With Presentation Area 22 Persons Without Presentation Area q__UU UU C -9 560 sf- 14 Persons at Table (16 Without Built -in Cabinet); 6 -8 Side Seating Report to the City of Newport Beach Appendix B — Page 21 City Hall Space Needs Analysis 0 • • Illustration Large Conference Rooms II ICI �! ICI ICI N ICI � ICI f-I C -10 690 sf • 18 Persons at Table (20 Without Built -in Cabinet); 8 -10 Side Seating Nix, I M, ITIMMINIZIMEM111 C -1 1 720 sf • 22 Persons at Table (24 Without Built -in Cabinet); 10 -12 Side Seating Report to the City of Newport Beach Appendix B — Page 22 City Hall Space Needs Analysis • • 1101 I C -12 800 sf • Divisible Conference Room Illustration Divisible Conference Room 24 Persons at Table with 10 -11 Side Seating 16 Persons at Table #1 with 8 -9 Side Seating • 8 -10 Persons at Table #2 Report to the City of Newport Beach Appendix 8 — Page 23 City Hall Space Needs Analysis E • Illustration Training or Meeting Room 1 1 C EU T Computer Training Arrangement F1 0 F1 CO rq i Symposium Arrangement Training or Symposium Room 540 sf • 12 -15 Persons Report to the City of Newport Beach Appendix B — Page 24 City Hall Space Needs Analysis • • • Illustration Training or Meeting Room II Meeting Room 700 sf - 20 -24 Persons Report to the City of Newport Beach Appendix B — Page 2S Symposium Seating Presentation Seating City Hall Space Needs Analysis • • • Illustration Sample Assembly and Meeting Room (Flat Floor Multi -use Room) Video Control Booth (incl. optional Voice -over booth) (180sf) Provide jacks for cable N and communications interface to outside Board Room /Multi- Purpose Complex (1,650sf + circulation allowance) Audience seating for 70 is shown. Hospitality/ Coffee (120sf) Report to the City of Newport Beach Appendix 8 — Page 26 Storage (120sf) N i Assembly Room (1,41 Osf) City Hall Space Needs Analysis • Illustration Sample Small Board and Commission Meeting Room (Flat Floor Multi -use Room) Video Control Booth (incl. optional Voice -over booth) (180sf) Hospitality/ Coffee (I 20sf) Storage ...., (120sf) Seating for 53 shown. With front table extended. 5 Members plus 4 staff at table in basic remove 2 rows for a capacity of about 40 seats. position. Add 4 at table in extended position. Fla[ Door area required. L I _ Provide jacks for cable N and Assembly Room communications interface to outside _ Movable disp{ay area (1,410sf) Board Room /Multi- Purpose Complex (1,6SOsf+ circulation allowance) Audience seating for 53 is shown. Report to the City of Newport Beach Appendix B — Page 27 City Hall Space Needs Analysis • We also program a conference room (similar in size to the room allocated today to the Building Department, but programmed as an enclosed room, not an open, panel - enclosed space). This room also is to be used for packet preparation, but will further be useful not only for conferences and meetings but to serve as workspace for special projects (or consultants) when this is needed. • The department vault is sized based on the equipment located in it, and because it is so over- crowded the need is computed at 415 sq. ft. This also includes space for the items currently lo- cated under the stairs. In total, the existing storage space amounts to 257 sq. ft. Code Enforcement • Code Enforcement staff currently share one large office. In the future we have programmed the Code Enforcement Supervisor with an office based on the standard for division managers, and provided a basic (120 sq. ft.) office for the assistant. • This approach provides the most flexibility in the future, and also allows space to be allocated in different ways if the function is changed in the future. Summary The requirements are summarized as follows: Item Administration NSF Economic Development NSF Current Planning is Office Areas NSF OSS Areas NSF Advance Planning NSF Shared Area NSF Code Enforcement NSF Total Planning Dept • Pres Pres Actual Req'd Level Leve12 Level 579 630 630 630 630 360 404 404 404 404 564 710 670 780 780 378 747 812 812 812 309 420 420 420 420 1054 1280 1350 1350 1,440 231 360 360 360 360 3,475 4,551 4.646 4.756 4.846 Report to the City of Newport Beach Page 31 City Hall Space Needs Analysis • Public Works Department Administration • We have programmed a private office for the Director, and note that the standard for this position is essentially the same size office as that now provided. • The Administrative Manager is programmed with an office here, and is presumed to remain with the Administrative area even if the One -stop Shop (OSS) functions which are supervised are lo- cated farther away in the future. • A work area is programmed with the Director (similar to the configuration today) for a possible administrative assistant and reception space in the administrative area. This space is used for general filing today. One $top $hop Areas • OSS staff and support areas are programmed separately. These areas would be located near the public functions making up the City Hall OSS, including those for Building, Planning, and Public Works Departments. • The area includes an allocation for 3 counter stations today, and increasing to a requirement for 4 stations in the future (at PL -1). This is in line with the guidelines approved (via questionnaire) by the OSS review team and discussed in the white papers which have been submitted under sepa- rate cover. • The OSS functions include a public waiting area. This, and the counter stations as well, should be examined in relation to the other OSS counter and waiting areas which are programmed for the • building (see discussion below with City Hall Shared and Common Areas). En¢ineering • Engineering requirements are divided into three parts: Administration (City Engineer), General Engineering, and Inspection/Survey. • The City Engineer is allocated space for a Deputy Department Director. Other engineers are al- located workstations according to the standards discussed elsewhere in this report. • There are three open work areas allocated to Engineering, but they can be combined based on building configuration and convenience. But each open area should be kept together for opera- tional efficiency. The three areas are (a) Engineering Open Work Area, (b) Inspection Open Work Area, and (c) Survey Open Work Area.. Transportation and Development Services • Transportation and Development Services requirements are divided into three parts: Administra- tion (the T &DS Manager), Transportation, and Development Services. • As with Engineering (noted above), each engineer is allocated a workstation according to the standards discussed elsewhere in this report. • Two open work areas (Transportation, and Development Services) are programmed separately, but these can be combined in design and layout, as long as the staff workstations and items of equipment programmed in each one are kept together. • Note that in some cases we have programmed layout tables, copy and blueline equipment, and - other items which require general access by various staff from any part of the Department. Report to the City of Newport Beach Page 32 City Hall Space Needs Analysis • A Traffic Control Room is programmed with Transportation and should be designed with its electronic systems and other requirements in mind. This room will have display panels and com- puter equipment that connects to the traffic sensors and control devices throughout the City. • A Plan File Room ( "vault ") is programmed with Development Services to contain the archive of plans for the City's public works as well as the scanning and printing system which the City is moving to. The room size is based on current equipment, with some allowance for growth. But, due to current crowding, the present need is 610 sq. ft. compared to 458 sq. ft. today (this existing figure includes the plan storage rooms in both buildings). Shared Areas • Three areas are programmed as "shared" by the department: a conference room, a coffee area, and a general storage room. • The program includes space for a department conference room somewhat larger than the present one (to accommodate 8 persons comfortably). This should be located for general City use, as well as occasional public access, but it is expected that Public Works will make significant use of it. All conference rooms, whether allocated to a specific department or not, should be reserved through a central system. • Note that a separate conference room is allocated with general OSS areas, similar in size to the existing Public Works conference room. See discussion with City Hall Shared and Common Ar- eas. • The coffee area and general store room should be convenient to all staff areas. The store room corresponds to the space currently under the back stairs. isSummary The requirements are summarized as follows: • Item (Net Sq. Ft.) Administration NSF OSS Areas NSF Engineering NSF Transportation & Dev. Svcs. NSF Shared Areas NSF Total, Public Works Dept Pres Pres Actual Req'd Level I Level Level 714 780 780 780 780 642 1040 1105 1105 11105 1903 2300 2385 2530 2.530 2099 2782 2852 3122 3.327 365 500 500 500 500 5,723 7.402 7.622 8.037 8.242 Report to the City of Newport Beach Page 33 City Hall Space Needs Analysis • City Hall Shared and Common Areas Conference Rooms • Two conference rooms are programmed with City Hall Shared and Common Areas: a 300 sq. ft. conference room seating up to 12 persons (8 -10 with a presentation area), and a large conference room of 560 sq. ft. intended to serve as the "Fire Department" conference room does today. • In addition, a number of conference rooms are programmed with the departments as primary us- ers, though it is understood that all' conference rooms will be accessible for use by any depart- ment if it is so scheduled. The use of conference rooms should be scheduled through a central re- source (via computer). Each conference room programmed with a department should be located in close proximity to it. • The following table summarizes the programmed conference rooms, and compares them to the corresponding areas where feasible. Note that there are 4 new conference rooms in the program: City Manager conference, Administrative Services conference, Human Resources inter- view /conference, and a new, smaller Fire Department conference in lieu of the larger one now listed with Shared & Common Areas. Existing Standard Required Sq. Ft. if any Code Sq. Ft. Programmed with Shared & Common Areas Hearing Room ('Lobby Conf Rm" today) 244 C -5 300 Large Conference Room (general use) (see Fire Dept) C -9 560 Programmed with Departments City Admin- Council Conference Room 400 (Existing) 400 City Mgr. Conference Room none C -3 180 • Admin. Svcs. Conference Room none C -5 300 Bldg. Dept. Conference Room/Library 178 C -3 180 City Any. taw Library 258 C -5 300 Fire Department Conference Room 555 C -6 360 HR Conference/Interview Room none C -3 180 Planning Dept. Conf Rm /Packet Prep 84 C -3 180 Public Works Conference Room 176 C-4 240 Shared Areas -OSS Conference Rm none C -3 180 Total SF. all Conference Rooms 1,895 3,360 Total No. of Conference Rooms 7 12 Avg. SF /Room 271 280 Building Lobby and Related Areas The existing building lobby (excluding the workstations and lobby conference room) amounts to 532 sq. ft. today. In keeping with this conservative approach we have programmed only 1,000 net sq. ft. into lobby space. Additional space may be derived from the net -to -gross circulation allowance, but this depends entirely on circumstances of design and layout. Public lavatories are not separately programmed and are assumed to be contained in the 80% building efficiency used to calculate gross space requirements. Lunchroom • We have programmed a modest lunchroom facility similar to that which exists today. The City has recently invested space and funds to provide a newly configured lunchroom, and the consen- sus obtained in our interviews suggests that this size facility meets the City Hall requirements. 1 There may be exceptions to this. based on City policy. For example, the Law Library might be off - limits. due to valuable books there, unless cleared with the City Attorney. Report to the City of Newport Beach Page 34 City Hall Space Needs Analysis • One -Stop Shgp Facili • One -stop Shop (OSS) facilities are programmed with the departments that each have some OSS functions (Building, Planning, Public Works). There are additional areas which are not allocated to the needs of one department, however, and these are programmed here with City Hall Shared and Common Areas. • The additional items programmed here include (a) Counter space (2 stations) for other users, such as on call or on periodic scheduled bases. These may include Utilities, Harbor, General Services, Police, and others. In addition, even though the Fire Department is programmed space for public counter functions with the Fire Marshal, it may be desired to have the Fire Department physically locate some staff resources to the central OSS on a scheduled bases, and this counter allowance would serve such a plan. (b) Visitor research space, including provision for 2 -3 PC terminals, file areas, and two work ta- bles. (c) Space behind the public counter for 3 -4 department PC terminals for staff use. (d) A conference room, similar in size to the existing Public Works conference room, and for use exclusively by OSS functions. • The areas programmed with the three main OSS departments include the following: (a) Building counter stations (4 now, then 5) each about 5 -ft 6 -in wide) (b) Planning counter stations (1 now, then 2) each about 5 -ft 6 -in wide) • (c) Public Works counter stations (3 now, then 4) each about 5 -ft 6 -in wide) (d) Waiting Areas with each department, totaling 480 sq. ft. (e) Staff workstations and work areas with each department. • • The total OSS space requirement, including the department areas, conference room, visitor areas, counters, etc., is 4,237 net sq. ft. at present and 4,642 net sq. ft. at PL -2/3. Warehouse and Storage • The existing warehouse space is 445 net sq. ft. (including interior aisles), and we have pro- grammed a requirement of 600 net sq. ft. plus 90 sq. ft. for net circulation areas. The added space should accommodate both the increase need due to the small amount of City Hall growth over time, and also integration of file storage space into a warehouse area (now in the attic of Building B). Summary The requirements are summarized as follows: Item Conference Center NSF Building Lobby & Related NSF Lunch Room NSF OSS Facility Additions NSF Warehouse NSF Total, Shared /Common Areas Pres Pres Actual Req'd Level) Level Level 3 244 1080 1080 1080 1,080 S32 1000 1000 1000 1.000 S40 730 730 730 730 0 690 690 710 710 44S 690 690 690 690 1,761 4.190 4,190 4,210 4,210 Report to the City of Newport Beach Page 3S City Hall Space Needs Analysis • REQUIREMENTS DETAILS — DATA SHEETS AND BUBBLE DIAGRAMS The following pages present the requirements detail computation sheets. The conventions used and other information which may assist in reading the data sheets are presented in Appendix A of this re- port. The standards which underly the requirements are presented in Appendix B. • • Report to the City of Newport Beach Page 36 City Hall Space Needs Analysis • • • Newport Beach Civic Center Space Needs Analysis City Hall • Page I Griffin Advisors, Inc. Printed 8/26102 At Present Projected Requirements Actual Re uired Level 1 Level 2 Level 3 Space Standard ITEM Code S . Ft. S . Ft WS S . Ft WS S . FC r (Administration Office of Mayor and Council . Office Areas , Mayor PO -3 I50 144 1 1 I50 I I I50 I I I50 I I 150 Council Member 0 0 0 0 0 0 0 0 Dept Asst to Mayor en -D 80 58 1 I. 80 1 1 80 1 1 80 1. 1 80 Subtotal Assigned SF 202 2 230 2 230 2 230 2 230 Circulation Allowance Unit Circ -4 25% 60 60 60 60 Total, Council Office Areas. NSF 202 2 290 2 290 2 290 2 290 Council Chambers Areas Existing Complex is assumed to remain . Council Conference Room 400 400 400 400 400 Council Lavatory 42 42 42 42 42 Chambers, Front Area 735 _ 735 735 _ 735 735 Chambers_, Seating Area 1084 1084 1084 1084 1084 Chamber, Projection _ 96 _ 96 96 96 96 Chambers, Storage 148 148 148 148 148 Chambers,Lobby 621 621 621 621 621 Chambers, Inner (Net) Circulation 65 65 65 65 65 Chambers, Lobby Lavatories 292 292 292 292 292 Chambers, Misc Mechanical Areas 12 12 12 12 12 Chambers, Misc. Wall Thickness 127 127 127 _ 127 127 Subtotal Assigned SF 3.622 3.622 0 3.622 0 3,622 0 3,622 Circulation Allowance (11m ded above) .0 -- — 3.622 0 3,622 0 3,622 0 3.622 0 3.622 Total. Chambers Areas, GSF Office of City Manager APO - _ Chty.Manager -7 300 294 1 1 300 1 1 300 I 1 300 1 1 300 Exec Asst to City Mgr. ,Recepu2 180 186 I 1 180 I, I, 180 1. 1 180 1 1 180 Asst City Mgr. PO -5 210 235 1 1 210 1 1 210 1 1 210 1 I 210 Asst Gcy Mgr. 00-5 210 156_ I 210 1 1 210 1 1 210 1 1 210 Flo PDA 180 152 1 1 180 1 1 180 1 1 180 1 1 180 Copy RoomlSupplles dos -4 60 50 1. 60 1 60 1 60 1 60 Lobby Reception Area .Dept Asst en -D 80 117 1 1 80 2 2 160 2 2 160 2 2 160 Equipment/Files allowance 40 incl 1. 40 I 40 1 40 I. 40 Conference Room C -3 180 none 1 180 1 180 1 180 1 180 - Subtotal Ms ed SF: 1.190_ 6 1.440 7 1.520 7 L_52_0 7 1,520 Circulation Allowance Unit Circ -4 25% _ 360 380 _ 380 380 1.190 6 1.800 .7 1.900 7 1.900 7 1,900 - ToW City Manager, NSF, Total, Administrative Areas 5,014 8 5,712 9 9 5,812 9 5,812 . Area less chambers complex - _ 1,392 2,090 _5.812 090 2,190 2.190 Density (sf /workstation) 174.0 - 261.3 243.3 243.3 243.3 Griffin Advisors, Inc. Printed 8/26102 • • • Newport Beach Civic Center Space Needs Analysis City Hall - Page 2 Griffin Advisors. Inc. Printed 8/26/02 At Present Pro'ected Re uirements Actual Re uired Level I Level 2 Level 5 ace Standard Code S . FC S . Ft. WS S . Ft I WS I Qtyj S . Ft I WS I Qtyj S . Ft WS Q S . Ft ITEM Administrative Services Department Administration7Resource Management D,reccor/Treasurer PO -66 280 177 I I 280 I 1 280 1 1 280 1 1 280 Deputy Director PO -5 r 210 I80 I I 210 I I 210 I I 210 I I 210 Adm. Asst en -E 100 57 1 1 100 I 1 100 I 1 100 1 1 100 [Conference Room (none at present) C -5 300 1_ 300 1 300 1 300 1 300 Subtotal Assigned SF 414 3 890 3 890 3 890 3 890 Circulation Allowance Unit Circ -3 20% 105 180 1801 I80 180 519 3 1.070 3 1.070 3 1.070 3 1.070 Total ASD Administration, NSF Fiscal Services Administration Fiscal Ops. Mgr. P6-4 184 101 I I I80 I I l00 I I I80 I I I80 _ --Subtotal Assigned SF 101 ... 1 .. 180 1 180 .. 1 I80 I .... . 180 Circulation Allowance Unit Grc -3 20% 40 40 40 40 101 1 220 1 220 1 220 I 220 Tota]. ASD. Fiscal Svcs. Adm. NSF Cashie ring &Collections _ Cashiering Open Work Area [417] [631] [631] [631] [63I Fiscal Specfsupervisig) en -C 64 55 1 1 64 1 I 64 1 I 64 1 I 64 (near Supervisor) 32 .Equipment File Lat File IS 1 IS I IS _ I IS 1 IS Typewriter station stand IS I IS I IS I IS I IS Sr. Fiscal Clerk en -C 64 59 1 1 64 1 1 64 I 1 64 1 1 64 Fiscal Clerk en -C 64 42 1 1 64 1 1 64 1 1 64 1 1 64 Fiscal Clerk( pt) en -C 64 102 2 2 128 2 2. 128 2 2 128 2 2 l28 Equipment (Counter and Behind) Public Counter (each "station) cntr stn 40 127 3 120 3 120 3 120 3 120 Supplies (now closet) Sqg Cab IS ind. I IS I IS I IS I IS Printer prim 20 ind., 1 20 1 20 I 20 t 20 _(other items included in cnrr standard) _ Circulation inside work inner ner circ2 25% 126 126 126 126 Subtotal Assigned SF 417 5 631 5 631 5 631 5 631 _ Circulation Allowance Unit Circ -2 15% 95 90 90 90 90 512 5 721 S. 721 5 721 5 _ 721 . Total. ASD. Fiscal Svcs.Cashiering NSF Accounts Payable _- CashieringOpenWorkArea 11741 (340] (340) [340] [340 Fiscal Spec en -C 64 33 1 1 64 1 1 64 1 1 64 I 1 64 Sr. Fiscal Clerk en -C 64 46 1 1 64 1 I 64 1 1 64 2 1 64 Fiscal Clerk (pt) en -C 64 1 1 I, 64 I, 1 64 I I. 64 1 1 64 -6 79 .Equipment Files 10 6 60 6 60 6 60 6 60 _file Printer _ _ _ _mint 20 1 20 I_ 20 1 20 I 20 Circulation inside work area inner circ2 25% 68 68 68 68 Subtotal Assigned SF. 174 3 340 3 340 3 340 4 _ _ 340 Circulation At Unit Circ -2 I5% 31 50 50 50 S0 Total. ASD. Fiscal Svcs. A(P. NSF 205 3 390 3 390 3 390 4 390 Print Shoe _ _ Work Room allow 800 719 1 800 1 800 1 800 I 800 _Manager mcl. I I I I Specialist incl. I I I I Equipment Incl. Subtotal Assigned SF 719 2 800 2 800 2 800 2 800 Circulation Allowance Curt. 10% incl. 80 80 80 80 _Unit Total. ASD. Fiscal Svcs. Prinq Shop NSF 719 2 880 2 880 2 880 2 880 Griffin Advisors. Inc. Printed 8/26/02 • E I Newport Beach Civic Center Space Needs Analysis City Hall - Page 3 Griffin Advisors, Inc. Printed 8126102 At Present Pro ected Requirements Space Standard Actual Re wired Level 1 Level 2 Level 3 ITEM Code lSq.Ft MailroomlRemittance Processing Work Room allow_ 600_ 513 1 600 1 600 1 600 1 600 Coordinator /Fiscal Clerk Incl. I I Fiscal Clerk (pt) Incl. I I 1. I Equipment incl. Subtotal Assigned SF 513 2 600 2 600 2 600 2 600 Circulation Allowance Unit Circ -1 10% 60 601 60 60 513 2 660 2 660 2 660 2 660 Total. ASD, Fiscal Svcs, Mailroom NSF Total, Fiscal Services 2.050 13 2,871 13 2.871 13 2971 14 2,871 Management Information Systems - Administration Manager PDA 180 141 1 1 )80 1 I 180 I I I80 I I _ 180 Subtotal Assigned SF 141 1 IBO I 180 1 180 I 180 Circulation Allowance _.__. Unit Circ -3 20% 40 40 40 40 Total. ASD, MI5, Administration NSF 141 I 220 I 220 I 220 I 220 Applications Coordinator PO -2 120 121 1 1 120 I 1 120 1 1 120 1 1 120 Senior Analyst PO42 120 1261 1 120 1 1 120 1 1 120 1 1 120 Analyst. 1O -2 120 381 3 3 360 3 3 360 3 3 360 3 3 360 MIS Technician en -D 80 B2 I 1 80 2 2 160 2 2 160 2 2 160 Subtotal Assigned SF 710 6 680 7 760 7 760 7 760 Circulation Allowance Unit Circ -3 20% 25 140 150 150 150 Total, ASD, MI5, Applications NSF 735 6 820 7 910 7 910 7 910 GIS GIS Open Work Area _ [467] [669] [733] [733] [733) GIS Coordinator en -D 80 58 1 1 80 1 1 80 1 1 80 1 1 80 GIS Analyst en -E 100 60 1 1 100 I I 100 I I 100 I I 100 MappiAsst en -E 100 160 2 2 200 2 2 200 2 2 200 2 2 200 PT/Te.p/Intern en -C 64 56 1 1 64 2 2. 128 2 2 128 2 2 128 Equipment 133 -. Counter /Reception (access control) cnh stn 40 1 40 1 40 1 40 1 40 Plotter _ prino3 30 2 60 _ 2 60 2 60 2 60 Pnnter(sharedt print -I 10 1 10 I 10 I 10 t f0 Files file 10 6 60 6 60 6 60 6 60 Horizontal Batplan fileSstack) fiat plan -h 40 1 40 1 40 1 40 1 40 Vertical rolled plan file roll plan_v 5 3 IS 3 IS_ 3 IS 3_ Bookcase be 2 _I5_ Circulation inside -work area Inner circ2 25% - 167 183 183 183 ._ - -, Subtotal Assigned SF _ 467 5 836 6 916 6 916 6 916 Circulation Allowance Unit Circ -2 I5_% 190 130 140 140 140 Total, ASD, MI5, GIS NSF 657 5 966 6 1.056 6 1.056 6 1,056 Operations —_ Operations Open Work Area j390] [552] [552] (552 [552] _ _Coordinator en -D 80 77 1 1 80 1 1 80 1 1 80 1 1 80 MIS Tech Supp SLeec - 64 197 3 3 192 3, 3- 19.2 3 3 192 3_ 3 192 Equipment .en-_C 116. Work Table(large) table 40 1 40 I 40 I 40 I 40 Printer (shared) not -2 20 1 20 1 20 1 20 I 20 N CartlTraining Tapes cart 10 - 1 10 10 _ 1 10 10 Storage stg ab IS 3 45 3 45 3 45 3 45 Book cases (reference) be 10 _ 2 20 2 20 2 20 2 20 Coffee cof-I IS I IS I IS I IS I IS Mist. storage area/floor space allowance 20 I 20 I 20 I 20 I 20 ,Circulation inside work area inner circ2 25% 110 110 11. 0 110 iStoreroom Clos -5 90 _ 58 I 90 I 90 I 90 I ..._ 90 note that items now also in circulation corridors Griffin Advisors, Inc. Printed 8126102 • • • Newport Beach Civic Center Space Needs Analysis City Hall - Page 4 Griffin Advisors. Inc. Printed 8/26/02 At Present Pro'ected Requirements Actual Required Level Level2 Level Space Standard _ ITEMSubtoral Code S . Ft Sq. Ft W � W � S W S W � S • Assigned SF 4 4 6 2� 48 642 4 642 4 642 Circulation Allowance Unit Grc -2 15% 125 100 100 100 100 . Total. ASD. MIS. Operations NSF 573 4 742 4 742 4 742 4 742 Computer Room Computer Room Allowance 500 443 1 500 I 500 I 500 I 500 Subtotal Assigned SF 443 0 500 0 500 0 500 0 500 Circulation Allowance Unit Circ -I 10% incl. 50 50 50 50 Total. ASD. MI5, Computer Room M.F. 443 0 550 0 550 0 550 0 550 Telecommunications /networks Telecom Open Work Room Comm. Coordinator en -D (Combine with pay phone ws. below) 80 [209] 82 _ P8 11 BO I I [381] 80 I [381] 80 I [381] 80 Comm. Spec en -C .Equipment._. 64 42 85 1 1. 64 I 1 64 1 1 64 1 1 . 64 Storage wall (equipment) stgcab IS 7' 105 7 105 7 105 7 105 Filing file Cart ,cart Workstation (pay phone control) en -A Circulation inside work area inner circ2 10 10 36 25% 1 1 1 10 10 36 76 1 1 1 10 10 36 76 1 1 I 10 10 36 76 1 1 1 10 10 36 76 Pay Phone Control Equipment Rm Clos -3 Storage Room Allowance 45 350 42 311 1 I, 45 350 1 I. 45 350 1 1 45 350 1 1 45 350 'i elephone Equipment Room Na listed here. See Building Support/Common Areas Subtotal Assoed SF _ Circulation Allowance Unit Circ -2 Total. ASD. MIS. Telecoms NSF 15% _562 2 _ 776 78 120 2 776 120 2 776 120 2 776 120 _ 640 2 896 2 896 2 896 2 896 Total. MIS 3,189 18 4,194 20 4.374 20 4,374 20 4,374 Revenue Manager _PDA 180 153_. 1. 1_ 180 I. 1 180 1 1, 180 1 I 180 Revenue Open Work qLR ception) _ Counter (can integrate with WS's) on or stn Fiscal Clerk en -C ,Other Equipment 40 64 [1201_ 120 2 2 2 [228] 60 128 - 2 2 2 [228] 80 128 2 2 2 [228] 80 128 2 2 2 [228] 80 128 File file Circulation Included) 10 _ 2 20 2 20 2 20 2 20 Revenue Open WOrk Area Rev.Tech. en_D Fiscal Spec en -C Fiscal_ Spec (pt) en_C Sr. Fiscal Clerk enC Fiscal Clerk _en_C License Inspector en -A on Film Liaison en -A 80 64 _ C4 - _ 64 64 36 36 [595] 62 98_ 36 ___ 35 64 72 36 1 1 2. 2 1 1 _ I 1 -- 2 2 I I [912] 80 128 64 64 64 72 36 1 1 2 2 1 1 1 1 1 1 2 2 1 I L91>) 80 128 64 64 64 72 36 I I 2 2 1 1 1 2 2 2 2 1 I [992] 80 128 64 64 128 72 36 I I 2 2 1 1 I 1 3 3 2 2 I I [1,072] 80 128 64 64 192 72 36 Hearing en -A Files and Equipment 36 35 1 1 36 1 1 36 1 1 36 1 1 36 Coffee (see Department Shared Areas).__ 20 y _Worktable table y Printer .prinn2 Copy copy -2 Can cart Bookcase/Reference Materials be Coatrack coat .Circulation inside work area inner circ2 - 40 _ 20 _ 40 10 10 6 25% 137 incl. incl. Ind. Incl. Incl. 2 2 1 I- I 1 80 40 40 10 10 6 182 2 2 1 1 1 1 80 40 40 10 10 6 182 2 2 1 1 1 1 80 40 40 10 10 6 198 2 2 1 I _ 1 80 40 40 _ __10 10 6 214 Hearing Room (listed with shared/common areas) . Subtotal Assigned SF Circulation Allowance Unit Circ -2 - Total. ASD_ Revenue NSF If 868 13 1.320 216 200 13 1.320 200 14 1_.400 210 IS 1.480 220 _ 1.084 13_ _ 1.520 13 1.520 14 1.610 is. 1:700 Griffin Advisors. Inc. Printed 8/26/02 • • • Newport Beach Civic Center Space Needs Analysis City Hall - Page 5 Griffin Advisors, Inc. Printed 8/26/02 At Present Rmiected Reci.irements Space Standard Actual I Required Level Level Level ITEM Code I S . Ft S . Ft WS I Qtyj S . Ft WS I Qtyj S . Ft WS I Qtyj S . Ft WS I Qtyj S . Ft Accounting Finance Ofcr, POA 180 121 1 1 180 1 1 I80 1 1 180 1 1 180 Accounting Open Work Area [395] [550] [550] [550] (650] Accountant en -D 80 175 2 2 160 2 2 160 2 2 160 3 3 240 Mgt Asst. en -D 80 92 1 1 80 I I 80 I 1 80 1 1 80 Fiscal Clerk en -C 64 40 1 1 64 1 1 64 I 1 64 1 1 64 PT/Temp Wkstn en -C 64 69 1. 1 64 1 1 64 1 1 64 1 1 64 Files & Equipment 19 Files file 10 4 40 4 40 4 40 4 40 Printer print 20 1 20 1 20 1 20 1 20 Storage Cabinet (or equal) ng cab IS 2, 30 2 30 2 30 2 30 Circulation inside work area inner arcl 2S% 92 92 92 112 Payroll Work Area [111]. (268] [268] [268] [268] Note: This area requires some privacy. Fiscal SPec_ayrolq en -D 80 _ 75 _ _ I 80 1 I BO I, 1 80 1 I. 80 Files & Equipment 36 _ Waitin 8 area . _._ chair IS 2 30 2 30 2 30 2 30 . _ Counter {can incl with W52 -_-... cnv stn . _ —. 90 I 90 I 40 I 90 I 40 Files file 10 2' 26 2 20 2 20 2 20 Storage Cabs {mainly primouu2 cab 15 3 45 3 45 3 45 3 45 ,Circulation inside work area inner circ2 25% 53 53 53 53 Subtotal Assigned $F_ 627 7 998 7 998 7 998 8 1,098 Circulation Allowance Unit Circ -2 15_% 126 _ 150 ISO ISO 160 Total FSD_ Accounting NSF 753 7, 1.148 7 1,148 7 1.148 .8 1.258 Department Shared Areas Vault _ _ Wgh_Density Shelving (37 units) Each Unit _6 300 - 25 [350] 150 2$ [350] ISO 25 (350] 150 25 - [350] ISO Coin Counter Allowance 20 _ _ 1 20 1 20 1 20 1 20 Hoist for lifting collec,tion bins _Allowance 25 1 25 1 25 1 25 I _ 25 Bagging Area Allowance 80 1 80 1 80 1 86 1 80 Endorser Allowance 5 1 5 1 5 1 5 1 5 Circulation inside work area ,inner circ2 _ 25% - 76 70 70 70 Coffee Area _ col -3 - 30 17 1. 30 I. 30 1 3.0 I 30 (Note, no coffee programmed in other dinsions _ except for MIS which has night activity. - Subtotal Assigned SF _ _ 317 0 380 0 380 0 380 0 - Circulation Allowance —. Unit Circ -2 IS% —Inc[. _ 66 60 _ 60 _380 60 Total, ASD, Shared Areas NSF 317 0 440 0 440 0 440 0 440 _. _.. _.. Total Admin., Svcs. Department 7,912 54 11,243 56 11,423 57 11,513 60 11,713 Density {s( /worksrauon� —... 146.5 208.2 204.0 202.0 5 195.2 Griffin Advisors, Inc. Printed 8/26/02 E • • Newport Beach Civic Center Space Needs Analysis City Hall - Page 6 Griffin Advisors, Inc. Printed 8/26/02 At Present Prc ected R uiremente Space Standard Actual I Required Level I Level 2 Level 3 ITEM Code S . Ft. S . Ft WS So. Ft WS Q S . FC WS Qtyj S . Ft WS I Qtyj S . Ft Building Department Administration Budding Director PO -66 280 272 1 I I 280 1 1 280 1 1 280 1 1 280 Open Work Area [319] [51 f) [631] [631] [631] Admin. Asst. en -D 80 93 1 1 80 1 1 80 1 1 80 1 1 80 Dept. Asst. en-6 64 51 1 1 64 1 1 64 1 1 64 1 1 64 Office Asst. en- recep -1 100 76 1 1 100 1 1 100 I I 100 I I 100 Aide en -B �- 48 0 0 0 2 2 96 2 2 96 2 2 96 ,Equipment 99 -- MF Reader /Printer sws_ 45 1 45 1 45 1 45 1 45 MF Files file 10 2 20 2 20 2 20 2 20 _Table with Fax. PC table 40 1 40 1 40 1 40 1 40 -File-General file _ 10 5 50 5 50 5 50 5 50 Fite -Dep. Director b1e 10 I 10 1 10 1 10 1 10 ,Circulation inside work area Inner circ2 25% ind. 102 126 126 126 Copy Centerl(or dtpartment) copy -3 - 60 43 1 60 1 60 1 60 1 60 Supplies Closet clos -2 30 20 1 30 1 30 I 30 1 30 Coffee Niche cof -4 60 47 _ 1 60 1 60 I 60 1 60 Conference RooMLibrary C-3 -I80 178 I 180 I 180 1 I80 I I80 Subtotal Assigned SF 879 4 1,121 6 1,241 6 1,241 6 1,241 _ Circulation Allowance Unit Circ -2 15% - 276 170 190 190 190 Total, Bldg Dept, Admin NSF 1,155 4 1.291 6 1,431 6 1,431 6 1 431 Plan Check & Permitting Administration Deputy Bldg. Official PO,-5 210 168 1 1, 210 1 1 210 1 1 210 1 1 210 _ Subtotal Assigned SF 168 1 210 1 210 1 210 I 210 Allowance Unit Circ -3 20% 53 40 40 40 40 _Circulation Torsi, Bldg Dept, Plan Check Adm NSF _221 1 250 1 250 1 250 1 250 Customer_Service - One Stop Shop _ Customer Work Area (at One -Stop Shop) [3461 _ [710 [770] [770] [770] Sr. Permit Tech. en -E 100 105 1 1 100 1 1 100 1 1 100 I I 100 Permit Tech &Intern _— - ';n-B en -B 48 124 3_ 3 144 4 4 192 4 4 192 4 4 192 InterdAlde 4B ind I_ 1 48 1 1 48 1 1 48 1 1 48 Files & Equipment _ _ I I17. Table with printers (2)_ table 40 1 40 1 40 1 40 1 40 Files (back of work areal file 10 14 140 14 140 14 140 14 140 Plan File Bins (back of work area) allow ea If 6 16 96 16 96 16 96 16 96 _ (Note bins now above files: so ladder is needed. But space is programmed _ as if it is a se grace file unit) Circulation inside work area inner nrQ 25% Inc[. _ 142 154 154 154 Counter Allocation Public Counter cntr nn.Ig 55 239 4 220 5 275 5 275 5 275 Waiting (allocation) .allowance _ 200 _ 168 _ 1 200 I 200 _ I 200 I_ 200 Subtotal Assigned SF _ 753 5 1.130 6 1,245 6 1,245 6 1.245 Circulation Allowance Unit Circ -2 IS% 158 170 190 190 - 190 Total Bldg. Deft., Cun 9r1O55Z NSF 911 5 1.300 6 1,435 6 1,435 6 _ 1,435 Plan Check _One Sn Shop Civil Engr en -E 100 102 1 1 100 2 2 200 2 2 200 2 2 200 - _Subtotal Assigned SF 102 1 100 2 2.001 2 200 2 200 . Circulation Allowance - Unit Circ -3 20% _ rcl. 20 40 40 _ 40 Total. Bldg. Dept.. Plan Ch (O55). NSF 102 120 2 240 2 240 2 240 Griffin Advisors, Inc. Printed 8/26/02 • `J u Newport Beach Civic Center Space Needs Analysis City Hall - Page 7 Griffin Advisors. Inc. Printed 8/26/02 At Present Pro ected Re uirements Space Standard Actual Re wired Level I Level 2 Level 3 ITEM Code S . Ft. S . Ft. WS S . Ft. WS S . Ft. WS I QtYj S . Ft WS I QtyFSq. Ft Plan Check - Back Office Civil Engr 1`0.2 120 328 3 3 360 3 3 360 3 3 360 4 4 460 Vault/Plan File Storage Boom Allowance 180 139 1 180 1 180 1 180 1 180 Plan Rack/ Forms (in open area) Allowance 50 34_ 1 5o I 50 I 50 I 50 Subtotal Assigned SF 501 3 590 3 590 3 590 4 710 Circulation Allowance Unit Circ -3 20% 157 120 120 120 140 Total. Bldg. Dept. Plan Ch (055)_ NSF_ 658 3 710 3 710 3 710 4 850 Total. Plan Check & Permitting 1.892 10 2.380 12 2.635 12 2.635 13 2.775 Inspection Division. _.. .. _ . Administration Chief Bldg. Insp, F0-3 (Note that library n added to conf rm_ above) - I50 180 I 1 150 1 1 150 1 1 150 1 I I50 PC Station (oare) (in open area) en -A 36 22 1 36 1 36 1 36 1 36 Res'I BuildiiN Record ' Res. Bldg. Record Insp. .en -B 48 31, I. 1. 48 1 1 48 1 48 1 1 48 Residential Inspection ' Pr Bldg. InsR. en -D - 80 65 1 1 80 1 80 1 1 80 1 1 80 5r. Bldg. Inp. Bldg, Insp. en -C en -B _ 64 48 31 198 I 6 1 64 6 288 I 1 7 7 64 336 I I 7 7 64 336 I I 7 7 64 336 Commercial Inspection Pr. Bldg. Insp. en -D 80 65 1 1 80 1 1 80 1 1 80 1 1 80 Sr. Bldg. Insp. _ en -C 64 62 2 2._ 128 2 2 128 2 2 128 2 2 128 Bldg. Imp. .en -B - 48 - -- 1 1 48 1 1 48 Subtotal Assigned SF. 654 874 14 922 Is 970 15 970 Circulation Allowance Unit Circ -4 25% 287 _ _13 220 230 240 240 Total. BIdg Inspection NSF. _ 941 13 1.094 14 1.152 IS 1.210 15 1.210 Total Building Department 3,988 27 4,765 32 5,218 33 5,276 34 5,416 ,Density(sf /workstation) 147.7 176.5 163.1 159.9 1593 Griffin Advisors. Inc. Printed 8/26/02 • I Newport Beach Civic Center Space Needs Analysis City Hall - Page B Griffin Advisors. Inc. Printed 8/26102 At Present Pro'ected Re uirements S ce StarMard Actual Re wired Level I Level 2 Level 3 ITEM Code S . FC S . FC WS S . FC WS S . FC WS I Qtyj,Sq. Ft WS I Qtyj S . Ft City Attorney City Any PO -6b 280 273 1 1 280 1 1 280 1 1 280 1 1 280 Asst. City Atty. PO -5 210 208 1 1 210 1 1 210 1 1 210 1 1 210 Dep. City Any. PO -5 210 153 1 1 210 1 1 210 2 2 420 2 2 420 Open Work Area [262] [397] [397] [397] [397] Adm. Assc en -E 100 _1.74 1 1 100 1 1 100 1 1 100 1 1 100 Law Clerk/intern en -C 64 35 1 1 64 1 1 64 1 1 64 1 1 64 Dept. Asst. en -C _ 64 35 I. 64 1 1 64 1 1 64 I 1 64 .Equipment _ allowance 75 18_ Copy & paper storage copy.1 20 _ 1 20 1 20 1 20 1 20 files file 10 2 20 2 20 2 20 2 20 coffee cof -2 20 I 20 1 20 1 20 1 20 Guest Seating chair IS 2_ 30 2 30 2 30 2 30 Circulation inside work area inner circ2 25% 79 79 79 79 Law Library _C -5 258 1 300 1 300 1 300 1 300 Supplies Clos -2 _300 30 IS _ I. 30 1. 30 1 30 1. 30 He Room I I.B. I 150 I I50 I 150 I 150_ Litigation Files file 10 4 4 4 4 Code Enforcement Files file 10 3 3 3 3 Subject Files file 10 4 4 4 4 Storage for 26 cartons _sig cab Is _ 2 2 2 2 shredder allowance 10 I II I Subtotal Assigned 5F _ ___ _ 1.287_ ___ 6 1,577 6 1.577 7 1.787 7 1.787 _ .. Circulation Allowance Unit Orc -2 - 15% 179 240 _ 240 270 270 . Total City Attorney NSF 1,466 6 1.817 6 1.817 7 2,057 7 2,057 Total City.Attorney 1,466 6 1,817 6 1,817 7 2,057 7 2,057 . Density(sf /workstation) 244.3. _ 302.8 302.8 293.9 293,9 Griffin Advisors. Inc. Printed 8/26102 • C� • Newport Beach Civic Center Space Needs Analysis City Hall - Page 9 Griffin Advisors. Inc. Printed 8126/02 At Present Pm ected Requirements; Space Standard Actual Re wired Level I Level 2 Level 3 IT Code S . FC S . FC City Clerk City. Clerk PO -66 280 125 I I. 280 1_ 1 280 1 1 280 1 1 280' Public Counter Area (allow 12) cntr stn 40 66 3 120 3, 120 3 120 3 120 Open Work Area [259] [423] [423] [423] [423] ,-.Dep. City Clerk en -D 80 75 1 1 80 I 1 80 1 1 80 1 1 80 Dep. City Clerk en -D 80 77 I. 1 80 1 I 80 1 1 80 1. 1. 80 Equipment _ Scanning Station sws 45 33 1 45 1 45 1 45 I 45 Work Counter /Packet Prep (10 k) cncr -Ink 6 74 10 60 10 60 10 60 10 60 C opy topy_2 40 incl. _. I . 40 I 40 I 40 I 40 Council Mail Racks allowance 20 ind. 1 20 1 20 1 20 1 20 Supplies Sig cab IS incl._ 2 30 2. 30 2 30 2. 30 Circulation inside work area inner circ2 25% Incl. 68 68 68 68 Vault _ 145 1 200 1 200 1 200 1 200 Shelving unit - Minutes shv IS I I I I Shelving unit - Resolutions shv 15 - - 2 2 2 2 Shelving unit - General (hi- density) be 10 10 10 10 10 Files _ file 10 3 _ 3 3 3 C&Tub fie art can 10 2 2. 2 T. _ Subtotal Assigned SF 595 3 1.023 3 1,023 3 1.023 3. 1,023 Circulation Allowance Unit Circ -2 15% 229 _ _ 150 150 150 150 Tool. Net Sq. Ft. Block Area .814 3 1,173 3 1,173 3 1,173 3 L473 Total CittClerk 824 3 1,173 3 1,1.73 3 1,173 3 1,173 Density (sf /workstation) 274.7 391 0 391.0 391.0 391.0 Griffin Advisors. Inc. Printed 8126/02 • • • Newport Beach Civic Center Space Needs Analysis City Hall -Page 10 Gnffn Advisors. Inc. Printed 826/02 At Present Pro ected Require en Space Standard Actual Re wired Level I I Level 2 Level 3 REM Cade jSq. Ft S . Ft WS Q S . FC WS I tyf S . Ft I WS I Qtyj S . Ft WS S . 7 Community Services Administration_ Director PO -6b 280 199 I. I 280 1 1 280 1 11 280 1 1 280 Reception Area/Counter Counter/Wamng Area allowance 120 [3q 114 1 [472] 120 1 [472] 120 1 [472] 120 1 [472] 120 Office Asst en -C 64 149 2 2 128 2 2 128 2 2 128 2 2 128 Integrate work stations into counter. Equipment 58 Copy copy.l 20 1 20 1 20 1 20 1 20 Work Counter (8)15toragefl` x allow 40 1 40 1 40 1 40 1 40 Table table 40 1 40 1 40 1 40 1 40 Coffee cof.3 30 61 1 30 1 30 1 30 1 30 _ Circulation inside work area inn, circ2 25% incl. 94 94 94 94 Administration Open Work Area (150) _ [272] [272] 1272 [272] Adm. Asst. en -C 64 45 1 1 64 1 1 64 1 1 64 1 1 6_4 Sr. Fiscal Clerk ,en-C _ 64 43. I 1 64 1_ 1. 64 1 I 64 1. 1 .Equipment .64 Work counter (IS)withstg cntr_In ft 6 62 IS 90 IS 90 I5. 90 IS 90 Circulation inside work area inner circ2 25% incl.. 54 54 54 54 City Hall space not provided for. (Media Coordinator) (Graphic Spec) Subtotal Assigned SF _ 731 5 1.024 5 1.024 5 1,024 5 1.024 Circulation Allowance Unit G_r_c_ -2 IS% 162 I50 I50 1150 I50 Total. Community SKs.. Admin. NSF 893 5 1.174 5 1.174 5 1.174 5 1.174 Recreational Services Recreation Supt PO _44 180 _ 168 1 1 180 1 1 180 1 1 180 1 1 180 Recreation Manager. P0.3 I50 263 2 2 300 2 2 300 2 2 300 2 2 300 Recreation Coordinator PO -2 120 484 4 4 480 4 4 480 4 4 480 4 4 480 Recreation Open Work Area _._ _ 1136]_ [245] (390] [390] (390 (Can combine with A_dm_ in Open Area, above) Dept Asst en.D 80 90 1 1 80 2 2 160 2 2 160 2 2 160 Field Desk en.A 36 incl. 1 I 36 2 2 72 2 2 72 2 2 72 Equipment 46 Files file 10 8 80 8 80 8 80 8 80 Circulation inside work area .inner circ2 25% incl.. _ 49 _ 78 _ 78 78 Closet QBe&ard uniforms, etc.) clos-2 30 30 1 30 1 30 1 30 1 30 Store Room _ 102 - 1 [1 50] _ 1 [150] 1 (150 1 [I 50 ) SheMng shv IS 3 45 3 45 3 45 - _ 3 45 Storage Cabinet (supplies, etc.) stgcab IS 1 15 1 IS I IS I IS . File file 10 1 10 1 10 _ I 10 I 10 AlY Cart ._ cart 10 1 10 I 10 I 10 I 10 Easels. screens. flat storage allowance .. IS � .. .. I_ IS 1 IS I IS I — IS Open floor storage, misc. items allowance 25 - 1 25 1 25 1 25 I 25 Circulation inside work area inner circ2 25% ind. 30 _ 30 _ 30 _ 30 City Hall space not provided for. (Rea Maint Wkr.) Subtotal Assigned SF 1.183 9 1.385 It 1,530 II 1,530 II 1,530 Circulation Allowance Unit Circ.2 15% 210 230 230 230 Total, Community Svcs., Rec. Svcs. NSF_ 1,183 9 1,595 11 1,760 11 1,760 11 1,760 Total Community Services 2,076 14 2,769 16 2.934 16 2,934 16 Density (sf /workstation) 148.3. 197.8 183.4 183.4 _ _2,934 _ 183.4 Gnffn Advisors. Inc. Printed 826/02 E Newport Beach Civic Center Space Needs Analysis City Hall - Page I I Griffin Advisors. Inc. Printed 8/26/02 At Present Projected Requirements Actual Re wired Level I Level Level Space Standard Code S . Ft S . Ft WS Q S . Ft WSTQtyj S . Ft ITEM Fire Department Office of the Chief _ Fire Chief PO -6b 280 234 1 1 280 1 1 280 1 1 280 1 1 280 Adm Asst. Recept -2 180 174 1 1. 180 1 I 180 I 1 180 1 1 180 Subtotal Assigned SF 408 2 460 2 460 2 460 2 460 Circulation Allowance Unit Circ -4 25% 60 120 120 120 120 Total. Fire Dept, Ofc. of Fire Chief NSF 468 2 580 2 580 2 580 2 580 Support Services Manager PO-4 180 198 I 1 180 1 1 180 1 1 180 1 1 180 Sr Fiscal Clerk en -C 64 76 1 1 64 1 1 64 1 1 64 1 1 64 .. . -. Added equipment allowance {in WS) allowance 60 I 60 I 60 I 60 I . — 60 Administrative Area Reception Point_ _ Oft. Asst. en- recep -1 100 48 1 1 100 I I 100 I. I. 100 I. 1 100 Open Work Area .. _ .. [75].. [76] [76] [76 .. [76] Field Work Station/Aide en -A 36 36 1 36 1 36 1 36 1 36 Copier copy -1 20 20 1 20 I 20 1 20 1 20 .. _ Coffee Area cof-2 20 19 .Fire 1 20 1 20 1 20 1 _ 20 Conference Room C -6 360 SSS- 1 360 1 360 1 360 1 360 See discussion with CH Shared/Common Areas Staff relocated out of City Hall complex , Supp Svcs Capt Facility & Supply Coord. - - -- -_ _. Subtotal Assigned SF 952 3 840 3 840 3 840 3 840 _ Circulation Allowance Unit Circ -3 20% 140 170 170 170 170 _ _. _ —. ..__. __._ Total, Fire Dept, Supp. Svcs. NSF I.092_.._._3. 1,010 3 1,010 3 1,010 3 1,010 Fire Prevention Fire Marshal PO -5 210 220 1 1 210 I I 210 1 1 210 1 1 210 Fire Prevention Open Work Area_ _ [543]. [692] [785] [857] _ [857] Dep Fire Marshal en -O 80 543 1 1 80 1 1 80 1 1 BO I 1 80 Fire Pre, Spec en -C. 64 Incl. 1 1 64 2 2 128 2 2 128 2 2 12B Inspector en- B 48 incl. I I 48 1 1 48 2 2 96 2 2 96 _ Dept Ass t_ en -C _ 64 ina1.- I 1 64 1 I, 64 1 1 64 1 F 64 _ Equipment & Files _. Work Station dfc 75 I 75 1 75 I 75 1 75 _Draping Verticalplan files roll elan -v 5 2 10 2 10 2 10 2 10 Storage Cabinet_ stg cab i5 I 15 I IS I IS I IS Table with printers {2] table 40 I 40 1 40 1 40 1 40 _ _ Work counter with cabs above cnv -In ft 6 B 48 B 48 8 48 8 48 .... _. Fire. Fire ...._ Fil. es 8le 10 3 30 4 4 40 ...— 5 50 5 50 Public counter (4 it ea section) cnv stn 40 2 BO 2 80 2 80 2_ 80 Circulation inside work area inner circ2 25% rcl. 138 157 171 _ 171 Subtotal Assigned SF, 763 S 902 6 995 7 1,067 7 1,067 - _ Circulation Allowance Unit Circ -2 15% 146 t40 150 160 160 ._ —. Total, Fire Dept. Fire Prev_ NSF 909 S 1,042 6 1.145 7 1,227 7 1.227 - ......_ Fire_... EMS Management _ _ .. Fire .. . Manager PO -4 180 102 1 I 180 1 1 180 1 1 180 1 1 180 -- -- _- EMS Open Work Area [107] [144 ] [144] [I4J4- [144) _ Dept. Asst. -C 64 107 1 1. 64 1 1 64 1 1 64 1 1. 64 .en Equipment Files file 6 60 6 60 6 60 6 60 _ _ Misc equipment/shredder .allowance _ .. .20 _incl. in - I 20 1 20 1 20 .1. 20 .. Subtotal Assigned SF. 209 2 324 2 324 2 324 2 324 Circulation Allowance Unit @c.2 IS'. 31 _ _ SO SO SO SO Total. Fire. Dept_ EMS Mgc NSF 240 2 374 2 374 2 374 2 _374 Griffin Advisors. Inc. Printed 8/26/02 • • Newport Beach Civic Center Space Needs Analysis City Hall -Page 12 Griffin Advisors. Inc. Printed 8126/02 At Present Pro etted Requirements, Space Standard Actual Re wired Level I Level 2 Level ITEM Code S . Ft. S . Ft. WS I Qty S . Ft. TrainingCommunity RelationslES Training Chief P0-4 180 163 1 1 180 I I I80 I I 180 I 1 180' Comm Reis /ES Open Work Area [241] [343] _ [343] [343] [343] Comm Relations Ofcr. en -D 80 100 I I 80 I 1 80 1 1 80 1 1 80 Emerg. Svcs. Coord. en -D 80 100 1 1 80 1 1 80 1 1 80 I 1 80 Equipment (emerg Svcs) 41 Storage Cabinets IS 6 90 6 90 6 90 6 90 .Printers (2) .stgcab print -1 10 2 20 2 20 2 20 2 20 Fax allow 5 1 5 1 5 1 5 1 5 Circulation inside work area inner circ2 _ 25% Ind. 68 68 68 68 Located out of City Hall complex: Lifeguard Capt. — -- -- -- Subtotal Assigned SF_ 404 3 523 3 523 3 523 3 523 Circulation Allowance Unit Grc -2 15% 62 80 80 80 80 Total. Fire Dept. Training/CR/ES NSF 466 3 603 3 603 3 603 3 603 Department General Storage General Storage AIIOw 240 242 1 240 1 240 1 240 1 240 Subtotal Assigned SF 242 0 240 0 240 0_ 240 0 240 Circulation Allowance Unit Circ -2 IS% Na q0 40 40 40 Total, Fire Dept, Gen. Smrage NSF 242 0 280 0- 280 0 280 0 280 Total Fire Department {Admin) 3,417 15. 3,889 16 3,992 17 4,074 17, 4,074 Density (sf /worksration) 227.8 259.3 249.5 239.6 239.6 Griffin Advisors. Inc. Printed 8126/02 • • Newport Beach Civic Center Space Needs Analysis City Hall • Page 13 Griffin Adv sors. Inc. Printed 8/26/02 At Present Prc ected Re uirennents S ace Standard Actual Re mired Levell Level Level ITEM Code S . Ft. So. Ft WS Q S . Ft WS I Qtyj S . Ft. —W—S7—Qtyl Sq. Ft WS I Qtyl S . Ft General Services Facilities Maintenance Center _ I55 Facilities Maintenance Workstation desk included 0 1 0 1 1 0 1 1 0 1 1 0 Storage Area allowance 180 1 180 1 180 1 180 1 180 Note: general janitorial rooms and related areas are accounted in the Net to-Gross allowance. Subtotal Assigned SF_ _ I55 0 180 I 180 1 180 1 180 Circulation Allowance Unit Circ_ -2 15% 30 30 30 _ 30 Total General Services NSF 155 0 210 1 210 1 210 1 210 Total General Services 155 0 210 1 210 1 210 1-210 Density (sf /workstation) n/a n/a n/a n/a n/a Griffin Adv sors. Inc. Printed 8/26/02 • • • Newport Beach Civic Center Space Needs Analysis City Hall- Page 14 Griffin Advisors, Inc. printed 8/26/02 At Present Pro jected Requirements Space Standard Actual I Required Level Level Level ITEM Code S . Ft. Ft WS I Qtyj S . Ft WS Q . FC WS Q S . Ft WS Q S . Ft Human Resources Department _5_q. Director P0.66 280 144 I I 280 I I 280 I I 280 I I 280 1 Risk Mgr. PO -4 180 148 1 1 180 1 1 180 1 1 180 1 1 180 HR Ops. Mgr. PDA 180 138 1 1 180 1 1 180 1 1 180 1 1 180 HR Analyst PO -2 120 134 2 2 240 2 2 240 2 2 240 3 3 360 HR Asst PO-2 120 162 2 2 240 2 2 240 3 3 360 3 3 360 HR Open Work Area [305] [478] [478] [478] [608] Adm. Asst en -C 64 52 1 1 64 1 1 64 1 1 64 2 2 128 Ofc. Asst. en -C 64 52 1 1 64 1 1 64 1 1 64 1 1 64 Equipment - 127_ Supplies - stg cab 15 2 30 2 30 2 30 2 30 Copy copy -2 40 1 40 1 40 1 40 1 40 _ Fax allow 5 1 5 1 5 1 5 1 5 Counter (4' ea "station ch cntr stn 40 .ncl. 2 80 2 80 2 80 _ 3 120 _ Display/Application Area allowance 100 74 1 100 1 100 1 100 I 100 _Wainn Circulation inside open area inner circ2 25% incl., 95 95 95 _ 121 Conference/Intevlew Room C-3 I80 1 180 1 180 I I80 1 180 File Room (employee, files - secure) Allowance 120 1 120 1 120 1. 120 I 120 Subtotal Assigned SF- IA31 9 1.898 9 L898 10 2A18 12 2.268 Circulation Allowance Un_it_ Circ -2 15% _ 169 280 280 300 340 Total Human Resources N5F 1.200 9 2.178 9 2.178 10 2.318 12 2.608 Total Human Resources 1,200 9 2,178 9 2,178 10 2,318 12 2,608 Density (sf /workstation) 133.3 _ 242.0 242.0 231.8 2173 Griffin Advisors, Inc. printed 8/26/02 • • I Newport Beach Civic Center Space Needs Analysis City Hall - Page IS Griffin Advisors, Inc. Printed 8/26/02 At Present Pro ected Requirements Space Standard Actual Re wired Level 1 Level 2 Level 3 ITEM Code S . Ft. S . Ft WS S . Ft WS S . Ft WS S . FG WS I Qtyl S . Ft Planning Department Administration Director PO -6b 280 283 1 1. 280 1 1 280 1 1 280 1 1 280 Administrative Open Work Area [173) (220) [220] [220) (220) Adm. Asst en -E 100 138 1 1. 100 1 1 100 1 1 100 1 1 100 Addioonal Equipment - Reception area for 2 persons allowance 60 35 1 60 1 60 1 60 1 60 Files at workstation file 10 4 40 4 40 4 40 4 40 .Mail center allowance 20 incl. 1 20 1 20 1 20 1 20 Subtotal Assigned SF 456_ 2 500 2 500 2 500 2 500 - Circulation Allowance Unit Circ -4 25% 123 130 _ 130 130 130 Total, Planning, Admin. NSF 579 2 630 2 630 2 630 2 630 Economic Development _ Sr. Planner PO -3 ISO 104 _ I 1 ISO I I ISO 1 1 150 1 1 150 Assoc Planner PO -2 120 115 1 1_ 120 1 I. 120 1 1 120 1 1 120 Open Work Area Dept Asst _en -C 64 64 1 I. 64 1 I 64 1 1 64 1 1 64 Note: combine these open work areas. Theme are listed separately m show organizational and adjacency requirements. Subtotal Assigned SF 2.83 3 334 3 334 3 334 3 334 Circulation Allowance Unit Circ -3 20% 77 70 70 70 70 . Total. Planning_ Econ. Dev_ NSF, 360 3 409 3 409 3 409 3 404 Current Planning' Main Office Are. Sr_ Planner PO -3 ISO 120 I ISO I 1 150 I I 150 1 I 150 Sr. Planner P6-3 150 125 1 1 150 1 1 ISO I 1 150 1 1 ISO Assoc Planner PO -2 120 115 1 1 120 1 1 120 1 1 120 1 1 120 Current Planning Open Work Area Asst Planner. en -E 100 [84) 48 1 (200) 1 100 1 [160] 1 100 2 2 (260) 200 2 2 [260) Files /Egupment _ 36 _200 Files file 10 , 2 20 2 20 2 20 2 20 Files fneedecD file _ 10 1 10 1 10 1 10 1 10 .- Cart _ can 10 1 10 1 10 1 10 1 10 ocase _ok be 10 2 20 2 20 2 20 2 20 Circulation inside work area inner circ2 _ 25% Incl. _ 40 Subtotal Assigned SF 444 4 620 4 580 5 680 5 680 Circulation Allowance - - -_... Unit Orc -2 IS% 120 90 90 100 100 Total, Planning. Curr. Ping: Olc. NSF 564 4 710 4 670 5 780 5 780 _ One, A— St> op Shop rea _ --p0 .. Plammng Dept One Stoo shop open Area _...__.. %anningTech. .en-D ..__ 80 (2201 __ 45 1 _ [512] 1 80 1 X512) 1 80 - _., 1 1 [512 80 1 1 [512) 80 .. Asst Planner en -E 100 159 2 2 200 2 2 200 _. 2 2 200 2 2 200 File_s/E uq IPment . -16. .. .. _.. . File file _ IO 5 50 5 50 5 50 5 50 Plan Storage (and overflow) allowance 80 _ 1 80 1 80 1 80 80 _Circulation inside work area inner circ2 25% inch, _ 102 102 102 _ l00 _ ___ Counter Alloca cation _ Public Counter mtr stn -Ig 55 0 1 55 2 1 IO 2 110 2 I IO Waiting (allocation) ,allowance 80 0 _ 1- 80 80 1 80 I 80 Subtotal Assigned SF 220 3 647 3 702 3 702 3 702 - Circulation Allowance _Unit Grc -2_ _ ._ 1S% 1AJ 158 _ 1001 110 10 110 Total. Planning. O55 NSF 378 J. 747 3 812 3 812 3 - 812 Griffin Advisors, Inc. Printed 8/26/02 • 0 Newport Beach Civic Center Space Needs Analysis City Hall - Page 16 Griffin Advaors, Inc Printed 8126102 At Present Pro'ected Re uirennents Space Standard Actual Re wired Level 1 Level 2 Level 3 ITEM Code S . FC . FC WS S . FC WS I Qtyi S . i WSJ Q tyj S . FC I WS I Qtyj Sq.-R. Advance Planning Sr. Planner PO -3 150 208 2 2 300 2 2 300 2 2 300 2 2 300 Files & Equipment (in open area near offices) 35 Files (EIR's) file 10 3 30 3 30 3 30 3 30 File (general) fle 10 1 10 1 10 1 10 I 10 Bookcase be 10 1 10 1 10 I 10 1 10 Subtoal Assigned SF 243 2 350 2 350 2 350 2 350 Circulation Allowance Unit Grc -3 20% 66 70 70 70 70 Total, Planning, Adv. Ping, NSF 309 2 420 2 420 2 420 2 420 Shared: EDICP /AP Planning Dept Shared Functions Open Area -[4881 _ [500] [560] [560] [6401 Asst- Planner en -E too 110 I 1 100 1 1 100 1 1 100 1 1 100 Dept. Asst- en--C 64 49 I_ I 64 1 1 64 1 1. 64 2 2 128 Clerical Asst (Pt) en_C 64 45 1 _ 1 64 1. I 64 1 1 64 1 1 Interns en -8 48 41 I 48 2 2 96 2 2 96 2 2 _64 96 Intern Wk Stn (area being re- designed 135 Equipment & Filing_. _ _ . Tract Map counter /work area table 40 1 40 - 1 40 1 40 1 . 40 . Copier copy -2 40 1 40 I 40 1 40 1. 40 -Typing Stand_ stand IS I_ IS I IS I IS I IS Department Reception/Seat� seat -1 _ 60 73 1 60 1 60 1 60 1 60 Circulation inside work area inner orc2 25% mcl. 69 81 81 97 Conference/Packet Preparation C -3 180 84 1 180 1 180 1 180 1 180 Supplies Closet clos -I IS I IS I IS I IS I IS Vault_ _ 161 [415] [415] [415] [415) Files (with storage above file 10 17 170 17 170 17 170 17 170 Microfilm File file 10 I 10 I 10 1 10 1 10 Microfilm reader /printer sws 45 I 45 I 45 1 45 I 45 Bookcase be 10 _ 2 20 2 20 2 20 2 20 Table _ / Workstation tws 60 1 60 1 60 1 60 1 60 Card file file 10 _ _ _ _ 1 10 1 10 1 10 1 10 General storage (boards_ etc) .allowance 100 _ _ _ 1 100 1 100 1 100 1. 100 Storage Room (under stairs) 96 _.. (Requirement is included in Vault) _ Subtotal Assigned SF 829 4 1.110 5 1,170 5 1.170 6 1.250 __.. Circulation Allowance Unit Grc -2 _ IS% 225 170 180 180 —. 190 Total. Planning. Shared Area NSF 1.054 4 _ 1,280 5 1.350 5 1,350 6 1.440 Code Enforcement Code Enforcement Supv._ PO_4 180 182 1 1 180 1 1 180 1 1 180 1 1 180 Code Enforcement Officer PO -2 120 1 1- 120 1 1 120 1 1 120 1 I 120 (Spacers flexible to allow for possible growth) _ _ _.. _. _. ._Subtotal Assi ned SF 00 2 300 2 300 2 300 Circulation Allowance Unit Circ -3 20 60 60 60 _ 60 Total. Planning, Code Enforcement NSF_ _ 231 2 360 2 360 2 360 2 360 Total Planning Dept 3,475 28_ 4,551 21 4,646 22 4,7_56 23, 4,846 Density (sf/worksmoon) _ 173.8. - -._ _ 227.6 221.2 216.2 210.7 Griffin Advaors, Inc Printed 8126102 • • Newport Beach Civic Center Space Needs Analysis City Hall - Page 17 Gruen Advisors. Inc. Printed 8/26/02 At Present Pro iected Re uirensents S ace Standard Actual Re mired Level I Level 2 Level 3 ITEM Cade S . Ft S . Ft WS Q S . Ft WS I Qtyj S . Ft WS Q tyj S . Ft WS S . Ft Public Works Administration - Office Area Director PO -6b 28_0 280 1 1 280 1 1 280 1 1 280 1 1 280 Adm Mgr. .POA 180 166 1 1 180 1 1 180 1 1 180 1 1 180 Administrative Open Work Area Exec Sec'y (Intern WS) en-E. 100 141 1 1 100 I I 100 I 1 100 1 100 Equipment. Etc. Recepuon area for 2 persons allowance _ 60 incl. I 60 I 60 I 60 I 60 Subtotal Assigned SF 587 3 620 3 620 3 620 3 620 Circulation Allowance Unit Orc -4 25% 127 160 160 160 160 Total Public Works. Admin. NSF 714 3 780 3 780 3 780 3 780 Administration- One -stop Shop Area Planning Dept One Stop Shop Open Area [236]. [465] [465] 1465] [465 Adm. Asst. _.._ en -C 64 35 1 1 64 1 1 64 1 1 64 1 1 64 Dept. Asst.._ _ e n - —C 64 102 2 128 2 2 128 2 2 128 2 2 128 Files/EquiQment ,,.2 99 File can .. can 10 1 10 1 16 1 10 I 16 Vertical Plan Files eat plan -v 20 ...._. 3 60 3 60 3 60 3 60 Work table cable 40 1 40 1 40 1 40 1 46 Copier copy -2 _ 40 1 40 1 40 1 40 _ 1 40 _Printer print _ 20 _ .___ 1 20 1 20 1 20 1 20 File file 10 1_ 10 { 10 1 10 { 10 Circulation insidework area inner circ2 _ 25% ind. 93 93 93 93 Count Allocation_ -� -_– - Public Counter cntr stn -dg. 55 185 3 165 4* 220 4 220 4 220 Waiting(allocation), allowance 200 107 - I. 200 1 200 1 200 _ 1 200 . Includes display area/counter _ _... Subtotal Assigned SF 528 3_ 830 3 885 3 885 3 885 Circulation Allowance _ Circ -4 25% 114 210 220 220 220 _ Total Public Works. 055 NSF _Unit _ _ 642 3 1,040 3 11105 3 L.105 3 1.105 Engineering _... - AduninistratiordCit -y Engineer City Engineer PO -5 210 185 1 _ I. 210 I. 1 _ 210 1 . 1 216 1 _ 1 210 Engineering _._ .._ .. ..... _. __ Principal Civil Engineer PO -3 _ 150 432 _ _ 3 3 450 3 3 450 3_ 3 450 3 3 450 Engineering Open Work Area [446]. /L60] [940] [I A65] (1,065) Assoc. CE en -E 100 190 2 2 200 2 2 200 3 3 300 3 3 300 Sr. Eng. Tech, en-1. 100 94 I I 100 I I 100 I I 100 I I 100 Jr. CE en -E 100 43 I I 100 I I 100 I I 100 I I 100 Interns) en- B- 48 23 I 1 48 2 2 96 2 2 96 2 2 96 Contract Engineers 48 0 6 2 2 96 2 2 96 2 2 96 Files &Equipment _e�_B .,. .... 96 _ Files (near City Engineer) -hies file 10 incl. 2 20 . 2 20 2 20 2 20 Files (general) _- _ __._ file 10 .. _ _ Incl. _ 2 20 2 20 2 20 2 20 Copy copal _ 20 incl. 1 _ 20 1 20 1_ 20 1 20 Plotter 2 46 incl. 1_ 40 1 40 _ 1 40 I 40 Print (blueline) _m copy -2 40 in_c1. _ 1 40 1 40 1 40 1 40 _C_o_ffee_ _ cof -2 26 inc1. I 1 20 1 1 20 Grculation inside work area _ _ inner circ2 25% Ind. � _20 152 Ise _ _20 213 213 Field, Inspection & Survey Principal Civil Engineer . PO-3 I50 138. I . 1 150 1 1. 150 I _ I I50 I . I 150 _. ... [continued) Gruen Advisors. Inc. Printed 8/26/02 11 • Newport Beach Civic Center Space Needs Analysis City Hall - Page 18 Griffin Advisors. Inc. Pru- ed 8126102 At Present Pro'ected Rectuirememns Actual Re wired Level Level Level Space Standard ITEM Code S . Ft S . Ft WS Q S . Ft. WS I Qtyl S . Ft. WS Inspection Open Work Area [193]. [285] [180] [180] [180] PW Inspector en -B 48 193 3 3 144 3 3. 144 3. 3 144 3 3 144 Contract Inspectors none 0 Equipment Layout table dh 75 incl., 1 75 Vertical flat plan file Flat plan -v 20 incl 1 20 File file 10 incl. 1 10 Circulation inside work area tuner circ2 25% incl. 36 36 36 36 Survey Open Work Area [105] [145] [145] [1451 [145] Survey Parry Chief en -B 48 53 1 1 48 1 1 48 1 1 48 1 1 48 Survey Inst. Worker. en -B 48 52 1 1 48 1 I 48 1 1 48 1 1 48 Allowance for shared equipment allowance 20 Incl. I. 20 1 20 1 20 1 20 Circulation inside work area inner circ2 25% Ind. 29 29 29 29 Subtotal Assigned SF 1,499 Is 2,000 18 2,075 19_ 2,200 19 Circulation Allowance Unit Circ-2 15% 404 _ 300 310 330 _2.200 330 Total Public Works, Engineering Nff 1.903 15 2.300 18 2.385 19. 2,530 19 2,530 Transportation and Development Services Administration Manager PO -4 180 l48 _ _ l 1 180 1 1 180 1 1 180 I I 180 Transportation Pr. CE_ Transportation Manager PO -) I50 127 I_ 1, 150 V. 1 150 1 1 150 i 1 150 Transportation Planning Open Work Area [107]- [125] [1251 [250] Q10 Assoc. CE _ en-E 100 107 1 1 100 1 1 100 2 2 200 2 2 200 {Needs added privacy) Eng. Aide/Intern en -8 48 0 0 0 0 1 1 48 Circulation inside work area inner circ2 25% incl- 25 25 50 62 Transportation Ops. Open Work Area [369L [535] [595] [595] __ [595] Assoc. CE en -E 100 107 1 1 1.00 1 1 100 I I 100 I 1 100 TE Tech. en -D 80 93 1 1 80 1 1 80 1 80 1 1 80 jr. CE en -E 100 61 _ I I 100 I I 100 _I 1 100 1 1 100 Eng. Aide -B 48 39 I I 48 2 2 96 2-- 2 96 2 2 96 .en Fites ik Equipment _ 69 Lateral Files _. File 10 6 60 6 60 6 60 6 60 ,., ,Bookcaze be 10 2 20 2 20 2 20 2 20 Storage Cab (now over files) stg =b I5 3 45 _ 3 45 3 45 _ 3 45 Circulation inside work area Inner circ2 25% _ ind. 82 94 94 94 Traffic Control Room Allowance 200 200 200 I 200 1 200 T_ here staff not provided space in CH: Parking Meter Supv _ 0 0 0 0 0 Parking Meter Svc Worker. 0 0 0_ _ 0 _ 0 Development Services Develo�ment Engr PO -3 _ 150 14fl 1 1 150 1 1 150 l l 150 1 1 _— 150 D_evel. Svcs. Open Work Area _- . -_- -. [356]_ -00 - [600 _ [725] _ [850) Assoc CE ._ .- -_ .en -E . 100 92 1 1 100 1 1 100 I I 100 2 2 200 -. Gi55ystAnalyst ._. en -E _. 100 _._.. 149 _- V 1 ICO .. I 1 100 __. f I .. _ i .- ICO Eng:Tech. en -D 80 63 _ .. _. I I 80 I I 80 — I I _1C0 80 __1_ I I 80 )r. CE en -E 100 33 I I� 100 I I 100 2 2 200 2 2 200 Files &_ Equipmeint 20 _ Drahing /Layout table (gen use) _ table 40 1 40 1 40 1 40 1 40 Print (blueiinel copy -2 40 1 40 1 40 1 40 1 40 Copy /print_ {need)_ copy -1 20 1. 20 I� 20 1 20 _ I 20 Circulation inside work area inner circ2 25% incl. 120 120 145 170 Griffin Advisors. Inc. Pru- ed 8126102 E • I Newport Beach Civic Center Space Needs Analysis City Hall - Page 19 Griffin Advisors. Inc. Printed 8/26/02 At Present I'miected Reci.irenne nts S ace Standard Actual I Required Level I Level 2 Level 3 ITEM Cade . Ft Sq. Ft WS I Qtyj Sq. Ft WS Q S . Ft WS I Qtyl S . Ft WS I Qtyj Scl. Ft Pian File Room (combines both existing vaults) Verncal Flat Plan File Bat plan -v 12 458 [592] 27 324 27 [5921 324 27 [592] 324 27 [592] 324 Files (standard) fie 10 5 50 5 50 5 50 5 50 (Storage on wall above all files) 5wnner Print -3 30 1 30 1 30 1 30 1 30 Printer Pnno3 30 1 30 1 30 1 30 1 30 Work Table table 40 1 40 1 40 1 40 1 40 ,Added circulation inside room inner orc2 —Ni incl. tie 118 118 118 _. Subtotal Assigned SF 1.713 12 2.532 13 2.592 IS 2.842 17 3.027 Circulation Allowance Unit Circ -1 10%386 250 260 280 300 Tom Public Works. Transp. & DS NSF 2.099 12 2.782 13 2.852 IS 3,122 1.7 3,327 Department Shared Areas Conference Room C -4 240 176' I 240 1 240 1 240 1 240 Coffee _ ,c04-4 60 48 I, 60 1 60 1 60 _ I. 60 General Storage (now under stair) .Allowance 120 95 1 120 1 120 1 120 1 120 - Subtotal Assigned SF 319 0 420 0 420 0 420 0 420 Circulation Allowance Unit Circ -3 20% 46 80 80 80 80 Total Public Works, Shared Areas NSF 365 0 Soo 0 Soo 0 Soo 0 500 Total Public Works Dent _ Density (sf/workstation) 5,723 33 7,402 173.9 224.3 37 7,622 206.0 40 8,037 200.9 42 8,242 196.2 Griffin Advisors. Inc. Printed 8/26/02 • • • Newport Beach Civic Center Space Needs Analysis City Hall - Page 20 Griffin Adnscrs. Inc. Printed 8/26/02 At Present Pro'ected Re uirements Actual Re wired Level I Level 2 Level Space Standard ITEM Code S . Ft S . Ft WS S . Ft WS S . Ft WS . Ft WS FQtYT S . Ft City Hall Shared /Common Areas Conference Areas Hearing Room ("Lobby Conf Rm" today) C -5 300 244 1 300 1 300 1 300 1 300 Large Conference Room (general use) C -9 560 now FD 1 560 1 560 1 560 1 560 Other Conference Rooms programmed with Depanments City Admin- Council Conference Room Existing 400 [4001 [400] [400] [400] [400] City Mgr. Conference Room C -3 180 none [180] [180] [180] [180] Admin. Svcs. Conference Room C -5 300 none [300] [300] [300] [300] Bldg. Dept Conference Room/Library C -3 180 [178] [180] [1 SO] [180] [IBO] City Any. Law Library _ C -5 300 [2581 [300] [300] [300] [300] Fire Department Conference Room C -6 360 [551 [360] [360] [360] [360] HR Conference/Interview Room C -3 180 none [180] [180] [180] [180] Planning DeEt,Conf Rn!Tai;6t Prep C -3 180 [84] [180] [1 SO] [180] (180] Public Works Conference Room CA 240 [176) [240] [240] [240] [240] Shared Areas -O55 Conference Rm C -3 180 none 180 180 11801 rIB 0 Total SF. ail Conference Rooms [1.895] [3.360] (3.360] (3.360] [3.360] Total No. of Conference Rooms [7] [I2] [12] [12] [I2] Avg. SF/ Room [271] [280] [280] [280] [280] Subtotal Assigned SF 244 0 860 0 860 0 860 0 860 Circulation Allowance Unit Grc-4 25% 220 220 220 220 Total Conference Center NSF 244 _ 0 1.080 0 1,080 0 1.080 0 1,080 Building Lobby and Related Lobby Allowance Allowance 1000 532- 1 1.000 . 1. 1.000 1 1,000 1 1.000 Public Lavatories (see n -t -g) _ Subtotal Assigned SF 532__ 0 11000 0 11000 0 11000 0 1.000 Circulation Allowance Unit Grc -0 0% 0 0 0 0 Total Boilding Lobby & Related NSF_ 532 0 1.000 0 1.000 0 11000 0 19.0.0 Lunch Room lunchroom .Allowance 500 472 1 500 I 5.00 I 500 I 500 Storage Allowance 80 68 1 80 180 1 80 I 80 - - Subtotal Assigned SF_ _ 540 0 580 0 580 0 580 0 580 Circulation Allowance Unit Grc -4 - 25% .__. .. 150 150 150 _... 150 Total Lunch Room NSF _ 540 0 730 0 730 0 730 0 730 One Stop Shop Facility - Staff & Counter Areas Programmed with Department Requ.. Spice Stns Space Stns Space Stns Space Sms Space Bldg. Dept, Cust Svc (O55), NSF Bldg. Dept, Plan Ch (055). NSF 1911] [102] (4] [1300] [ - -] [120] (5] [ - -]. [1435) [240) [5] [ - -], 1. [1435] [140] [5] [ - -]_ [1435] [240] Planning, 055 NSF Public Works, 055 NSF - [378] [642] [I] [747] [3]- [1040] [2] [4) [812] [1.105] [2 (4] [812 [1,105] [2] [2] [812] [1,102] Noce that HR. CS, FD counters are not accounted for in the 655 allowance. _ - Additional items - -- - Counter Stations for other users cntr sm -Ig 55 incl._ 2 110 2 110 2 110 2 110 Visitor Research Area _ allowance Incl. 1 200 1 200 1 200 1 200 Waiting Area (included in Dept areas above) _2_00 incl. [480] _ [480 _ [480) [480] Department PC Stations allowance 20 incl. 3 60 3 60 4 80 4 80 .055 Shared Conference Rm C -3 180 none I ISO 1 180 1 180 1 180 Subtotal Assigned SF 0 0 550 0 550 0 570 0 570 Circulation Allowance Unit C_irc _ -4 25% 140 140 140 _ 1 40 Total 055 Facili� Additions NSF _ _ 0 0_ 690 0 690 0 710 0 710 Warehouse - - - Purchasing Warehouse Allowance 600 445, 1. 600 1 600 1 600 I 600 Subtotal Assigned SF 445_ 0 600 0 600 0 600 0 600 . Circulation Allowance U_ Circ -2 15% 90 90 90 90 _nit Total Warehouse NSF 445 0 690 0 690 0 690 0 _ 690 .Total City Hall Shared/Common Areas 1,761 0 4,190 770 4,190 0 4,210 0 4,210 Griffin Adnscrs. Inc. Printed 8/26/02 • • Newport Beach Civic Center Space Needs Analysis City Hall - Page 21 Griffin Advisors. Inc. Printed 8126/02 At Present P. Re uirements ITEM Space Standard Actual Re wired Level 1 %ted Level 2 Level 3 Code . Ft S . Ft WS Q S . FC WS Q . Ft Total Net Sq. Ft. Total City Hall, NSF Calculations —37,011 189 49,899 206 51,215 215 52,370 224 53,295 Council Chambers Building (from above) 3,622, _ 3,622 3,622 3.622 3,622 Total City Hall NSF, excluding Chambers _ 33,389 169 46,277 206 47,593 215 48,748 224 49,673 Calculation of Gross Sq. Ft. Total non- chambers NSF from Above 33.389_ 46.277 47,593 48,748 49,673 Statistical N -o-G Allowance Net/Gros's 80% _ 1 1,569 1 1298 12.187 12,418 Actual Existing Elements of Net- to-Gross: (excluding chambers. listed on its page) " Circulation - horizontal 1539 Circulation- Vemcal 348 Atrium _ 395 -- _- Other Shafts and Penetrations 101 Mechanical Rooms _577 -_ - -- Lavatories (public 8 stall) - 1.460 Other 427 Misc Wall Thickness 1.171 Subtotal N-T -G allowance - [7018] - - - Total City Hall, Gross Sq. Ft, Excluding Chambers 40,407 189 57,846 2 06 59,491 215 60,935 224 62,091 . Density(gsf /person) - _ 306 289 283 277 Council Chambers Building (from above) 3.622 _ 3,622 - 3.622 3.622 3.622 Total City H-11, Including Chambers 44_029 189 61,468 206 63,113 215 641557 224 65,713 ' The Council Chambers component however. is based on GSF. This is subtracted as noted in the subsequent totals. Griffin Advisors. Inc. Printed 8126/02 • • Bubble Diagram City Administration Primary Access Point Council Chambers Building Council Chambers Complex 3.622 (gross) sf Reception City Manager 180 sf 1 300 sf Asst. CM NO 210 sf 180 sf Office of the City Manager Passage or Access Regular Security , , Required Access or Egress Barrier Access Needed _ Periodic ......� Counter (Optional Passage) Access or Egress Access Griffin Advisors, Inc. Newport Beach Civic Center Needs Assessment Conference 180 sf Lobby Reception 200 Locate in the Building Lobby FAss' CM 210 sf Copy 60 sf Asst. CM NO 210 sf 180 sf Office of the City Manager Passage or Access Regular Security , , Required Access or Egress Barrier Access Needed _ Periodic ......� Counter (Optional Passage) Access or Egress Access Griffin Advisors, Inc. Newport Beach Civic Center Needs Assessment 0 xg NEWPORT BEACH CIVIC CENTER CITY HALL FACILITIES NEEDS ASSESSMENT • REPORT ON SPACE REQUIREMENTS • 9 August 2002 Griffin Advisors 385 Second Street • Laguna Beach, CA 92651 • 949 -497 -9000 • J TABLE OF CONTENTS I. INTRODUCTION What is in This Report Objectives Methodology 2. PROTECTIONS OF WORKSTATIONS __ Growth Model Approach Summary of Workstation Projections 3 3. SPACE REQUIREMENTS FOR THE BUILDING AS A WHOLE _ I I Summary of Space Requirements Functional Requirements for the Building As a Whole General Design Guidelines Building Systems (Communications, Electrical /Lighting, HVAC, Acoustics, Loading, Plumbing) Security and Fire Safety Requirements Summary of General Design Requirements and Guidelines 4. SPACE REQUIREMENTS DETAILS BY DEPARTMENT _ Presentation of the Requirements General Allocation of Space Standards Comparison of Space Standards to Existing Spaces Data Sheets Bubble Diagrams Discussion of Allocations City Administration Administrative Services Department Building Department City Attorney City Clerk Community Services Department Fire Department (Administration) General Services Human Resources Department Planning Department Public Works Department City Hall Shared and Common Areas Requirements Details — Data Sheets and Bubble Diagrams I 14 14 15 16 16 17 17 18 IS 19 20 20 21 23 24 25 26 27 28 29 30 32 34 36 APPENDIX A — GUIDE TO READING REQUIREMENTS TABLES A -1 APPENDIX B — SPACE STANDARDS B- I Introduction Workstation Standards — Private Offices Workstation Standards — Traditional Open Workstations Workstation Standards — System Work Stations Open Area Equipment and Related Standards Conference Room Standards Standards for Other Rooms 10 17 18 29 APPENDIX C — OCCUPANCY OF EXISTING BUILDINGS C -1 Table of Contents Page 1 City Hall Space Needs Analysis E • E 1. INTRODUCTION WHAT IS IN THIS REPORT Objectives This is the second report requested by the City regarding possible improvements to the existing Civic Center. The objectives of this report are I. To identify a draft assessment of space needs for the functions housed in the Newport Beach civic center (City Hall) facilities. 2. To analyze and describe these space requirements, the assumptions and calculations driving the requirements, and the components from which they are made. 3. To identify proposed and recommended space standards by position, which are used to com- pute the space requirements. 4. To identity the assumptions of City Hall staffing and growth which support the space re- quirement calculations. 5. To provide a basis for City review and analysis of our findings and for validations with ap- propriate City personnel. Methodology Determining the space needs of City Hall is a process of several steps, as outlined below. This meth- odology is at it was outlined in the statement of work under which the scope of work has been under- taken. Step ]—Determination of Operations Source Four levels of information have been obtained. First, we obtained general infor- Information mation from specific City sources, such as historic or annual reports, plans of ex- isting buildings, and so on. Second, we distributed questionnaires to each em- ployee in the scope of our work, both of a general nature to regular staff and of more detail to management staff. Third, we surveyed the operations in each area and noted space usage, equipment, and other factors. Fourth, we interviewed most senior staff, managers, and department heads. Projection The projection of operations and staff is based on using two growth parameters: Model increases related to annexation of South Coast, increases related to observed gen- eral trends over past years, as a response to legislation, demands for service, tech- nology, environmental issues, and the like. The projections are based on workstations, not on FTE, because we are interested in computing space needs. We divide the increases (which actually amount to a small number of workstations over present) into three factors: the annexation consideration, historic trends carried forward for 10 years, and historic trends car- ried forward for an additional 10 years. Report to the City of Newport Beach Page I City Hall Space Needs Analysis • Stejp.2 —Space Standards Development The development of space standards has been the result of (a) review of existing of Standards operational requirements and working conditions for each person, (b) considera- tion of existing and projected activities, (c) analysis of established standards in use in other cities and public offices, and (d) consideration of future trends and the needs for flexibility and adaptability to new and even unexpected activities. • Step 3= Space Requirements Department The calculation of space requirements for each of the functions and operations in Work Areas City Hall is accomplished mainly by applying space standards to the staff levels and to the support areas which each division or department requires to perform its function. For equipment areas, we use the existing count of files and other items as a baseline, and increase this square footage in the future projection periods based on identified growth factors. The requirements details are tabulated on data sheets for each department. These detail sheets show the items, the space standards used, and the projected quantity and well as square footage requirement at each of the projection levels. This al- lows the City to analyze the needs on an individual basis, and also to examine how requirements change from each Planning Level to the next. Special Special areas were examined separately and needs were arrived at using a combi- Areas nation of interview results, observations, and experience in other Cities. These areas include (a) the One -stop Shop area, (b) the meeting and conference room requirements, and (c) assessment of City Hall shared -use or common areas. Adjacency We analyzed the non - quantitative space requirements, including proximity and and Other adjacency requirements, requirements for security, lighting, power, and other Requirements systems, and other functional needs. Adjacency needs within the department work areas will be presented using graphic bubble diagrams that are drawn using blocks in scale with the actual computed requirements for the corresponding functions. These diagrams are not contained in this draft document. Review The review process is based on allowing a period of individual department review Process of the assumptions and conclusions for operations and space projections. The procedures will be worked out during the interim review of this draft document. Report to the City of Newport Beach Page 2 City Hall Space Needs Analysis • 2. PROJECTIONS OF WORKSTATIONS GROWTH MODEL Approach The following observations were made in advance of any projections for future requirements above and beyond present needs. These observations led us to the approach we have taken: I. The City is essentially built -out, except for (a) the annexation area of South Coast and (b) poten- tial annexation of smaller pockets in the north east. 2. The City is generally conservative in respect to growth, and any additions should be directly re- lated to demand for services, legislated mandates, and factors of this type. 3. The affected departments have indicated that selected functions will experience about 15% more workload from the South Coast annexation. This is mainly the permitting and inspection func- tions. This effect is delayed, however, due to the fact that initial processes will be handled by Or- ange County and turned over to the City later. 4. We have obtained past City staffing data from annual reports, and note that there has been a slow rise of somewhat less than 1/2 of one percent per year in total staff (and in staff housed in City Hall). This is understood to be due to some transfer of functions and duties (via mandate, mostly) to local government, and also due to some new services which are demanded over time by the citizens. An example of this includes an expected future interest in greater attention to water • quality and environmental control along the coastal areas. This very slow growth is not linear: there are periods of ups and downs. But the trend is slowly upward. A table is given below that shows this total staffing data. 5. The above slow "background" trend of 1/2 does not amount to much addition in workspace, once the core requirement for conference areas, counters, vaults, and other basic needs are met. There- fore it seems to provide a reasonable contingency in facility planning. Based on these observations, we have computed requirements under several scenarios, so that the City can see the impacts of the underlying assumptions, and also select the appropriate level to use as the basis for a building program. We have provided projections of workstations (not staff, since we are interested in computing space needs, though there is a clear relationship) under the following sce- narios: • Present requirements — this is the computation of needs based on the existing number of worksta- tions, but includes added conference rooms, adequate vault and storage areas, and other func- tional spaces needed today. Note that there is a distinction between workstations actually pro- vided and workstations needed today, however. • Planning Level 1 (PL -1) — this is based on adding an amount of staff (up to 15% in some catego- ries of staff, but amounting only to a few positions in total) to appropriate job functions to ac- count for possible impacts of the annexations which are completed or planned. • Planning Level 2 (PL -2) — this is based on adding 0.4% workstations per year for 10 years, or a total of about 4% to the total staff levels of PL -1. • Planning Level 3 (PL -3) — this is based on adding a second 10 -year period of increase, or an • added 4% overall onto the PL -2 figures. Report to the City of Newport Beach Page 3 City Hall Space Needs Analysis 0 • • EXHIBIT Historic Growth Rates City Staff, Newport Beach, California State mandates and statutes, technological effects, and social demands and interests all add pressure for City services. This often results in City staff and resource increases, some of which require office or function spaces in City Hall. We note that it may be prudent in long -term facility planning to provide for these effects using historic trends as a guideline. The following chart is derived from historic City figures. We do not have the actual numbers of persons housed in City Hall, but we do have budgeted numbers of City staff by department function. By remov- ing life safety, library, and other functions, we get an approximation of staff functions which are in City Hall today. The City Hall numbers are shown in black print: 1990 1991 1992 1993 1994 1995 12202 1996 1998 1999 2000 2001 General Government City Clerk 4 4 4 3 3 3 2 3 3 3 3 3 City Manager /Dep CM 4 4 4 4 4 4 4 4 4 12 18 12 Human Res /Personnel 6 5 5 5 5 0 0 0 0 0 0 9 City Attorney 4 4 4 4 3 5 5 6 6 5 5 5 Administrative Services 0 0 0 0 0 46 48 49 50 49 49 49 Telecommunications 2 2 2 2 2 0 0 0 0 0 0 0 Community Development Planning 23 23 22 20 18 17 12 15 16 16 18 18 Building 22 22 21 19 18 W 20 21 21 23 24 25 Public Works Public Works & Utils 0 0 0 0 0 32 33 33 34 35 37 38 Public Works 36 35 35 29 29 0 0 0 0 0 0 0 Utilities 5 5 5 5 4 0 0 0 0 0 0 0 Community Services Administration 2 2 2 2 3 2 2 2 2 2 2 2 Recreation 11 11 12 11 10 8 8 8 8 8 9 11 .. -r C'i.•. , .. Total all 666 659 658 613 586 620 626 636 645 660 683 695 Total CH (black lines) 119 117 116 104 99 134 134 141 144 153 165 172 Total CH (adjusted)' 165 163 162 150 145 134 134 141 144 153 165 172 Growth year -to -year — -1.2°/ -0.6% -7.4% -3.3% -7.6% 0.0% 5.2% 21% 6.3% 7.8% 4.2% The total staff has increased over the 11 years by 4.4 %. or about 0.4% per year (compounded). The growth for the adjusted CH total line is similar to that for the total staff: 4.2% overall or 0.38% per year compounded. Thus, trends in legislated mandates, technology, service demands, and political and other factors seem to show an overall increase in the past 11 years averaging something less than 4- tenths % /year, though the number has bounced plus -or -minus 7 -1/2% in any one year. ' The lines for Administrative Services (included with City Hall ) and General Services (excluded from City Hall ) show a transfer of staff from General Services to Administrative Services in 1995. The true number for earlier years is unknown, but we compute an adjusted CH line by adding the 1995 amount (46 persons) to the earlier years. Report to the City of Newport Beach Page 4 City Hall Space Needs Analysis • SUMMARY OF WORKSTATION PROJECTIONS The following table shows the number of workstations provided by this forecast model at each of the planning levels. It also indicates the methodology of projection for each category of staff. The space requirements are computed for each of these levels, and the City may then elect to provide space for present only, for PL -I, PL -2, or PL -3. The differences between these levels in terms of space needs, however, will be shown (later in this report) to be very small, once the core requirements are met and suitable additions are made to workstation sizes that are too small based on our analysis of bench- marks (see our previous report for this analysis). Orcaniution /Position /Item Administration Office of City Manager City Manager Asst City Mgr. Asst City Mgr. PIO Exec Asst to City Mgr. Dept Asst Office of Mayor and Council Office of Mayor Mayor is Dept Asst to Mayor Council Council Member Exhibit Projection of City Hall Workstations Staff WS WS WS WS WS Now Now Need PLI PL2 PL3 Projection Notes I I I I I I I I I I I I I I I 2 1 2 I I I I I 2 I I I I I 2 I I I 1 I 2 Note that 3rd Dept Asst is listed with Mayor 7 6 7 7 7 7 I I 6 I I 0 I I 0 I I 0 I I 0 I I 0 At this time. Council offices are not added. 8 2 2 2 2 2 Total Administration 15 8 9 9 9 9 Administrative Services Department Administration /Resource Management Director/Treasurer I I I I I I Deputy Director I I I I I I Adm. Asst I I I I I I Fiscal Services Administration Fiscal Ops. Mgr. Cashiering & Collections Fiscal Spec. Sr. Fiscal Clerk Fiscal Clerk Fiscal Clerk (pt) Accounts Payable Fiscal Spec. Sr. Fiscal Clerk Fiscal Clerk (pt) Print Shop Manager Specialist Mailroom/Remittance Processing Coordinator /Fiscal Clerk Fiscal Clerk (pt) I I I I I I I I I I I 1 I I I I I I I 1 I I I I 2 2 2 2 2 2 I I I I I I I I I 1 1 2 Based on 4% general total City trend L213 I I I I I I 1 I I I I I 1 I I I I I I I I I I I I I I I I I 13 13 13 13 13 14 Report to the City of Newport Beach Page 5 City Hall Space Needs Analysis • Report to the City of Newport Beach Page 6 City Hall Space Needs Analysis Staff WS WS WS WS WS Organization /Position /Item • Nov& Now Need PL I P12 P13 Projection Notes Management Information Systems Administration Manager I I I I I I Applications Coordinator I I I I I I Senior Analyst I I I I I I Analyst 3 3 3 3 3 3 MIS Technician I 1 1 2 2 2 A second pos'n is unfilled today, shown at PL -I GIS Coordinator I I I I I I Analyst I I I I I I Mapping ASSL 2 2 2 2 2 2 PTrremp /Intern 2 1 1 2 2 2 Operations Coordinator I I I I I I MIS Tech Supp Spec 3 3 3 3 3 3 Telecommunications/networks Comm Coordinator I I I I I I Comm Spec I I I I 1 1 19 IB 18 20 20 20 Revenue Manager I I I I I I Rev. Tech. I I I 1 I I Fiscal Spec. 2 2 2 2 2 2 Fiscal Spec. (pt) I I I I I I Sr. Fiscal Clerk I 1 I I I 1 Fiscal Clerk 3 3 3 3 4 S Based on 4% general total City vend L213 License Inspector 2 2 2 2 2 2 Film Liaison I I I I I I Hearing Officer 3 1 1 1 1 1 Assumes Hearing Officers share a desk. IS 13 13 13 14 IS Accounting • Finance Ofcr. I I I I I 1 Accountant 2 2 2 2 2 3 Based on 4% general total City trend 1213 PT/Temp Wkstn I I I I I I Mgt ASSL I I I I I I Fiscal Spec. I 1 I I 1 I Fiscal Clerk I I I I 1 1 7 7 7 7 7 8 Total Admin. Svcs. Dept S7 S4 S4 S6 S7 60 Building Department Administration Building Director I I I I I 1 Adm.in Asst. I I I I I 1 Dept. Asst. I I I I I I Office Asst. I 1 I I I I Aide/intern 2 0 2 2 2 2 Workstations provide some contingency. 6 4 6 6 6 6 Plan Check & Permitting Administration Deputy Bldg. Official 1 I I I I I Customer Service Sr. Permit Tech. I I I I I I Permit Tech 3 4 4 S S S IS %at Ll Intern/Aide I -- — -- — — Included with Permit Tech for projection & WS Plan Check Civil Engr 4 4 4 S S 6 IS% at L1; 4% total department 1213 10 10 10 12 12 13 • Report to the City of Newport Beach Page 6 City Hall Space Needs Analysis • Report to the City of Newport Beach Page 7 City Hall Space Needs Analysis Stan WS WS WS WS WS Organ ut'onlPos t on /Item • Now Now Need PLC. PL2 PL3 Projection Notes Inspection Division Administration Chief Bldg. Insp. I I I 1 I I Rest BuildingRecord Res. Bldg. Record Insp. I 1 1 1 1 1 Residential Inspection Pr. Bldg. Insp. I I I I I I Sr. Bldg. Insp. I I I I I I Bldg. Insp. 5 6 6 7 7 7 1 S% at L I: rounds to allow 4% L213 Commercial Inspection Note one Insp. is unfilled now. Pr. Bldg. Insp. I I I I I I Sr. Bldg. Insp. 2 2 2 2 2 2 Bldg. Insp. 0 0 0 0 1 1 4% total department 1_213 12 13 13 14 IS IS Total Building Department 28 27 29 32 33 34 15% growth on 28 is 32.2; +4% +4% is 34.8 City Attorney City Atty. 1 I I I I 1 Asst, City Atty. I I I I I I Dep. City Atty. I I 1 1 2 2 General increases in litigation. Adm. Asst. I I I 1 1 I Law Clerk/Intern 0 1 1 1 1 1 Law Clerk WS is required. even if unfilled today. Dept. Asst. I I I I I I Total City Attorney S 6 6 6 7 7 City Clerk City Clerk I I I I I I Dep. City Clerk I I I I I I Dep. City Clerk I I I I I I • Total City Clerk 3 3 3 3 3 3 Community Services Administration Director 1 I I I I I Adm. Asst, I I I I I 1 Sr. Fiscal Clerk I I I I I I Office Asst. 4 2 2 2 2 2 O.A. staff share workstations (part -time staff) (Media Coord) I -- -- -- -- -- Position is located outside of City Ha11. (Graphic Spec) I -- — -- -- -- Position is located outside of City Hall. 9 S S S S S Recreational Services Rec. Supt I I I I I I Rec. Mgr. 2 2 2 2 2 2 Rec Coord. 4 4 4 4 4 4 (Rec Maint Wkr.) 1 0 0 0 0 0 No workstation required at City Hall. Dept Asst, 1 1 1 2 2 2 Based on interviews: need for customer service Field Desk 1 1 2 2 2 Add one more desk (at LI) based on interviews. 9 9 9 II II II Total Community Services 18 14 14 16 16 16 Fire Department Office of the Chief Fire Chief I I I I I I Adm. Asst I I I I I I Comm Relations Ofa. i I 1 I I I Emerg. Svcs. Coord. I I I I I I • Report to the City of Newport Beach Page 7 City Hall Space Needs Analysis • Staff WS WS WS WS WS OrZaniution/Position /Item Now Now Need PL P12 PO Projection Notes Support Services Manager I I I I I I Sr. Fiscal Clerk I I I I I I Supp Svcs Capt — — -- — — -- Position is located outside of City Hall. Facility & Supply Coord. — -- -- -- -- -- Position is located outside of City Hall. Oft. Asst I I I I I I Fire Prevention Fire Marshal I I I I I I Dep Fire Marshal I I I I I I Fire Prev Spec I 1 1 2 2 2 Based on I S% at L I Insp I I 1 1 2 2 Based on 4% general total dept. vend for 1213 Dept Asst I I I I I I 5 5 S 6 7 7 EMS Management Manager I I I I I I Dept Asst I I I I I I Training Training Chief I I I I I I Lifeguard Capt. 1 0 0 0 0 0 Position is located outside of City Hall. 2 1 1 1 1 1 Total Fire Department (Admin) 16 IS IS 16 17 17 General Services Facilities Mantenance -- 0 1 1 1 1 Desk is needed for general use in City Hall Total General Services 0 0 1 1 1 1 Human Resources Department Director • I I I I 1 I Risk Mgr. I I I I I I HR Ops. Mgr. I I 1 I I I HR Analyst 2 2 2 2 2 3 Based on 4% general total City vend L2 13 HR ASSL 2 2 2 2 3 3 Based on 4% general total City trend 1.214 Adm. AssL I I I I I I Oft. ASSL I I I 1 1 2 Based on 4% general total City vend 1-2/3 Total HR Department 9 9 9 9 10 12 Planning Department Administration Director I I I I I I Adm. Asst I I 1 I 1 1 2 2 2 2 2 2 Economic Development Sr.. Planner I 1 1 I I I Assoc Planner I I I I I I DepL Asst I I I I 1 1 3 3 3 3 3 3 Current Planning Sr. Planner I I I I I I Sr. Planner I I I I I I Assoc Planner I I I I I I ASSL Planner 3 3 3 3 4 4 Based on 4% general total City trend 1-2/3 Planning Tech. I I I I 1 1 7 7 7 7 B 8 Advance Planning Sr. Planner 2 2 2 2 2 2 2 2 2 2 2 2 • Report to the City of Newport Beach Page 8 City Hall Space Needs Analysis Report to the City of Newport Beach Page 9 City Hall Space Needs Analysis Staff WS WS WS WS WS • Organization/Position /Item Now Now Need PL I PL2 p13 Projection Notes Shared: ED /CP /AP Asst Planner I I I I 1 I Dept Asst I I I 1 1 2 Based on 4% general total City trend 1213 Clerical Asst (pt) I I I I I I Interns 2 1 1 2 2 2 Increase to two desks (interns now share) S 4 4 S 5 6 Code Enforcement CE Supv. I I I I I I CE Ofcr. I I I I 1 1 2 2 2 2 2 2 Total Planning Dept 21 20 20 21 22 23 Public Works Administration Director I I I I I I Intern I I I I I I Adm. Mgr. I I I I I I Adm. Asst. I I I I I I Dept Asst 2 2 2 3 3 3 IS %at L1 6 6 6 7 7 7 Engineering Administration /City Engineer City Engineer I I I I I I Engineering Pr. CE 3 3 3 3 3 3 Assoc. CE 2 2 2 2 3 3 Engineer added for Water Quality Jr. CE I I I I I I Sr. Eng. Tech. I I I I I I Intern(s) 2 1 1 2 2 2 Increase to two desks (interns now share) ract Engineers [2] 0 0 2 2 2 Workstations provided as contingency • Field. Inspection & Survey Cr. P CE I I I I I I PW Insp. 3 3 3 3 3 3 Contract Inspectors [2] 0 0 0 0 0 No space assumed at City Hall Survey Party Chief I I I I I I Survey Inst Wrkr. I I I I 1 1 16 IS IS 18 19 19 Transportation and Dev. Svcs. Administration Manager I I I I I I Transportation -Admin Pr. CE 1 1 I 1 I I Transportation -Trans Plan Assoc CE I I 1 1 2 2 Eng. Aide 0 0 0 0 0 1 Based on 4% general total City vend 1213 Transportation -Trans Ops Assoc. CE I I I I I I TE Tech. I I I I I I Jr. CE I I I I I I Eng. Aide 2 1 1 2 2 2 Parking Meter Supv 1 0 0 0 0 0 No workstation required Parking Meter Svcwkr. 2 0 0 0 0 0 No workstation required Development Services Development Engr I I I I I I Assoc. CE I I I 1 1 2 Based on 4% general total City trend 120 Jr. CE I I 1 1 2 2 Based on 4% general total City trend 1-20 CIS Syst Analyst I I I I I I Eng. Tech. I I I I 1 1 16 12 12 13 IS 17 Total PWD 38 33 33 37 40 43 Total All Workstations 210 4% on PL base of 207 is 8.28 for total 189 193 207 216 22S • of 216 and 224 for levels L2 and U. Report to the City of Newport Beach Page 9 City Hall Space Needs Analysis • Note that there are 189 workstations observed in City Hall today, but there are 210 staff. Some of these staff are actually provided space elsewhere (such as a graphics artist in Community Services) and others do not need workstations here (such as parking meter staff). But some staff, particularly intems (two, for example, in the Building Department) need workstations but either have to share or just inefficiently move from spot to spot. The third column (total = 193) identifies these presently needed workstations. is • The final three columns of the table above show the PL -I, PL -2, and PL-3 projections, respectively. The increases are broken down as follows: Growth rate on existing WS Growth rate on required WS Growth due to annexation effects First 10 -yr increase cue to trend Second 10 -yr increase cue to trend Annual rate for 20 years on PL -1 base Overall annual rate including PL -1 Pres. Actual Pres. Req d PL -1 PL -2 PL -3 1.000 1.095 1.143 1.190 1.000 1.073 1.119 1.166 7.3% 4.7 4.7 0.45% 0.77% Comment Used to check benchmarks over pre- sent Measures true growth from present For the increase from present to PL -1 For the 1st 10 -year period to PL -2 For the 2nd 10 -year period to PL -3 per year for 20 years (PL -1 to PL -3) per year for 20 years (present to PL -3) Report to the City of Newport Beach Page 10 City Hall Space Needs Analysis • 3. SPACE REQUIREMENTS FOR THE BUILDING AS A WHOLE SUMMARY OF SPACE REQUIREMENTS The table below presents a summary of the existing and required space for City Hall at each of the Projection Levels. The rationales for the projections are presented with the other requirements de- tai Is. The computation of Net Sq. Ft. requirements (NSF) is presented in the detailed tabulations later in this report. Conversion of NSF to Gross Sq. Ft. (GSF) is based on several considerations, and can be approached in a number of ways. In this report, we include the following items in the addition be- tween net and gross s.f.: • Electrical and communications equipment rooms • Mechanical equipment rooms • Data/communications risers (each floor) • Public lavatories (each floor) • General staff lavatories beyond those specified • Janitor closets and storage • Drinking fountains • Trash rooms or general recycling areas • Main corridors and stair wells • Elevator shafts Other risers or shafts Structural elements (columns, exterior thickness, etc.) wall • We include an allowance for smaller internal corridors (as part of the NSF "inner" circulation as de- fined in the Appendix), and have added a minimal contingency of 1,000 NSF for a building lobby. The assumptions of lobby size (the existing City Hall has about 500 sq. ft.), scale, openness, and other design decisions all affect the allowance for increase from NSF to GSF. Our approach is to examine the typical ratio of net -to -gross and use that factor in computing GSF. As a rule, multi -floor City Halls and general government office buildings are found to have a net -to -gross ratio of about 80 %, though this can range to 75% or less for buildings with more monumentality, wider corridors, more generous common areas, and the like. We have assumed a fairly efficient building here, and have based the net -to -gross ratio at 80 %.1 In addition, note that the GSF omits all outdoor elements, such as balconies, structural overhangs or awnings, and terraces,. It also omits large atria and courtyards. The net -to- gross, however, may allow for an enclosed atrium of smaller scale, or various sky - lighted shafts which penetrate to the lower floor. ' Some analysts take the approach of adding a percentage of the NSF onto itself to obtain GSF. A net- to-gross ratio of 80% amounts to adding 25% onto the NSF to obtain GSF. Report to the City of Newport Beach Page I i City Hall Space Needs Analysis 0 Item (Net Sq. Ft.) Administration Council Office Areas, NSF Chambers Areas, GSF (see note) City Manager, NSF Total Administrative Areas Administrative Services Department Administration, NSF Fiscal Services Fiscal Svcs, Adm. NSF Fiscal Svcs, Cashiering NSF Fiscal Svcs, A/P, NSF Fiscal Svcs, Print Shop NSF Fiscal Svcs, Mailroom NSF Management Information Systems MIS, Administration NSF MIS, Applications NSF MIS, GIS NSF MIS, Operations NSF MIS, Computer Room NSF MIS, Telecoms NSF Revenue NSF Accounting NSF Total Admin. Svcs. Department Building Department Administration NSF • Plan Check & Permitting Plan Check Adm NSF OSS Customer Service, NSF OSS Plan Check, NSF Back Office Plan Check, NSF Inspection NSF Total Building Department City Attorney City Clerk Community Services Administration NSF Recreation Services NSF Total Community Services Fire Department Office of the Fire Chief NSF Support Services NSF Fire Prevention NSF EMS Management NSF Trainmg/CR/ES NSF General Storage NSF Total Fire Department ( Admin) General Services • Human Resources Department Pres Pres Actual Reu'd Level Leve12 Leve13 202 290 290 290 290 3,622 3,622 3,622 3,622 3,622 1,190 1,800 1,900 1,900 1,900 5,014 5,712 5,812 5,812 5,812 S19 1,070 1,070 1,070 1,070 101 220 220 220 220 S12 721 721 721 721 20S 390 390 390 390 719 880 880 880 880 S13 660 660 660 660 141 220 220 220 220 73S 820 910 910 910 6S7 966 I,OS6 I,OS6 I,OS6 S73 742 742 742 742 443 SSO SSO SSO SSO 640 896 896 896 896 1,084 I,S20 I,S20 1,610 1,700 7S3 1,148 1,148 1,148 1,258 7,912 11,243 11,423 1 I,S I3 11,713 I ISS 1291 1431 1431 1,431 221 2S0 2S0 2S0 2S0 911 1,300 1,435 1,435 1,435 102 120 240 240 240 6S8 710 710 710 8S0 941 1094 IIS2 1210 1,210 3,988 4,765 5,218 5,276 5,416 1,466 1,817 1,817 2,OS7 824 1,173 1,173 1,173 1,173 893 1174 1174 1174 1,174 1183 IS9S 1760 1760 1,760 2,076 2,769 2,934 2,934 2,934 468 S80 S80 S80 S80 1092 1010 1010 1010 1,010 909 1042 1145 1227 1,227 240 374 374 374 374 466 603 603 603 603 242 280 280 280 280 Report to the City of Newport Beach Page 12 3,417 3,889 3,992 4,074 4,074 ISS 210 210 210 210 1,200 2,178 2,178 2,318 2,608 City Hall Space Needs Analysis • *Includes Council Chambers actual space as GSF. *` Using a Net -to -Gross ratio of 80 %, ' This figure is the actual Net -to- Gross. Report to the City of Newport Beach Page 13 City Hall Space Needs Analysis Pres Pres • Item (Net Sq. k) Actual Req'd Level I Level 2 Level 3 Planning Department Administration NSF S79 630 630 630 630 Economic Development NSF 360 404 404 404 404 Current Planning Office Areas NSF S64 710 670 780 780 OSS Areas NSF 378 747 812 812 812 Advance Planning NSF 309 420 420 420 420 Shared Area NSF IOS4 1280 1350 1350 1,440 Code Enforcement NSF 231 360 360 360 360 Total Planning Dept 3,475 4,SS 1 4,646 4.756 4,846 Public Works Administration NSF 714 780 780 780 780 OSS Areas NSF 642 1040 IIOS IIOS I,IOS Engineering NSF 1903 2300 2385 2530 2,530 Transportation & Dev. Svcs. NSF 2099 2782 2BS2 3122 3,327 Shared Areas NSF 36S S00 S00 S00 S00 Total, Public Works Dept 5,723 7,402 7,622 8,037 8,242 City Hall Shared /Common Areas Conference Center NSF 244 1080 1080 1080 1,080 Building Lobby & Related NSF S32 1000 1000 1000 1.000 Lunch Room NSF S40 730 730 730 730 OSS Facility Additions NSF 0 690 690 710 710 Warehouse NSF 44S 690 690 690 690 • Total, Shared/Common Areas 1,761 4,190 4,190 4,210 4,210 Total Net Sa. Et. Total City Hall. NSF From Above* 37,011 49,899 S 1,21 S 52,370 53,295 Programmed Amount for Chambers -3,622 -3,622 -3,622 -3,622 -3,622 Total City Hall NSF, excluding Chambers 33,389 46,277 47,593 48,748 49.673 Total Net Sq. Ft. Total Gross Sq Ft. (without Chambers) Total non - chambers NSF from Above 33,389 46,277 47,593 48,748 49,673 Statistical N -t -G Allowance 7,018 I I,S69 11,898 12,187 12,418 Total City Hall, GSF, excluding Chambers 40,407 57,846 59,491 60,935 62,091 • *Includes Council Chambers actual space as GSF. *` Using a Net -to -Gross ratio of 80 %, ' This figure is the actual Net -to- Gross. Report to the City of Newport Beach Page 13 City Hall Space Needs Analysis • FUNCTIONAL REQUIREMENTS FOR THE BUILDING AS A WHOLE The following information is presented as a guideline in assumptions which will eventually drive cost estimates, and which will give some basis for design considerations in master planning the facilities. This information is also important as part of the architectural program to guide the Architect when design specifics are required. General Design Guidelines • All appropriate codes apply, including accessibility requirements of the ADA. • City guidelines must be consulted, including those developed and distributed by the various mem- bers of any future project advisory committee. At present, City building regulatory agencies must be contacted individually to obtain available published guideline materials. • Major building corridors should be 6 to 8' wide. Other corridors preferably should be T -6" to 6-0" wide, and must have a minimum width of 5'. Exposed "outside" turns in these corridors should be reinforced (though this may be hidden by design treatment) - This is especially true of facilities which will be occupied by the Police Department. • Doors with heavy, active use should be designed with metal kick plates. Where possible, each ac- tively used door onto a major corridor should be equipped with a small window or side - light, es- pecially doors serving larger assembly areas or meeting rooms. • Wherever rooms have large items of equipment or often produce large volumes of records, the room should be designed with some access having double doors; examples include the computer isroom, etc. • Throughout the facility, the design should provide unobtrusive and adequate storage locations for recycling bins. Recycled materials include, at a minimum, paper and soft drink bottles or cans, deposited into separate containers. • • All lavatories should have locked storage inside or nearby for supplies (paper, soap, etc.) and some provision for extra capacity in the dispensers themselves. • Carpet tiles or modular carpet design is suggested in heavy -use carpeted areas to facilitate re- placement of soiled and damaged areas. • Floor in copy rooms, file rooms, storage rooms, and related areas should be designed with hard and durable finishes. Static resistant floors are required in areas where banks of sensitive com- puter and related equipment are located. • Rooms and areas with heavy traffic, as well as selected workrooms, should be equipped with du- rable wall coverings. • Wherever system furnishings are programmed, it is assumed that the panels will have wire man- agement for power and communications. • Cabinets in coffee areas should be designed so that coffee makers do not have upper cabinets di- rectly above them, but otherwise designed with as much storage cabinets as possible.. All such cabinets should be designed for heavy use and easy cleaning. • Where more than one multi -staff work room or open work area is programmed within the same operational unit, it may be possible to integrate these separate work areas into a single larger work room or area. Report to the City of Newport Beach Page 14 City Hall Space Needs Analysis • Building Systems (Communications, Electrical /Lighting, HVAC, Acoustics, Loading, plumbing) • General office requirements for good lighting, heating, and air conditioning prevail. The designer must assure that future building systems are fully integrated with other city control systems where feasible. Lighting design must take into account the general use of computer monitors throughout the facility. • All work stations should be wired for computer LAN, telephone, one computer dedicated duplex power outlet (verify this requirement with MIS), and one double duplex convenience power outlet. Offices require additional power outlets on opposing or adjacent walls. • In addition, selected areas (such as for system printers and copiers) will require a separate com- puter LAN drop; this should be verified at time of design. • Large conference rooms and all Department Head offices (or equivalent) should have CCTV lines, connected to local cable TV. They also should be switchable to other feeds (such as press releases and central DVD/Video Tape) at a central location, when desired. • Computer systems must be verified with MIS staff at time of building design. • HVAC zones should be liberally provided, and must be approved specifically by appropriate De- partment representatives. All conference and meeting rooms require an independent zone. • Four levels of acoustic control are needed in the building: general office acoustics, sound attenua- tion for special equipment, sound insulated rooms (acoustic batt in partitions and above ceiling surfaces), and acoustic isolation for rooms. The last of these is assumed to include (at a minimum) insulated slab -to -slab construction, sound baffles in ducts, acoustically sealed doors, and insulated • penetrations (including outlets and switches). This requirement is identified in room -by -room dis- cussions elsewhere in this report. • Offices of City Manager and all Department Heads should be acoustically isolated. All conference and meeting rooms should be sound insulated, or better if so noted. • Copy equipment may require "special equipment" acoustic attenuation, but this depends on the machine. In any event, including some separation from other work areas is needed (distance, low walls, or movable partitions). • File storage areas (file banks and special file rooms) listed in the program may require extra floor load capability so that high density filing systems can be used either now or in the future. Simi- larly, all bulk storage rooms (such as central stores) require high floor load capability. • Large copy equipment requires both 220v and 110v power, as well as LAN access, for flexibility in future equipment selection. • Closets and infrequently used rooms should have lighting on motion detectors (or timer switches) to assure that lights are turned off when the rooms are not used. Consider such systems through- out the building as well; this may result in construction or utility -use credits. Verify current local code requirements with the Building Department. • Conference rooms should be equipped with a separate, switchable exhaust system, with the motor somewhat isolated or acoustically insulated, besides the regular HVAC system on an independent AC zone. Wall timers and control switches may be appropriate in conference areas to activate AC systems when the rooms are used after hours. Coffee service areas, where programmed, require (at a minimum) above - counter power, cold water supply (114" copper line with shut -off) to a coffee maker on the counter, and a nearby sink with • provision for a garbage disposal. Report to the City of Newport peach Page IS City Hall Space Needs Analysis • Where copy or fax equipment is programmed with coffee service areas, the functions must be separated to keep copy and fax areas clean and dry. • Wherever coffee stations are programmed, in the event that a microwave oven is provided at the coffee station, then provision for a separate, switchable exhaust fan is also required. Security and Fire Safety Requirements • Where door control is required, it is recommended that a proximity reader card key system be used. The control center should be in a secure area near the building computer or telecom- munications mechanical spaces. • Where provided, security wiring should be in rigid conduits, to improve the security level. • It is assumed that the entire building will be fire sprinkled. Some areas require non - standard fire protection systems, such as chemical systems or use of pre- action controls, high- temperature heads, integrated pre- discharge alarm systems, earthquake switches, and the like, which will sub- stitute for or add to the traditional water -based sprinklers. Areas requiring such systems include the computer room, communications electronics rooms and equipment riser rooms, electrical equipment rooms, and UPS areas, where they are provided. • The sprinkler heads should be semi - recessed except where fully recessed heads are required either to prevent accidental damage or release due to equipment or activity in use there, or due to special design appearance considerations. • A separate CCTV security monitoring system may be required for the building. The extent of such a system, and the location of monitors, should be identified at the time of building design, • Areas to be camera monitored for security may include each exterior door, parking facilities, se- cure storage areas, and the main lobby area. • Selected doors may require security alarm sensors, even including doors which may not be card key operated (such as certain closets or store rooms). SUMMARY OF GENERAL DESIGN REQUIREMENTS AND GUIDELINES The City has indicated a number of desires for a new City Hall. Where feasible, these are reflected in the requirements tabulations and discussions, and the following summary is presented here to give further assistance in eventual cost estimating, master plan design, and general indication of functional overview. • A One -stop Shop concept is assumed, with a long and probably continuous counter serving Building and Safety, Planning, and Engineering. The counter for Cashiering, should be nearby. Other counters and reception areas, including Revenue, Human Resources, Personnel (in Admin- istrative Services) and Fire Department should be convenient to a central "front door" of the facil- ity. • The possibility of co- locating Fire Prevention with the other One -stop Shop functions must be ex- plored. • There is a desire for more conference rooms rather than fewer, and the program lists some which are associated with specific departments or functions, and some which are to serve general pur- poses. Even so, the department - related conference rooms should be designed so that they serve • multiple uses and general City needs, Report to the City of Newport Beach Page 16 City Hall Space Needs Analysis • 4. SPACE REQUIREMENTS DETAILS BY DEPARTMENT PRESENTATION OF THE REQUIREMENTS The Space requirements are divided into department groupings as follows: • City Administration (Council, City Manager) • Administrative Services • Building Department • City Attorney • City Clerk • Community Services • Fire Department • General Services (only a central janitor facility) • Human Resources Department • Planning Department • Public Works Department • City Hall Shared/Common Areas In each case we present first a brief discussion of how the space requirements were arrived at, with • some comments which clarify the requirements, followed by a tabulation ( "data sheets ") of the re- quirements and finally illustrations ( "bubble diagrams ") which graphically (and in scale) represent the proximity requirements between the functions of the grouping. General Allocation of Space Standards Space standards are presented in an Appendix to this report. In summary, we have made the follow- ing general allocations: Position Standard So. Ft. City Manager PO -7 300 Department Head PO -6b 280 Deputy Department Head; Attorney PO -S 210 Division Head PO-4 180 Typical Manager Requiring an Office PO -3 150 Other Offices (based on function) varies 180 -120 Large Cubicles (100 sl) en -E 10' x 10' Most Cubicles (80 sf to 64 sl) en -C /D 8' x 10' or 8'x B' Other Cubicles (48 so en -B 6' x 8' Field -based Staff (36 sl) en -A 6' x 6' �J It is an easy matter to adjust the standard allocations since all data sheets are entered into our com- puter systems. If the City in its review should wish to examine the effects of larger (or smaller) stan- dards, then this can be computed by changing an appropriate reference table. Report to the City of Newport Beach Page 17 City Hall Space Needs Analysis 0 is • Comparison of Space Standards to Existing Spaces The following table identifies a selected list of space allocations from Report I and the space stan- dards which have been allocated for them in the analysis which follows. The "Std" columns identify the space allocated (required) and the "Pres" columns identify the average amount of space now oc- cupied by the indicated staff position and the numbers of workstations used in computing the indi- cated averages. Ranges are noted where we have used different standards based on actual job activi- ties and functions. Details of allocations made are presented on the requirements computation data sheets in this report, and details of the present actual space occupied are presented in Report 1. Space Standards Assigned Selected List of Grouped Workstations by Category of Similar Job Tides Data Sheets Std Std Pres Pres Position Code SF Avg No Accountant en -D 80 87.5 2 Aide -eng en -B 48 39.0 1 Analyst en -E 100 104.0 2 Analyst PO -2 120 106.8 6 Asst - Administrative varies varies 96.0 8 Asst - Clerical en -C 64 45.0 1 Asst - Department en -C 65 61.2 11 Asst -Human Resources PO-2 120 81.0 2 Asst - Mapping en -E 100 80.0 2 Asst- Management en -D 80 92.0 1 Asst -Office varies varies 65.0 5 Deputy City Clerk en -D 80 76.0 2 Clerk - Fiscal en -C 64 48.0 8 Clerk -Sr. Fiscal en -C 64 51.8 5 Asst City Manager PO -5 210 195.5 2 Coordinator en -D 80 79.3 4 Coordinator PO -2 120 121.0 5 Director PO-6b 280 227.0 7 Eng -CE Assoc en -E 100 99.2 5 Eng -CE, Jr en -E 100 45.7 3 Data Sheets A discussion of the conventions, abbreviations, and formats used in the data sheets appears as an Ap- pendix to this report. Generally the tabulation is straight forward: each item is followed by the corre- sponding space standard, and then, in columns for each Planning Level we identify the quantity and extended value or space required. Items which form sub - categories of space are indented in the item name column. We have listed equipment now in use as a baseline, and have applied standards to the list to show what space is needed today, but we would obviously not advocate building the "present required" amount of space since it has no expansion or contingency built in. To allow for increases in equip- ment, where this is logical and advisable, we have added a growth factor, which is identified on the data sheets. Note that each block of required space also has a inner circulation allowance ranging from 10% to 20 %. Where a unit has significant amounts of open plan workspace, we typically use a lower total- Report to the City of Newport Beach Page 18 City Hall Space Needs Analysis Std Std Pres Pres Position Code SF Avg No Eng -Civil varies varies 107.5 4 Eng -PCE PO-3 150 139.4 5 Insp -Bldg /Eng en -B 48 43.4 9 Insp -Bldg, Chief PO -3 150 180.0 1 Insp -Bldg, Principal en -D 80 65.0 2 Insp -Bldg, Sr en -C 64 31.0 3 Intem(s) en -B 48 34.7 3 Intern(s) en -C 64 53.3 3 Manager PO -3 150 131.5 2 Manager, Div & Admin PO-4 180 143.9 9 Planner- senior PO -3 150 111.4 5 Planner -Assoc PO -2 120 115.0 2 Planner -Asst en -E 100 79.3 4 Specialist -fiscal en -C 64 44.4 5 Specialist-fiscal (Payroll) en -D 80 75.0 1 Specialist -other en -C 64 55.8 5 Technician en -D 80 69.0 5 Technician -Sr en -E 100 99.5 2 Technician- permit en -B 48 41.3 3 Field Staff (most) en -A 36 35.6 5 A discussion of the conventions, abbreviations, and formats used in the data sheets appears as an Ap- pendix to this report. Generally the tabulation is straight forward: each item is followed by the corre- sponding space standard, and then, in columns for each Planning Level we identify the quantity and extended value or space required. Items which form sub - categories of space are indented in the item name column. We have listed equipment now in use as a baseline, and have applied standards to the list to show what space is needed today, but we would obviously not advocate building the "present required" amount of space since it has no expansion or contingency built in. To allow for increases in equip- ment, where this is logical and advisable, we have added a growth factor, which is identified on the data sheets. Note that each block of required space also has a inner circulation allowance ranging from 10% to 20 %. Where a unit has significant amounts of open plan workspace, we typically use a lower total- Report to the City of Newport Beach Page 18 City Hall Space Needs Analysis • unit inner circulation. The open work areas themselves have a built -in circulation allowance of up to 25 %, based on the items located there. • • The inner circulation allows for depart ment -based circulation and not the main building corridors or lavatories, etc. An example of existing "inner circulation" space is shown on the existing City Hall space plan which is presented in our earlier report. Bubble Diagrams The bubble diagrams are also presented according to a logical convention that illustrates the priorities of adjacency and functional proximity. A legend is supplied which keys the symbols used. Note that open areas generally can be combined, but we suggest that the departments remain somewhat distinct for security and privacy, and also for efficient work flows. The bubble diagrams are also presented in relative scale, so that similar rooms on each drawing are similarly presented. This also allows for easier understanding of the tabulation of requirements, which are fully presented on the bubble diagrams. The Planning Level used is PL -2, which is ap- proximately the mid -point of the projection window. Report to the City of Newport Beach Page 19 City Hall Space Needs Analysis • DISCUSSION OF ALLOCATIONS City Administration City Council • The Council Chambers is programmed exactly as it is today, under the assumption that the facil- ity will remain in the renovation plan. • One office of size similar to the room used today is programmed for use by the Mayor. We do not program separate offices for each of the other council members. • The space for the Department Assistant to the Mayor is increased, and it is assumed that this will (continue to) be located in the building lobby in the future. Cir Manager and Related • The office -based staff are allocated rooms of similar average size, though it is noted that these rooms vary quite a bit today due to the existing building configuration. • The space allocated for the Department Assistant is similar to that today, and a second person is programmed in the future (PL -2). It is assumed that these persons will be located in a reception or lobby area near the Administrative offices. • We program a conference room in the requirements at present. The CM's office is used often as a conference area (by others when the CM is away), and a separate room to seat 6 or so appears needed. • Summary The requirements are summarized as follows: f 1 L_J Item (Net Sq. Ft.) Administration Council Office Areas, NSF Chambers Areas, GSF (see note) City Manager, NSF Total Administrative Areas Pres Pres Actual Req'd Level I Level2 Leve13 202 290 290 290 290 3,622 3,622 3,622 3.622 3,622 1,190 1,800 1.900 1.900 11900 5,014 5,712 5,812 5,812 5,812 Report to the City of Newport Beach Page 20 City Hall Space Needs Analysis • Administrative Services Department Adminiscrat' • Aside from increases due to application of proposed space standards, the major increase in Ad- ministrative areas is due to the addition of a conference room for this department. There is no such room today. This room, if located accordingly, should serve all divisions of the Department, including Revenue (personnel) for private meetings, but also to meet a range of other needs. Fiscal Services • The workstations of Fiscal Services are in some cases very much below the recommended stan- dards, and this accounts for the greatest part of increase in requirement. • Print Shop and Mail Room are programmed essentially on the basis of current operational levels, and assume that the functions now in place will continue. Also, some increase is programmed for the Print Shop, to account for overcrowding today. • Note that the warehouse area is programmed with City Hall Shared and Common Areas, below, but should be located very close to these operations. MIS • MIS is the largest component of the department, and represents the greatest total square footage increase, though not the largest amount on a percentage basis. • A significant part of the requirement is driven by application of appropriate work station sizes, • especially for GIS functions (but also others). • An increase in the Computer Room requirement is based on contingency assumptions (we allow a 15% increase). • Telecommunications workspace includes storage facilities which are now provided in the old jail building adjacent to the current work areas. • No separate conference room is programmed with this division, but the Department is allocated its own conference room, and it is expected that MIS could make good use of it. Revenue • Even though this area was recently renovated, our calculations suggest that this function requires more space than it is currently allocated. Part of this is due to the layout constraints imposed by the existing building. • We have noted that the hearing officers programmed here (we program a shared workstation) also use the central hearing room in the Building Lobby. We program conference space that can be used for hearing room functions with City Hall Shared and Common Areas. Accountinf • We have programmed this area with the Finance Officer nearby in a private office. That position is today remotely located from the other functions. • Payroll functions are given increased work areas, and space is allocated to allow for increased privacy. Report to the City of Newport Beach Page 21 City Hall Space Needs Analysis • Shared Area • The department is programmed with two support areas: a vault and a coffee area. These should be located in an area convenient to all functions, though the vault itself is more closely related to Fiscal Services and should be nearest to it. The vault is programmed for (continued use of) high- density shelving systems, and so needs added floor loading capacity. The vault also contains items of value, including some cash, and should be designed with this heightened security in mind. Summary The requirements are summarized as follows: L Report to the City of Newport Beach Page 22 City Hall Space Needs Analysis Pres Pres Item (Net Sq. Ft.) Actual Req'd Level 1 Level 2 Level 3 Administrative Services Department Administration, NSF S19 1.070 1.070 1.070 1.070 Fiscal Services Fiscal Svcs, Adm. NSF 101 220 220 220 220 Fiscal Svcs. Cashiering NSF S12 721 721 721 721 Fiscal Svcs, A/P, NSF 20S 390 390 390 390 Fiscal Svcs, Print Shop NSF 719 880 880 880 880 Fiscal Svcs, Mailroom NSF S13 660 660 660 660 Management Information Systems MIS. Administration NSF 141 220 220 220 220 MIS. Applications NSF 73S 820 910 910 910 MIS, GIS NSF 6S7 966 I.OS6 I.OS6 I.OS6 MIS, Operations NSF S73 742 742 742 742 MIS. Computer Room NSF 443 SSO SSO SSO SSO MIS, Telecoms NSF • 640 896 896 896 896 Revenue NSF 1.084 I,S20 I.S20 1,610 1.700 Accounting NSF 7S3 1,148 1.148 1.148 1.258 Total Admin. Svcs. Department 7,912 11.243 11,423 1 1513 11.713 L Report to the City of Newport Beach Page 22 City Hall Space Needs Analysis • Building Department Administration • The Director and the department clerical staff are programmed with Administration. • We program a conference room (not an enclosed open area) of similar but slightly larger size than the existing panel - enclosed space, which should be located also for use by other department. • We assume this conference room will be located near the administrative functions, however, rather than near the One -stop Shop functions which would have a more public location. Plan Check and Permitting • Plan Check and Permitting is divided into four areas: Plan Check/Permitting Administration (the Deputy Building Official), One -stop Shop (OSS) Customer Service, OSS Plan Check, and Back - room Plan Check. • It is assumed that the administrative and back room areas will be located near to but not with the OSS functions which would be located at a central counter for all development functions. Cur- rently, these other areas are located upstairs with the OSS operations downstairs. This is not ideal, but it is workable, as long as there is convenient access between the areas. • The office of the Deputy Director should be near to the department administration, discussed above. • The OSS operations should be integrated with other OSS functions allocated to other depart- ments, as well as general OSS spaces allocated with City Hall Shared and Common Areas (see • discussion under that heading). Ins ections • Inspection functions are programmed open work areas, in concept similar to the facilities today but enlarged according to proposed and recommended workstation space standards. The work areas today are improved from earlier conditions, but are constrained by the existing building de- sign. • Summary The requirements are summarized as follows: Report to the City of Newport Beach Page 23 City Hall Space Needs Analysis Pres Pres Item (Net Sq. Ft) Actual Req'd Level I Level 2 Level 3 Building Department Administration NSF 1 155 1291 1431 1431 1.431 Plan Check & Permitting Plan Check Adn NSF 221 250 250 250 250 OSS Customer Service, NSF 911 1,300 1,435 1,435 1.435 OSS Plan Check, NSF 102 120 240 240 240 Back Office Plan Check, NSF 658 710 710 710 850 Inspection NSF 941 1094 1 152 1210 1.210 Tout Building Department 3.988 4.765 5.218 5.276 5.416 Report to the City of Newport Beach Page 23 City Hall Space Needs Analysis • City Attorney 0 • All attorneys are provided offices of the same size, except for allocating the standard for depart- ment heads to the City Attorney. • The law library is allocated a slightly larger space, assuming law books will be located here. The current library in the City Attorney's office is assumed (eventually) to be allocated space in the main library, once it is configured and located appropriately. • We also program a small guest receiving area and assume that the clerical areas are sized for open -area work stations that have both some improved privacy but also ability to observe the point of entry and guest seating areas. Summa The requirements are summarized as follows: Pres Pres Item (Net Sq. Ft) Actual Req'd Level I Level 2 Level 3 City Attorney 1,466 1,817 1,817 2,057 2,057 Report to the City of Newport Beach Page 24 City Hall Space Needs Analysis • City Clerk • The City Clerk is allocated an office based on the proposed standard for department heads, which is notably larger than the current office size. • Deputy staff are programmed work areas similar to that today, but assuming better configuration and circulation to and around the required counters and equipment. • Some added space is programmed for scanning functions and work area, though it is assumed that each department will retain responsibility for conducting its own scanning programs and that re- cords management will be accomplished through guidelines and programs which the individual departments will carry out. • The vault is sized to accommodate some increases in time (we program a 25% increase at pre- sent), but also to provide for needed circulation and access within the vault itself. • A general store room is currently provided upstairs, and contains some records from each of sev- eral departments. Corresponding space is not programmed with the City Clerk, but is listed with City Hall Shared and Common Areas, discussed separately. Summary The requirements are summarized as follows: Pres Pres Item (Net Sq. Ft) Actual Req'd Level I Level 2 Level 3 City Clerk 824 1,173 1,173 1,173 1.173 • • Report to the City of Newport Beach Page 25 City Hall Space Needs Analysis • Community Services Department Administration • The items included with Administration are those that were present at out survey of operations. That is, some staff, such as Media Coordinator and Graphic Specialist, which are listed with Ad- ministration but located elsewhere, are not allocated City Hall space. • We do not allocate a dedicated conference room for this department since many meeting areas are provided in off -site facilities, and it appears possible for the department to meet it's City Hall meeting needs by sharing one of the other conference rooms in the program. Recreation Services • The staff who now have offices (even shared ones) are programmed private offices in the future. Our standards provide for no space smaller than the present allocation, and some are larger. • The open work area includes a larger work station for visiting (field) staff, and two such work stations in the future. This allows for some flexibility in regard to City Hall staff as well, since the added station could be converted to various uses if needed. • The store room allocation is enlarged by 50%, based on our survey, but the allocation is only an estimate of future needs. Summary The requirements are summarized as follows: Pres Pres • Item (Net Sq. ft.) Actual Req'd Level I Level 2 Level 3 Community Services Administration NSF 893 1174 1174 1174 1,174 Recreation Services NSF 1183 IS9S 1760 1760 1,760 Total Community Services 2,076 2,769 2,934 2.934 2,934 • Report to the City of Newport Beach Page 26 City Hall Space Needs Analysis • Fire Department (Administration) • The Fire Chief is allocated office space for a department head, and the secretary is assumed to remain in a separate reception room (rather than in a shared open work area) as is the case today. • Support Services functions are programmed in a central open work area (with the Manager in a private office). The office standard is similar to the take -off for the existing room (slightly smaller), but the present room is made somewhat dysfunctional due to its shape. • The conference room allocated to the department is smaller than present, with a larger conference room listed with City Hall Shared and Common Areas. This allows smaller training and meeting sessions in the department conference room (2/3 the existing large room) and larger sessions in the room shared by all in the City Hall. • Fire Prevention areas are programmed with the Fire Marshal allocated space for a deputy depart- ment director (in terms of City Hall based Fire administrative staff). Other staff are provided space in an open work area, with a public counter and waiting area. This may be combined with the City Hall One -stop Shop (OSS) functions if it is so desired. • EMS Management functions are programmed with the Manager in a private office (based on ex- ecutive manager office standards), and the other staff in an open work area. The open work areas of the department can be combined in the final layout, but this is an issue for the Fire Department to determine once a design approach is selected by the City. • We have added Training, Community Relations, and Emergency Services under the same head- ing on the data sheets. The Training Chief is allocated a Manager -level private office (a bit larger than the existing office), and the other staff are, as is the case today, provided space in open area • work stations. In total, the requirement is about 30% greater than the space allocated today. • General storage is also allocated to the department based on the space taken now in the old jail building (adjacent to the current office facility), but we allocate only an area which is equal in size to this. • Summary The requirements are summarized as follows: Report to the City of Newport Beach Page 27 City Hall Space Needs Analysis Pres Pres Item (Net Sq. Ft.) Actual Req'd Level I Level 2 Level 3 Fire Department Office of the Fire Chief NSF 468 S80 S80 S80 S80 Support Services NSF 1092 1010 1010 1010 1,010 Fire Prevention NSF 909 1042 114S 1227 1.227 EMS Management NSF 240 374 374 374 374 Training/CR/ES NSF 466 603 603 603 603 General Storage NSF 242 280 280 280 280 Total Fire Department (Admin) 3.417 3,889 3,992 4.074 4.074 Report to the City of Newport Beach Page 27 City Hall Space Needs Analysis • General Services • We have programmed a central work room for janitorial supplies and coordination. The room should be equipped with shelving, open floor storage space, and a small desk for management purposes. • • • The allocation we have made is contingent upon various design decisions and development, and must be reviewed again by General Services once space planning is underway. Summary The requirements are summarized as follows: Pres Pres Item (Net Sq. rt.) Actual Req'd Level I Level 2 Level 3 General Services ISS 210 210 210 210 Report to the City of Newport Beach Page 28 City Hall Space Needs Analysis • Human Resources Department • The biggest increase in space required over space currently occupied is driven by upgrading workstations to the proposed standards for these positions. • The Director is allocated a department -head office standard, which is nearly double the present size, and other staff, some of whom are in shared offices, are each allocated private offices due to the need for privacy and confidentiality. • An open work area is also allocated for support staff and related functions. The space also in- cludes adequate circulation and access space, which accounts for most of the increase in need to- day. • A department conference room is allocated for interviews and some small -group or individual testing, though the room should be located for general use by other departments when available. All conference rooms, whether allocated to a specific department or not, should be reserved through a central system. • A separate file room is programmed for employee files, even though these are in an open area to- day. We believe the added security and the increased flexibility in providing ample storage space overcome any inconvenience from having the files more accessible in an open area. • Note that this department staffing is increased on the basis of total City growth as well as other needs (such as improved attention to risk management) based on our interviews with City staff. The space requirements take the staff projections into account. • Summary The requirements are summarized as follows: Pres Pres Item (Net Sq. k.) Actual Recid Level 1 Level 2 Level 3 Human Resources Department 1,200 2,178 2,178 2,318 2,608 Report to the City of Newport Beach Page 29 City Hall Space Needs Analysis • Planning Department Administration • We have programmed a private office for the Director, and note that the standard for this position is essentially the same size office as that now provided. • The Administrative Assistant is allocated an open work area (not unlike the space today), includ- ing some added seating for visitors to the Director's office. Economic Development • Economic Development staff are allocated private offices of appropriate workstation standard, and an open workstation for the department assistant. This open area should be near to the of- fices, but can otherwise be combined with the open work areas for the department so that support staff can communicate and work with one another as required. Current Planner • Current Planning is divided into two areas: the main office (which would be located with the rest of the department) and One -stop Shop (OSS) functions (which would be located with the central OSS counter and work areas for the City Hall). These functions are today on separate floors, but this need not be the case. The functions require convenient access between them both for staff and for public visitors. • The main office functions are provided with private offices (for Senior and Associate Planners), plus an open work area for Assistant Planner staff and equipment. Note that Senior Planners in is the Department are allocated offices of slightly larger size than Associate Planners, based on a possible need for more visitor seating or more special project storage space. • The OSS functions include a counter allocation and a public waiting area. These should be ex- amined in relation to the other OSS counter and waiting areas which are programmed for the building (see discussion below with City Hall Shared and Common Areas). • Note that there is only a small counter area which can be ascribed to Planning today; in the pro- jection of needs, we identify the need for one Planning counter station today and two in the future (but these should be shared as needed with other departments). • Staff work space in the OSS area is included for the Planning Technician in charge of counter functions and for two Assistant Planners who are programmed to be located in this vicinity. Advance Planning • Advance Planning staff are allocated private offices of appropriate workstation standard, and an open workstation for the department assistant. As noted above, Senior Planners in the Depart- ment are allocated offices of slightly larger size than Associate Planners, based on a possible need for more visitor seating or more special project storage space. • The Advance Planning open area (files and equipment only) should be near to the offices, but can otherwise be combined with the open work areas for the department. Shared Areas • A number of staff and items of equipment are shared by the planning functions of the department • and are listed separately under the "shared" heading. This provides information for the designers so that these operations can be located for most convenient operations. Report to the City of Newport Beach Page 30 City Hall Space Needs Analysis