Loading...
HomeMy WebLinkAbout05 - Pipeline Inspection ServicesCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. s April 22, 2003 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Michael J. Sinacori, Principal Engineer 949 -644 -3311 msinacori@city.newport-beach.ca.us SUBJECT: AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH TERATEST LABS, INC. FOR PIPELINE INSPECTION SERVICES RECOMMENDATION: Approve Amendment No. 1 to Teratest Labs, Inc., for additional inspection and material testing services for the 24 -inch Jamboree Road Water Transmission Main Replacement Project and authorize the Mayor and City Clerk to execute the Amendment for a not -to- exceed fee of $14,675.00. BACKGROUND: On June 25, 2002 the City Council approved Contract No. 3412 for the construction of 24 -inch water transmission mains on Irvine Avenue from Santiago to University and Jamboree Road from Santa Barbara to Eastbluff /Ford Road. The project involves the replacement of existing steel water mains in accordance with the Water Master Plan. The existing transmission mains in Irvine Avenue were constructed in the late 1950's and early 1960's. There have been several breaks in this 2.5 -mile reach of water line in the last five years. The existing line may have had another 10 to 15 -year lifespan, but in all probability, several more breaks would have occurred during this time period. The Jamboree Road transmission main serves as the second supply line to the airport area. It also serves the areas around the Eastbluff community. The existing 18 -inch steel pipeline was constructed in 1958 and had two main breaks in 2001. The joint failures were caused by corrosive soils around the pipe and there is evidence the remaining pipe also has corrosion problems. DISCUSSION The City entered into an Professional Services Agreement with Teratest for special certified welding inspection and material testing related to the overall Irvine Avenue and Jamboree Road 24 -inch Water Transmission Main Replacement project in the Fall of 2002. During the first phase of installation on Irvine Avenue, additional services were SUBJECT: Amendment No. 1 to Professional Services Agreement with Teratest Labs, Inc. for Pipeline Inspection Services April 22, 2003 Page 2 requested to provide a higher testing level of the welded steel joints along with further study of mortar placement on the interior of the 24 -inch steel pipe. Because of the critical nature of these two pipelines, interior pipeline inspection was requested, which is accomplished by crawling through over a mile of pipeline on a small skateboard type apparatus. Each joint was visual inspected, documented and pictured to insure the integrity of the $2,100,000 pipeline investment. In addition to the requested mortar inspection, more extensive welding inspection was also required beyond the original estimate by Teratest. For the above reasons, Teratest will provide services exceeding their original $27,060 Agreement and on April 10, 2003, requested additional authorization as required. The attached Amendment No. 1 provides the necessary funds to complete the inspection and materials testing for the Jamboree Road portion of the project. Environmental Review: The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302 of the CEQA Implementing Guidelines at the time the project was authorized by the City Council. This exemption covers the maintenance and alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. The project involved replacement of existing steel water mains in existing street right -of -way. Funding Availabilit : Funds for this project are available in Account No. 7501- C5500386. Prepared by: Submitted . Sinacon S,t�phZG. Badum Civil Engineer ub' orks Director Attachments: Amendment No. 1 INSPECTION AND MATERIALS TESTING FOR THE IRVINE AVENUE FROM SANTIAGO TO UNIVERSITY AND JAMBOREE ROAD FROM SANTA BARBARA TO EASTBLUFF I FORD ROAD 24 -INCH WATER TRANSMISSION MAIN REPLACEMENT PROJECT AMENDMENT NO. 9 TO PROFESSIONAL SERVICES AGREEMENT WITH TERATEST LABS, INC This AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, entered into this _ day of May, 2003, by and between the City of Newport Beach, a municipal corporation, (hereinafter referred to as "CITY ") and Teratest Labs Inc., whose address is 17781 Cowan, Suite 150, Irvine, California, 92614, (hereinafter referred to as "Consultant "), is made with reference to the following: RECITALS: A. On March 26, 2003, City and Consultant entered into a Professional Services Agreement, hereinafter referred to as "Agreement", for engineering services for Inspection and Materials Testing related to the construction of the 24 -inch Water Transmission Main on Irvine Avenue from Santiago Drive to University Drive and Jamboree Road from San Joaquin Hills Road to Eastbluff Road, hereinafter referred to as "Project." B. City and Consultant desire to amend Agreement, hereinafter referred to as Amendment No. 1, to provide additional scope of work as defined in Exhibit "A" dated April 10, 2003. -1- Now, Therefore, the parties hereto agree as follows: 1. Section X, Additional Services: Consultant shall perform the additional inspection and material testing services for the project, identified in attached Exhibit A dated April 10, 2003. The fee for the additional services identified in this Amendment is $14,675. 2. Except as expressly modified herein, all other provisions, terms, and covenants set forth in Agreement shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this Amendment No. 1 on the date first above written. APPROVED AS TO FORM: By: City Attorney ATTEST: 0 City Clerk CITY OF NEWPORT BEACH, A municipal corporation Mayor TERATEST LABS, Inc. F: \USERS \PBW\Shared\Agreements \FY 02- 03 \Teratest Labs -Irvine Ave Water Main - Amendment No. 1.doc -2- 04/10/2003 15:59 9492636843 TESTING AND INSPECTI PAGE 02 4 Teratest Labs, Inc. A 4EIGH70N GROUP COMPANY April 10, 2003 Additional Authorization for Contract No. 3412, T -03 -0302 To: City of Newport Beach Public Works Department 3300 Newport Blvd. Newport Beach, California 92658 -8915 949 - 644 -3311 fax 949 - 644 -3318 Attention: Mr. Mike Sinacori Subject: Additional Authorization to Provide Special Inspection and Material Testing Services: Jamboree Road from Santa Barbara to Eastbluff/Ford Road -24 -inch Water Main Replacement, Newport Beach, California - Contract No. 3412 Introduction We estimate the special inspection portion will require approximately 20 weekdays and 4 Saturdays working %: days (4hrs,). Our proposed scope and cost estimate for materials inspection is based on required continuous inspection of field welding, dye- penetrant testing and inspection of mortar. Proposed Scope of Work We anticipate our personnel will be on site periodically for both full time and part time observation and testing. Our proposed scope of work will consist of Special Inspection and Material Testing Services in support of Mark Puglisi, Newport Beach City Inspector in charge of this project. The actual scope of work or time required may be different than outlined herein. Our proposed scope based upon our understanding of the project will consist of the following: Special Inspection and Materials 'l estina Inspection • Field special inspection will be performed by a licensed, registered Deputy Inspector (AWS- CWI) during, pipe -seam welding (field fabrication, welding). • Field special inspection and testing will be provided on an as- needed basis to evaluate the conditions of existing structural components. 17781 Cowan ■ Irvine, CA 92614 -6009 949.253.5922 • Fax 949.263.8843 ■ www.teratest.com 04/10/2003 15:59 9492638843 TESTING AND INSPECTI PAGE 03 T- 03.0302 o Verify Mill Certification. O Field testing per AWS specifications of - Welding o Inspector coordination and administrative services - Laboratory compressive strength test.reports - Scheduling and supervision O Supervising QA /QC and project management will be provided by our Senior Project Engineer, as needed. Sche ule Teratest is prepared to begin our work immediately upon receipt of your signed authorization to proceed. We would appreciate at least 72 hours advance notice for scheduling of field personnel at the commencement of construction; work thereafter may be scheduled with 24 -how notice. Estimate: THIS IS A PREVAILING WAGE RATE PROJECT. We estimate the additional fees for Special Inspection and Materials Testing Services to be approximately Fourteen Thousand Six Hundred and Seventy Five Dollars ($14,675). A breakdown of the assumptions and our estimated fee for each task is provided in the attached table. The actual fee will be charged on a time -and- materials basis. The actual scope and cost may vary from that presented herein. If the actual site visits or hours requested are less than assumed, our budget would be less than estimated. Attached is a Scope of Work Agreement covering the additional services. If the scope of Work Agreement is acceptable to you, please have one original copy of the Agreement executed by a duly authorized officer and return it to us. your assent to our beginning work before the Agreement is fully executed constitutes your agreement that the terms and conditions of this Scope of Work are acceptable to you. We look forward to again working with the City of Newport Beach. If you have any questions regarding our proposal or information that would update our fee estimate or scope of work, please call me at your convenience at (949) 253 -5922 x159. Respectfully submitted, TERATEST LABS, INC. Joe Ritchey Materials Inspection Manager 49 Teratest Labs, Inc. A LEICNTON CROUP COMPANY 04/10/2003 15:59 9492638843 TESTING AND INSPECTI PAGE 04 T- 03-0302 SCOPE OF WORK AGREEMENT This Scope of Work, by and between Teratest Labs, Inc., ( "TERATEST ") and City of Newport Beach is effective as of: PROJECT LOCATION: Jamboree Road from Santa Barbara to Eastbluff/Ford Road, Newport Beach, California DESCRIPTION OF SERVICES: Deputy Inspection and Materials Testing for the Jamobree Main Waterline Project. See attached estimate dated December 06, 2002, Estimate No. T-02 -1202 TERATEST LABS: Teratest Labs, Inc. 17781 Cowan Avenue Irvine, CA 92614 Telephone: (949) 253 -5922 Facsimile: (949) 263 -8843 Prime Contact: Mr. Joe Ritchey CLIENT: I have reviewed and agree to this Scope of Work. TERATEST LABS, INC. By (Signature) (Print Name) Date: City of Newport Beach 3300 Newport Blvd. Newport Beach, California 92658 Public Works Department Telephone: 949 -644 -3311 Facsimile: 949- 644 -3318 Prime Contact: Mike Sinacori City of Newport Beach By (Signature) (Print Name) 49 Teratest Labs, Inc. A LEIGNTON GROUP COMPANY 04/10/2003 15:59 9492638843 TESTING AND INSPECTI PAGE 05 T- 03.0302 Materials Inspection & Testing Additional Authorization for Jamboree Road from Santa Barbara to Eastbluff /Ford Road -24 -Inch Water Main Replacement City of Newport Beach 'This rate is not valid for Swing or Graveyard shift hours. The following surcharges will apply for Swing and Graveyard shifts: Swing Shift: +10% for first 7' /z hours worked. His. worked between 3:30pm -11 pm. Graveyard Shift: t15% for first 7 hours worked. Hrs. worked between 11pm -6am. The above schedule of charges Is based on the attached 2003 Materials Inspection and Materials Testing Fee Schedule, dated 03/07/03. The rate for an ICBO- certified special deputy inspector for this project Is $581hour at a daily four -hour minimum. Any hours worked in excess of the four -hour minimum will be charged at the eight -hour daily rate. Sams -day cancellations will be charged as a four -hour minimum. Additional Inspectors, overtime, and material testing not stated above will be provided as requested with fees as presented In the attached fee schedule. Our services are dependent upon the contractor's work schedule. The above estimate is based on the Special Testing Scope of Work. Variances to the construction schedule resulting in additional hours, trips, or tests are subject to additional fees as shown in the above Estimate. April 10, 2003 City of Newport Beach T -03 -0302 Teratest Labs, Inc. • LEIGHTON GNOOP COMPANY Unit Quantity Rate Cost 1. Steel Water Pipeline Welding Welding Inspection (AWS-CWI) Approx. 20 Hours 160 $58* $9,280* days, eight hours per day)' Overtime (Approx. 6 Days four hrs per day (Sat) Hours 24 $87 $2,088 Dye - penetrant Hours 330 $6 $1,980 Subtotal $13,348 2. Mortar Mortar Inspection Hours 16 $58 $928 Mortar Compression Sample Each 21 $19 $399 Subtotal $1,327 TOTAL $14,675, 'This rate is not valid for Swing or Graveyard shift hours. The following surcharges will apply for Swing and Graveyard shifts: Swing Shift: +10% for first 7' /z hours worked. His. worked between 3:30pm -11 pm. Graveyard Shift: t15% for first 7 hours worked. Hrs. worked between 11pm -6am. The above schedule of charges Is based on the attached 2003 Materials Inspection and Materials Testing Fee Schedule, dated 03/07/03. The rate for an ICBO- certified special deputy inspector for this project Is $581hour at a daily four -hour minimum. Any hours worked in excess of the four -hour minimum will be charged at the eight -hour daily rate. Sams -day cancellations will be charged as a four -hour minimum. Additional Inspectors, overtime, and material testing not stated above will be provided as requested with fees as presented In the attached fee schedule. Our services are dependent upon the contractor's work schedule. The above estimate is based on the Special Testing Scope of Work. Variances to the construction schedule resulting in additional hours, trips, or tests are subject to additional fees as shown in the above Estimate. April 10, 2003 City of Newport Beach T -03 -0302 Teratest Labs, Inc. • LEIGHTON GNOOP COMPANY