Loading...
HomeMy WebLinkAbout18 - Mariners Library Status ReportCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. is July 22, 2003 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Lois Thompson, Administrative Manager 949 - 644 -3311 Ithompson@city.newport-beach.ca.us SUBJECT: MARINERS LIBRARY STATUS REPORT RECOMMENDATION: Receive and file. DISCUSSION: The Mariners Library project is on schedule and within budget parameters. A schematic design, specifications, and supporting documents package was submitted to the State Library Office of Construction on July 2, 2003. The State's Facilities Consultant has a 3 -5 week window period to comment and return the plans. The City had minimal comments on the grant submittal documents and is planning for the same at this level of review. The first invoice for reimbursement will be submitted to the State Library Board before the end of the month. All library safety features and enhancements are intact as submitted in the original grant application. The interior and exterior colors, materials, and textures have been chosen by the Library Working Group and then approved by the Library Ad Hoc Committee. Material boards will be available at the Council meeting for review. The following is a list of the changes that have been incorporated into the submittal while refining the design for the new library: The existing mature trees along Irvine Boulevard will be saved by increasing the landscape setback between the street and the parking lot, which also caused the parking area and building to shift to the east. • The southern driveway has been moved outside the project boundary to align with the median break in Irvine Avenue. This driveway will be positioned across school property and staff is working on finalizing a Grant of Easement with the SUBJECT: Mariners Library Status Report July 22, 2003 Page 2 School District. The easement has already been conceptually approved by the District, City, Working Groups, and Committee members. • The area of the floor plan has increased from 15,125 sq. ft. to 15,305 sq. ft due to design refinement. Park site development is not a planned concurrently. The S the sports field which include area along Dover to enhance near the tot lot, and a plan tc new library. component of the grant project but the projects are being :e Working Group have developed conceptual plans for a re- positioned ball field, drop off area, extended curb pedestrian safety, additional parking, a restroom facility keep the ball fields operating during construction of the The first phase of the project will be the construction of the new tennis courts near the Fire Station. The Project Management Team met with Southern California Edison this week to review the relocation and possible undergrounding of the last remaining pole behind the Fire Station in Mariners Park. The tennis court project will begin construction before the end of the year. Prepared by: Lois Thompson Administrative Manager Submitted by: