HomeMy WebLinkAbout08 - C-3648 - Balboa Island Pavement Reconstruction Phase IIICITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 8 October 14, 2003 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen Luy, Associate Civil Engineer 949 - 644 -3311 sluy@city.newport-beach.ca.us SUBJECT: BALBOA ISLAND PAVEMENT RECONSTRUCTION PHASE III - AWARD OF CONTRACT NO. 3648 RECOMMENDATIONS: 1. Approve the plans and specifications. 2. Award Contract No. 3648 to NOBEST Inc. for the Total Bid Price of $110,000 and authorize the Mayor and the City Clerk to execute the contract. 3. Establish an amount of $15,000 to cover the cost of unforeseen work and geotechnical and testing services. DISCUSSION: At 11:00 A.M on September 30, 2003, the City Clerk opened and read the following bids for this project: TOTAL BID AMOUNT $110,000.00 115,100.00 115,975.00 *125,375.00 132,700.00 152,545.00 162,070.00 187,650.00 * Corrected Bid Amount is $125,325.00 BIDDER Low Nobest Inc. 2 E.A. Mendoza Contracting 3 Alliance Streetworks, Inc. 4 Damon Construction Co. 5 Beador Construction Co. 6 All American Asphalt 7 J.D.C. Inc. 8 Fleming Environmental TOTAL BID AMOUNT $110,000.00 115,100.00 115,975.00 *125,375.00 132,700.00 152,545.00 162,070.00 187,650.00 * Corrected Bid Amount is $125,325.00 Subject: Balboa Island Pavement Reconstruction Phase III —Award of Contract No. 3648 Date: October 1, 2003 Page: 2 The low bid amount is 15 percent below the Engineer's Estimate of $130,000. The low bidder, Nobest Inc., possesses a General Classification "A" contractor's license as required by the project specifications. Nobest Inc. has satisfactorily completed similar concrete repair projects for the City. This project provides for the reconstruction of concrete roadway and driveway approaches on Crystal Avenue and Abalone Avenue from Park Avenue to Balboa Avenue. The Contractor shall complete all work in twenty consecutive working days. In order not to inconvenience the residents during the upcoming holiday season no work shall begin until January 5, 2004. Normal working hours are limited to 8:00 A.M. to 4:30 P.M. Monday through Friday. The Contractor shall work on one street at a time and not begin construction on another street until the first street is opened to traffic. Access to areas of Little Balboa Island north of Park Avenue shall be maintained at all times. Trash collection will continue on the normal schedule. Environmental Review: Categorically Exempt -under Chapter 3, Article 19, Section 15301, Class 1 (c) of the Title 14 California Code of Regulations. Exemption of maintenance of existing facilities. Geotechnical /Survey Services: Survey services will be provided by the Contractor. A proposal for $3,524 is attached from Harrington Geotechnical Engineering, Inc. to provide geotechnical services. Funding Availability: There are sufficient funds available in the following account for the work: Account Description Gas Tax Prepared by: - YZ � t�w /_ Stephen Luy Associate Civil Engineer Attachments: Project Location Map Bid Summary Geotechnical Proposal Account Number Amount 7181- C5100645 $125,000.00 Submitted by: RfIJtMe 1718 W O O K m BALBOA ISLAND CHANNEL Ln N O FRONT NORTH m clP� LITTLE a 5A L 50A ABALON PL 9'� I S L Ar 1 D oy� o, PARK A4ENUE PARK AVE � FRONT SOUTH a a o w pQp�� Q U NEWPORT CHANNEL C -3648 CITY OF NEWPORT BEACH DRAWN s L DATE a -� -Eo PUBLIC WORKS DEPARTMENT BALBOA ISLAND PAVEMENT REPAIR, PHASE III I DRAWING ND. EXHIBIT A U Q w m F m O CL LJ w Z w O F E F Z W F m Q CL w N Y m O U J m CL m O O N O m m 0 O w OF w m � = F U v V m o Y O Y v U _ O U U m Z W O Q J C U r O � J r o N m m O r O � O d O t W YI W F Q W 7 O W Z Z N Q U w F Q w U � Z w z - B Z U' O O Z � U w d m a llarrin ton CrIchnical *eerin& Inc. September 15, 2003 Mr. Steve Luy, Associate Civil Engineer Public Works Department CITY OF NEWPORT BEACH 3300 Newport Boulevard Newport Beach, CA 92658 -8915 RECEIVIFz SEP 1 9 2003 PUBLIC WORKS DEPAHTMENI CITY OF NEWPORT BEACH Re: Cost Estimate of Geotechnical Engineering Testing Services for Balboa Island, Phase III, C -3648, Newport Beach, CA Dear Mr. Luy: As a follow -up to our telephone conversation, Harrington Geotechnical Engineering, Inc. is please to present an estimate of fees to provide the required geotechnical and materials testing services during the above - referenced project. Per our conversation, our services will be necessary on a part- time, test as directed, basis. Our services should be completed within a maximum of 5 working days. GEOTECHNICAL Field Technician with Field Testink, Equinment and Vehicle Test Subgrade and casting of Concrete Cylinder Specimens -36 hours @ $70.00 /hr ... $2,520.00 Laboratory 2 Maximum Density /Optimum Moisture Test @ $110.00 /ea ................... $ 220.00 9 Compression Tests - Concrete @ $26.00 /eat .............................. $ 234.00 Office Support Engineering - Reports ................. ............................... $ 500.00 Clerical - Data report - Compression Results, Fax's, etc . ...................... $ 50.00 ESTIMATED TOTAL ............. $3,524.00 ' Including Sample Pick -Up Batavia Business Center, 1938 North Batavia Street, Suite N, Orange, CA 92865 (714) 637.3093 • (800) 924.7645 • FAx (714) 637 -3096 CITY OF NEWPORT BEACH September 15, 2003 s Our fees will be calculated using our current fee schedule and will be based on actual time worked and tests preformed to provide the requested services. Should moreor less time be required, our fees will be adjusted accordingly. We look forward to being of service again and should you require any additional information please do not hesitate to call. Very truly yours, HARRINGTON GEOTECHNICAL ENGINEERING, INC. LI \� . Don P. Harrington, Jr., R.E. Vice President DPH:hmp � w�` vii s�caa enimw UM con Mfnxu6Co* piiL -city of leanta uindl s -ism..