HomeMy WebLinkAbout29 - 1401 Dove Street - IMHACH Dove Street (applicant)CITY OF NEWPORT BEACH
COMMUNITY AND ECONOMIC DEVELOPMENT
PLANNING DEPARTMENT
_ = 3300 NEWPORT BOULEVARD
°�t� °n" •
NEWPORT BEACH. CA 92658
(949) 644 -3200; FAX (949) 644 -3250
Hearing Date:
Agenda Item No.:
Staff Person:
REPORT TO THE MAYOR AND CITY COUNCIL
PROJECT: 1401 Dove Street
IMHACH Dove Street (applicant)
December 14, 1
29
Marc Myers
(949) 644 -3210
PURPOSE OF
APPLICATION: A request to permit the construction of a two -story 26,122 square foot
commercial office building built over a partially subterranean parking lot.
The proposed site encompasses approximately 3.8 acres of land area and is
currently developed with a six -story office building and related on -site
parking. The new office building will be located to the west of the existing
building towards the rear of the site where a portion of the parking lot
currently exists. The project involves the approval of:
• a General Plan Amendment and PC Amendment to increase the square
footage entitlement in Block E of Newport Place Planned Community.
The current limit of 834,762 square feet will be increased to 860,884
square feet to accommodate the construction of the new commercial
office building, and
• a Modification to permit reduction of the parking requirement ratio from
I space for each 225 square feet to 1 space for each 250 square feet of
net floor area, and
• a Traffic Study.
ACTION: I. Conduct public hearing; and
2. Adopt Resolution No. 98 -_, approving General Plan
Amendment 98 -1 (B); and
3. Introduce Ordinance No. 98- , an amendment to the Newport
Place Planned Community, and pass to second reading on January
11, 1999; and
3. Sustain the action of the Planning Commission and approve the
applications related to the General Plan and Zoning Amendments,
subject to the Findings, Mitigation Measures and Conditions as
modified by the Planning Commission:
• The acceptance of a Negative Declaration
• Modification No. 4731
• Traffic Study No. 117
LEGAL
DESCRIPTION: Parcel 1, Book 40, Page 32 of Orange County Parcel
Maps
ZONE: PC (Planned Community)
OWNER: IMHACH Dove Street LLC, Santa Ana Heights
Planning Commission Recommendation
At its meeting of November 19, 1998, the Planning Commission voted (6 ayes, 1 absent) to
recommend approval of the applications related to the proposed new office building. An excerpt of
the draft Planning Commission minutes, with the recommended mitigation measures, findings, and
conditions of approval, and the Planning Commission staff report are attached for the information
of the City Council.
The key issue discussed by the Planning Commission was the incremental growth associated with
small entitlement increases of this nature. The primary concern in this regard was the potential for
such projects to adversely affect the ability of other property owners to exercise their existing
entitlements while meeting the criteria of City regulations, particularly the Traffic Phasing
Ordinance. In making its recommendation for approval, the Commission felt that the small scale of
the project would not be a significant deterrent to the exercise of the development rights of other
property owners in the airport area.
Submitted by:
SHARON Z. WOOD
Assistant City Manager
Prepared by:
PATRICIA L. TEMPLE
Planning Director
Attachments:
I. Resolution
2. Ordinance
3. Excerpt of draft November 19, 1998 Planning Commission minutes
4. November 19, 1998 Planning Commission staff report
5. Plans and elevations
GPA No. 98 -1(B)
Amendment No. 877
Modification No. 4731
Traffic Study No. 117
Page 2
RESOLUTION NO.98-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
NEWPORT BEACH APPROVING AN AMENDMENT TO THE
LAND USE ELEMENT OF THE NEWPORT BEACH
GENERAL PLAN TO INCREASE THE ALLOWED
DEVELOPMENT IN THE NEWPORT PLACE PLANNED
COMMUNITY [General Plan Amendment No. 98 -1(B)]
WHEREAS, as part of the development and implementation of the Newport
Beach General Plan the Land Use Element has been prepared; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy B, since the proposed increase in office development will not result in
significant changes to the long range traffic service levels with the contribution to an identified
improvement; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy D, since the location of the new structure will not adversely affect
public views nor will it impact environmentally sensitive habitat; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy L, because additional office space is supportive of the prosperity of the
Newport Place area; and
WHEREAS, on November 19, 1998, the Planning Commission of the City of
Newport Beach conducted a public hearing regarding General Plan Amendment 98 -1 (B) at
which time this amendment to the Land Use Element was discussed and determined to be
consistent with the goals of the Newport Beach General plan and, therefore, recommended for
approval to the City Council; and
WHEREAS, pursuant to the California Environmental Quality Act, an Initial
Study has been prepared for the project. Based upon information contained in the Initial Study, it
has been determined that if proposed mitigation measures are incorporated, the project would not
have a significant effect on the environment. A Negative Declaration has been prepared and
accepted by the City of Newport Beach in connection with the application noted.
GPA No. 98 -1(B)
Amendment No. 877
Modification No. 4731
Tmffic Study No. 117
Page 3
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of
Newport Beach does hereby amend the Land Use Element, Statistical Area L4 (NP Block E)
Block E, and the Estimated Growth for Statistical Area 14 Table of the General Plan to read as
follows:
Newport Center (Statistical Area Ll)
2 -5. NP Block E. Block E is bounded by Westerly Place, Dove Street and Quail Street. The site
is designated for Administrative, Professional and Financial Commercial land use and is
allocated 834,762 sq. ft.
BE IT FURTHER RESOLVED that the development authorized by this
action is allocated to 1401 Dove Street, Newport Beach.
GPA No.98 -1(B)
Amendment No. 877
Modification No. 4731
Traffic Study No. 117
Page 4
ESTIMATED
GROWTH FOR STATISTICAL AREA L4
Residential (in do's)
Commercial (in sq. ft.)
Existing
Gen. Plan
Projected
Existing
Gen. Plan
Projected
1/1187
Projection
Growth
1/1/87
Projection
Growth
1 -I.KCN OS A
-0-
-0-
-0-
874,346
874,346
-0-
1-2.KCN OS B
-0-
-0-
-0-
1,060,898
1,060,898
-0-
1-3.KCN OS C
-0-
-0-
-0-
734,641
734,641
-0-
1-4.KCN OS D
-0-
-0-
-0-
250,176
250,176
-0-
1-5.KCN OS E
-0-
-0-
-0-
27,150
32,500
5,350
1 -6.KCN OS F
-0-
-0-
-0-
31,8161
34,300
2,484
1 -7.KCN OS G
-0-
-0-
-0-
81,372
81,372
-0-
1-8.KCN OS I
-0-
-0-
-0-
377,520
442,775
65,255
1- 9.KCNRS 1
-0-
-0-
-0-
52,086
102,110
50,024
1- 10.CourtHouse
-0-
-0-
-0-
69,256
90,000
20,744
2- INP BLK A
-0-
-0-
-0-
349,000
380,362
31,362
2- 2.NPBLKB
-0-
-0-
-0-
10,150
11,950
1,800
2 -3.NP BLK C
-0-
-0-
-0-
211,487
457,880
246,393
2 -4.NP BLK D
-0-
-0-
-0-
274,300
288,264
13,964
2 -5.NP BLK E
-0-
-0-
-0-
834,762
860,884
26,122
2 -6.NP BLK F
-0-
-0-
-0-
192,675
201,180
8,505
2 -7.NP BLK G & H
-0-
-0-
-0-
255,001
295,952
40,951
2 -8.NP BLK I
-0-
-0-
-0-
160,578
160,578
-0-
2-9.NP BLK 7
-0-
-0-
-0-
190,500
228,530
38,030
3. Campus Drive
-0-
-0-
-0-
885,202
1,261,727
376,525
TOTAL
-0-
-0-
-0-
6,922,916
7,850,425
927,509
Population
-0-
-0-
-0-
BE IT FURTHER RESOLVED that the development authorized by this
action is allocated to 1401 Dove Street, Newport Beach.
GPA No.98 -1(B)
Amendment No. 877
Modification No. 4731
Traffic Study No. 117
Page 4
ADOPTED this _day of December, 1998, by the following vote, to wit:
AYES
NOES
ABSENT
MAYOR
ATTEST:
City Clerk
GPA No. 98 -1(B)
Amendment No. 877
Modification No. 4731
Traffic Study No. 117
Page 5
ORDINANCE NO. 98-
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY
OF NEWPORT BEACH APPROVING AN AMENDMENT TO
THE NEWPORT PLACE PLANNED COMMUNITY
DISTRICT TO ESTABLISH THE PERMITTED GROSS
FLOOR AREA FOR PROFESSIONAL & BUSINESS OFFICES
SITE 1 & 2 AT 860,884 SQUARE FEET
(PLANNING COMMISSION AMENDMENT NO. 877)
WHEREAS, on November 19, 1998, Planning Commission of the City of
Newport Beach held a public hearing regarding this amendment, and recommended approval to
the City Council; and
WHEREAS, on December 14, 1998, the City Council of the City of Newport
Beach held a public hearing regarding this amendment; and
Beach; and
WHEREAS, the public was duly noticed of the public hearings; and
WHEREAS, the City of Newport Beach has determined that the proposed project
will not have a significant effect on the environment upon implementation of the mitigation
measures set forth in the Negative Declaration prepared for the project pursuant to the California
Environmental Quality Act (CEQA) and the State CEQA Guidelines; and
WHEREAS, the proposed amendment to the land use limitations of the Newport
Place Planned Community District, to increase the permitted amount of development, will apply
only to the property at 1401 Dove Street and not to any other site in Newport Place.
THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH DOES
HEREBY ORDAIN AS FOLLOWS:
SECTION 1: The permitted level of development for Professional & Business
Offices Site I & 2 of the Newport Place Planned Community is established at 860,884 gross
square feet. The additional development authorized by this action shall be limited to new
construction at 1401 Dove Street, Newport Beach.
GPA No. 98 -1(B)
Amendment No. 877
Modification No. 4731
Traffic Study No. 117
Page 6
SECTION 2: The Mayor shall sign and the City Clerk shall attest to the passage
of this Ordinance. This Ordinance shall be published once in the official newspaper of the City,
and the same shall become effective thirty (30) days after the date of its adoption.
This Ordinance was introduced at a regular meeting of the City Council of the City of
Newport Beach held on December 14, 1998, and adopted on the 11th day of January, 1999, by
the following vote, to wit:
AYES, COUNCIL MEMBERS
NOES, COUNCIL MEMBERS
ABSENT COUNCIL MEMBERS
MA
ATTEST:
CITY CLERK
GPA No. 98 -I(B)
Amendment No. 877
Modification No. 4731
Traffic Study No. 117
Page 7
City of Newport Beach
Planning Commission Minutes
November 19, 1998
J. This use permit f `e
with the terms of this
approval unless a license has b
State Department of Alcoholic
date.
beverage outlet granted in accordance
II expire within 12 months from the date of
or transferred by the California
GQntrol prior to the expiration
•••
SUBJECT: 1401 Dove Street
IMH /ICH Dove Street (applicant)
• General Plan Amendment No. 98 -1(B), with the
acceptanceof a Negative Declaration
• Amendment No. 877
• Modification No. 4731
• Traffic Study No. 117
A request to permit the construction of a two -story 26,122 square foot
commercial office building built over a partially subterranean parking lot. The
proposed site encompasses approximately 3.8 acres of land area and is
currently developed with a six -story office building and related on -site parking.
The new office building will be located to the west of the existing building
towards the rear of the site where a portion of the parking lot currently exists.
The project involves the approval of:
a General Plan Amendment and PC Amendment to increase the
square footage entitlement in Block E of Newport Place Planned
Community. The current limit of 834,762 square feet will be increased to
860,884 square feet to accommodate the construction of the new
commercial office building, and
a Modification to permit reduction of the parking requirement ratio from
1 space for each 225 square feet to 1 space for each 250 square feet of
net floor area, and
the approval of a Traffic Study.
Associate Planner Mark Myers noted the following:
• Subject property is currently developed with a six -story, 74,000 square foot
office building.
• The proposed office building will be located on site where a portion of the
surface parking lot currently exists.
• Since the Land Use Element of the General Plan does not provide for further
growth in this particular area of Newport Place Planned Community, a
General Plan Amendment is required.
• Amendments to the General Plan may be approved with the findings that
the amendmentis consistentwith the policies of the General Plan.
18
I 121101
Item No. 4
GPA 98 -1 (B)
Negative Declaration
A 877
M. 4731
TS 117
Recommended for
approval
City of Newport Beach
Planning Commission Minutes
November 19, 1998
INDEX
• While consistencywith the General Plan can be made in this case, it should
be noted that the General Plan provides a focused and limited amount of
policy criteria by which a projectcan be analyzed.
• The intent of the General Plan Amendment No. 98 -1 (B) allows for growth
provided traffic does not exceed the level of service desired by the City.
• The subject property is only able to achieve consistency with policy B of the
General Plan with a proportional contribution to an identified intersection
improvement.
• The traffic analysis shows the additional office space would result in an
increase in the level of service at one intersection without the intersection
improvement.
Concluding, he noted that on page 5 of the staff report in the third paragraph
under the subheading Modification, there is a typographical error. The last
sentence should read a surplus of 44 spaces, not 69.
At Commission inquiry, staff noted that the total number of spaces provided on
site is 430.
Chairperson Selich noted his confusion with this site that is proposing to add
26,000 square feet and does not trip the TPO and another proposed expansion
project (also subject to the General Plan Amendment) had to cut 10,000
square feet so. that it would not trip the TPO. It is confusing as to what can
happen with incremental square footage being added. There is additional
development that the General Plan allows that has not been built yet. The TPO
will effect the propertyowner's abilityto use that square footage. By approving
this project, what will we do to their ability to use their property to their full
advantage? Here, we are going over and above the square footage that is
presently allowed in the General Plan on this site. It becomes confusing
because it seems you could go through and incrementally do these little
projects behind the various office buildings and before you know it, you have a
lot of additional square feet without actually tripping TPO.
Commissioner Adams stated this was not unique to this application or site. The
argument can be made citywide and has been going on for the last 15 years.
This is one of the issues being addressed in the TPO Committee.
Discussion continued on:
• discussing the hotel site on the original Fletcher Jones site, the office project
and this application together;
• this project not factored into the TPO study
• challenges of deciding the base line for the TPO
• regional growth factors
• distribution and peak hour characteristics
• scale of projects
U
City of Newport Beach
Planning Commission Minutes
November 19, 1998
Public comment was opened.
IUbl
Craig Cooper, representative of Impact Company noted the following:
• first proposal was for 32,000 square feet expansion
• through initial traffic study, made aware of impact on neighborhood
circulation necessitating reduction to 26,000 square feet
• the original building purchased to house corporate facilities
• projected growth is to occupy the entire six story and future expansion
• three operation shifts starting at 6:30 a.m. to 3:30 p.m., 7:00 a.m. to 4:00 p.m.
and 8:00 a.m. to 5:00 p.m.
Public comment was closed.
Commissioner Kranzley noted his concerns about a general plan review and
perhaps a specific area plan for the airport. The Commissioncan then address
the many small changes to the general plan with these reviews. Continuing, he
stated that reducing the parking requirement to 1 for 250 suggests that
additional development may occur. He suggested the condition make the
requirement so that the parking surplus is 0.
Marc Myers noted that Condition 2 under the Heading of Modification No.
4721, could be changed to 231 square feet of net floor which would establish
the parking requirementat 429 spaces
Motion was made by Commissioner Kranzley to recommend to the City Council
approval of General Plan Amendment No. 98 -1 (B), with the acceptance of a
Negative Declaration; Amendment No. 877, Modification No. 4731 with the
change to condition 2, and Traffic Study No. 117
Ayes: Fuller, Ashley, Selich, Gifford, Adams, Kranzley
Noes: None
Absent: Ridgeway
Abstain : None
A. Mitigated Negative Declaration:
Findinas:
An Initial Study and Mitigated Negative Declaration have been
prepared in compliance with the Environmental Quality Act
(CEQA), the State CEQA Guidelines, and Council Policy K -3.
2. On the basis of the analysis set forth in the Initial Study, and
Mitigated Negative Declaration, including the mitigation
measures listed, the proposed project does not have the
potential to significantly degrade the quality of the
20
City of Newport Beach
Planning Commission Minutes
November 19, 1998
environment.
INDEX
3. There are no long -term environmental goals that would be
compromised by the project.
4. No cumulative impacts are anticipated in connection with this
or other projects.
5. There are no known substantial adverse affects on human
beings that would be caused by the proposed project.
6. The contents of the environmental document have been
considered in the various decisions on this project.
Mitigation Measures:
During construction activities, the project will comply with the
erosion and siltration control measures of the City's grading
ordinance and all applicable local and State building codes
and seismic design guidelines, including the City Excavation
and Grading Code (NBMC Section 15.04 or applicable
sections).
2. Prior to the issuance of a grading permit, the applicant shall
submit a comprehensive geotechnical investigation to the
Planning and Building Departmentfor review and approval.
3. Prior to the issuance of a grading permit, the applicant shall
submit a construction traffic control plan which includes the
haul route, truck hauling operations, construction traffic
flagmen, and construction warning /directional signage to the
Planning and Traffic Department for review and approval.
4. The project shall conform to the requirements of the National
Pollution Discharge Elimination System (NPDES) and shall be
subject to the approval of the Public Works Department to
determine compliance.
5. During construction activities, the applicant shall ensure that
the following measures are complied with to reduce short-term
(construction) air quality impacts associated with the project:
a) controlling fugitive dust by regular watering, or other dust
palliative measures to meet South Coast Air Quality
Management District (SCAQMD) Rule 403 (Fugitive Dust): b)
maintaining equipment engines in proper tune; and c)
phasing and scheduling construction activities to minimize
21
City of Newport Beach
Planning Commission Minutes
November 19, 1998
project - related emissions.
INDEX
6. During construction activities, the applicant shall ensure that
the project will comply with SCAQMD Rule 402 (Nuisance), to
reduce nuisance due to odors from construction activities.
Prior to the issuance of a building permit, the developer shall
contribute its proportionate pro -rata fair share traffic impact
fees required for improvements at the intersection of
MacArthur Boulevard and Jamboree Road as recommended
in the traffic study dated September 3, 1998, prepared by
Austin -Foust Associates, Inc. and determined by the City Traffic
Engineer.
8. The applicant shall ensure that the project will comply with the
provisions of the City of Newport Beach General Plan Noise
Element and the Municipal Code pertaining to noise
restrictions. During construction activities, the hours of
construction and excavation work are allowed from 7:00 a.m.
to 6:30 p.m. on weekdays and 8:00 a.m. to 6:00 p.m. on
Saturdays, and not at any time on Sundays and holidays.
Prior to the commencement of grading activities, the
applicant shall coordinate with utility and service organizations
regarding any construction activities to ensure existing facilities
are protected and any necessary expansion or relocation of
facilities are planned and scheduled in consultation with the
appropriate public agencies.
10. Prior to the commencement of grading activities, the
applicant shall submit to the Planning and Building
Department a letter from the City Utilities Department
confirming availability of water and wastewater services to
and from the site.
11. Light sources within the parking area shall be designed or
altered to eliminate light and glare spillage onto adjacent
properties or uses. Prior to the issuance of a building permit,
the applicant shall demonstrate to the Planning Department
that the exterior lighting system has been designed and
directed in such a manner as to conceal the light source and
to minimize light spillage and glare to the adjacent properties.
Prior to the issuance of a building permit, the applicant shall
provide to the Planning Department, in conjunction with the
lighting system plan, light fixture product types and technical
22
City of Newport Beach
Planning Commission Minutes
November 19, 1998 INDEX
specifications, including photometric information to determine
the extent of light spillage or glare which can be anticipated.
This information shall be made a part of the building set of
plans for issuance of the building permit. Prior to issuance of
the certificate of use and occupancy or final of building
permits, the applicant shall schedule an evening inspection by
the Code Enforcement Division to confirm control of light and
glare specified by this mitigation measure.
12. A qualified archeologist shall be present during grading
activities to inspect the underlying soil for cultural resources. If
significant cultural resources are uncovered, the archeologist
shall have the authority to stop or temporarily divert
construction activities for a period of 48 hours to assess the
significance of the find.
Standard Requirements:
1. The project shall comply with State Disabled Access
requirements.
2. All improvements shall be constructed as required by Ordinance
and the Public Works Department.
3. Arrangements shall be made with the Public Works
Department in order to guarantee satisfactory completion of
any required public improvements, if it is desired to obtain a
grading or building permit prior to completion of the public
improvements.
4. Public easements and utilities crossing the site shall be shown
of the grading and building site plans.
5. Prior to issuance of any grading or building permits for the site,
the applicant shall demonstrate to the satisfaction of the
Public Works Department and the Planning Department that
adequate sewer facilities will be available for the project.
Such demonstration shall include verification from the Orange
County Sanitation District and the City's Utilities Department.
6. Any Edison transformer serving the site shall be located outside
the sight distance planes as described in City Standard I I O-L.
The on -site parking, vehicular circulation and pedestrian
circulation systems be subject to further review by the City Traffic
Engineer.
23
City of Newport Beach
Planning Commission Minutes
November 19, 1998
INDEX
B. General Plan Amendment No. 98 -1 (B) : Adopt Resolution No.
1482(Attached) recommending to the City Council the adoption of
General Plan Amendment No. 98 -1 (B).
C. Amendment No. 877: Adopt Resolution No. 1483, recommending to the
City Council adoption of Amendment No. 877.
D. Modification No. 4721
Findinas:
The proposed development is consistent with the Land Use
Element of the General Plan as amended by this application.
2. On the basis of the analysis set forth in the Initial Study and
Mitigated Negative Declaration, including the mitigation
measures listed, the proposed project does not have the
potential to significantly degrade the quality of the
environment.
3. The granting of a modification to establish a parking
requirement of 1 space for each 250 square feet of net floor
area will not be detrimental to persons, property or
improvements in the neighborhood and the modifications as
approved are consistent with the legislative intent of Title 20 of
the Newport Beach Municipal Code because this parking ratio
has proven to be adequate for most general office
developments in the City.
Conditions:
1. That development shall be insubstantial conformance with the
approved site plan, floor plan and elevations, except as noted
below.
2. That one parking space for each 250 231 sq. ft. of net floor area
shall be provided on -site.
Standard Requirements:
That all signs shall conform to the provisions of Chapter 20.06 of
the Municipal Code.
24
City of Newport Beach
Planning Commission Minutes
November 19, 1998
2. That the proposed office building and related parking structure
shall conform to the requirementsof the Uniform Building Code.
3. That the project shall comply with State Disabled Access
requirements.
4. That the on -site parking, vehicular circulation and pedestrian
circulation systems be subject to further review by the City Traffic
Engineer.
5. That this Modification shall expire unless exercised within 24
months from the date of approval as specified in Section
20.80.090A of the Newport Beach Municipal Code.
E. Traffic Study 117
Findings:
That a Traffic Study has been prepared which analyzes the
impact of the proposed project on the peak -hour traffic and
circulation system in accordance with Chapter 15.40 of the
Newport Beach Municipal Code and City Policy 1 -18.
2. That the Traffic Study has been reviewed by the City Traffic
Engineer and found in compliance with the Traffic Phasing
Ordinance.
3. That the Traffic Study indicates that the project - generated traffic
will neither cause nor make worse an unsatisfactory level of
traffic on any' major," primary- modified,'or'primary'street at any
of the nine intersections selected for evaluation by City staff and
based on the characteristicsof the proposed development.
4. That the Traffic Study indicatesthat the project- generatedtraffic
will not be greaterthan one percent of the existing traffic during
the 2.5 hour peak period on eight of the nine study intersections
and that the ICU analysis for one of the nine intersections
indicates that the ICU value does not increase.
25
INDEX
�E`x'POgr CITY OF NEWPORT BEACH Hearing Date: November 19, 1998
COMMUNITY and ECONOMIC DEVELOPMENT Agenda Item No.: 4
PLANNING DEPARTMENT
\_ s 3300 NEWPORT BOULEVARD Staff Person: Marc Myers
NEWPORT BEACH. CA92658 (949) 644 -3210
(949) 644 -3200: FAX (949) 644.1250 Appeal Period: 14 days
REPORT TO THE PLANNING COMMISSION
PROJECT: 1401 Dove Street
IMHACH Dove Street (applicant)
PURPOSE OF
APPLICATION: A request to permit the construction of a two -story 26,122 square foot
commercial office building built over a partially subterranean parking lot.
The proposed site encompasses approximately 3.8 acres of land area and is
currently developed with a six -story office building and related on -site
parking. The new office building will be located to the west of the existing
building to,vards the rear of the site where a portion of the parkng lot
currently exists. The project involves the approval of:
• a General Plan Amendment and PC Amendment to increase the square
footage entitlement in Block E of Newport Place Planned Community.
The current limit of 834,762 square feet will be increased to 860,884
square feet to accommodate the construction of the new commercial
office building, and
• a Modification to permit reduction of the parking requirement ratio from
I space for each 225 square feet to 1 space for each 250 square feet of
net floor area, and
• the approval of a Traffic Study.
ACTION: Recommend to the City Council approval of:
• General Plan Amendment No. 98 -1(B), with the acceptance of a
Negative Declaration
• Amendment No. 877
• Modification No. 4731
• Traffic Study No. 117
LEGAL
DESCRIPTION: Parcel 1, Book 40, Page 32 of Orange County Parcel
Maps
ZONE: PC (Planned Community)
OWNER: IMH/ICH Dove Street LLC, Santa Ana Heights
Points and Authority
• Conformance with the General Plan
The Land Use Element of the General Plan designates the site for "Administrative,
Professional and Financial" commercial uses. Office use is permitted within this
designation. The Land Use Element currently allows 834,762 square feet of floor area in
Block E of Newport Place Planned Community. The proposed project requires an
amendment to the Land Use Element to increase the entitlement in Block E by 26,122
square feet, which will allow for a total maximum limit of 860,884 square feet in Block E
of Newport Place Planned Community.
Environmental Compliance (California Environmental Quality Act)
In accordance with the California Environmental Quality Act (CEQA), the State CEQA
Guidelines and City Policy K -3, an Initial Study has been prepared for the project. Based
upon the information contained in the Initial Study, it has been determined that if proposed
mitigation measures are incorporated, the project would not have a significant effect on the
environment. A Mitigated Negative Declaration has, therefore, been prepared for the project
and a copy of it is attached for the Planning Commission's review. The Negative
Declaration states that the subject development will not result in a significant effect on the
environment. It is the present intention of the City to accept the Negative Declaration and
supporting documents. The Negative Declaration is not to be construed as either approval or
denial by the City of the subject applications. The City encourages members of the general
public to review and comment on this documentation. Copies of the Negative Declaration
and supporting documents are attached to this report and are also available for public review
and inspection at the Planning Department.
Modification procedures and requirements are set forth in Chapter 20.93 of the Municipal
Code.
• Traffic Study requirements are set forth in Chapter 15.40 of the Municipal Code
GPA 98.1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 2
VICINITY MAP
w
T m Sim U
w."A Ae.
PC
t
Is a six -story, 74,000 square foot professional office building and related off - street
parking.
To the north:
k1m,
�
Y
To the south:
Are additional mid and high rise office buildings and related off-street parking.
•
Y
•
1
+A►f
r
+
•r
VICINITY MAP
w
T m Sim U
w."A Ae.
PC
t
i
ac
ac
d
,• r . \
+' 1
crl.
Ac
sRUWAV
z
General Plan Amendment No. 98 -1(B�,
Subject Property and Surroundinal,and Uses
AC
,t
PLO
i•
70 hit
Current Development:
Is a six -story, 74,000 square foot professional office building and related off - street
parking.
To the north:
k1m,
To the east:
I
To the south:
i
ac
ac
d
,• r . \
+' 1
crl.
Ac
sRUWAV
z
General Plan Amendment No. 98 -1(B�,
Subject Property and Surroundinal,and Uses
AC
,t
PLO
i•
70 hit
Current Development:
Is a six -story, 74,000 square foot professional office building and related off - street
parking.
To the north:
Are mid and high rise commercial office buildingsand related off-street parking.
To the east:
Are mid and high rise professional office buildings and related off - street parking.
To the south:
Are additional mid and high rise office buildings and related off-street parking.
To the west:
Are also mid and high rise office buildings and related off-street parking.
GPA 98 -1
PC Amendment No. 977
Modification No 4731
Traffic Study No. It 7
November 19. 1998
Page 3
Analysis
The project is a two -story office building over a partially subterranean parking garage. Each of the
two floors of the building contain approximately 13,061 square feet of floor area, and the partially
subterranean parking garage consists of approximately 31,716 square feet. Currently the site is
developed with a 74,000 square foot, six -story office building and related surface parking.
Various multi -story professional office buildings and financial institutions surround the site. The
new building is to be located to the west of the existing office building within the existing
parking lot.
General Plan and Planned Community Text Amendments
The Land Use Element of the General Plan is a long range planning document setting forth the
City's policies for the use of land. The objective of the Land Use Element is to provide for an
orderly balance of residential and commercial uses with an emphasis on preserving the quality of
life found in the City.
The project is ?ocated in Statistical Area L4, Newport Place Block E •)f the Land Use Element
which does not provide for further growth at this time. However, amendments to the General Plan
may be approved with the finding that the amendment is consistent with th° intent and policies of
the General Plan. The General Plan policies applicable to this proposal are discussed below.
General Plan Policy B allows for some modest growth provided that traffic does not exceed the
level of service desired by the City. In order to assess consistency with this policy, a General Plan
level traffic analysis was conducted. This analysis showed the proposed additional office
development would result in an increase in the predicted Level of Service at the intersection of
MacArthur Boulevard and Jamboree Road. However, an improvement to this intersection has been
identified which was not anticipated in the current Circulation Element. This is the same
improvement identified as part of the City's action on the Burger King Restaurant, which recently
was approved by the City. Implementation of the improvement will allow the intersection to stay
within the predicted Level of Service contained in the Circulation Element. Therefore, approval of
this amendment would be consistent with this policy, if the project makes a proportional
contribution to the improvement.
General Plan Policy D requires that the siting of new buildings and structures shall be controlled
and regulated to preserve, to the extent practical, public views and unique natural resources. While
the City remains committed to protect private property rights, it is also committed to regulate the
placement of buildings in areas adjacent to valuable natural resources and environmentally sensitive
habitats.
The proposed location of the office building, Block E of Newport Place Planned Community,
contains a mixture of administrative and financial commercial uses, with the existing development
a combination of low and high rise office buildings. The proposed office building addition will
maintain an overall height of approximately 57 feet, which is less than many of the existing
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 4
buildings in the area. The new office will be developed on the interior of the lot and block, and will
be integrated into the existing site development. The height and bulk of the new building are such
that it will be visible from many locations within and around the Newport Place area, and could be
visible from MacArthur Boulevard at Newport Place Drive. The proposed architectural style, finish
and color will be similar to the existing development, and therefore, is in keeping with the general
character of the area. Additionally, the location of the new structure will not adversely affect natural
resources nor will it impact environmentally sensitive habitat since the site is currently fully
developed. The proposed amendment, therefore, meets the intent of General Plan Policy D.
General Plan Policy L provides for the City to promote the prosperity of its commercial districts
through the adoption of appropriate development regulations, so that those districts reflect and
compliment the high quality of its residential areas. As previously stated, the proposed amendment
will provide for additional professional and business office space. Professional and business office
uses are an integral part of an important commercial district in Newport Beach. It is the opinion of
staff that an additional office building will improve the prosperity of Newport Place and the overall
airport area by increasing the availability of quality office space in the area. Therefore, the
amendment meets the intent of General Plan Policy L.
The Newport Place Planned Community Text is intended to implement the policies and
development limitations of the General Plan. Should the Planning Commission determine that the
General Plan Amendment is appropriate in this case, the related PC text amendment would be the
implementation of the policies of the General Plan.
Modification
The Newport Place Planned Community District Regulations require the provision of parking for
office use at a ratio of i space for each 225 square feet of net floor area. The regulations also
provide for the reduction of the ratio to 1 space for each 250 square feet, upon review and approval
of the Modifications Committee in each case. The applicant is requesting that the parking
requirement for the office building use be reduced in accordance with the PC Text Regulations.
The existing 6 -story office building currently provides the required number of parking spaces on
site at a ratio of 1 space for each 225 square feet. However, with the new construction located in a
portion of the existing parking lot, the site, including the partially subterranean parking garage, is
unable to provide the required number of parking spaces on site at that ratio. With a parking
requirement of 1 space for each 225 square feet of net floor area, the project has a deficit of 10
parking spaces. However, by reducing the parking requirement to 1 space for each 250 square feet
of net floor area, there would be a surplus of 69 spaces.
Most areas of the City have a parking requirement of 1 space for each 250 square feet of net floor
area for general office development. Additionally, several modifications to the parking requirement
have been approved in various parts of the Newport Place Planned Community with no resulting
problems. Therefore, staff is of the opinion that the reduction in the requirement ratio is consistent
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Trnfric Study No. 117
November 19, 1998
Page 5
with the intent of Title 20, and has no objection to the reduction in the puking requirement. A
condition of approval has been suggested which reflects this parking ratio.
Traffic Study
A traffic study has been prepared which analyzes the impact of the proposed project on the peak
hour traffic and circulation system in accordance with Chapter 15 of the Municipal Code and
Council Policy L -18. The City Traffic Engineer identified nine intersections which could be
affected by the proposed project. Each of these intersections are identified on Page 6 of the
attached traffic study. The traffic study indicates that the proposed project will not have a
significant impact on the level of service at the key intersections identified and, therefore, the
project complies with the requirements of the City's Traffic Phasing Ordinance and Council Policy.
A detailed discussion of the traffic study can be found in the appendix of this report.
Vehicular Access and On -Site Circulation: The proposed partially subterranean parking structure
will provide the parking for the proposed building. The ingress /egress to this parking structure is
provided through the existing surface parking lot from Dove Street. The site plan (Figure 2,
attached traffic st.:dy) calls for a 26 foot wide drive aisle with direct access to the parking structure
from Dove Street. Since there are two existing access points to the site from Dove Street, access
and circulation for the site are considered adequate.
Recommendations
The adoption and amendment of the General Plan is considered a legislative act on the part of the
City, and State Planning Law does not set forth any required findings for either approval or denial
of such requests. Zoning actions are required to be consistent with the General Plan. Staff is of the
opinion that the proposed additional office entitlement could be found consistent with General Plan
policies because adverse traffic impacts are not anticipated in association with the project, the
project will not affect public views or unique natural resources, and the additional office space will
add to the prosperity of Newport Place. Additionally, the project is located within a large regional
office center and therefore is physically compatible with the existing surrounding development.
Staff is also of the opinion that the granting of the modification to reduce the required parking to
1 space for each 250 square feet of net floor area will not be detrimental to persons, property or
improvements in the neighborhood, and would be consistent with the legislative intent of Title 20
of the Newport Beach Municipal Code, since most office developments in the City provide
parking at that ratio with no resultant problems.
Additionally, based on the traffic analysis performed for this project, the ICU values during the
A.M. and P.M. did not increase with the project within the timeframes for this analysis specified by
the Traffic Phasing Ordinance. Therefore, the proposed project is in conformance with that
ordinance.
GPA 98 -1
PC Amendment No. 877
Modification No 5731
Traffic Study No. 117
November 19. 1998
Page 6
Should the Planning Commission wish to approve the subject project, the actions, findings and
conditions of approval set forth in the attached Exhibit "A" are suggested.
Staff cannot reasonably conceive of findings for denial since the proposed use in this particular
case, conforms to all other requirements of the Newport Place Planned Community District
Regulations and does not appear to have any detrimental effect on the surrounding neighborhood.
However, should information be presented at the public hearing which would warrant the denial of
this application, the Planning Commission may wish to take such action.
Submitted by:
PATRICIA L. TEMPLE
Planning Director
Prepared by:
MARC W. MYERS
Associate Planner
P,1uc.� 1761C
Attachments: Appendix
Exhibit "A" with Resolutions
Negative Declaration with Traffic Study attached
Site Plan, Landscape Plan and Elevations
F: \USERS \PLN\SFIARED\ I PLANCOM\ 1998\ 11- 19 \GPA98 -1 RPT
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 7
APPENDIX "A"
LOCATION: 1401 Dove Street; Parcel 1, Book 40, Page 32 of Orange County Parcel
Maps
ZONE: PC (Planned Community) Newport Place Planned Community
APPLICANT: IMH /ICH Dove Street Santa Ana Heights
OWNER: IMH/ICH Dove Street LLC, Santa Ana Heights
Expanded Traffic Study Analysis
The attached traffic study satisfies the requirements of the City's Traffic Phasing Ordinance and
Council Policy L -18. The trip generation forecasts are set forth in Table 1, located on Page 4 of the
study. A detailed explanation of the criteria used for the trip generation forecasts is set forth on
Page 1 of he traffic study. The City Traffic Engineer identified ni %ie intersections which could be
affected by the proposed project, which are listed on Page 6 of the study.
The first step in evaluating intersections is to conduct a one percent traffic volume analysis, taking
into consideration existing traffic, regional growth, and committed projects' traffic. For any
intersection where, on any approach leg, project traffic is estimated to be greater than one percent of
the projected 2' /z hour volume in either the morning or afternoon, an Intersection Capacity
Utilization (ICU) analysis is required.
As summarized in Table 3 on Page 10, only one of the nine intersections increased traffic at any
approach leg by 1% of the projected 2 -%z hour afternoon peak. This intersection is Campus Drive
and Dove Street. An ICU analysis was, therefore, conducted for this intersection. The result of this
analysis showed (Page 11) that the project did not increase the existing ICU of 0.90.
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 8
EXHIBIT "A"
FINDINGS, MITIGATION MEASURES AND CONDITIONS OF APPROVAL
Mitigated Negative Declaration
General Plan Amendment No. 98 -1 (B)
Amendment No. 877
Modification No. 4731 and
Traffic Study 117
A. Mitigated Negative Declaration:
Findings:
1. An Initial Study and Mitigated Negative Declaration have been prepared in
compliance with the Environmental Quality Act (CEQA), the State CEQA
Guidelines, and Council Policy K -3.
2. On the ?tasis of the analysis set forth in the Initial Study and 1itigated Negative
Declaration, including the mitigation measures listed, the proposed project does not
have the potential to significantly degrade the quality of the environment.
3. There are no long -term environmental goals that would be compromised by the
project.
4. No cumulative impacts are anticipated in connection with this or other projects.
5. There are no known substantial adverse affects on human beings that would be
caused by the proposed project.
6. The contents of the environmental document have been considered in the various
decisions on this project.
MitgationMeasures:
1. During construction activities, the project will comply with the erosion and
siltation control measures of the City's grading ordinance and all applicable local
and State building codes and seismic design guidelines, including the City
Excavation and Grading Code (NBMC Section 15.04 or applicable sections).
2. Prior to the issuance of a grading permit, the applicant shall submit a comprehensive
geotechnical investigation to the Planning and Building Department for review and
approval.
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 9
3. Prior to the issuance of a grading permit, the applicant shall submit a construction
traffic control plan which includes the haul route, truck hauling operations,
construction traffic flagmen, and construction warning /directional signage to the
Planning and Traffic Department for review and approval.
4. The project shall conform to the requirements of the National Pollution Discharge
Elimination System (NPDES) and shall be subject to the approval of the Public
Works Department to determine compliance.
5. During construction activities, the applicant shall ensure that the following
measures are complied with to reduce short-term (construction) air quality
impacts associated with the project: a) controlling fugitive dust by regular
watering, or other dust palliative measures to meet South Coast Air Quality
Management District (SCAQMD) Rule 403 (Fugitive Dust); b) maintaining
equipment engines in proper tune; and c) phasing and scheduling construction
activities to minimize project- related emissions.
6. During construction. ctivities, the applicant shall ensure that the project will cc -mply
with SCAQMD Rule 402 (Nuisance), to reduce nuisance due to odors from
construction activities.
7. Prior to the issuance of a building permit, the developer shall contribute its
proportionate pro -rata fair share traffic impact fees required for improvements at
the intersection of MacArthur Boulevard and Jamboree Road as recommended in
the traffic study dated September 3, 1998, prepared by Austin -Foust Associates,
Inc. and determined by the City Traffic Engineer.
8. The applicant shall ensure that the project will comply with the provisions of the
City of Newport Beach General Plan Noise Element and the Municipal Code
pertaining to noise restrictions. During construction activities, the hours of
construction and excavation work are allowed from 7:00 a.m. to 6:30 p.m. on
weekdays and 8:00 a.m. to 6:00 p.m. on Saturdays, and not at any time on
Sundays and holidays.
9. Prior to the commencement of grading activities, the applicant shall coordinate
with utility and service organizations regarding any construction activities to
ensure existing facilities are protected and any necessary expansion or relocation
of facilities are planned and scheduled in consultation with the appropriate public
agencies.
10. Prior to the commencement of grading activities, the applicant shall submit to the
Planning and Building Department a letter from the City Utilities Department
confirming availability of water and wastewater services to and from the site.
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 10
11. Light sources within the parking area shall be designed or altered to eliminate
light and glare spillage onto adjacent properties or uses. Prior to the issuance of a
building permit, the applicant shall demonstrate to the Planning Department that
the exterior lighting system has been designed and directed in such a manner as to
conceal the light source and to minimize light spillage and glare to the adjacent
properties. Prior to the issuance of a building permit, the applicant shall provide
to the Planning Department, in conjunction with the lighting system plan, light
fixture product types and technical specifications, including photometric
information to determine the extent of light spillage or glare which can be
anticipated. This information shall be made a part of the building set of plans for
issuance of the building permit. Prior to issuance of the certificate of use and
occupancy or final of building permits, the applicant shall schedule an evening
inspection by the Code Enforcement Division to confirm control of light and glare
specified by this mitigation measure.
12. A qualified archeologist shall be present during grading activities to inspect the
underlying soil for cultural resources. If significant cultural resources are
uncovered, the archeologist shall have the authority to stop or temporarily divert
construction activities for a period of 48 hours to assess the significance of the
find.
Standard Requirements:
The project shall comply with State Disabled Access requirements.
2. All improvements shall be constructed as required by Ordinance and the Public
Works Department.
3. Arrangements shall be made with the Public Works Department in order to
guarantee satisfactory completion of any required public improvements, if it is
desired to obtain a grading or building permit prior to completion of the public
improvements.
4. Public easements and utilities crossing the site shall be shown of the grading and
building site plans.
5. Prior to issuance of any grading or building permits for the site, the applicant shall
demonstrate to the satisfaction of the Public Works Department and the Planning
Department that adequate sewer facilities will be available for the project. Such
demonstration shall include verification from the Orange County Sanitation
District and the City's Utilities Department.
6. Any Edison transformer serving the site shall be located outside the sight distance
planes as described in City Standard 110 -L.
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 11
The on -site parking, vehicular circulation and pedestrian circulation systems be
subject to further review by the City Traffic Engineer.
B. General Plan Amendment No. 98-1 (B): Adopt ResolutionNo. (Attached)
recommending to the City Council the adoption of General Plan Amendment No. 98-1 (B).
C. Amendment No. 877: Adopt Resolution No. recommending to the City Council
adoption of Amendment No. 877.
D. Modification No. 4721
Findings:
The proposed development is consistent with the Land Use Element of the General
Plan as amended by this application.
2. On the basis of the analysis set forth in the l,»tial Study and Mitigated Negative
Declaration, including the mitigation measures listed, the proposed project does not
have the potential to significantly degrade the quality of the environment.
3. The granting of a modification to establish a parking requirement of 1 space for
each 250 square feet of net floor area will not be detrimental to persons, property or
improvements in the neighborhood and the modifications as approved are consistent
with the legislative intent of Title 20 of the Newport Beach Municipal Code because
this parking ratio has proven to be adequate for most general office developments in
the City.
Conditions:
That development shall be in substantial conformance with the approved site plan,
floor plan and elevations, except as noted below.
2. That one parking space for each 250 sq.ft. of net floor area shall be provided on -site.
Standard Requirements:
That all signs shall conform to the provisions of Chapter 20.06 of the Municipal
Code.
2. That the proposed office building and related parking structure shall conform to the
requirements of the Uniform Building Code.
3. That the project shall comply with State Disabled Access requirements
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 12
4. That the on -site parking, vehicular circulation and pedestrian circulation systems be
subject to further review by the City Traffic Engineer.
5. That this Modification shall expire unless exercised within 24 months from the date of
approval as specified in Section 20.80.090A of the Newport Beach Municipal Code.
E. Traffic Study 117
Findings:
That a Traffic Study has been prepared which analyzes the impact of the proposed
project on the peak -hour traffic and circulation system in accordance with Chapter
15.40 of the Newport Beach Municipal Code and City Policy L -18.
2. That the Traffic Study has been reviewed by the City Traffic Engineer and found in
compliance with the Traffic Phasing Ordinance.
3. That the Traffic Study indicates that the project - generated traffic will neither cause
nor make worse an unsatisfactory level of traffic on any 'major,' 'primary- modified;
or 'primary' street at any of the nine intersections selected for evaluation by City
staff and based on the characteristics of the proposed development.
4. That the Traffic Study indicates that the project - generated traffic will not be greater
than one percent of the existing traffic during the 2.5 hour peak period on eight of
the nine study intersections and that the ICU analysis for one of the nine
intersections indicates that the ICU value does not increase.
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 13
I9
RESOLUTION
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF NEWPORT BEACH RECOMMENDING TO THE
CITY COUNCIL APPROVAL OF AN AMENDMENT TO THE
LAND USE ELEMENT OF THE NEWPORT BEACH
GENERAL PLAN TO INCREASE THE ALLOWED
DEVELOPMENT IN THE NEWPORT PLACE PLANNED
COMMUNITY [General Plan Amendment No. 98 -1(B)]
WHEREAS, as part of the development and implementation of the Newport
Beach General Plan the Land Use Element has been prepared; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy B, since the proposed increase in office development will not result in
significant changes to the long range traffic service levels with the contribution to en identified
improvement; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy D, since the location of the new structure will not adversely affect
public views nor will it impact environmentally sensitive habitat; and
WHEREAS, it has been determined that the proposed development is consistent
with General Plan Policy L, because additional office space is supportive of the prosperity of the
Newport Place area; and
WHEREAS, on November 19, 1998, the Planning Commission of the City of
Newport Beach conducted a public hearing regarding General Plan Amendment 98 -1 (B) at
which time this amendment to the Land Use Element was discussed and determined to be
consistent with the goals of the Newport Beach General Plan; and
WHEREAS, pursuant to the California Environmental Quality Act, an Initial
Study has been prepared for the project. Based upon information contained in the Initial Study,
it has been determined that if proposed mitigation measures are incorporated, the project would
not have a significant effect on the environment. A Negative Declaration has been prepared and
accepted by the City of Newport Beach in connection with the application noted.
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 14
NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of
the City of Newport Beach does hereby recommend that the City Council of the City of Newport
Beach amend the Land Use Element, Statistical Area L4 (NP Block E) Block E, and the
Estimated Growth for Statistical Area L4 Table of the General Plan to read as follows:
Newport Center (Statistical Area Ll )
2 -5. NP Block E. Block E is bounded by Westerly Place, Dove Street and Quail Street. The site
is designated for Administrative, Professional and Financial Commercial land use and is
allocated 834,762 sq. ft.
BE IT FURTHER RESOLVED that the development authorized by this
action is allocated to 1401 Dove Street, Newport Beach.
GPA 98.1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 15
ESTIMATED GROWTH FOR STATISTICAL AREA L4
Residential (in du's)
Commercial (in sq.
ft.)
Existing
Gen. Plan
Projected
Existing
Gen. Plan
Projected
1/1/87
Projection
Growth
1/1/87
Projection
Growth
1 -I.KCN OS A
-0-
-0-
-0-
874,346
874,346
-0-
1-2.KCN OS B
-0-
-0-
-0-
1,060,898
1,060,898
-0-
1-3.KCN OS C
-0-
-0-
-0-
734,641
734,641
-0-
1-4.KCN OS D
-0-
-0-
-0-
250,176
250,176
-0-
1-5.KCN OS E
-0-
-0-
-0-
27,150
32,500
5,350
1 -6.KCN OS F
-0-
-0-
-0-
31,816
34,300
2,484
1 -7.KCN OS G
-0-
-0-
-0-
81,372
81,372
-0-
1-8.KCN OS t
-0-
-0-
-0-
377,520
442,775
65,255
1 -9.KCN RS 1
-0-
-0-
-0-
52,086
102,110
50,024
1- 10.Court House
-0-
-0-
-0-
69,256
90,000
20,744
2 -1NP BLK A
-0-
-0-
-0-
349,000
380.362
31,362
2- 2.NPBLK B
-0-
-0-
-0-
10,150
11,950
1,800
2 -3.NP BLK C
-0-
-0-
-0-
211,487
457,880
246,393
2 -4.NP BLK D
-0-
-0-
-0-
274,300
288,264
13,964
2 -5.NP BLK E
-0-
-0-
-0-
834,762
860,884
26,122
2 -6.NP BLK F
-0-
-0-
-0-
192,675
201,180
8,505
2 -7.NP BLK G & H
-0-
-0-
-0-
255,001
295,952
40,951
2 -8.NP BLK 1
-0-
-0-
-0-
160,578
160,578
-0-
2-9.NP BLK J
-0-
-0-
-0-
190,500
228,530
38,030
3. Campus Drive
-0-
-0-
-0-
885,202
1,261,727
376,525
TOTAL
-0-
-0-
-0-
6,922,916
7,850,425
927,509
Population
-0-
-0-
-0-
BE IT FURTHER RESOLVED that the development authorized by this
action is allocated to 1401 Dove Street, Newport Beach.
GPA 98.1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 15
M
M
ADOPTED this 191h day of November, 1998, by the following vote, to wit:
Edward Selich, Chairman
Richard Fuller, Secretary
AYES
NOES
ABSENT
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 16
RESOLUTION NO.
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF NEWPORT BEACH RECOMMENDING TO
THE CITY COUNCIL APPROVAL OF AN AMENDMENT TO
THE NEWPORT PLACE PLANNED COMMUNITY
DISTRICT TO ESTABLISH THE PERMITTED GROSS
FLOOR AREA FOR PROFESSIONAL & BUSINESS
OFFICES SITE 1 & 2 AT 860,884 SQUARE FEET
(PLANNING COMMISSION AMENDMENT NO. 877)
WHEREAS, as part of the development and implementation of the Newport Beach
General Plan the Land Use Element has been prepared; and
WHEREAS, Section 20.51.045 of the Newport Beach Municipal Code provides
that amendments to establish or amend a Planned Community Devolopment Plan must be approved
by a Resolution of the Planning Commission setting forth full particulars of the amendment; and
WHEREAS, the Planning Commission is of the opinion that the proposed
amendment to the Newport Place Planned Community District Regulations is consistent with the
General Plan; and
WHEREAS, the Planning Commission conducted a public hearing on November
19, 1998, at which time this amendment to amend the Newport Place Planned Community District
Regulations was discussed and determined to be in conformance with the "Administrative,
Professional and Financial Commercial' designation of the Newport Beach General Plan, since the
proposed amendment does not alter the industrial /office character of the subject property or the
Newport Place Planned Community District as a whole; and
WHEREAS, the Newport Beach Municipal Code provides specific procedures for
the implementation of Planned Community zoning for properties within the City of Newport
Beach;and
WHEREAS, the City of Newport Beach has determined that the proposed project
will not have a significant effect on the environment upon implementation of the mitigation
measures set forth in the Negative Declaration prepared for the project pursuant to the California
Environmental Quality Act (CEQA) and the State CEQA Guidelines; and
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Traffic Study No. 117
November 19. 1998
Page 17
WHEREAS, the proposed amendment to the land use limitations of the Newport
Place Planned Community District, to increase the permitted amount of development, will apply
only to the property at 1401 Dove Street and not to any other site in Newport Place.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the
City of Newport Beach does hereby recommend that the City Council approve Amendment No.
877 to establish the permitted level of development for Professional & Business Offices Site 1 &
2 of the Newport Place Planned Community at 860,884 gross square feet.
BE IT FURTHER RESOLVED that the additional development authorized by
this action shall be limited to new construction at 1401 Dove Street, Newport Beach.
M
IM
ADOPTED this 19th day of November, 1998, by the following vote, to wit:
Edward Selich, Chairman
Richard Fuller, Secretary
AYES
NOES
ABSENT
GPA 98 -1
PC Amendment No. 877
Modification No 4731
Trafc Study No. 117
November 19. 1998
Page 18
CITY OF NEWPORT BEACH
3300 Newport Boulevard - P.O. Box 1768
!Newport Beach, CA 92658 -8915
(949) 644 -3225
NEGATIVE DECLARATION
To: From: City of Newport Beach
Planning Department
Office of Planning and Research 3300 Newport Boulevard - P.O. Box 1768
1400 Tenth Street, Room 121 Newport Beach, CA 92658 -8915
Sacramento, CA 95814 (Orange County)
County Clerk, County of Orange
X Public Services Division
P.O. Box 238 Date received for filing at JrIv,-ounty Clerk:
Santa Ana, CA 92702
Public review period: September 30, 1998 to October 29, 1998
Name of Project: 1401 Dove Street Office Building & Partially Subterranean Parking Structure.
Project Location: 1401 Dove Street, Newport Beach, CA
Located on Dove Street near the intersection with Newport Place Drive.
Project Description: The application is a request to permit the approval of a General Plan Amendment, an Amendment to
the Planned Community, a Traffic Study and a Modification. The project involves the construction of a two -story 26,122
square foot commercial office building built over a partially subterranean parking lot. The General Plan Amendment and PC
Amendment are required to increase the square footage entitlement in Block E of Newport Place Planned Community. The
current limit is 834,762 square feet which will be increased to 860,884 square feet to accommodate the construction of the new
commercial office building. A modification is required to permit a reduction in the parking requirement ratio from 1 space per
225 square feet to 1 space per for each 250 square feet of net floor area. The proposed site is currently developed with a six-
story office building and related on -site parking. The new office building is located to the west of the existing building
towards the rear of the site where a portion of the parking lot currently exists. The architectural treatment will be compatible to
that of the existing office building on -site and those professional buildings and financial institutions that surround the site. The
project is located on Dove Street in Newport Place near the intersection with Newport Place Drive. The project site
encompasses approximately 3.8 acres.
Finding: Pursuant to the provisions of City Council K -3 pertaining to procedures and guidelines to implement the California
Environmental Quality Act, the Environmental Affairs Committee has evaluated the proposed project and determined that the
proposed project would not have a significant effect on the environment.
A copy of the Initial Study containing the analysis supporting this finding is 0 attached ❑ on file at the Planning
Department. The Initial Study may include mitigation measures that would eliminate or reduce potential environmental
impacts. This document will be considered by the decision - makers) prior to final action on the proposed project. If a public
hearing will be held to consider this project, a notice of the time and location is attached. Additional plans, studies and/or
exhibits relating to the proposed project may be available for public review. If you would like to examine these materials, you
are invited to contact the undersigned.
If you wish to appeal the appropriateness or adequacy of this document, your comments should be submitted in writing
prior to the close of the public review period. Your comments should specifically identify what environmental impacts you
believe would result from the project, why they are significant, and what changes or mitigation measures you believe should be
adopted to eliminate or reduce these impacts. There is no fee for this appeal. If a public hearing will be held, you are also
invited to attend and testify as to the appropriateness of this document.
If you have any questions or would like further information, please contact the undersigned at (949) 644 -3200.
Date 7-3-
Marc Myers, As & to Planner
4'
19
NOTICE OF PUBLIC HEARING
and
NOTICE OF INTENT TO ADOPT A NEGATIVE DECLARATION
Notice is hereby given that the Planning Commission of the City of Newport Beach will hold a public hearing
on the application of IMHACH Dove Street (Richard Martin, Architect) for General Plan Amendment
No. 98 -1(B), PC Amendment No. 877, Traffic Study No. 117 and Modification No. 4731 on property
located at 1401 Dove Street, Newport Beach, California.
The application is a request to permit the approval of a General Plan Amendment, an Amendment to the
Newport Place Planned Community, a Traffic Study and a Modification. The project involves the
construction of a two -story 26,122 square foot commercial office building built over a partially subterranean
parking lot. The General Plan Amendment and PC Amendment are required to increase the square footage
entitlement in Block E of Newport Place Planned Community. The current limit is 834,762 square feet which
will be increased to 860,884 square feet to accommodate the construction of the new commercial office
building. A Modification is required to permit a reduction in the parking requirement ratio from 1 space for
each 225 square feet, to 1 space for each 250 square feet of net floor area. The proposed site is currently
developed with a six -story office building and related on -site parking. The new office building is located to
the west of the existing building towards the rear of the site where a portion of the parking lot currently exists.
The architectural treatment of the new building will be compatible to that of the existing office building on-
site and those professional buildings and financial institutions that surround the site. The project is located on
Dove Street near the intersection with Newport Place Drive. The project site encompasses approximately 3.8
acres of land area.
NOTICE IS HEREBY FURTHER GIVEN that an Initial Study/Mitigated Negative Declaration has been
prepared by the City of Newport Beach in connection with the application noted above. The Initial
Study/Mitigated Negative Declaration states that the subject development as proposed, and with
implementation of the recommended mitigation measures, will not result in a significant effect on the
environment. It is the present intention of the City to accept the Initial Study/Mitigated Negative Declaration
and supporting documents. This is not to be construed as either approval or denial by the City of the subject
application. The Initial Study/Mitigated Negative Declaration 30 -day public review period is September 30,
1998 to October 29, 1998. The City encourages members of the general public to review and comment on
this documentation. Copies of the Initial Study and Mitigated Negative Declaration and supporting
documents are available for public review and inspection at the Planning Department, City of Newport Beach,
3300 Newport Boulevard, Newport Beach, California, 92659 -1768, (949) 644 -3200.
Notice is hereby further given that said public hearing will be held on the 19th day of November, 1998, at the
hour of 7:00 p.m. in the Council Chambers of the Newport Beach City Hall, 3300 Newport Boulevard,
Newport Beach, California, at which time and place any and all persons interested may appear and be heard
thereon. If you challenge this project in court, you may be limited to raising only those issues you or someone
else raised at the public hearing described in this notice or in written correspondence delivered to the City at,
or prior to, the public hearing. For information call (949) 644 -3200.
Richard Fuller, Secretary, Planning Commission, City of Newport Beach.
NOTE: The expense of this notice is paid from a filing fee collected from the applicant.
7�
�fi
CITY OF NEWPORT BEACH
ENVIRONMENTAL CHECKLIST FORM
1. Project Title: 1401 Dove Street Office Building & Partially Subterranean Parking
Structure, Newport Beach, California.
2. Lead Agency Name and Address: City of Newport Beach
Planning/Building Department
3300 Newport Boulevard,
Newport Beach, CA 92658 -8915
Contact Person and Phone Number: Marc Myers, Associate Planner, Planning Department
(949) 644 -3200
4. Project Location: 1401 Dove Street, Newport Beach, CA 92660. The site is located at 1401
Dove Street near the intersection with Newport Place Drive in Block E of Newport Place
Planned Community.
Project Sponsor's Name and Address: The Burge Corporation, 981 Calle Negocia, Suite 200,
San Clemente, CA 92673
6. General Plan Designation: Administrative, Professional & Financial Commercial
7. Zoning: PC — Newport Place Planned Community
8. Description of Project: (Describe the whole action involved, including but not limited to later
phases of the project, and any secondary, support, or off -site features necessary for its
implementation. Attach additional sheets if necessary.)
The application is a request to permit the approval of a General Plan Amendment, an
Amendment to the Planned Community, a Traffic Study and a Modification. The project
involves the construction of a two -story 26,122 square foot commercial office building built
over a partially subterranean parking lot. The General Plan Amendment and PC
Amendment are required to increase the square footage entitlement in Block E of Newport
Place Planned Community. The current limit is 834,762 square feet which will be
increased to 860,884 square feet to accommodate the construction of the new commercial
office building. A modification is required to permit a reduction in the parking
requirement ratio from I space per 225 square feet to 1 space per for each 250 square feet
of net floor area. The proposed site is currently developed with a six -story office building
and related on -site parking. The new office building is located to the west of the existing
building towards the rear of the site where a portion of the parking lot currently exists.
The architectural treatment will be compatible to that of the existing office building on -site
and those professional buildings and financial institutions that surround the site. The
project is located on Dove Street in Newport Place near the intersection with Newport Place
Drive. The project site encompasses approximately 3.8 acres.
CHECKLIST
Page 1 '
�J.
9. Surrounding Land Uses and Setting: (Briefly describe the project's surroundings.)
Current
Development:
The proposed site is located on an existing parcel which contains a
74,000 square -foot building, six -story office building and parking
lot.
To the north:
Office building uses and parking areas
To the east:
Office building uses and parking areas
To the south:
Office building uses and parking areas
To the west:
Office building uses and parking areas
10. Other public agencies whose approval is required (e.g., permits, financing approval, or
participation agreement.)
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The environmental factors checked below would be potentially affected by this project, involving at
least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following
pages.
❑ Land Use Planning
❑ Population & Housing
❑ Geological Problems
❑ Water
❑ Air Quality
❑ Transportation/
Circulation
❑ Biological Resources
❑ Energy & Mineral
Resources
❑ Hazards
❑ Noise
❑ Mandatory Findings of
Significance
❑ Public Services
❑ Utilities & Service
Systems
❑ Aesthetics
❑ Cultural Resources
❑ Recreation
CHECKLIST
Page 2
DETERMINATION (To be completed by the Lead Agency.)
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the
environment, and a NEGATIVE DECLARATION will be prepared. p
I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because the
mitigation measures described on an attached sheet have been added to the
project. A NEGATIVE DECLARATION will be prepared. ❑
I find that the proposed project MAY have a significant effect on the
environment, and ENVIRONMENTAL IMPACT REPORT is required. ❑
I find that the proposed project MAY have a significant effect(s) on the
environment, but at least one effect 1) has been adequately analyzed in an
earlier document pursuant to applicable legal standards, and 2) has been
addressed by mitigation measures based on the earlier analysis as
described on attached sheets, if the effect is a "potentially significant impact"
or "potentially significant unless mitigated." An ENVIRONMENTAL IMPACT
REPORT is required, but it must analyze only the effects that remain
to be addressed. ❑
I find that although the proposed project could have a significant effect
on the environment, there WILL NOT be a significant effect in this case because
all potentially significant effects (a) have been analyzed adequately in an earlier
EIR pursuant to applicable standards and (b) have been avoided or mitigated
pursuant to that earlier EIR, including revisions or mitigation measures that are
imposed upon the proposed project. ❑
7.310, 7�
Submitted by: Signature Date
M y. 3 7 r
Printed Name Date
.( t kale /moo /r�
Prepared by: Hodge & Associates V Signature Date
Cheryle L. Hodge
CHECKLIST
Page 3
�;�
CHECKLIST
Page 4
Potentially
Potentially
Lass than
No
Significant
Significant
Significant
Impact
Impact
Unless
Impact
Mitigation
Incorporated
I. LAND USE AND PLANNING.
Would the proposal:
a)
Conflict with general plan
❑
❑
❑
Q
designation or zoning? (1,2,3)
b)
Conflict with applicable environ-
❑
❑
❑
Q
mental plans or policies adopted by
agencies with jurisdiction over the
project? (1,2,3)
C)
Be incompatible with existing land
❑
❑
❑
Q
use in the vicinity? (1,2,3)
d)
Affect agricultural resources or
❑
❑
❑
Q
operations (e.g. impacts to soils or
farmlands, or impacts from
incompatible land uses)? (1,2,3)
e)
Disrupt or divide the physical
❑
❑
❑
Q
arrangement of an established
community (including a low- income
or minority community)?
(1,2,3)
II.
POPULATION AND HOUSING.
Would the proposal:
a)
Cumulatively exceed official
❑
❑
❑
Q
regional or local population
projections ?(1,2,3)
b)
Induce substantial growth in an area
❑
❑
❑
Q
either directly or indirectly (e.g.
through projects in an undeveloped
area or extension of major
infrastructure)? (1,2,3)
C)
Displace existing housing,
❑
❑
❑
Q
especially affordable housing?
(1,2,3)
III.
GEOLOGIC PROBLEMS.
Would the proposal result in or
expose people to potential impacts
involving:
a)
Fault rupture? (1,2,3,4)
❑
❑
❑
Q
CHECKLIST
Page 4
b)
Seismic ground shaking? (1,2,3,4)
C)
Seismic ground failure, including
Significant
liquefaction? (1,2,3,4)
d)
Seiche, tsunami, or volcanic
Impact
hazard? (1,2,3,4)
e)
Landslides or mudflows? (1,2,3,4)
f)
Erosion, changes in topography or
unstable soil conditions from
excavation, grading, or fill?
(1,23,4)
g)
Subsidence of land? (1,2,3,4)
h)
Expansive soils? (1,2,3,4)
1)
Unique geologic or physical
features? (1,2,3,4)
IV. WATER.:
❑
Would the proposal result in:
a)
Changes in absorption rates,
❑
drainage patterns, or the rate and
0
amount of surface runoff? (1,2,3,4)
b)
Exposure of people or property to
0
water related hazards such as
flooding? (1,2)
C)
Discharge into surface waters or
other alteration of surface water
quality (e.g. temperature, dissolved
oxygen or turbidity)? (1,2)
d)
Changes in the amount of surface
water in any water body? (1,2)
e)
Changes in currents, or the course
or direction of water movements?
(1,2)
f)
Change in the quantity of ground
waters, either through direct
additions or withdrawals, or through
interception of an aquifer by cuts or
excavations or through substantial
loss of groundwater recharge
capability? (1,2)
Potentially
Potentially
Less than
No
Significant
Significant
Significant
Impact
Impact
Unless
Impact
0
Mitigation
Incorporated
❑
❑
❑
0
❑
❑
❑
0
❑
❑
❑
0
❑
❑
❑
0
❑
❑
❑
0
❑
❑
❑
0
❑
❑
❑
0
CHECKLIST
Page 5
❑
❑
❑
0
❑
❑
❑
0
CHECKLIST
Page 5
g) Altered direction or rate of Flow of
groundwater? (1,2)
h) Impacts to groundwater quality?
(1,2)
1) Substantial reduction in the amount
of groundwater otherwise available
for public water supplies? (1,2)
V. AIR QUALITY.
Would the proposal:
a) Violate any air quality standard or
contribute to an existing or
projected air quality violation?
(1,2,6,7,8)
b) Expose sensitive receptors to
pollutants? (1,2,6,7,8)
C) Alter air movement, moisture, or
temperature, or cause any change
in climate ?(1,2,6,7,8)
d) Create objectionable odors? (6,7,8)
VI. TRANSPORTATION /CIRCULATION
Would the proposal result in impacts
to:
a) Increased vehicle trips or traffic
congestion? (1,2,3,10)
b) Hazards to safety from design
features (e.g. sharp curves or
dangerous intersections) or
incompatible uses (e.g. farm
equipment? (1,2,3,10)
C) Inadequate emergency access or
access to nearby uses? (1,2,3,10)
d) Insufficient parking capacity on -site
or off -site? (1,2,3,10)
e) Hazards or barriers for pedestrians
or bicyclists? (1,2,3)
Aentially
Potentially
Less than
No
gnincant
significant
significant
Impact
Impact
Unless
Impact
Mitigation
Incorporated
❑ ❑ 0 ❑
CHECKLIST
Page 6
f) Conflicts with adopted policies
supporting alternative transportation
(e.g. bus turnouts, bicycle racks)?
(1,2,3)
g) Rail, waterborne or air traffic
impacts ?(1,2,3)
VII. BIOLOGICAL RESOURCES.
Would the proposal result in impacts
to:
a) Endangered, threatened or rare
species or their habitats (including but
not limited to plants, fish, insects,
animals, and birds)? (1,2,3)
b) Locally designated species (e.g.
heritage trees)? (1,2,3)
c) Locally designated natural
communities (e.g. oak forest, coastal
habitat, etc.)? (1,2,3)
d) Wetland habitat (e.g. marsh, riparian
and vernal pool)? (1,2,3)
e) Wildlife dispersal or migration
corridors? (1,2,3)
VIII. ENERGY & MINERAL RESOURCES
Would the proposal:
a) Conflict with adopted energy
conservation plans? (1,2,3)
b) Use non - renewable resources in a
wasteful and inefficient manner?
(1,2,3)
C) Result in the loss of availability of a
known mineral resource that would
be of future value to the region and
the residents of the state? (1,2,3)
Potentially
Potentially
Less than No
Significant
Significant
Significant Impact
Impact
Unless
Impact
❑
Mitigation
Q
❑
Incorporated
❑
❑
❑
❑ Q
❑ ❑ ❑ Q
CHECKLIST
Page 7
h.
❑
❑
❑
Q
❑
❑
❑
Q
❑
❑
❑
Q
CHECKLIST
Page 7
h.
❑
❑
❑
Q
❑
❑
❑
Q
CHECKLIST
Page 7
h.
IX. HAZARDS.
Would the proposal involve:
a) A risk of accidental explosion or
release of hazardous substances
(including, but not limited to: oil,
pesticides, chemicals or radiation)?
(1,2,3,9)
b) Possible interference with an
emergency response plan or
emergency evacuation plan ?(1,2,3)
C) The creation of any health hazard or
potential health hazard? (1,2,3,9)
d) Exposure of people to existing
sources of potential health hazards?
(1,2,3,9)
e) Increased fire hazard in areas with
flammable brush, grass, or trees?
(1,2,3)
X. NOISE.
Would the proposal result in:
a) Increases in existing noise levels?
(1,2,3,5)
b) Exposure of people to severe noise
levels? (1,2,3,5)
XI. PUBLIC SERVICES.
Would the proposal have an effect
upon, or result in a need for new or
altered government services in any
of the following areas:
a) Fire protection? (1,2,3)
b) Police protection? (1,2,3)
C) Schools? (1,2,3)
d) Maintenance of public facilities,
including roads? (1,2,3)
e) Other governmental services?
(1,2,3)
Potentially
Potentially
Less than
Significant
Significant
Significant
Impact
Unless
Impact
Mitigation
Incorporated
❑
❑
❑
No
Impact
❑
❑
❑
0
CHECKLIST
Page 8 `i3
C;L?-
CHECKLIST
Page 9
lip
Potentially
Potentially
Less than
No
Significant
Significant
Significant
Impact
Impact
Unless
Impact
Mitigation
Incorporated
XII.
UTILITIES & SERVICE SYSTEMS.
Would the proposal result in a need
for new systems or supplies, or
substantial alterations to the
following utilities?
a)
Power or natural gas? (1,2,3)
❑
❑
Q
❑
b)
Communications systems? (1,2,3)
❑
❑
Q
❑
C)
Local or regional water treatment or
❑
❑
Q
❑
distribution facilities? (1,2,3)
d)
Sewer or septic tanks? (1,2,3)
❑
❑
Q
❑
e)
Storm water drainage? (1,2,3)
❑
❑
Q
❑
f)
Solid waste disposal? (1,2,3)
❑
❑
Q
❑
g)
Local or regional water supplies?
❑
❑
Q
❑
(1,2,3)
XIII.
AESTHETICS.
Would the proposal:
a)
Affect a scenic vista or scenic
❑
❑
Q
❑
highway? (1,2,3)
b)
Have a demonstrable negative
❑
❑
❑
Q
aesthetic effect? (1,2,3)
C)
Create light or glare? (1,2,3)
❑
❑
Q
❑
d)
Affect a coastal bluff? (1,2,3)
❑
❑
❑
Q
XIV.
CULTURAL RESOURCES. Would
the proposal:
a)
Disturb paleontological resources?
❑
❑
Q
❑
(1,2)
b)
Disturb archaeological resources?
❑
❑
Q
❑
(1,2)
C)
Affect historical resources? (1,2,)
❑
❑
❑
Q
d)
Have the potential to cause a
❑
❑
❑
Q
physical change which would affect
unique ethnic cultural values?
(1,2,3)
CHECKLIST
Page 9
lip
e) Restrict existing religious or sacred
uses within the potential impact
area? (1,2,3)
Potentially
Potentially
Less than No
Significant
Significant
Significant Impact
Impact
Unless
Impact
environment, substantially reduce
Mitigation
the habitat of a fish or wildlife
Incorporated
❑
❑
❑ 0
XV. RECREATION.
Would the proposal:
a) Increase the demand for ❑ ❑ ❑ E]
neighborhood or regional parks or
other recreational facilities? (1,2)
b) Affect existing recreational ❑ ❑ ❑ 0
opportunities? (1,2)
XVI.
MANDATORY FINDINGS OF
SIGNIFICANCE.
A)
Does the project have the potential
to degrade the quality of the
environment, substantially reduce
the habitat of a fish or wildlife
species, cause a fish or wildlife
population to drop below self -
sustaining levels, threaten to
eliminate a plant or animal
community, reduce the number or
restrict the range of a rare or
endangered plant or animal or
eliminate important examples of the
major period of California history or
prehistory?
b)
Does the project have the potential
to achieve short-term, to the
disadvantage of long -term,
environmental goals?
C)
Does the project have impacts that
are individually limited, but
cumulatively considerable?
( "Cumulatively considerable" means
that the incremental effects of a
project are considerable when
viewed in connection with the
effects of past projects, the effects
of other current projects, and the
effects of probable future projects.)
❑ ❑ ❑ 0
❑ ❑ ❑ 0
❑ ❑ ❑ 0
CHECKLIST
Page 10
q�
XVII. EARLIER ANALYSES.
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, one or
more effects have been adequately analyzed in an earlier EIR or negative declaration. Section
15063(c)(3)(D). In this case a discussion should identify the following on attached sheets:
a) Earlier analyses used. Identify earlier analyses and state where they are available for review.
b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope of and
adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such
effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation measures. For effects that are "Less than Significant with Mitigation Incorporated," describe the
mitigation measures which were incorporated or refined from the earlier document and the extent to which
they address site - specific conditions for the project.
CHECKLIST
Page 11
_Z
Potentially
Potentially
Less than No
Significant
Significant
Significant Impact
Impact
Unless
Impact
Mitigation
Incorporated
d) Does the project have
❑
❑
❑ Q
environmental effects which will
cause substantial adverse effects
on human beings, either directly or
indirectly?
XVII. EARLIER ANALYSES.
Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, one or
more effects have been adequately analyzed in an earlier EIR or negative declaration. Section
15063(c)(3)(D). In this case a discussion should identify the following on attached sheets:
a) Earlier analyses used. Identify earlier analyses and state where they are available for review.
b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope of and
adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such
effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation measures. For effects that are "Less than Significant with Mitigation Incorporated," describe the
mitigation measures which were incorporated or refined from the earlier document and the extent to which
they address site - specific conditions for the project.
CHECKLIST
Page 11
_Z
SOURCE LIST
The following enumerated documents are available at the offices of the City of Newport Beach, Planning
Department, 3300 Newport Boulevard, Newport Beach, California 92660.
1. Final Program El — City of Newport Beach General Plan
2. General Plan, including all its elements, City of Newport Beach.
3. Title 20, Zoning Code of the Newport Beach Municipal Code.
4. City Excavation and Grading Code, Newport Beach Municipal Code.
5. Chapter 10.28, Community Noise Ordinance of the Newport Beach Municipal Code.
6. South Coast Air Quality Management District, Air Quality Management Plan 1997.
7. South Coast Air Quality Management District, Air Quality Management Plan EIR, 1997.
8. South Coast Air Quality Management District, CEQA Air Quality Handbook, 1993.
9. Phase 1 Environmental Assessment, prepared by Eckland Consultants Inc., July 14, 1997.
10. 1401 Dove Street Traffic Phasing Ordinance & General Plan Traffic Analysis, prepared by Austin -Foust
Associates, Inc., September 3, 1998.
CHECKLIST
Page 14 n
a.,)- l
ENVIRONMENTAL ANALYSIS CHECKLIST EXPLANATIONS
New Office Building and Partially Subterranean Parking Garage
1401 Dove Street
General Plan Amendment No. 98 -1(B), PC Amendment No. 877,
Traffic Study No. 117 and Modification No. 4731
Project Description
The application is a request to permit the approval of a General Plan Amendment,
an Amendment to the Planned Community, a Traffic Study and a Modification.
The project involves the construction of a two -story 26,122 square foot commercial
office building built over a partially subterranean parking lot. The General Plan
Amendment and PC Amendment are required to increase the square footage
entitlement in Block E of Newport Place Planned Community. The current limit is
834,762 square feet which will be increased to 860,884 square feet to accommodate
the construction of the new commercial office building. A modification is required
to permit a reduction in the parking requirement ratio from 1 space per 225 square
feet to 1 space per for each 250 square feet of net floor area. The proposed site is
currently developed with a six -story office building and related on -site parking. The
new office building is located to the west of the existing building towards the rear of
the site where a portion of the parking lot currently exists. The architectural
treatment will be compatible to that of the existing office building on -site and those
professional buildings and financial institutions that surround the site. The project
is located on Dove Street in Newport Place near the intersection with Newport Place
Drive (see Exhibits 1 and 2; Regional Location Map and Project Vicinity). The
project site encompasses approximately 3.8 acres. The project plans and site photo
exhibits are presented in Appendix A of this document.
ANALYSIS
The following discussion provides explanations for the conclusions contained in the
Environmental Analysis Checklist regarding the proposed project's environmental
Impacts. The project site has been subject to previous environmental assessment
in the Final Program EIR for the City of Newport Beach General Plan (hereinafter
referred to as FPEIR) and General Plan. These documents are hereby
incorporated by reference consistent with Section 15150 of the CEQA Guidelines
and are on file and available for review at the Planning Department, City of
Newport Beach.
y
i
LOS ANGELES 3
COUNTY '
L
Garden Grove
1
1�
1
—� SAN BERNARDINO
COUNTY
ORANGE r
Sd 3
��a d
ti
way
TUSTIN
9�d •
SANTA ANA
•
•
aWg�_ IRVINE
COSTA
doe MESA
Jl •
H\
'9 NEWPORT
Li BEACH
�C
LAKE
OREST
•
`ono
Sd7 MISSION
\ VIEJO
RIVERSIDE
COUNTY
\' 1
1
ORANGE
COUNTY
/ BEACH LAGUNA T I
NIGUEL EL ?t �
• .G
• Orr•9a
O SANJUAN
PROJECT CAPISTRANO
SITE � DANA
POINT
SAN •
.L eLeMENTE\`
MAP NOT TO SCALE
SAN DIEGO
COUNTY
Regional Location
11 EXHIBIT 1
q171
a
W
J
Q
V
® N
O
I-
'0"
Z
a
a
C (V
O
U m
O =
i X
U w
O
O
^^L
1..L
a
W
J
Q
V
® N
O
I-
'0"
Z
a
a
I.
Land Use and Planning
The proposed site is located on the west side of Dove Street near Newport Place
Drive within Block E of Newport Place. Currently the site is developed with a
74,000 square foot, six -story office building and parking lot. Professional office
buildings, and financial institutions, surround the site. The new addition is to be
located to the west of the existing office building within the existing parking lot.
The City's General Plan Land Use Plan designation for the site is Administrative.
Professional & Financial Commercial, which includes office use. The site is
further designated within the General Plan Land Use Element as Airport Area
(Statistical Area L4.) Block E — Newport Place. Under the current General Plan
Land Use provisions, the Block E designated area is limited to 834,762 square
feet. Therefore, the proposed expansion of 26,122 square feet requires a General
Plan Amendment. The General Plan Amendment would allow an increase from
the current designation of 834,762 square feet to a total maximum limit of
860,884 square feet for Block E.
The City's Zoning Code designation for the site is PC — Newport Place Planned
Community, which permits office use. This project is located outside the Coastal
Zone Boundary and therefore a Coastal Development Permit is not required.
The project has the potential to result in impacts related to demolition and
construction activities (e.g., dust, noise, and traffic). Additionally, Block E and C
businesses nearby the site will be exposed to views of the demolition and
construction of the additional office facilities and parking structure. Through
anticipated conditions of approval and mitigation measures, short and long -term
impacts to surrounding and adjacent properties from the proposed office building
addition will be eliminated or minimized.
Potential short-term and long -term impacts, which will be minimized through
mitigation measures, include an increase in local traffic and minor alteration of
views from surrounding business properties and structures due to the orientation
of the new office building structure. These potential short-term and long -term
impacts are discussed with recommended mitigation measures in the following
sections of this document.
H. Population and Housing
The proposed project is an addition of 26,122 square feet of office space. The
office uses are projected to increase employment from an existing 300 (at full
occupancy) to a total of 445 employees (an addition of 145 employees).
However, no direct population increase would result from the project or the
increase in employees.
CHECKLIST EXPLANATIONS
Page 2
rI
While the proposed project will include a minor increase in employment, which
could generate an incremental increase in the demand for housing, this increase is
not considered significant.
III. Geologic Problems (Earth)
The topography of the site is relatively flat. The site is not located in an area of
unique geologic or physical features. There are no evident faults on the site. The
closest known active or potentially active fault is the Newport- Inglewood fault.
The existing surface parking on the west of the site will be altered to
accommodate the proposed on -site improvement. The property was originally
graded in conjunction with the development of the existing office building and
parking lot. Although the project site is relatively flat, precise grading and
excavation will be required for the partially subterranean parking structure and it
is anticipated that the project will require an estimated 9,416 cubic yards of export
earthwork. The excess earthwork will be exported to a site located in Huntington
Beach. It is anticipated that a total of 673 truckloads (14 c.y. per double trailer
rig trucks) will be necessary to export the 9,416 cubic yards of earthwork. A
mitigation measure is presented requiring for the exportation of earthwork (e.g.
haul route) to the disposal site.
Potential impacts to surrounding properties from erosion of the exposed soils
during grading operations will be minimized through conditions of approval
and/or mitigation measures. Stockpiling of excavated earth will contribute to
impacts resulting in erosion and the generation of dust. Dust generated by
grading activities is considered a short-term impact on air quality and is further
discussed in Section V (Air Quality) of this analysis.
Soil contamination is discussed under Hazards (Section IX). Compliance with the
City Excavation and Grading Code (NBMC Sec.15.04.140) will reduce any
potential impacts to an insignificant level. No cumulative impacts associated with
geological conditions are anticipated as a result of the hotel addition.
Mitigation Measure No. 1 During construction activities, the project will comply with
the erosion and siltation control measures of the City's grading ordinance and all
applicable local and State building codes and seismic design guidelines, including
the City Excavation and Grading Code (NBMC Section 15.04 or applicable
sections).
Mitigation Measure No. 2 Prior to the issuance of a grading permit, the applicant shall
submit a comprehensive geotechnical investigation to the Planning and Building
Department for review and approval.
CHECKLIST EXPLANATIONS
Page 3
Mitigation Measure No. 3 Prior to the issuance of a grading permit, the applicant shall
submit a construction traffic control plan which includes the haul route, truck
hauling operations, construction traffic flagmen, and construction
warning /directional signage to the Planning and Traffic Department for review and
approval.
IV. Water
The proposed site is largely developed, and the proposed improvements would not
substantially increase water runoff. The project is located outside of all flood
hazard areas; therefore, no significant impacts are anticipated. Subject to the
incorporation of City standard conditions of approval and/or mitigation measures,
no cumulative impacts associated with hydrologic conditions are anticipated as a
result of the office building /parking structure addition. Provisions for drainage
requirements are contained in the City Exaction and Grading Code. To ensure
that storm runoff will not significantly impact the existing drainage system, a
mitigation measure is presented. Compliance with said Code will reduce any
potential impacts to an insignificant level.
Mitigation Measure No. 4 The project shall conform to the requirements of the
National Pollution Discharge Elimination System (NPDES) and shall be subject to
the approval of the Public Works Department to determine compliance.
V. Air Quality
The project site is located in the South Coast Air Basin (SCAB). The South Coast
Air Quality Management District ( SCAQMD) sets and enforces regulations for
stationary sources in the basin. The California Air Resources Board (CARB) is
responsible for controlling motor vehicle emissions. The SCAQMD in
coordination with the Southern California Association of Governments (SCAG)
has developed the Air Quality Management Plan (AQMP) for the air basin. The
AQMP goals include the implementation of technological and innovative changes
that provide for achieving clean air goals while maintaining a healthy economy.
The AQMP also addresses state and federal planning requirements and programs.
Potential air quality impacts to surrounding business properties from project
construction activities will be minimized through mitigation measures, including
short-term impacts to air quality from air pollutants being emitted by construction
equipment and dust generated during grading'. The small amount of project -
related emissions will have no impact on regional particulate levels. Where
grading is near existing development, the dust generated by such activities is a
CHECKLIST EXPLANATIONS
Page 4
local nuisance as opposed to an actual health hazard. However, dust will be
minimized as a result of site watering required by City and SCAQMD regulations.
Potential air quality impacts to surrounding business properties from potential
long -term air quality impacts associated with the proposed project include those
associated with vehicular emissions. A traffic study (dated September 3, 1998,
prepared by Austin -Foust Associates, Inc. has been prepared for the project and is
discussed in Section VI ( Transportation /Circulation/Parking). The traffic study
identified that the project is estimated to generate 366 daily vehicle trips. The
findings of the traffic study concluded that the proposed project will not result in
significant impacts to transportation/circulation and parking.
The South Coast Air Quality Management District CEQA Air Quality Handbook
(Table 6 -2 & 6 -3) provides screening tables which identify projects (based on
size) of potential significance for air quality. The screening tables indicate that
the proposed project (as a result of the size of project) does not have the potential
to exceed the emission thresholds of significance for air quality (for project
construction and project (office building) operations.
With the implementation of the recommended mitigation measures, it is
anticipated that the project will not result in a significant impacts to air quality.
Mitigation Measure No. 5 During construction activities, the applicant shall ensure
that the following measures are complied with to reduce short -term (construction)
air quality impacts associated with the project: a) controlling fugitive dust by
regular watering, or other dust palliative measures to meet South Coast Air Quality
Management District (SCAQMD) Rule 403 .(Fugitive Dust); b) maintaining
equipment engines in proper tune; and c) phasing and scheduling construction
activities to minimize project- related emissions.
Mitigation Measure No. 6 During construction activities, the applicant shall ensure
that the project will comply with SCAQMD Rule 402 (Nuisance), to reduce nuisance
due to odors from construction activities.
Vl. Transportation /Circulation/Parking
A traffic analysis has been prepared for the proposed project by Austin -Foust
Associates, Inc. and is available for review at the Planning Department, City of
Newport Beach. The study is herein incorporated by reference consistent with
Section 15150 of the CEQA Guidelines.
The traffic report includes an analysis of existing traffic conditions and future
conditions with and without development of the proposed project. The office
building is located on Dove Street near the intersection of Newport Place Drive,
CHECKLIST EXPLANATIONS
Page 5 6j i
which is known as Block E of Newport Place. The following describes information
presented in the traffic report prepared by Austin -Foust Associates, Inc.
Traffic Impact Analyses
a. Site Access
Site access will remain the same as that which currently exists. Access to the site
is provided off of Dove Street. The existing site has two access points
(driveways) from Dove Street. Also, there is an existing pedestrian sidewalk area
provided adjacent to Dove Street along the frontage of the site.
b. Trip Generation
Appropriate trip generation rates for the proposed project were obtained from
Newport Beach Traffic Analysis Model (NBTAM). These rates were derived
from Institute of Transportation Engineers (ITE) trip rates for 100,000 square foot
office buildings. The proposed project will generate 366 trips daily, of which 49
will be generated during the AM peak hour and 48 will be generated during the
PM peak hour.
C. Trip Distribution
Distribution of project - generated traffic was derived from observed travel patterns
in the vicinity of the project site as well as from locations and levels of
development in relation to the location of the proposed project. An estimated 15
percent of project traffic is assumed to travel north along MacArthur Boulevard,
25 percent is assumed to travel north and 10 percent to travel south along
Jamboree Road, 15 percent is assumed to travel south on MacArthur Boulevard or
the San Joaquin Hills Transportation Corridor (SR -73), 5 percent is assumed to
travel south on Irvine Avenue, and 30 percent is assumed to travel west on SR -73.
d. Traffic Intersection Analyses
The City of Newport Beach identified nine intersections for analysis to determine
the impact of the proposed office development. Intersection analyses were
completed for the following nine (9) study intersections:
1. Irvine Avenue /Campus Drive & Bristol Street
2. Campus Drive & Bristol Street N
3. Campus Drive & Dove Street
4. MacArthur Boulevard & Campus Drive
5. MacArthur Boulevard & Birch Street
6. Jamboree Road & Bristol Street
7. Jamboree Road & Bristol Street N
CHECKLIST EXPLANATIONS J
Page 6
8. MacArthur Boulevard & Jamboree Road
9. Jamboree Road & Birch Street
A "One Percent Traffic Volaeme Analysis, " which is part of the City of Newport
Beach Traffic Phasing Ordinance (TPO), was utilized for each of the study
intersections. If project generated traffic is greater than one percent of the
combined total of existing, regional growth and committed project traffic on any
approach to any of the selected intersections, then additional analyses are required
which consists of Intersection Capacity Utilization (ICU) analyses.
If one percent of the 2000 peak 2.5 hour volumes of each approach were larger
than the peak 2.5 hour project volumes, no further analysis was required. If
project peak 2.5 hour volumes were higher than one percent of the projected peak
2.5 hour volumes on any approach of any intersection, the intersection was
analyzed using the intersection capacity utilization (ICU) method.
Comparison of the one percent of the peak 2.5 hour volumes with the project peak
2.5 hour volumes resulted in one intersection failing the one percent test and
requiring additional analysis. The intersection of Campus Drive and Dove Street
does not pass the one percent test.
The Campus Drive and Dove Street intersection was further analyzed to
determine potential impacts. Existing lane configurations were assumed, and a
capacity of 1,600 vehicles per hour (vph) per lane with no clearance factor was
utilized. The traffic analysis indicates that the intersection will operate at
acceptable Levels of Service, with the existing geometrics, during both the AM
and PM peak hours under the TPO guidelines for conditions with the project.
Projects may be approved when the ICU value for an intersection will not exceed
0.90 or the ICU value does not change when the project is added. As established
by the TPO, the basis for the comparison includes existing traffic, regional growth
and approved/committed project traffic.
e. Future Traffic Conditions (Long Range General Plan)
The City's General Plan allows a maximum limit of 834,762 square feet for Block
E in Newport Place Planned Community. The proposed General Plan
Amendment would increase the maximum limit from 834,762 square feet to a
maximum of 860,884 square feet. The traffic study prepared by Austin -Foust
Associates, Inc. included an evaluation to determine the project's impact on the
buildout circulation system. Future volume projections were obtained from the
NBTAM.
The traffic report indicates that five intersections will operate at LOS "F" under
buildout conditions. Dove Street, being a local street, is not included in the
NBTAM network; therefore, the intersection of Campus Drive and Dove Street is
CHECKLIST EXPLANATIONS
Page 7
not included in the buildout year summary. The project will result in a one
percent increase in the PM Peak hour ICU value at the intersection of MacArthur
Boulevard and Jamboree Road, which operates at LOS "F" under buildout
conditions. The City is investigating additional improvements at this intersection,
including the addition of a northbound free right -tum lane. A northbound free
right -turn lane will mitigate the project's impacts at this location and will improve
the intersection to LOS "E ". The project will be responsible for its fair share of
the cost of the northbound free right -turn lane.
Parkins
The project includes the construction of a two -level parking garage to be built
below the proposed office building. The construction area will utilize
approximately 35% of the available existing parking space leaving 170 spaces
available. It is anticipated that the existing building will be at 45% occupancy
during construction as a result of remodeling work previously planned for the
building. Therefore, it is anticipated that 170 spaces will be available during
construction activities will accommodate the estimated occupancy of the existing
occupied building. The proposed project includes a request for a modification to
reduce the parking requirement from I space per 225 square feet to 1 space per
each 250 square feet of net floor area. Following project completion, a total of
430 parking spaces (includes surface parking & spaces within the new parking
structure) will be provided for the office buildings. Following project completion,
there will be a surplus of approximately 29 parking spaces (based on 1 space per
each 250 square feet of net floor area).
Mitigation Measure No. 7 Prior to the issuance of a building permit, the developer
shall contribute its proportionate pro -rata fair share traffic impact fees required for
improvements at the intersection of MacArthur Boulevard and Jamboree Road as
recommended in the traffic study dated September 3, 1998 prepared by Austin -
Foust Associates, Inc. and determined by the City Traffic Engineer.
VII. Biological Resources (Plant and Animal Life)
The site is developed and located in an urbanized area of the City. No rare,
endangered, or threatened plan or animal species have been previously reported, or
are expected to inhabit the project site. The project will not affect any natural
vegetation.
The project site is fully developed and has been developed for more than 15 years.
Surrounding properties are also fully developed. On -site flora consists of
ornamental landscaping, with no natural or native communities of vegetation
remaining. Due to the highly developed nature of the subject property and
surrounding properties, on -site fauna is limited to small rodents and/or mammals
adaptive to an urbanized area. Therefore, the project will not result in a significant
impact to plant and/or animal life.
CHECKLIST EXPLANATIONS i
Page 8 7
VIII. Energy and Mineral Natural Resources
The project site is fully developed and has been developed for more than 15 years.
Surrounding properties are also fully developed. The use of natural resources will
not be significantly affected by this project. No significant increase in the use of
energy or natural resources is anticipated.
IX. Hazards
The proposed use is an addition to an existing office building operation.
Therefore, no foreseeable hazard to public health and safety is anticipated.
Eckland Consultants Inc. (study dated July 14, 1997) has conducted an
Environmental Assessment Phase 1 study. The Phase I study indicated no on -site
contamination. The proposed project will not utilize hazardous materials on the
site, therefore, no adverse effect on human health or risk of upset is anticipated.
X. Noise
Construction noise represents a short-term impact on ambient noise levels. Noise
generated by construction equipment, including trucks, graders, bulldozers,
concrete mixers and portable generators can reach high noise levels. However,
intervening structures and/or topography will act as noise barriers and reduce
levels further. Noise levels will be further mitigated by limiting the hours of
construction through provisions contained in the City Noise Control Regulations
(NBMC Chapter 10.28).
OQVerational Impact
Future on -site noise impacts will not significantly differ from those, which now
exist. The increase in traffic noise is not of a magnitude that would be discernable
to the average person. Traffic from the office building addition, together with
other planned projects in the area will cumulatively cause an incremental increase
in ambient noise levels. However, with the incorporation of City standard
conditions of approval and/or mitigation measures, no cumulative impacts
associated with office operations to noise are anticipated as a result of the
addition.
Mitigation Measure No. 8 The applicant shall ensure that the project will comply with
the provisions of the City of Newport Beach General Plan Noise Element and the
Municipal Code pertaining to noise restrictions. During construction activities, the
hours of construction and excavation work are allowed from 7:00 a.m. to 6:30 p.m.
on weekdays and 8:00 a.m. to 6:00 p.m. on Saturdays, and not at any time on
Sundays and holidays.
CHECKLIST EXPLANATIONS [j
Page 9
L��
kA
XII.
Public Services
The project site is developed and has been for more than 15 years. Surrounding
properties are also fully developed. There are sufficient public or governmental
services that serve the area and the project would not create additional demand for
these services.
Utilities and Service Systems
Utilities and service systems are already servicing the existing office building at
1401 Dove Street. A survey was conducted to assess any possible changes on
demand for existing community services and public utility providers currently
serving the site. Each appropriate agency was given a project description
(overview), regional location map, vicinity map, a preliminary plot plan of the
proposed addition, and a Service Availability /Capacity Information Request
questionnaire designed to determine any possible impacts on services. The
agencies contacted and which provide services to the site are:
Fire Protection
City of Newport Beach Fire & Marine Department
Law Enforcement
City of Newport Beach Police Department
Natural Gas
The Gas Company
Electricity
Southern California Edison Company
Telecommunications
Pacific Bell
Water/Wastewater
City of Newport Beach Utilities Department
Solid Waste
Waste Management of Orange County
Transit System
Orange County Transportation Authority
The survey and responses from these service providers are presented in the
Appendix of this document. The following information discusses the results of
the survey and potential impacts associated with the proposed project.
a. Fire Protection
The City of Newport Beach Fire and Marine Department are currently
providing fire protection and emergency response services for the existing
office building at 1401 Dove Street. The City of Newport Beach Fire and
Marine Department will continue to provide fire protection and emergency
response services to the site once construction of the new building addition
is complete. The closest emergency response facility to the site is Station
#3 located on Santa Barbara Drive. Five other facilities are also available
for emergency response service. Response times to the site are dependent
on various factors. Emergency calls receive the quickest response times
with alarm calls and non - emergency calls having longer response times
CHECKLIST EXPLANATIONS
Page 10 J
respectively. The availability of personnel and extenuating circumstances
may further affect response times.
The addition of the new office building may potentially increase the
number of calls for service to the location; however, no new facilities or
staff will be required. The Newport Beach Fire and Marine Department
(letter dated September 2, 1998 included in the appendix of this document)
has indicated that the project is not expected to negatively impact any
current facility, service or service expansion plans for the project area
and/or site.
Current emergency equipment and facilities at the project site must be
evaluated to ensure that the current facilities are adequate and serviceable
for the office addition. Items that need to be evaluated include, but are not
limited to, the following: the fire alarm panel, firefighter communication
equipment, fire pump, emergency generator, and on site water supply.
All fire protection must be designed as an integral part of the construction
process with all improvements and/or modernization of equipment
systems or devices identified and agreed upon by the City of Newport
Beach Fire and Marine Department prior to any construction approval.
b. Law Enforcement
The City of Newport Beach Police Department is currently providing Law
enforcement services for the office building at 1401 Dove Street. The City
of Newport Beach Police Department will continue to provide law
enforcement services to the site once the construction is complete. The
City's police facility is located at 870 Santa Barbara Drive. Response
times to the site are dependent on various factors. Emergency calls
receive the quickest response times with alarm calls and non - emergency
calls having longer response times respectively. The availability of
personnel and extenuating circumstances may further affect response
times. It is anticipated that the office addition will increase the number of
calls for service to the location; however, no new facilities or staff will be
required.
C. Natural Gas
The Gas Company currently provides the office building at 1401 Dove
Street with natural gas services via an existing gas line. They will
continue to provide the service once the construction is complete. Their
ability to meet any future demand is dependent on the supply of natural
gas and the policies of the California Public Utilities Commission. The
Gas Company (per communication of August 28, 1998 included in
CHECKLIST EXPLANATIONS �_D
Page 11
appendix hereto) has indicated that there are no expected negative impacts
from the new office building and no new facilities or staff will be required.
d. Electricity
The Southern California Edison Company currently provides electricity to
the office building at 1401 Dove Street and will continue to provide this
service once the proposed office building is complete. The Southern
California Edison Company has been contacted regarding the project
(letter dated August 19, 1998 in the appendix hereto) and it is anticipated
that no new facilities or staff will be required. There are no expected
negative impacts on electric service expected from the office .
e. Telecommunications
Pacific Bell currently provides telecommunications services to the office
building at 1401 Dove Street and expects to provide their services once the
office building is complete. Existing telephone facilities are located along
Dove Street. Pacific Bell (letter dated September 16, 1998 presented in
the Appendix of this document) has indicated that two 4" conduits,
plywood backboard(s), and ground wire(s) will be need to be placed on the
site by the applicant to allow service to the new building addition. Pacific
Bell has also stated that the proposed project will utilize all of the
remaining available telecommunications facilities in the immediate area.
There are no expected negative impacts from the new office building.
Further, no new facilities or staff will be needed for the continued service
to the office building.
f. Water and Wastewater
The City of Newport Beach Utilities Department currently provides water
and wastewater services to the office building at 1401 Dove Street in the
public right -of -way (Dove Street and City easements). It is anticipated
that there is adequate capacity to serve the proposed office building. The
points of connection for all applicable water and sewer lines will need to
be identified and agreed to by the City of Newport Beach Utilities
Department prior to any construction approval.
g. Solid Waste
The 1401 Dove Street complex is currently being provided solid waste
services by Waste Management of Orange County. Waste Management of
Orange County will continue to provide solid waste disposal services to
the office building once the project is complete. Further, there are no
expected negative impacts from the office addition, and no new facilities
or staff are anticipated.
CHECKLIST EXPLANATIONS
Page 12 t'
�1
h. Transit System
The Orange County Transportation Authority (OCTA) provides public
transportation services to and around the site. The OCTA currently
provides local bus service in the vicinity of the project site along
MacArthur Boulevard and Birch Street. They are expected to continue
their services once the new office building is complete. The OCTA bus
route 61 operates along MacArthur Boulevard. Service consists of 30 one -
way trips daily. Bus routes 71 and 76 operate along Birch Street. These
routes operate 57 one -way daily trips. The OCTA has indicated (per letter
dated August 28, 1998) that the service is significantly underutilized.
OCTA's long range plan calls for a 49% expansion of bus service (in
Orange County) by year 2015. The project is not expected to negatively
impact any current facility, service or service expansion plans for the
project area and/or site. It is the belief of the OCTA that there is adequate
capacity available to service the site. Further, the addition is not expected
to necessitate any new facilities or staff.
Mitigation Measure No. 9 Prior to the commencement of grading activities, the
applicant shall coordinate with utility and service organizations regarding any
construction activities to ensure existing facilities are protected and any
necessary expansion or relocation of facilities are planned and scheduled in
consultation with the appropriate public agencies.
Mitigation Measure No. 10 Prior to the commencement of grading activities, the
applicant shall submit to the Planning and Building Department a letter from the
City Utilities Department confrming availability of water and wastewater
services to and from the site.
XIII. Aesthetics
The project site is near fully developed and has been developed for more than 15
years. Surrounding properties are also fully developed. Site photos are presented
in Appendix A of this document. The proposed addition includes a new 25,806
professional office building and parking structure to be located within the existing
parking lot. The new structure will be compatible with the existing office
building in architectural style, finish and color. The height and bulk of the new
building are sufficient that it will be visible from many locations within and
around the Newport Place area. The immediate vicinity of the project site includes
a number of existing buildings (many over 3 stories) in photos presented in the
Appendix of this document.
CHECKLIST EXPLANATIONS rrT
Page 13
Due to the highly developed nature of the subject property and surrounding
business properties, including existing multi -story high rise office buildings, the
aesthetic impacts associated with the new office building is not considered a
significant impact. In addition, with the incorporation of the project's design,
landscaping and other aesthetic features of the site, as well as the application of
City standard conditions of approval and/or mitigation measures, any impacts will
be reduced to an insignificant level.
The proposed project will introduce additional lighting associated with the
operation of the building (security lighting, landscape lighting, etc.). The exterior
lighting will be visible, however, due to the high urbanized developed nature of
the immediate vicinity, potential impacts of light and glare are not considered
significant. Parking lot lighting similar to existing site lighting will be utilized for
the proposed project. Additionally, to ensure that exterior lighting is designed
such that direct rays are confined to the site (to the greatest extent feasible) a
mitigation measure is recommended to limit affects on the neighboring uses.
Mitigation Measure No. 11 Light sources within the parking area shall be designed or
altered to eliminate light and glare spillage onto adjacent properties or uses.
Prior to the issuance of a building permit, the applicant shall demonstrate to the
Planning Department that the exterior lighting system has been designed and
directed in such a manner as to conceal the light source and to minimize light
spillage and glare to the adjacent properties. Prior to the issuance of a building
permit, the applicant shall provide to the Planning Department, in conjunction
with the lighting system plan, light future product types and technical
specifications, including photometric information to determine the extent of light
spillage or glare which can be anticipated. This information shall be made apart
of the building set of plans for issuance of the building permit. Prior to issuance
of the certificate of use and occupancy or final of building permits, the applicant
shall schedule an evening inspection by the Code Enforcement Division to
confirm control of light and glare specified by this mitigation measure.
XM Cultural Resources
The project site is located in an area where there is currently a parking lot where
initial earthwork was performed in 1972. There is no record of any archaeological
and paleontological resources that have been discovered in the past and may
potentially exist on this site. Previous surveys (as documented in Final General
Plan EIR) indicate that there are no observable cultural resources on the property.
No known paleontological resources exist onsite, however, fossils (i.e. marine
mammals, invertebrate fossils etc.) may potentially exist under the surface.
Therefore, the following mitigation measure is recommended to ensure
compliance with City Council Policies regarding archaeological and
paleontological surveys and recovery of resources.
CHECKLIST EXPLANATIONS f _
Page 14 ) V
�a
Mitigation Measure No. 12 A qualified archeologist shall be present during grading
activities to inspect the underlying soil for cultural resources. If significant
cultural resources are uncovered, the archeologist shall have the authority to stop
or temporarily divert construction activities for a period of 48 hours to assess the
significance of the find.
XV. Recreation
Due to the highly developed nature of the subject property and surrounding
properties, including existing multi -story office and other commercial/retail land
uses, the demand for additional neighborhood or regional parks is not anticipated.
CHECKLIST EXPLANATIONS v
Page 15
XVI. Mandatory Findings of Significance
1. On the basis of the foregoing analysis, the proposed project does not have the
potential to significantly degrade the quality of the environment.
2. There are no long -term environmental goals that would be compromised by the
project.
3. No cumulative impacts are anticipated in connection with this or other projects.
4. That there are no known substantial adverse effects on human beings that would be
caused by the proposed project.
CHECKLIST EXPLANATIONS
Page 16
—5-",�—
MITIGATION MONITORING AND REPORTING PROGRAM
New Office Building and Partially Subterranean Parking Garage
1401 Dove Street
General Plan Amendment 98 -1(B), PC Amendment No. 877,
Traffic Study No. 117 and Modification No. 4731
I. OVERVIEW
This mitigation monitoring program was prepared in compliance with Public Resources Code
Section 21081.6 (AB 3180 of 1988). It describes the requirements and procedures to be followed
by the applicant and the City to ensure that all mitigation measures adopted as part of this project
will be carried out. Attachment I summarizes the mitigation measures, implementing actions, and
verification procedures for this project.
II. MITIGATION MONITORING PROCEDURES
Mitigation measures can be implemented in three ways: (1) through project design, which is
verified by plan check and inspection; (2) through compliance with various codes, ordinances,
policies, standards, and conditions of approval which are satisfied prior to or during construction
and verified by plan check and /or inspection; and (3) through monitoring and reporting after
construction is completed. Compliance monitoring procedures for these three types of mitigation
measures are summarized below.
A. Mitigation measures implemented through project design:
Upon project approval, a copy of the approved project design will be placed in the official project
file. As part of the review process for all subsequent discretionary or ministerial permits, the file
will be checked to verify that the requested permit is in conformance with the approved project
design. Field inspections will verify that construction conforms to approved plans.
B. Mitigation measures implemented through compliance with codes, ordinances,
policies, standards, or conditions of approval:
Upon project approval, a copy of the approved project description and conditions of approval will
be placed in the official project file. As part of the review process for all subsequent discretionary
or ministerial permits, the file will be checked to verify that the requested permit is in compliance
with all applicable codes, ordinances, policies, standards and conditions of approval. Field
inspections will verify that construction conforms to applicable standards and conditions.
C. Mitigation measures implemented through post - construction monitoring:
If any mitigation measures require verification and reporting after construction is completed, the
City will maintain a log of these mitigation monitoring and reporting requirements, and will
review completed monitoring reports. Upon submittal, the City will approve the report, request
additional information, or pursue enforcement remedies in the event of noncompliance. Final
monitoring reports will be placed in the official file.
L
54---
fL' �
d �
y
rA O
"i z.,
d .a
a E
iLLE_
H W W
'A O
'No 0, R
zP.
f1z�
y
=v a,
O 0.1 v e
d Ev,
d v
ZE
OO rE
L
z��
� O
rl
0
w u
u �
u
Y
fi
y
fi
r
a
4omo
�,o�o
a no
c
VY
M
C O
U
U
9
Y`
N d
fi
fi
Ra
9°
P
P
p
•� O
tl
C
d
a+ d
a
E
o
C
0
fi
0
a
G
o c m U
o
°
ya
eoi
tl
t3
Q-
a' =�ctli 0 o
tOZlz`, n
� t3 "a
7
O-0 .- fi U C
b
S y Z 2y
fi
W
��dy
y
CTS tl C C y
C
Ir. N
C O 3 Zf
b G
i4
.S tl tl v7 y 0 'a
tl V O Y
p V fi O
O
tl' r 'tl
tl C
�0
O m tl
d Cy
3
3 `I. A
'yam+
U ctlU� tl
b 0�
p V OYi i
O
't d 041
y .tlC fi C r~
O V O h
r 5 � 0
r y tl tl O d
�0 3 4 d cc� fi
fi
� u� b
� V O Y dF d Cqf
4�,•
4 tl b U
'^
5
V M fi C
4 0
4 fi
.t_p Q
C
z
�
H
�
SV
O
•� A
d
d
e
°p 3
�:o0
3tloo
O
CL
Ow
k)
140
v .Q El-
40oa0
40ro0
4� t
c
tl
00 1°
e u
o u oo _
co u
oo u m
° e ..
p0
tl
C U
Q 0
j
d
O
d
O
C
O
•`
C
Q
4
D
4
O
4
b
d Z
O
O
O
O
u
C
Up
Up
U°
Uo
3 „Z U 0
4 Q y tl 3
CU
4
4 C
•`
y
•S U° 4
�; co :. a e a c a'-
0?
` m
4 c v •Q� •b
fl
p.o4 a.S
n`��u
�. v
0 •� d �' O C [� � .p a i
C{ O 'C
G C v a tl> ".C. W
4 •C• C'C
V O' i d v v
a tl `t[
T O
O
tl U p
t3 y tl
0
U .0. 0- q .1. 4 •C
` S C; tl �` `' y
? O
2.S
Q -C C]
U
C tl C O
U C
u N
Q -y A
O
Q
'� Q 0]
i O U •• ?, 01 aLIN C U y
Q A U Q U
01 Q yp tl 001 041 5
�a
t3
4`•1� 4�/]IT
O
z
y N
F h
Z C'
6
X
F
.J
Y
Ci
VJ
y
5%
(ƒ
!
Le
0
�
)�
>
..
.
\
a
Ioo
ƒa4a
3�a
%■®
®�
ket
4a ■&|
4e■ &k
\
R
)
.
)
)
)
Its
e!�
7 ■§
}
\ *k)a\ 4b
(t \@)!! ¥)
;
■
$\ « ¥�2[�
) {M_tl {
§QZazAQu
4S
t3
\])
\p
kk
\
k } / {§
;§(33ma§
`
2()\{ 277
*t``#Q)\
§2, 7z
2
9
! >i E°}�-
!Mw -!�
«= &4k>7
��(a,�wa
°]E
J7 \ %s
\�,cf•
\ \44�
§ })!`
§!
i
;#ta2\
/ \�
k\ /�&§
}®
:5MIg
4)](4tla
) k34 ■a
k
(ƒ
!
Le
0
�
C
O
R N
V R
:a
L
d
d
o �
�
a
as
40 0
C
O O
O
d
E">
4�a c.
�
p•pc
O
?
O
r
O
G
4
u
da
o
0
E
a
`c
U
U
v v
o
tl
'3 U O tl TS p
Its
v `'
C
CC
C Y cOtli
tip
V
tl v 1.! tl
to
N i N U r` O tl
v-Oprp u '� �` w t3
O
4 y r
.`
¢ +^. • 5 V h "' V
pp
• V a .�..
�+
,�. 4,p i�
bo
V
.0 ..0
.b
,`Vt
o
o tl v
oo
^p
Q Cd tl
o
.`c
r
v° u
°: 'tl ,tl o� • V '�
4.E
pp 'o cq o C ovi v Z
y$
C
e o
Y v tl tl .0 r y
'G y :�
v �` ° O G v "•1 Oti
0°i ti tl i
pp ...
Q
° yl tl E O ,G y y 5 v
m
N V
tl
O',�O
v
a
'C pop c> Q v
°'
v M 5 O C cvi
e o0
y tl v Q 4 4 y
b Q
C
tl
v c
�`' y'Ybpj d U N ^pp
o o 0• c
C V
i O O
N
i
y Q
e
y cti
v
2 tl tl
C pp "'
O
• O ,Cp
d
z
^
N
o�
z a.
a
qa
X
til
N
U
w
2
U
Appendix A
Project Plans & Site Photo Exhibits
�I
2
i�
a
1
J
L
d
J
C
I
I
rt
6 c
Ji�l': f•1 � �C# W
i
i1
0
i!
�a
1
a
1
J
L
d
J
C
I
I
rt
6 c
Ji�l': f•1 � �C# W
i
i1
0
i!
�a
tA�r'
� r
s' L
.* Y .' i .� ,�. BPS � r s • .1.. _ - -
_ c
�DY
• lC� �
L-
Appendix B
Traffic Study
1�
1401 DOVE STREET
TRAFFIC PHASING ORDINANCE & GENERAL PLAN
Traffic Analysis
Prepared for:
City of Newport Beach
Prepared by:
Austin -Foust Associates, Inc.
2020 North Tustin Avenue
Santa Ana, California 92705 -7827
(714) 667 -0496
September 3, 1998
1(0
/�
1401 DOVE STREET TRAFFIC PHASING ORDINANCE & GENERAL PLAN
TRAFFIC ANALYSIS
PROJECT DESCRIPTION
The proposed office development at 1401 Dove Street in the City of Newport Beach consists
of 26,122 square feet of general office space. The project site is located on Dove Street between Birch
Street and Newport Place Drive/Von Karman Avenue. Figure 1 illustrates the location of the project,
and Figure 2 illustrates the proposed site plan. Access to the proposed project will be provided on
Dove Street.
TRIP GENERATION AND DISTRIBUTION
Appropriate trip generation rates for the proposed project were obtained from the Newport
Beach Traffic Analysis Model (NBTAM). These rates were derived from Institute of Transportation
Engineers trip rates for 100,000 square foot office buildings. Table 1 summarizes the trip generation
for the proposed project.
As this table indicates, the proposed project will generate 366 trips daily, of which 49 will be
generated during the AM peak hour and 48 will be generated during the PM peak hour. The trip
generation was factored to obtain a peak 2.5 hour volume for the AM and PM peak periods. The
peak 2.5 hour volumes were based on an estimated factor of 2.0 to account for the extension of the
usual one -hour peak period.
Distribution of project- generated traffic was derived from observed travel patterns in the
vicinity of the project site as well as from locations and levels of development in relation to the
location of the proposed project. The general trip distribution is illustrated in Figure 3. An estimated
15 percent of project traffic is assumed to travel north along MacArthur Boulevard, 25 percent is
assumed to travel north and 10 percent to travel south along Jamboree Road, 15 percent is assumed
to travel south on MacArthur Boulevard or the San Joaquin Hills Transportation Corridor (SR -73),
1401 Dove Street Traffic Phasing ordinance I Austin -Foust Associates. far-
and General Plan Traffic Analysis 017057ta.wpd
V
7 UJ
Q N
a
r�
1401 Dove Street Tragic Phasing Ordinance
and General Plan TratTc Analysis
z
O
U
L O
7
� U
0
O
a
a
Austin -Foust Associates, Ina
017057uwpd
,�v
�y I IU
.T
I '
r ; '
1401 Dove Street Traffic Phasing Ordinance
and General Plan Traffic Analysis
3
z
Z
S
a
N �
F
v �
L
i o
_m
Cu m
a
a
0
a
a
Austin -Foust Associates, Ina
017057ta.wpd (�
Imo/
Table I
TRIP GENERATION SUMMARY
1401 Dove Street Traffic Phasing Ordinance
and General Plan Traffic Analysis
4 Austin -Foust Associates, Inc
017057ta.wpd 20
f .�,�
—AM PEAK HOUR—
- - -PM
PEAK HOUR.—
LAND USE
UNITS IN OUT TOTAL
IN
OUT TOTAL ADT
TRIP RATES
Office
TSF 1.69 11 1.90
32
1.55 1.87 14.03
TRIP GENERATION
Office
26.1 TSF 44 5 49
8
40 48 366
1401 Dove Street Traffic Phasing Ordinance
and General Plan Traffic Analysis
4 Austin -Foust Associates, Inc
017057ta.wpd 20
f .�,�
1101 Dove Street Traffic Phasing Ordinance
and General Plan Traffic Analysis
z
0
E
m
tu, N
7 q
m
G F
U
is7
0
O
M.
M.
Austin4bust Associates, Inc
017057ta.wpd
five percent is assumed to travel south on Irvine Boulevard, and 30 percent is assumed to travel west
on SR -73. Figures 4 and 5 illustrate AM and PM peak hour project trips, respectively.
TRAFFIC IMPACTS
The City of Newport Beach identified nine intersections for analysis to determine the impact
of the proposed office development. These intersections are:
Irvine Avenue /Campus Drive & Bristol Street
Campus Drive & Bristol Street N
Campus Drive & Dove Street
MacArthur Boulevard & Campus Drive
MacArthur Boulevard & Birch Street
Jamboree Road & Bristol Street
Jamboree Road & Bristol Street N
MacArthur Boulevard& Jamboree Road
Jamboree Road & Birch Street
The 1997 peak 2.5 hour volumes for the study intersections were provided by City staff. An
expected completion date of 1999 was assumed. The analvsis year, 2000, is one year after the project
is completed. An ambient growth rate of 1.0 percent per year was added to volumes along MacArthur
Boulevard, Jamboree Road, and Irvine Avenue.
The peak 2.5 hour volumes of all approved projects, also provided by City staff, were added
to the peak 2.5 hour volumes. The resulting volumes represent the projected peak 2.5 hour volumes
prior to the addition of project traffic. A list of approved projects is given in Table 2.
One percent of the projected 2.5 hour volumes of each approach of each intersection was
compared with the peak 2S hour distributed volumes from the proposed project. A summary of this
comparison is shown in Table 3.
1401 Dove Street Traffic Phasing ordinance
and General Plan Tratric Analyse
Austin -Foust Associates, Ina
017057mwpd !� a
1-
°[ °o77tt � i It
oil O1 1` o I
tib i 00 \ /
000 t i O
0
a
y�-- 0 ARM R 1 --v a l
r0
0
i 00
t,
V r
/ 11tt
000 l— 0 \ O Ro l , OQ,�\
ro Zo1r� ti�� o
o �W °° `may �%o
\ 0 Z 0000'
O _
I
I °iLy
r
i
,g 1 0 y1�to j
QQ
0 'n
w.
F5
Cr
s ws
fy 0
' VO
UY
a
ww
002
ag
as
1401 Dwe Street Traffic Phasing Ordinance 7 Austin -Foust Associates, Inc Q
and General Plan Traffic Analysis 017057tawpd
000 � �t�•
2° ' DL O 0A �\ O
.
° Z~ 1� p° 1 ho
Hb OOO
000 0 10 ��
f 0 1NUR
0
ro
t �
0 Z 00
i
d
JOOti Q-y� p" �.
0
/ oI 0 I0 � 0 0 y t 0
Y�Yro ii o1�0 Jd.,e , O
o
`\\ �
p ahb ` 1 �` ° 1
J � 000 I
i �~ ti0
ay
t
i
Y r�1�o°
0
1401 Dove Street Traffic P4asing Ordimnm
and General Plan TralGc Anat is
0.
a(a.
a
n wa
m WO
� �o
m
� Uk
a
ww
'o0.
a�
0.0.
8 Austin -Foust Associates. Inc
017057mwpd
(
Table I
APPROVED PROJECTS SUMMARY
APPROVED PROJECT SUMMARY PERCENTCOMPLETED
Newport Village
0% Occupancy
Ovie PLm
0% Occupancy
Corporate Plaza R West
13% Occupancy
Hoag Hospital Extension
2% Occupancy
Interpretive Center
0% Occupancy
Hong Hospital Expansion
0% Occupancy
Balboa Bay Club Expansion
0% Occupancy
Fashion Island Expansion
2% Occupancy
Fletcher Imes Mercedes
0% Occupancy
Temple Bat Yahm Expansion
0% Occupancy
Corona Del Mar Plats
0% Occupancy
Ford Redevelopment
0% Occupancy
71.4 Drive thru Restaurant
0% Occupancy
CI OSA - Irvine Prgcct
0% Occupancy
Newport Dunes
0% Occupancy
Oty of Irviae Development
0% Occupancy
1401 Dove Street Traffic Phasing Onfinance
and General Plan TrafcAnalysis
Austin -Foust Associates, Inc �� 5
017057ta wpd
M
INTERSECTION
Table 3
SUMMARY OF ONE PERCENT ANALYSIS
AM PROJECT PEAK 2.5 HOUR VOLUMES
NB SB EB WB
LESS THAN 1% OF 2000
PEAK 2.5 HOUR VOLUMES
1.
Irvine /Campus & Bristol
4
0
26
0
Yes
2.
Campus & Bristol N
30
2
0
0
Yea
3.
Campus & Dave
30
0
0
2
Yes
4.
MacArthur & Campus
2
14
0
0
Yes
S.
MacArthur & Birch
0
12
2
0
Yes
6.
Jamboree & Bristol
8
2
0
0
Yes
7.
Jamboree & Bristol N
8
2
0
0
Yes
S.
MacArthur & Jamboree
14
6
8
22
Yea
9.
Jamboree & Birch
2
22
0
0
Yes
PM PROJECT'PEAK 2.5 HOUR VOLUMES
LESS THAN I% OF 2000
INTERSECTION
NB
SB
EB
WB
PEAK 2.5 HOUR VOLUMES
L
IrvinelCampus & Bristol
0
4
4
0
Yes
2.
Campus & Bristol N
4
l0
0
18
Yes
3.
Campus & Dove
4
0
0
10
No
4.
MacArthur & Campus
12
2
0
0
Yes
S.
MacArthur & Birch
0
2
12
0
Yes
6.
Jamboree & Bristol
2
8
0
0
Yes
7.
Jamboree & Bristol N
2
8
0
0
Yes
S.
MacArthur & Jamboree
2
40
2
4
Yes
9.
Jamboree & Birch
20
4
0
0
Yes
1401 Dove Street Traftie Phasing Ordinance 10 Austin -Foust Associates, I=
and General Plan Traffic Analysis 017057t&wpd
If one percent of the 2000 peak 2.5 hour volumes of each approach were larger than the peak
2.5 hour project volumes, no further analysis were required. If project peak 2.5 hour volumes were
higher than one percent of the projected peak 2.5 hour volumes on any approach of any intersection,
the intersection was analyzed using the intersection capacity utilization (ICU) method.
Comparison of the one percent of the peak 2.5 hour volumes with the project peak 2.5 hour
volumes resulted inone intersection failing the one percent test and requiring additional analysis. The
intersection of Campus Drive and Dove Street does not pass the one percent test. The one percent
analysis sheets are included in the appendix.
An ICU analysis was performed for the intersection which failed the one percent test. Existing
lane configurations were assumed, and a capacity of 1,600 vph per lane with no clearance factor was
utilized. The following table summarizes the existing, background and background -plus- project ICU
values for Campus Drive and Dove Street.
INTERSECTION
1401 DOVE STREETTPO -ICU ANALYSIS
EXISTING BACKGROUND
AM PM AM PM
BACKGROUND +
PROJECT
AM PM
3. Campus & Dave
.71 .90 .71 .90
.72 .90
' Exceeds level of service "D"
Level of service ranges .00 - .60 A
.6l - .70 B
,71 - .80 C
At -.90 D
9l -1.00 E
Above 1.00 F
As this table indicates, the project will have no marginal impact on the intersection of Campus
Drive and Dove Street.
1401 Dove Street Traffic Phasing Ordinance
and General Plan Traffic Aaalysis
11
it
Austin -Foust Associata, Ina 4" !
0170571awpd `'
CONCLUSIONS
The proposed office building would generate 50 trips during the AM peak hour and 50 trips
during the PM peak hour. Mine intersections in the vicinity were checked to determine the marginal
impact of project traffic on the street system. One of the nine intersections did not pass the one
percent analysis. An ICU analysis was performed on the intersection. The intersection passes the
ICU analysis. The proposed project has no marginal impact on the study intersections, and no
intersection improvements are required.
GENERAL PLAN ANALYSIS
The proposed office development requires a General Plan Traffic Study to determine the
project's impact on the buildout circulation system. Future volume projections were obtained from
the Newport Beach Traffic Analysis Model ( NBTAM). NBTAM was developed to support the traffic
analysis portion of the City's General Plan. Details of the traffic model can be found in the reference
at the end of this report.
Buildout -with- project ICU values are compared with no- project ICU values in Table 4. These
ICU values are based on buildout lane configurations. As this table indicates, rive intersections will
operate at LOS "F" under buildout conditions. Dove Street, being a local street, is not included in
the NBTAM network; therefore, the intersection of Campus Drive and Dove Street is not included
in the buildout year ICU summary.
The proposed project causes a one percent increase in the PM peak hour ICU value at the
intersection of MacArthur Boulevard and Jamboree Road, which operates at LOS "F" under buildout
conditions. The City is investigating additional improvements at this intersection, including the
addition of a northbound free right -turn lane. A northbound free right -turn lane will mitigate the
project's impacts at this location and will improve the intersection to LOS "E ". The project will be
responsible for its fair share of the cost of the northbound free right -turn lane.
1401 Dave Street Tratne Phasing ordinance 12 Austin•Fowt Associates, Inc <C
and General Plan TranlcAnalysis 017057ta.wpd
INTERSECTION
Table 4
BUILDOUTICUSUMMARY
BUILDOUT
1444ROJECT
AM PM
-
BUILDOUT
W/PROJECr
AM PM
1. Irvine/Campus & Bristol
.83 .83
.83
.83
2. Campus & Bristol N
.74 124
.75
124
4. MacArthur & Campus
.69 1.11
.69
1.11
S. MacArthur & Birch
S6 14
S6
.84
6. Jamboree & Bristol
.TJ .87
.72
.87
7. Jamboree & Bristol N
1.01 1.02
1.01
1.02
8. MacArthur & Jamboree
39 1.11
.89
1.12
9. Jamboree & Bird
m 1.07
.80
1.07
Level of service rangm .00 -.60 A
.61- .70 B
.71 -SOC
SI -.90 D
.91. 1.00 E
Above 1.00 F
1401 Dove Street Traffic Phasing Ordinance
and General Plan Tral6c Analysis
13
Austin -Foust Associates, Ina G
017(157ta.wpd C
-74)
REFERENCES:
1. "Newport Beach Traffic Analysis Model (NBTAM), Traffic Model Data," Austin -Foust
Associates, Inc. September 1996.
1401 Dove Street Traffic Phasing Ordinance
and General Plan Tmffic Analysis
14
Austin -Foust Associates, lnc "
017057a-wpd
,T_7'
APPENDIX
(�,1
1-?�
I% Traffic Volume Analysis
Intersection: 1. IrvwWCampus 8 Bristol
Existing Traffic Volumes Based on Average Winter /Spring 1997
Peak 2 112 Hour Approved
Existing Regional Projects Projected 1% of Projected Project
Approach Peak 2 1/2 Hour Growth Peak 2 12 Hour Peak 2 1/2 Hour Peak 2 1/2 Hour Peak 2 112 Hour
Direction Volume Volume Volume Volume Volume Volume
AM PEAK PERIOD
Northbound
3501 105 48 3654
37
4
Southbound
1145 0 13 1158
12
0
Eastbound
7210 0 200 7410
74
26
Westbound
0 0 0 0
0
0
_ =>
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 2 112 Hour Traffic Volume.
Project AM Traffic is estimated to be greater than I% of Projected AM Peak 2 12 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
2624 79 30 2733
27
0
Southbound
3286 0 19 3305
33
4
Eastbound
5216 0 66 5302
53
4
Westbound
0 0 0 0
0
0
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 212 Hour Traffic Volume.
Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 2 12 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PROJECT:
1401 Dove St. FULL
OCCUPANCY YEAR:
2000 ryry
�I
1 % Traffic Volume Analysis
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 2 12 Hour Traffic Volume.
Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 2 12 Hour Traffic Volume.
Intersection Capacity Util ®dort (ICU) Analysis is required.
PROJECT: 1401 Dove St. FULL OCCUPANCY YEAR: 2000
1�
Intersection: 2. Campus 8 Bristol N
Existing Traffic Volumes Based on Average Winter15pring 1997
Peak 2 12 Hour Approved
Existing
Regional Projects Projected
1 % of Projected
Project
Approach
Peak 2 1/2 Hour
Growth Peak 2 12 Hour Peak 2 12 Hour
Peak 2 12 Hour
Peak 2 112 Hour
Direction
Volume
Volume Volume Volume
Volume
Volume
AM PEAK PERIO0
Northbound
5566
0 32 5598
56
30
Southbound
1218
0 24 1242
12
2
Eastbound
0
0 0 0
0
0
Westbound
3385
0 131 3516
3S
0
Project AM Traffic is estimated to be less than 1% of Projected AM Peak 2 12 Hour Traffic Volume.
Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 2 12 Hour Traffic
Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOO
Northbound
3681
0 0 3681
37
4
Southbound
3941
0 112 4053
41
10
Eastbound
0
0 0 0
0
0
Westbound
6586
_ 0 189 6775
fib
18
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 2 12 Hour Traffic Volume.
Project PM Traffic is estimated to be greater than 1 % of Projected PM Peak 2 12 Hour Traffic Volume.
Intersection Capacity Util ®dort (ICU) Analysis is required.
PROJECT: 1401 Dove St. FULL OCCUPANCY YEAR: 2000
1�
I% Traffic Volume Analysis
PROJECT: 1401 Dove St. FULL OCCUPANCY YEAR:
2000�n `7
Intersection: 3. Campus & Dove
Existing Traffic Volumes Based on Average Winter /Spnng 1997
Peak 2 12 Hour Approved
Existing Regional Projects Projected 1 %of
Projected
Project
Approach
Peak 2 112 Hour Growth Peak 2 1/2 Hour Peak 2 12 Hour Peak 2 112 Hour
Peak 2 112 Hour
Direction
Volume Volume Volume Volume Volume
Volume
AM PEAK PERIOD
Northbound
4050 0 0 4050
41
30
Southbound
1848 0 0 1848
18
0
Eastbound
8 0 0 8
0
0
Westbound
324 0 0 324
3
2
Project AM Traffic is estimated to be less than 1 % of Projected AM Peak 2 112 Hour Traffic Volume,
Project AM Traffic is estimated to be greater than 1 % of Projected AM Peak 2 112 Hour Traffic Volume.
Intersection Capacity Utilization (ICU) Analysis is required.
PM PEAK PERIOD
Northbound
2091 0 0 2091
21
4
Southbound
6949 0 0 6949
69
0
Eastbound
35 0 0 35
0
0
Westbound
758 0 0 756
8
10
Project PM Traffic is estimated to be less than 1 % of Projected PM Peak 21/2 Hour Traffic Volume.
Project PM Traffic is estimated to be greater than 1% of Projected PM Peak 2 12 Hour Traffic Volume.
Intersection Capacity Utilodion (ICU) Analysis is required.
PROJECT: 1401 Dove St. FULL OCCUPANCY YEAR:
2000�n `7
3. Campus i Dave
Existing
AM PK HOUR
PM PK HOUR
Background
CAPACITY
VOL
V/C
VOL
V/C
NBL
1
1600
AM PK
HOUR
PM PK
HOUR
NBT
3
4800
AM PK
HOUR
PM PK
HOER
NBR
LANES
CAPACITY
VOL
V/C
VOL
V/C
SBL
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1
1600
16
.01
22
.01*
NBL
1
1600
16
.01
22
.Oi*
NOT
3
4800
1761
.43'
793
.18
NBT
3
4800
1761
.43'
793
.13
NOR
0
0
315
83
NOR
0
0
315
83
SBL
1
1600
298
.19*
376
.24
SBL
1
1600
298
.19'
376
.24
SST
3
4800
597
.13
3060
.64*
SST
3
4800
597
.13
3060
.64'
SBR
0
0
6
7
SBR
0
0
6
7
EBL
1
1600
0
.00
3
.00
EBL
1
1600
0
.00
3
.00
EST
1
1600
0
.00
3
.01
EST
1
1600
0
.00
3
.01
E8R
0
0
1
7
EBR
0
0
1
7
WBL
0
0
40
251
WBL
0
0
40
251
WBT
1
1600
5
.09*
2
.25*
WBT
1
1600
5
.09'
2
.25'
WBR
0
0
93
149
WBR
0
0
93
149
TOTAL CAPACITY UTILIZATION .71 .90
Background + Project
TOTAL CAPACITY UTILIZATION .71 .90
. 1
�2
AM PK HOUR
PM PK HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1
1600
16
.01
22
.01*
NBT
3
4800
1761
.44*
793
.18
NBR
0
0
330
85
SBL
1
1600
298
.19*
376
.24
SBT
3
4800
597
.13
3060
.64*
SBR
0
0
6
7
EBL
1
1600
0
.00
3
.00
EST
1
1600
0
.00
3
.01
EBR
0
0
1
7
WBL
0
0
41
256
WBT
1
1600
5
.09*
2
.25*
WBR
'
0
0
93
149
TOTAL CAPACITY UTILIZATION
.72
.90
TOTAL CAPACITY UTILIZATION .71 .90
. 1
�2
1. Irvine /Campus 6 Bristol
Buildout - No Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL 7/C
NBL
0
0
0
3
0
NBR
NBT
5
8000
1618
.W
1370
.2.
NBR
0
0
330
6400
590
.37
SBL
1
1600
170
.11`
220
.14
SBT
3
4800
830
.17
2208
.46'
SBR
0
0
0
SBL
0
0
EBL
1.5
0
837
{.48 }'
358
.22
EST
2.5
6400
2230
.4B
1530
.32`
EBR
2
3200
520
.16
590
.18
WBL
0
0
0
0
WBT
0
0
0
0
WBR
0
0
0
0
Right Turn Adjustment
TOTAL CAPACITY UTILIZATION
Z. Campus 8 Bristol M
Buildout - No Project
LANES CAPACITY
NBL
2
3200
NBT
3
4800
NBR
0
0
SBL
0
0
SBT
4
6400
SBR
2
3200
.83
AM PK HOUR
VOL V/C
600 .19
1985 .41'
0
0
610 .10
649 .20
ESL
0
0
0
EST
0
0
0
EBR
0
0
0
WBL
1
1600
410
WBT
4
6400
1990
WBR
0
0
120
Right
Turn Adjustment
3
4800
TOTAL CAPACITY UTILIZATION
NBR .05'
tl-i1
PM PK HCUR
VOL ViC
930
838
0
0
1978
1147
0
0
0
.26 460
.33' 3711
50
.74
SBR
.29'
.17
.31'
.36
.29
.59'
.05'
1.24
Buildout with Project
AM PK HOUR PM PK HC1.R
LANES CAPACITY VOL V/C VOL vi-
1181. 0 0 0 0
NBT 5 8000 1620 .24• 1370 .2_
NOR 0 0 330 590
SBL 1 1600 170 .11' 220
SBT 3 4800 830 .17 2210 . =6`
SBR 0 0 0 0
EBL 1.5 850 {.48 }* 360 .27
EBT 2.5 6400 2230 .48 1530 .:2`
EBR 2 3200 520 .16 590 .la
WBL 0 0 0 0
WBT 0 0 0 0
WBR 0 0 0 0
Right Turn Adjustment NBR . ^r,`
TOTAL CAPACITY UTILIZATION .83 .83
Buildout with Project
0
0
EST 0 0
0
0
AM PK HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
VIC
NBL
2
3200
600
.19
930
.29`
NBT
3
4800
2000
.42'
B40
.18
NBR
0
0
0
0
SBL
0
0
0
0
SBT
4
6400
610
.10
1980
.31'
SBR
2
3200
650
.20
1150
.36
EBL 0 0
0
0
EST 0 0
0
0
EBR 0 0
0
0
WBL 1 1600
410
.26 460
.29
WBT 4 6400
1990
.33' 3720
.59'
WBR 0 0
120
50
Right Turn Adjustment
SBR
.05`
TOTAL CAPACITY UTILIZATION
.75
1.24
1(�
8. MacArthur 6 Jamboree
Buildout - No Project
Buildout with Project with improvements
I
LAMES
I
AM PK HOUR
PM PK HOUR
1600
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1
1600
230
.14
200
I
.13*
NBT
3
4800
1683
.35*
749
.16
NBR
1
1600
510
.32
630
.39
SBL
1
1600
99
.06*
310
I
.19
SBT
3
4800
519
.11
1624
.34*
SBR
f
.11
79
.34*
566
f
EBL
2
3200
886
.28*
599
I
.19*
EST
3
4800
1480
.31
640
.13
EBR
f
.31
520
.13
240
f
WBL
2
3200
100
.03
610
I
.19
WBT
3
4800
420
.09*
1620
.34*
WBR
f
.09*
449
.34*
38
f
Right
Turn Adjustment
40
I
NBR
I
.11*
TOTAL
CAPACITY UTILIZATION
.78
1.11
Buildout with Project with improvements
I
LAMES
I
NBL
1
1600
All PK
HOUR
PM PK
HOUR
1
LANES
CAPACITY
VOL
V/C
VOL
V/C
I
NBL
1
1600
230
.14
200
I
.13*
NBT
3
4800
1690
.35*
750
.16
NBR
f
WST
510
4800
630
f
I
SBL
1
1600
100
.06*
320
I
.20
SST
3
4800
520
.11
1630
.34*
SBR
f
80
570
I
EBL
2
3200
890
.28*
600
I
.19*
EST
3
4800
1480
.31
640
.13
EBR
f
520
240
WBL
2
3200
100
.03
610
.19
WBT
3
4800
420
.09*
1620
.34*
WBR
I
f
460
40
I
TOTAL CAPACITY UTILIZATION .78 1.00
Suildout with Project
Right Turn Adjustment
TOTAL CAPACITY UTILIZATION
AM PK HOUR PM PK HOUR
VOL V
LAMES
CAPACITY
NBL
1
1600
NBT
3
4800
NBR
1
1600
SBL
1
1600
SST
3
4800
SBR
f
EBL
2
3200
EST
3
4800 1
EBR
f
WBL
2
3200
WST
3
4800
WBR
f
Right Turn Adjustment
TOTAL CAPACITY UTILIZATION
AM PK HOUR PM PK HOUR
VOL V
V/C V
VOL V
V/C
230 .
.I4 2
200 .
.13*
�� i
9. Jamboree E Birch
Buildout - go
Project
Buildout with
Project
AM PK
HOUR
PM PK
HOUR
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
LANES
CAPACITY
VOL
V/C
VOL
V/C
N8L
1
1600
610
.38`
170
.11'
NBL
1
1600
610
.38`
170
.1i'
NBT
3
4800
1519
.37
1710
.37
118T
3
4800
1520
.38
1720
.37
N8R
0
0
280
60
N8R
0
0
280
60
SBL
1
1600
40
.03
10
.01 (
S8L
1
1600
40
.03
10
.01
S8T
3
4800
909
.19'
2238
.47'
S8T
3
4800
920
.19`
2240
.47`
S811
f
840
80
S8R
f
840
80
E8L
1.5
90
(.05 )'
560
(.19 }'
, E81.
1.5
90
(.OS )'
560
(.19)-
E8T
0.5
3200
70
.05
60
.19
EBT
0.5
3200
70
.05
60
.19
E8R
f
60
530
E811
f
60
530
W8L
0
0
80
210
W8L
0
0
80
210
W8T
1
1600
60
.18`
140
.30`
W8T
1
1600
60
.18'
140
.30`
WBR
0
0
140
130
WBR
0
0
140
130
1.07
TOTAL CAPACITY UTILIZATION
.80
1.07
TOTAL CAPACITY UTILIZATION
.80
�C
3. Canpus 6 Dove
Existing
(
( Background
(
AM PK
HOUR
PM PK HOUR (
AM PK
HOUR
PM PK
HOUR
LANES CAPACITY
VOL
V/C
VOL
V/C (
LANES
CAPACITY
VOL
V/C
VOL
V/C
( NBL 1 1600
16
.01
22
.01- (
NBL
1
1600
16
.01
22
.01`
( NBT 3 4800
1761
.43`
793
.18 (
NBT
3
4800
1761
.43'
793
.18
( NOR 0 0
315
83
( NBR
0
_ 0
315
83
( SBL 1 1600
298
.19'
376
.24
( SBL
1
1600
298
.19'
376
.24
( SST 3 4800
597
.13
3060
.64`
( SOT
3
4800
597
.13
3060
.64`
( SBR 0 0
6
7
(
( SBR
0
0
6
7
( ESL 1 1600
0
.00
3
.00 (
ESL
1
1600
0
.00
3
.00
( EST 1 1500
0
.00
3
.01 (
EBT
1
1600
0
.00
3
.01
( EBR 0 0
1
7
(
( EBR
0
0
1
7
( WBL 0 0
40
251
WBL
0
0
40
251
( WBT 1 1500
5
.09`
2
.25` (
( WBT
1
1600
5
.09`
2
.25'
( WBR 0 0
93
149
( W8R
0
0
93
149
TOTAL CAPACITY UTILIZATION
.71
.90
TOTAL CAPACITY UTILIZATION
.71
.90
( Background * Project
(
AM PK
HOUR
'PM PK
HOUR
( LANES CAPACITY
VOL
V/C
VOL
V/C
( N8L 1 1600
16
.01
22
.01'
( NBT 3 4800
1761
.44•
793
.18
( NBR 0 0
328
85
{
S8L 1 1600
298
.19`
376
.24
( SBT 3 4800
597
.13
3060
.64`
S8R 0 0
6
7
{
E8L 1 1600
0
.00
3
.00
EBT 1 1500
0
.00
3
.01
E8R 0 0
1
7
WBL 0 0
41
256
WBT 1 1500
5
.09'
2
.25`
( WBR 0 0
93
149
i
TOTAL CAPACITY UTILIZATION
.72
.90
1. Irvine /Campus 6 Bristol
Buildout - No Project
LANES CAPACITY
NBL 0 0
NBT 5 8000
NBR 0 0
SBL 1 1600
SOT 3 4800
S8R 0 0
EBL 1.5
EST 2.5 6400
EBR 2 3200
WBL 0 0
WBT 0 0
W8R 0 0
Right Turn Adjustment
TOTAL CAPACITY UTILIZAI
2. Campus 5 Bristol N
Buildout - No Project
LANES CAPACITY
NBL 2 3200
NBT 3 4800
NBR 0 0
SBL 0 0
SOT 4 6400
SBR 2 3200
EBL 0 0
EST 0 0
EBR 0 0
WBL 1 1600
WBT 4 6400
WBR 0 0
Right Turn Adjustment
TOTAL CAPACITY UTILIZAI
AM PK HOUR PM PK HOUR
VOL V/C VOL V/C
0 0
1618 .24' 1370 .21
330 590 .37
170 .11' 220 .14
$30 .17 2208 .46'
0 0
839 {.48 }' 358 .22
2230 .48 1530 .32'
520 .16 590 .18
0 0
0 0
0 0
NBR .05'
ION .83 .83
AM PK HOUR PM PK HOUR
VOL V/C VOL V/C
600 .19 930 .29'
1987 .41' 838 .17
0 0
0 0
610 .10 1978 .31'
649 .20 1147 .35
0 0
0 0
0 0
410 .25 460 .29
1990 .33' 3711 .59'
120 50
SBR .05`
ION .74 1.24
Buildout with Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 0 0 0 0
NOT 5 $000 1620 .24' 1370 .21.
NBR 0 0 330 590 .37
SBL 1 1500 170 .11' 220 .14
SBT 3 4800 830 .17 2210 .46'
SBR 0 0 0 0
EBL 1.5 850 {.48 }' 360 .23
EST 2.5 6400 2230 .48 1530 .32'
EBR 2 3200 520 .16 590 .18
WBL 0 0 0 0
WBT 0 0 0 0
WBR 0 0 0 0
Right Turn Adjustment NBR .05'
TOTAL CAPACITY UTILIZATION .83 .83
Buildout with Project
AM PK HOUR
PM PK HOUR
LANES CAPACITY
VOL
V/C
VOL
V/C
NBL 2 3200
600
.19
930
.29'
NBT 3 4800
2000
.42'
840
.18
NBR 0 0
0
0
SBL 0 0
0
0
SOT 4 6400
610
.10
1980
.31'
SBR 2 3200
650
.20
1150
.35
E8L 0 0
0
0
EBT 0 0
0
0
EBR 0 0
0
0
WBL 1 1600
410
.26
450
.29
WBT 4 6400
1990
.33'
3720
.59'
WBR 0 0
120
50
Right Turn Adjustment
'
SBR
.05'
TOTAL CAPACITY UTILIZATION
.75
1.24
r, �.
4. MacArthur & Campus
Buildout - No Project
Buildout with Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 140 .09* 460 .29*
MST 4 6400 980 .15 1340 .21
NBR 1 1600 80 .05 90 .06
SBL 1 1600 110 .07 210 .13
SST 4 6400 1870 .29* 930 .i5*
SBR 1 1600 400 .25 730 .46
E8L 2 3200 510 .16* 60 .02*
EST 3 4800 770 .16 680 .16
EBR 0 0 10 70
V8L 2 3200 60 .02 120 .04
VBT 3 4800 740 .15* 1640 .34*
VBR f 110 150
Right Turn Adjus:ment SBR ..,,
TOTAL CAPACITY UTILIZATION .69 1.11
5. MacArthur
& Birch
AM PK HOUR
PM PK HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
1
1600
140
.09*
460
.29*
MST
4
6400
979
.15
1334
.21
NBR
1
1600
80
.05
90
.06
SOL
1
1600
110
.07
210
.13
SBT
4
6400
1863
.29*
929
.15*
SBR
1
1600
400
.25
730
.46
EBL
2
3200
510
.16*
60
.02*
EST
3
4800
770
.16
680
.16
EBR
0
0
10
740
70
1560
VSL
2
3200
60
.02
120
.04
VST
3
4800
740
.15*
1640
.34'
VBR
f
300
110
130
150
SBL
Right
Turn Adjustment
300
.19*
130
SBR
.31*
TOTAL
CAPACITY UTILIZATION
.69
729
1.11
Buildout with Project
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL 1 1600 140 .09* 460 .29*
MST 4 6400 980 .15 1340 .21
NBR 1 1600 80 .05 90 .06
SBL 1 1600 110 .07 210 .13
SST 4 6400 1870 .29* 930 .i5*
SBR 1 1600 400 .25 730 .46
E8L 2 3200 510 .16* 60 .02*
EST 3 4800 770 .16 680 .16
EBR 0 0 10 70
V8L 2 3200 60 .02 120 .04
VBT 3 4800 740 .15* 1640 .34*
VBR f 110 150
Right Turn Adjus:ment SBR ..,,
TOTAL CAPACITY UTILIZATION .69 1.11
5. MacArthur
& Birch
Buildout - No
Project
Buildout with
Project
AM PK
HOUR
PM PK HOUR
AM PK
HOUR
PM PK
HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL 1
1600
120
.08
220
.14
NBL
1
1600
120
.08
220
.14
NOT 3
4800
740
.15*
1560
.33*
NBT
3
4800
740
.15*
1560
.33*
NBR f
220
80
NBR
f
220
80
SBL 1
1600
300
.19*
130
.08*
SBL
1
1600
300
.19*
130
.08*
SBT 4
6400
936
.20
729
.15
SBT
4
6400
940
.20
730
.15
SBR 0
0
418
.26
220
SBR
0
0
420
.26
220
ESL 1
1600
129
.08
234
.15*
E8L
1
1600
130
.08
240
.15*
EST 2
3200
540
.20*
500
.17
EST
2
3200
540
.20*
500
.17
EBR 0
0
110
50
EBR
0
0
110
50
VBL 1
1600
30
.02*
150
.09
VBL
1
1600
30
.02*
150
.09
VBT 2
3200
320
.10
910
.28*
NBT
2
3200
320
.10
910
.28*
NOR f
50
210
VBR
f
50
210
TOTAL CAPACITY UTILIZATION
.56
.84
TOTAL CAPACITY UTILIZATION
.56
.84
�� I
6. Jamboree 6 Bristol
Buildout - No Project
7. Jamboree b Bristol N
Buildout - No Project
LANES CAPACITY
NBL 2 3200
NBT 3 4800
NBR 0 0
SBL 0 0
SBT 4 6400
SBR 0 0
EBL 0 0
EBT 0 0
EBR 0 0
WBL 0 0
WBT 2 3200
WBR 1 1600
Right Turn Adjustment
TOTAL CAPACITY UTILIZAI
AM
VOL
1230
2076
260
0
449
310
0
0
0
0
910
700
Multi
ION
)K HOUR PM PK HOUR
V/C VOL V/C
.38 1470 .46`
.49* 1239 .26
10
0
.09 1866 .38`
.19 570
0
0
0
0
.28' 570 .18'
.44 210 .13
.24'
1.01 1.02
Buildout with Project
AM PK HOUR
PM PK HOUR
I
LANES
CAPACITY
VOL
V/C
VOL
V/C
NBL
0
0
0
0
I
NBT
5
8000
2326
.29'
1899
.24
NBR
0
0
20
10
I
SBL
0
0
0
0
I
SBT
3
4800
479
.10
1866
.39'
SBR
0
0
0
0
I
EBL
1.5
1370
.43'
740
{.42 }'
EBT
1.5
4800
350
.22
1260
.42
EBR
2
3200
840
.26
1540
.48
I
WBL
0
0
0
0
I
WBT
0
0
0
0
WBR
0
0
0
0
I
Right
Turn Adjustment
EBR
EBR
I
.06`
TOTAL
CAPACITY UTILIZATION
.72
.87
.87
7. Jamboree b Bristol N
Buildout - No Project
LANES CAPACITY
NBL 2 3200
NBT 3 4800
NBR 0 0
SBL 0 0
SBT 4 6400
SBR 0 0
EBL 0 0
EBT 0 0
EBR 0 0
WBL 0 0
WBT 2 3200
WBR 1 1600
Right Turn Adjustment
TOTAL CAPACITY UTILIZAI
AM
VOL
1230
2076
260
0
449
310
0
0
0
0
910
700
Multi
ION
)K HOUR PM PK HOUR
V/C VOL V/C
.38 1470 .46`
.49* 1239 .26
10
0
.09 1866 .38`
.19 570
0
0
0
0
.28' 570 .18'
.44 210 .13
.24'
1.01 1.02
Buildout with Project
Buildout with Project
I I
AM PK HOUR PM PK HOUR
L -9 E= IiPACITY VOL V/C VOL V/C
I
NBL 2 3200 1230 .38 1470 .46'
NBT 3 4800 2080 .49' 1240 .26
NBR 0 0 260 10
I I
SBL 0 0 0 0
SBT 4 6400 450 .09 1870 .38'
SBR 0 0 310 .19 570
I I
EBL 3 0 0 0
EBT 0 0 0 0
EBR 0 0 0 0
I I
WBL 0 0 0 0
WBT 2 3200 910 .28` 570 .18'
WBR 1 1600 700 .44 210 .13
I I
Right Turn :c:- stment Multi .24'
TOTAL CAPACITY UTILIZATION 1.01 1.02
In'`
AM PK HOUR
PM PK HOUR
I
- 1PACITY
VOL
V/C
VOL
V/C
NBL
..
0
0
0
I NBT
_
B000
2330
.29'
1900
.24
NBR
0
0
20
10
SBL
0
0
0
SBT
3
4800
480
.10
1870
.39'
SBR
I
0
0
0
0
EBL
1370
.43'
740
�
{.42 }'
EBT
I -`_
4800
350
.22
1260
.42
EBR
I
2
3200
840
.26
1540
.48
WBL
0
0
0
0
AT
0
0
0
0
WBR
0
0
0
0
I
Right
i
%-n = :._stment
EBR
I
.06'
TOTAL
CAPACITY UTILIZATION
.72
.87
Buildout with Project
I I
AM PK HOUR PM PK HOUR
L -9 E= IiPACITY VOL V/C VOL V/C
I
NBL 2 3200 1230 .38 1470 .46'
NBT 3 4800 2080 .49' 1240 .26
NBR 0 0 260 10
I I
SBL 0 0 0 0
SBT 4 6400 450 .09 1870 .38'
SBR 0 0 310 .19 570
I I
EBL 3 0 0 0
EBT 0 0 0 0
EBR 0 0 0 0
I I
WBL 0 0 0 0
WBT 2 3200 910 .28` 570 .18'
WBR 1 1600 700 .44 210 .13
I I
Right Turn :c:- stment Multi .24'
TOTAL CAPACITY UTILIZATION 1.01 1.02
In'`
S. MacArthur 6 Jamboree
Buildout - No Project
LANES CAPACITY
NBL 1 1600
NBT 3 4800
NBR 0 0
SBL 1 1600
SBT 3 4800
SBR f
EBL 2 3200
EBT 3 4800
EBR f
WBL 2 3200
WBT 3 4800
VBR f
Right Turn Adjustment
TOTAL CAPACITY UTILIZA
9. Jamboree 5 Birch
Buildout - No Project
NBL
NST
NBR
SBL
SBT
SBR
EBL
EBT
EBR
WSL
WBT
WSR
AM PK HOUR PM PK HOUR
VOL V/C VOL V/C
230 .14 200 .13`
1683 .46• 749 .23
510 630 .39
99 .06' 310 .19
519 .11 1624 .34'
79 566
886 .25' 599 .19`
1480 .31 640 .13
520 240
100 .03 610 .19
420 .09' 1620 .34'
449 38
NBR .11'
PION .89 1.11
0
0
AM
PK HOUR
PN
PK HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
1
1600
610
.35'
170
.11'
3
4800
1519
.37
1710
.37
0
0
280
60
1600
1
1600
40
.03
10
..01
3
4800
909
.19'
2238
.41*
f
840
80
1.5
{.05 }'
90
{.05 }•
560
{.19 }'
0.5
3200
70
.05
60
.19
f
60
530
0
0
0
80
210
1
1600
60
.18' 140 .30'
0
0
140
130
TOTAL CAPACITY UTILIZATION .80 1.07
Buildout with Project
LANES CAPACITY
NBL 1 1600
NBT 3 4800
NBR 0 0
S8L 1 1600
SBT 3 4800
SBR f
ESL 2 3200
EST 3 4800
EBR f
WBL 2 3200
MST 3 4800
NBR f
Right Turn Adjustment
TOTAL CAPACITY UTILIZA
Buildout with Project
NBL
NBT
NBR
SBL
SBT
SBR
EBL
EBT
EBR
WBL
WBT
WBR
AM PK HOUR PM PK HOUR
VOL V/C VOL V/C
230 .14 200 .13'
1690 .46' 750 .23
510 630 .39
100 .06' 320 .20
520 .11 1630 .34'
SO 570
890 .28' 600 .19'
1480 .31 640 .13
520 240
100 .03 610 .19
420 .09` 1620 .34'
460 40
N8R .12'
PION .89 1.12
TOTAL CAPACITY UTILIZATION .80 1.07
AM PK HOUR
PM PK HOUR
LANES
CAPACITY
VOL
V/C
VOL
V/C
1
1600
510
.38'
170
.11'
3
4800
1520
.38
1720
.37
0
0
280
60
1
1600
40
.03
10
.01
3
4800
320
.19'
2240
.41`
f
840
80
1.5
90
{.05 }'
560
{.19 }*
0.5
3200
70
.05
60
.19
f
60
530
0
0
80
210
1
1600
60
.18`
140
.30`
0
0
140
130
TOTAL CAPACITY UTILIZATION .80 1.07