Agenda Item No. 5
January 24, 2012
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Stephen G. Badum, Public Works Director
949 - 644 -3311, sbadum @newportbeachca.gov
PREPARED BY: Peter Tauscher, Junior Civil Engineer
APPROVED: A
TRAL BALB A PAVEMENT REHABILITATION —PHASE 1 -
TITLE: COMPLETION AND ACCEPTANCE OF CONTRACT NO. 4453
ABSTRACT:
On April 12, 2011, City Council awarded Contract No. 4453 to Nobest, Inc. ( Nobest), for
an amount of $448,000.00, and established a 25 percent contingency allowance to
address unknown cost and take advantage of the low bid pricing. Work is now complete
and staff requests City Council to accept and close out of the contract.
RECOMMENDATIONS:
1. Accept the completed work and authorize the City Clerk to file a Notice of Completion.
2. Authorize the City Clerk to release the Labor and Materials Bond 35 days after the Notice
of Completion has been recorded in accordance with applicable portions of the Civil Code.
3. Release the Faithful Performance Bond one year after Council acceptance.
FUNDING REQUIREMENTS:
Funds for the construction contract were expended from the following accounts:
Account Description
Gas Tax
Water Enterprise
Wastewater Enterprise
AD 101 - Contingency
AD 101 — Street Rehabilitation
Account Number
7181- C2002017
7511- C2002041
7531- C2002041
74101 -9805
74101 -9804
Amount
$406,198.65
$1,800.00
$40,480.00
$44,850.00
$19,000.00
Total: $512,328.65
DISCUSSION:
Central Balboa Pavement Rehabilitation — Phase 1
Completion and Acceptance of Contract No. 4453
January 24, 2012
Page 2
Overall Contract Cost/Time Summary
Construction
Description
Cost
Actual
Contract
Time
Contract Award
Final Cost at
Contingency
Contract
Time+
(Under)
Amount
Completion
Target
Change
Extteen sion
or Over
$448,000.00
$512,328.65
25% or less
14%
84
( -13)
The work necessary for the completion of this contract consisted of removing existing concrete
streets, sidewalks, curb and gutter, curb access ramps, alley approaches and driveways;
constructing street pavement, sidewalks, curb and gutter, curb access ramps, alley
approaches and driveways; adjusting utilities to grade; removing and installing new trees;
reconstructing catch basins; and incidental items of work as required by the contract.
As part of the award, a $112,000.00 contingency allowance was established to address
unknown cost and possibly take advantage of the low contract unit bid price to address
additional concrete repairs and or street rehabilitation in other parts of the City that were not
originally believed to be afforded. Under this contract, contingency funds were used to
rehabilitate Hardin Street and the southern portion of Cypress Street, construct an eastbound
left turn lane at 15t Street, and an alley approach on Newport Island.
The contract has now been completed to the satisfaction of the Public Works Department. A
summary of the contract cost is as follows:
Original bid amount:
Actual cost of bid items constructed:
Total change orders:
Final contract cost:
$448,000.00
423, 078.65
89,250.00
$512,328.65
The final overall construction cost including change orders was 14 percent over the original bid
amount.
There were four change orders broken down as shown below:
CO #
Description
Cost
1
Construct Turn Eastbound Left Lane on W. Balboa Boulevard at
15th Street
$17,750.00
2
Street Rehabilitation - Cypress Street and Harding Street
$49,500.00
3
Remove and Replace Sewer Manhole on Medina Way
$ 4,500.00
4
Install Alternative Island Avenue Trees /Remove and Replace
Newport Island Alley Approach
$17,500.00
TOTAL
$89,250.00
IN
A summary of the added project schedule is as follows:
Estimated completion date per July 2011 Schedule:
Project Awarded for Construction:
Contract Completion Date Plus Approved Extensions:
Actual Substantial Completion Date:
ENVIRONMENTAL REVIEW:
Central Balboa Pavement Rehabilitation — Phase 1
Completion and Acceptance of Contract No. 4453
January 24, 2012
Page 3
January 13, 2012
April 12, 2011
January 18 , 2012
December 21. 2011
City Council found this project exempt from the California Environmental Quality Act ( "CEQA ")
pursuant to Section 15301 (Minor alterations of existing facilities with negligible expansion of
the facilities) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3,
because it has no potential to have a significant effect on the environment.
NOTICING:
This agenda item has been noticed according to the Brown Act. In addition, the City Clerk will be
filing a Notice of Completion for the project as a result of this action.
Submitted by:
zznepnen�u tsaaum
PubliVOods Director
A. Location Map
I! I � i ��Ii I
111111" "'111 f ��� i i �: is �•� �.
PAVEMENT REHABILITATION
PRASE 1
(ISLAND AVENUE, MEDIAN WAY, AND CYPRESS STREET)
C-4453
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
LOCATION MAP
NOT TO SCALE