Project Update
RE Staite mobilized May 1.
Dredging began May 3.
z dredge units working concurrently.
14 cubic yard bucket
8 cubic yard bucket
3 disposal scows (z small and 1 large - same scows as Rhine
3 tugs
POLB Disposal
Window closes June 30
• Every conceivable effort will be made to meet this deadline
City authorized RE Staite to work from 6:oo am to lo:oo pm
Monday through Saturday
Concern about POLB fill site filling prematurely (before June 3c
Consider allowing Sunday work, then maybe z4 hours if necess
Public Outreach
December z3, 2011 Letter to
waterfront homes
vessels Y attachod. Pease contact the Harbor Patrol.
(949) 723 -1002, for securing an alternate mooting Ores
of charge, firgtome. first -served) if you wish to
mbcate your vessel Prior to dredging. The Impacts in
any given area will be temporary, and may last onty a
few days in front of the docks, and °¢,daps a low
weeks in each mooring field. Pease ask your harbor
friends or neghbom for assistance vin temporary coal
slorager dump the project.
The CM will prwd. anted proect updates vnth
antitlpatod schodues and Information as t becomes
available Pease contact Chris Miller to be included on
the ..,I drslribution hsl. cmiYer�nmwonbaachmpw
The City. Corps and RE State ewll do everything
possible to minrmze the mi 10 the harbor during
the project Nb thank you for your patience and
understanding as we complete this an octant dredging
Protect
If you have any questions please contact
Chris Miller
Harbor Resources Manager
cmiler ®novionboachca nov
(949) 6443043
Shannon Lwkr
Harbor Resources Supervisor
sImnnon®newDJnbea<hca gov
(949) 6M -3041
vnvw.newoodbeachca amwLowerBavaedama
�
March 7 & April 19 letter to
veaF
PUBLIC WORKS
DEPARTNENT
Harbor Resou Ices
IMPORTANT NOTICE
affected mooring
•
p e r m i t t e e s
Lo"r Bay Dredging Project
Dear Waledront Property Owner I Harbor User
The Corps of Engineers has awarded a contract to
dredge the Lower Newport Bay to R E. Stat e,
Engineering. The project a anticipated to commence
the week of April 23, and last until the end of summa,
April 16 door hangers to
or beyond Dredging will occur in the ,rain channels
only
The City Nerintl "idea' private
The or Nawpon Beach is a local sponsor of
protect IS Vnth financial
ct a and
0
waterfront homes
ma emenling
assistance
phase management , Ml it o,. h assamnce
Phone I or Ice berate vii dsperso material at the Pon
of Long Beach before the offal deadline closes on
l to
June 30 Every conceivable eal will be made to
ble
tlolNOr materal viha this disposal window.
Phase II of the Project me disposer material al the
EPA's approved disposal sae ILA -3ry which is cooled
Regular e m a • updates wit
4.5 miles off the coast of Newport Beach.
Most vessels at private and commercial docks mH not
tie regared to move dump dredging, but a law that
progress map
overhang into the federal channel Trey need to vacate
their slips fore day o wo g err,plea you mill ed
ahead teey er, please be teemed
that them
that tear¢ will the t ty be splashing of teat¢, and
a be splashing
•
T o receive updates email
seam¢m near the tlredge zone. so N s Mohr
advisable that you move your boats) whe the dredoer
dock.
,milleranewportbeachca.,rov
ate amd the Cry 0be renmwrtao tnemaadnd
frees, and the Call win ur re Mine s g e moorings and
vessels Y attachod. Pease contact the Harbor Patrol.
(949) 723 -1002, for securing an alternate mooting Ores
of charge, firgtome. first -served) if you wish to
mbcate your vessel Prior to dredging. The Impacts in
any given area will be temporary, and may last onty a
few days in front of the docks, and °¢,daps a low
weeks in each mooring field. Pease ask your harbor
friends or neghbom for assistance vin temporary coal
slorager dump the project.
The CM will prwd. anted proect updates vnth
antitlpatod schodues and Information as t becomes
available Pease contact Chris Miller to be included on
the ..,I drslribution hsl. cmiYer�nmwonbaachmpw
The City. Corps and RE State ewll do everything
possible to minrmze the mi 10 the harbor during
the project Nb thank you for your patience and
understanding as we complete this an octant dredging
Protect
If you have any questions please contact
Chris Miller
Harbor Resources Manager
cmiler ®novionboachca nov
(949) 6443043
Shannon Lwkr
Harbor Resources Supervisor
sImnnon®newDJnbea<hca gov
(949) 6M -3041
vnvw.newoodbeachca amwLowerBavaedama
Targeted Surveys to Verify Reported High Spots
�R ANCHOR Figure 11
1[,,, QEA a�"�"c. Lower Newport Bay - February 2012 Condition Survey
Targeted Surveys to Verify Reported High Spots
* )Q ANCHOR r Flgure8 sopach
Y s OE Lower Newport Say - February 2012Condition1Survey
Middle Harbor Fill Slate, POLB
Summary
• Total LA -3 Material (estimated, with option areas) 426,800 cy $5,629,665
• Total POLB Material 105,400 ccy $1.460,840
Total: 532,200 $7,090,505
• Total City Material (estimated) 456,659 cy $6,115,654
• Total County Material (estimated) 75,541 cY $974,851
• Original Federal Funds $2,300,000
• Additional Federal Funds $2,000,000
• City Contribution $2600,000
Total: $6,800,000
• Current Contract Award $6,387,640
• Additional Areas (estimated, to be negotiated later) $238615
• Grand Total — Full Project (estimated, includes mobilization) $8,777,255
• Less Current Available Funds - $6,800,00i
• Difference $1,977,255
• Less County Contribution (estimated) - $974p851
• Remaining Gap to Overcome $1,002,404
For More InformatiIs
on
Chris Miller
Harbor Resources Manager
:miller
newportbeachca.gov
(949) 644 -3043
Shannon Levin
Harbor Resources Supervisor
(949) 644 -3041