City Council Staff Report Agenda Item No. 14
June 12, 2012
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Public Works Department
Stephen G. Badum, Public Works Director
949 - 644 -3311, sbadum @newportbeachca.gov
PREPARED BY: Tom Sandefur, P.E., Associate Civil Engineer
APPROVED:
TITLE: Storm Drain CDS Unit Construction —Award of Contract No. 4915
ABSTRACT:
Staff received favorable construction bids for the Storm Drain CDS Unit Construction
project and is requesting City Council's approval to award the work to Palp Inc., (dba
Excel Paving Company).
RECOMMENDATIONS:
1. Approve the project drawings and specifications;
2. Award Contract No. 4915 to Excel Paving Company for the total bid price of
$261,456 and authorize the Mayor and City Clerk to execute the contract; and
3. Establish a contingency of $39,218 (approximately 15 percent) to cover the cost
of unforeseen work.
FUNDING REQUIREMENTS:
The current adopted budget includes sufficient funding in the following accounts for the
award of this contract. The following funds will be expensed:
Proposed uses are as follows:
Account Description Account Number Amount
General Fund 7012- C2502010 $ 142,724.00
Measure M Competitive 7284- C2502010 $ 157,950.00
Total: $ 300,674.00
Storm Drain CDS Unit Construction —Award of Contract No. 4915
June 12, 2012
Page 2
Vendor Purpose Amount
Excel Paving, Inc. Construction Contract $ 261,456.00
Excel Paving, Inc. Construction Contingency 39,218.00
Total: $ 300,674.00
DISCUSSION:
The Orange County Transportation Authority (OCTA) provides Measure M grant funding
opportunities to support cleaning urban and storm water runoff associated with
transportation corridors. City staff has identified and prioritized several locations within
the City where storm water trash & debris interceptors could be installed to improve
runoff water quality before it enters the bay or ocean. As part of this effort, staff then
applied for and received approval of two OCTA grants to fund the design and
construction of two Continuous Deflection Separator (CDS) trash & debris interceptors
at two high priority locations. The two CDS structures to be installed as part of this
project are on 42" storm drain lines that drain into the open bioswale along Newport
Boulevard just south of Industrial Way. The first location is in the embankment adjacent
to Newport Boulevard just south of 15th Street. The second location is in the back of
Corporation Yard near the transfer station. These two storm drain lines receive heavy
street litter flows during storm events. At times, the amount of street litter entering the
bioswale is so heavy that the outlet pipe clogs, requiring Municipal Operation workers to
clear the pipe to prevent Newport Boulevard from flooding. These CDS Units will
capture the street litter before it enters the bioswale and continues to the bay.
At 9:00 A.M. on May 23, 2012, the City Clerk opened and read the following bids for this
project:
BIDDER
Low Palp Inc, dba Excel Paving, Inc.
2 Nikola Corporation
3 AToM Engineering Construction
4 Beador Construction Company, Inc.
5 Transtar Pipeline, Inc.
6 Bali Construction, Inc.
7 GCI Construction, Inc.
8 Mike Bubalo Construction Co. Inc.
9 Paulus Engineering, Inc.
10 Atlas- Allied, Inc.
11 Caliagua, Inc.
12 Clarke Contracting Group
13 Garcia Juarez Construction
TOTAL BID AMOUNT
$261,456.00
$301,833.00
$333,100.00
$337,300.00
$337,750.00
$339,500.00
$357,700.00
$375,000.00
$379,100.00
$381,000.00
$386,540.00
$397,050.00
$424,600.00
2
Storm Drain CDS Unit Construction —Award of Contract No. 4915
June 12, 2012
Page 3
The low total bid amount is 2.5 percent below the Engineer's Estimate of $267,900. The
low bidder, Excel Paving, Inc., possesses a California State Contractors License
Classification "A" as required by the project specifications. A check of the contractor's
references indicates satisfactory completion of similar projects for other public agencies.
The work necessary for the completion of this contract consists of procuring and
installing CDS units and weir boxes including the excavation, removal of existing
improvements, backfilling and compaction, replacing asphalt, installing vegetation on
the existing slope, and restoring pavement. Pursuant to the Contract Specifications, the
Contractor will have 40 consecutive working days to complete the shop drawings and
procure the materials and 20 consecutive working days to install the work.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act ( "CEQX) pursuant to Section 15302(c) (Construction
resulting in no expansion of facility capacity) of the CEQA Guidelines, California Code of
Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect
on the environment.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
Submitted by:
Badum
s Director
A. Location Map
W
/l
In
LOCATION MAP
STORM DRAIN CDS UNIT CONSTRUCTION
CONTRACT NO. 4915
p2
�P
p QO /
{P
GpQe
V S� PROJECT LOCATIONS
ao�
_
`V
/
�` ^H\ SPI�TAL ROA ^>` '
5