Loading...
HomeMy WebLinkAbout03 - Tidegate Retrofits and UpgradesCITY OF NEWPORT BEACH p��EWPO�, C"Q[ /FORD \P City CouncH Staff Report Agenda Item No. 3 July 10, 2012 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Tom Sandefur, P.E., Associate Civil Engineer APPROVED: Q " �- TITLE: Tidegate Retrofits and Upgrades – Award of Contract No. 5116 ABSTRACT: Staff received favorable construction bids for the Tidegate Retrofits and Upgrades Project and is requesting City Council's approval to award the work to Bali Construction, Inc. RECOMMENDATIONS: 1. Approve the project drawings and specifications; and 2. Award Contract No. 5116 to Bali Construction, Inc., for the total bid price of $126,620.00 and authorize the Mayor and City Clerk to execute the contract, and 3. Establish a contingency of $18,993.00 (15 percent) to cover the cost of unforeseen work not included in the original contract. FUNDING REQUIREMENTS: There are sufficient funds available in the Tide and Submerged Lands Account for the award of the contract. Account Description Account Number Amount Tide and Submerged Lands 7231- C2502009 $ 145,61100 Total: $ 145,613.00 Tidegate Retrofits and Upgrades —Award of Contract No. 5116 July 10, 2012 Page 2 Proposed uses are as follows: Vendor Purpose Amount Bali Construction, Inc. Construction Contract $ 126,620.00 Bali Construction, Inc Construction Contingency $ 18,993.00 Total: $ 145,613.00 DISCUSSION: The fiscal year 2012/13 Capital Improvement Program includes funds for the Tidegate Retrofits and Upgrades project. This project provides for the installation of new tidegates and hardware to replace existing deteriorated and high maintenance units on Balboa Peninsula and Balboa Island. The project will install tidegates that will operate automatically depending on the tide thus reducing operation and maintenance costs associated with the existing tidegates. At 9:00 A.M. on June 27, 2012, the City Clerk opened and read the following bids for this project: BIDDER Low Bali Construction, Inc. 2 The Richards Group 3 PALP, Inc., dba Excel Paving, Co. 4 GCI Construction, Inc. 5 Mode Engineering 6 Altas- Allied, Inc. 7 Paulus Engineering, Inc. 8 Jeremy Harris Construction TOTAL BID AMOUNT $126,620.00 $139,470.00 $142,479.00 $153,700.00 $178,150.00 $178,150.00 $195,570.00 $199,986.00 The low total bid amount is 24.0 percent below the Engineer's Estimate of $157,750.00. The low bidder, Bali Construction, Inc. possesses a California State Contractors License Classification "A" as required by the project specifications. A check of the contractor's references indicates satisfactory completion of similar projects for other public agencies. The work necessary for the completion of this contract consists of furnishing and installing TideFlex tide valves and Checkmate check valves, removing existing corrugated outlet pipes, installing new outlet pipes, connecting to existing storm drain systems, and installing a new catch basin. Pursuant to the Contract Specifications, the Contractor will have 30 consecutive working days to complete the work. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301 (c) (minor alterations of existing public facilities with negligible expansion of the facilities) of the CEQA RM Tidegate Retrofits and Upgrades — Award of Contract No. 5116 July 10, 2012 Page 3 Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. The Notice Inviting Bids for this project was advertised in the City's official publication and in construction industry publications. Approximately two weeks prior to starting work, a City prepared notice will be distributed by the contractor to businesses within the project limits advising them of the pending work. Additionally, a second notice will be distributed by the contractor to businesses a few days before work will start adjacent to their property. Submitted by: ,*n G. Badum c Works Director Attachment: A. Location Map J ATTACHMENT A LOCATION MAP TIDEGATE RETROFITS AND UPGRADES CONTRACT NO. 5116 PROJECT LOCATIONS NOR � gRYrgqA'� I u P P UP p JF' qRi' P q� ROJECT LOCATIONS z- a P P� QPy O J� PROJECT LOCATIONS Qp P 7z= BALBOA ISLAND LOCATIONS LOCATION MAP TIDEGATE RETROFITS AND UPGRADES CONTRACT NO. 5116 PROJECT LOCATIONS 1 =1 BALBOA BLVD BAY AVENUE LOCATIONS 0 LOCATION MAP TIDEGATE RETROFITS AND UPGRADES CONTRACT NO. 5116 PROJECT LOCATION P Q O�� / .\ PROJECT LOCATION 133 R�q-+TO RrV�q(T0 V�`1 � LLz `1�� j i PROJECT LOCATIONS RIVO ALTO LOCATIONS