Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
04 - 15th Street Rehabilitation Project
F�EVYPp�T CITY OF NE W-PO;RT BEACH Cq<cORNP City Co uncH Staff Report Agenda Item No. 4 July 10, 2012 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Patrick Arciniega, P.E., Senior Civil Engineer APPROVED: TITLE: 15th Street Rehabilitation Project — Old Newport Boulevard to Redlands Avenue — Award of Contract No. 5077 ABSTRACT: Staff received favorable construction bids for the 15th Street Rehabilitation Project — Old Newport Boulevard to Redlands Avenue and is requesting City Council's approval to award the work to All American Asphalt. RECOMMENDATIONS: 1. Approve Reimbursement Agreement with the City of Costa Mesa and the City of Newport Beach; and 2. Approve the project drawings and specifications; and 3. Award Contract No. 5077 to All American Asphalt for the total bid price of $303,303.00 and authorize the Mayor and City Clerk to execute the contract; and 4. Establish a contingency of $45,000.00 (15 percent) to cover the cost of unforeseen work not included in the original contract; and 5. Approve Budget Amendment No. 13BA- 002 recognizing new revenue (reimbursement funds from the City of Costa Mesa) of $115,000.00 to Contribution Fund 250 -4858 and appropriating $115,000.00 to Account No. 7251- C2002042. FUNDING REQUIREMENTS: Upon approval of the proposed Budget Amendment, there will be sufficient funding for the award of this contract. The following funds will be expensed: 15th Street Rehabilitation Project — Old Newport Boulevard to Redlands Avenue — Award of Contract No. 5077 July 10, 2012 Page 2 Proposed uses are as follows: Account Description Gas Tax Contributions (City of Costa Mesa) Water Enterprise Vendor All American Asphalt All American Asphalt Geotechnical Services Various DISCUSSION: Account Number 7181- C2002042 7251- C2002042 7511- C2002042 Amount $ 234,303.00 $ 115,000.00 $ 10,000.00 Total: $ 359,303.00 Purpose Construction Contract Construction Contingency Pavement Testing Printing & Incidentals Total Amount $ 303,303.00 $ 45,000.00 $ 10,000.00 $ 1,000.00 $ 359,303.00 The current Capital Improvement Program includes funds for the 15th Street Rehabilitation Project which is intended to repair deteriorated pavement conditions from Old Newport Blvd. to Redlands Avenue, update access ramps to the elementary school and correct excessive street crowning at the entrance to the school. This project location shares the border between Newport Beach and Costa Mesa. Newport Beach has taken the lead role in design of this project and will also be the lead during construction. Staff has coordinated with Costa Mesa Public Services staff throughout the development of this project. Costa Mesa has reviewed the plans construction estimate, cooperative agreement and bids. Per the cooperative agreement Costa Mesa will reimburse Newport Beach for improvements to their City within this contract. This agreement also includes five percent (5 %) of Costa Mesa's total project cost to cover administrative costs related to their construction effort. At 10:00 A.M. on June 21, 2012, the City Clerk opened and read the following bids for this project: TOTAL BID AMOUNT $303,303.00 $321,870.50 $328,000,00 $328,732.00 $345,000.00 $353,814.00 1. BIDDER Low All American Asphalt 2 RJ Noble 3 Nobest Inc. 4 EBS 5 Hardy & Harper, Inc. 6 Palp Inc, dba Excel Paving, Inc. TOTAL BID AMOUNT $303,303.00 $321,870.50 $328,000,00 $328,732.00 $345,000.00 $353,814.00 1. 15th Street Rehabilitation Project — Old Newport Boulevard to Redlands Avenue — Award of Contract No. 5077 July 10, 2012 Page 3 The low total bid amount is 25.7 percent below the Engineer's Estimate of $408,000.00. The low bidder, All American Asphalt possesses a California State Contractors License Classification "A" as required by the project specifications. A check of the contractor's references indicates satisfactory completion of similar projects for other public agencies. The work necessary to complete this contract consists of distributing construction notices to affected businesses, construction surveying, removing existing pavement, reconstructing curb and gutter, sidewalk, curb access ramps, adjusting utility and survey facilities, repaving streets and other incidental items of work necessary to complete the work in place. Pursuant to the Contract Specifications, the Contractor will have 30 consecutive working days to complete the work. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301 (c) (minor alterations of existing public facilities with negligible expansion of the facilities) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The Notice Inviting Bids for this project was advertised in the City's official publication and in construction industry publications. Approximately two weeks prior to starting work, a City prepared notice will be distributed by the contractor to businesses within the project limits advising them of the pending work. Additionally, a second notice will be distributed by the contractor to businesses a few days before work will start adjacent to their property. Submitted by: GABadum orks Director Attachment: A. Location Map B. City of Costa Mesa Reimbursement Agreement C. Budget Amendment 11 NEWPOF 0 OLD -1 F I III II - - --� LPL ORANGE AVE BOLSA AVE I I II II I , I II II it I I A WESTMINSTER AVE _J L co CATALINA RD MI-JI SEE ABOVE RIGHT SEE BELOW LEFT _ I �r -- r l i IL II SANTA ANA AVE I JII� SAN BERNARDINO AVE I I I I � II I' I I REDLANDS AVE w 15th STREET NOT TO SCALE MISCELLANEOUS PAVING REPAIR PROJECT LIMITS I I� I I� I CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT AWN' 9T SHT. 1 OF 1 ATE: 6/22/12 C -5077 REIMBURSEMENT AGREEMENT BETWEEN THE CITY OF COSTA MESA AND THE CITY OF NEWPORT BEACH FOR 15TH STREET PAVEMENT REHABILITATION PROJECT This Reimbursement Agreement ( "Agreement ") is made and entered into this day of , 2012 ( "Effective Date "), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ( "Newport Beach ") and the CITY OF COSTA MESA, a California municipal corporation and general law city ( "Costa Mesa "): RECITALS A., The Newport Beach Capital Improvement Program (CIP) serves as a plan for the provision of public improvements. Street improvements on 15th Street from Old Newport Blvd. to Redlands Avenue are pavement improvements scheduled in Newport Beach's CIP ( "Project "). B. The boundary line between Newport. Beach and Costa Mesa exists through the center of 15th Street. C. Newport Beach will take the lead on the Project and design, construct and manage the administrative parts of the Project. D. Costa Mesa agrees to reimburse Newport Beach for the portion of the design, construction and administrative costs ( "Costs ") associated with the portion of the Project that is within the City limits of Costa Mesa under the terms and conditions set forth in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Agreement shall commence on the above written date, and shall terminate sixty (60) days after the acceptance of the work performed on the Project by Newport Beach and Costa Mesa or on July 1, 2013, whichever is sooner, unless terminated earlier as set forth herein. 2. SCOPE The terms and conditions of this Agreement shall provide the administrative and funding responsibilities of the parties with regard to the Project. 3. PLANS Newport Beach agrees that the Project shall be completed pursuant to approved Project plans and specifications (the "Plans and Specifications ") which shall be approved by Newport Beach and Costa Mesa and used in awarding the construction contract. Prior Reimbursement Agreement Page 1 I to commencement of preparation of the Plans and Specifications, Newport Beach shall submit its design engineer's proposal for the design of the Project. Costa Mesa will have a period of five (5) calendar days from the submittal date of such design proposal to review and either indicate its approval or request changes in writing. Newport Beach shall cause its design engineer to review and respond to any requested changes made by Costa Mesa. The Plans and Specifications shall be deemed to incorporate the applicable portions of the guidelines established by Standard Specifications of Public Works Construction (2012 Edition with the latest supplements) 4. BIDDING AND AWARD 4.1 The parties agree that the Project includes the 15th Street right of way located within the boundaries of Costa Mesa and shall be included in Newport Beach's contract awarded for the Project. During the bidding process, Newport Beach shall deliver to Costa Mesa one (1) complete set of the bid documents that includes the work in the Costa Mesa right of way including all related addenda concurrently with the distribution thereof to prospective bidders. Upon opening of bids by Newport Beach, Newport Beach will submit the bids or a spread sheet summary of the bids to Costa Mesa. Costa Mesa will have a period of ten (10) calendar days from its receipt of the bid results for review and approval of bid item(s) submitted by the bidder identified to Costa Mesa by Newport Beach as Newport Beach's proposed successful bidder. Newport Beach agrees that bids received shall be subject to the written approval of Costa Mesa prior to award of the Project construction contract(s); and further agrees that in the event Costa Mesa does not approve such bids, either party may terminate this Agreement upon twenty -four (24) hours' prior written notice, in which event Newport Beach shall have no further obligation to construct the improvements in the Costa Mesa right of way, and Costa Mesa may elect to improve the Costa Mesa right of way with its own contractor. Within ten (10) calendar days of termination under this Section, Costa Mesa shall reimburse Newport Beach for all costs incurred to date on behalf of Costa Mesa. If Costa Mesa approves of the bid item(s) of Newport Beach's successful bidder, Newport Beach agrees to cause the Costa Mesa right of way to be constructed as part of the contract awarded to such bidder. 4.2 The total estimated construction costs for the Costa Mesa right of way improvements is One Hundred FifteenThousand and 001100 Dollars ($115,000.00), which includes a fifteen percent (15 %) contingency to cover the cost of unforeseen expenses, in accordance with the Engineer's project cost Estimate attached hereto as Exhibit A. However, the actual amount to be reimbursed to Newport Beach by Costa Mesa shall be based on the actual costs incurred by Newport Beach on Costa Mesa's behalf under this Agreement. 4.3 Upon award of the construction contract, Newport Beach shall provide Costa Mesa with one (1) original copy of the fully executed contract documents and one (1) copy of the bid package received from the successful bidder. 5. DESIGN REVISIONS AND CHANGE ORDERS. 5.1 Costa Mesa agrees to reimburse Newport Beach for any change order(s) for revision(s) requested by Costa Mesa or otherwise required to construct the Costa Mesa Reimbursement Agreement Page 2 J right of way. Unless required by an emergency, Newport Beach shall promptly furnish Costa Mesa with copies of any proposed change order(s) to such contract within five (5) working days of the initiation of the changed conditions to such contract, which shall be subject to Costa Mesa approval if and to the extent the Costa Mesa right of way are affected therefrom. 5.2 Costa Mesa shall promptly review proposed change order(s) and provide Newport -Beach with a response within five (5) working days or sooner of receiving proposed change order(s) information from Newport Beach. Costa Mesa agrees not to unreasonably cause delay(s) to the construction schedule of the Project in reviewing proposed .change order(s) for the Costa Mesa right of way. Notwithstanding any other provision herein, any approval required to be given by Costa Mesa under this Section shall be deemed given if no response to the Newport .Beach's request for such approval is received .by the Newport Beach within eight (8) :working days following the written request for such approval unless, the parties agree otherwise: in a:yyriting executed by both parties. 6. REIMBURSEMENT 6.1 Costa Mesa agrees to reimburse Newport: Beach for the following costs (collectively, the "Costs "): (1) the actual costs of design, construction, compaction testing, geotechnical services, permits, bonds, and legal fees (excluding the costs of preparation of this Agreement) incurred by Newport Beach in connection with the design and construction of the Costa Mesa right of way, plus (2) an administration fee which shall be equal to five percent (5 %) of the actual cost of construction of the Costa Mesa right of way and which shall be deemed to cover all costs of project administration, including, but not limited to, accounting and inspection.. Newport Beach shall keep a separate accounting of all Costs incurred by Newport Beach in relation to the Costa Mesa right of way. 6.2 Within sixty (60) days of Costa Mesa's acceptance of the Costa Mesa right of way as provided in Section 9, a final accounting of the Costs shall be made by Newport Beach and submitted to Costa Mesa along with an invoice for the Costs and any supporting documentation necessary to show the amounts which represent Costs of Costa Mesa right of way improvements. Amounts paid pursuant to progress payment invoices shall be subject to adjustment in the final accounting. Within thirty (30) calendar days of said final accounting, Costa Mesa agrees to pay to Newport Beach the total amount of the Costs due. 7. LAWS, ORDINANCES, RULES AND REGULATIONS 7.1 Newport Beach shall require in its contract for the improvement of the Costa Mesa right of way that its contractor be fully informed of and comply with all laws, ordinances, rules and regulations, including, but not limited to, all applicable requirements of the California Labor Code, prevailing wage laws, the Construction Manual, and the Rules and Regulations of Costa Mesa, in connection with the improvement of the Costa Mesa right of way. Reimbursement Agreement Page 3 Cl 8. INSPECTION 8.1 Costa Mesa shall have discretion as to all aspects of design and construction of the Costa Mesa right of way improvements, and Costa Mesa shall be entitled to inspect the construction of the Costa Mesa right of way improvements as it deems necessary to assure compliance with the Plans and Specifications, including shop drawing review and material inspection thereof. Costa Mesa will promptly notify Newport Beach of any portion of the work on the Costa Mesa right of way which appears not to conform to the Plans and Specifications. The determination of Costa Mesa as to conformity of the Costa Mesa right of way with the Plans and Specifications shall be made in Costa Mesa's sole and absolute discretion. Costa Mesa agrees not to unreasonably withhold its approval as to such conformity of the Costa Mesa right of way with the Plans and Specifications. Newport Beach shall require its contractor to construct the Costa Mesa right of way so that the Costa Mesa right of way conforms to the Plans and Specifications. 9. ACCEPTANCE Costa Mesa agrees to accept the Costa Mesa right of way improvements when the Costa Mesa right of way improvements have been completed by Newport Beach in accordance with all requirements of the Plans and Specifications, including any change orders approved by Costa Mesa, or required due to emergency as provided in Section 5 hereof. 10.OWNERSHIP It is mutually agreed between the parties hereto that notwithstanding the fact that Newport Beach shall accomplish the construction of the Costa Mesa right of way improvements subject to reimbursements the Costa Mesa right of way improvements to be completed hereunder, together with the necessary franchises, licenses, easements, rights of way, and other privileges, shall at all times be subject to the applicable rates, rules and regulations of Costa Mesa, as modified or amended from time to time. Newport Beach hereby disclaims any interest in the Costa Mesa right of way and does hereby transfer and assign to Costa Mesa any and all right, title, and interest it may have in the Costa Mesa right of way. Costa Mesa shall own, operate and maintain the Costa Mesa right of way following acceptance thereof. 11. INDEMNIFICATION 11.1 Newport Beach shall indemnify, defend and hold Costa Mesa, its officers, agents, employees, and engineers harmless from any expense, liability or claim for death, injury, loss, damage or expense to persons or property which may arise or is claimed to have arisen during construction of the Costa Mesa right of way improvements as a result of any work or action performed by Newport Beach or on behalf of Newport Beach, save and except to the extent such expense, liability or claim is proximately caused in whole or in part by any act, omission, or negligence of Costa Mesa, its officers, agents, employees or engineers or by any act or omission for which Costa Mesa, its officers, agents, employees or engineers are liable without fault. Reimbursement Agreement Page 4 9 11.2 Costa Mesa shall indemnify, defend and hold Newport Beach, its officers, agents, and employees, harmless from any expense, liability or claim for death, injury, loss, damage or expense to persons or property which may arise or is claimed to have arisen either (i) as a result of any acts performed by Costa Mesa, its officers, agents, or employees, with respect to the Costa Mesa right of way improvements construction; or (ii) following Costa Mesa acceptance of the Costa Mesa right of way, with respect to maintenance and operation of the Costa Mesa right of way, save and except to the extent such expense, liability or claim is proximately caused in whole or in part by any negligence of Newport Beach; its officers, agents, employees or engineers, or by any act or omission for which Newport Beach, its officers, agents, employees or engineers are liable without fault. 12. INSURANCE AND BONDING 12.1 Newport Beach shall cause its contractor(s) to provide performance and payment bonds for the construction of the Project and to obtain insurance coverage sufficiently broad to insure the matters set forth :in:'`this Agreement and to include Costa Mesa, its officers, agents, employees and engineers, as additional insureds on all insurance policies that Newport Beach requires its contractor(s) to provide. As evidence of such insurance coverage; Newport Beach shall, prior to commencement of construction of the Project, provide Costa Mesa with certificates of insurance and insurance endorsements from Newport Beach's contractor(s). 13. TERMINATION 13.1 Costa Mesa shall have the right to terminate this Agreement at any time, subject to the provisions of this section, by providing five (5) business days' prior written notice to Newport Beach, except as noted in Section 4.1. If at the request or direction of a party other than Newport Beach, the construction 'of the Costa Mesa right of way improvements is not accomplished or completed, Costa Mesa shall remain obligated for the actual amount of the Costs incurred by Newport Beach to the date of termination. 13.2 If Newport Beach's Project is canceled or modified so as to eliminate the necessity of the construction of the Costa Mesa right of way improvements, Newport Beach shall have the right to terminate this Agreement and thereby terminate its obligation to construct the Costa Mesa right of way improvements, by providing five (5) business days' prior written notice to Costa Mesa. In such case, Costa Mesa will not be obligated for any design or any other Costs incurred by Newport Beach. If Costa Mesa elects to construct the Costa Mesa right of way improvements, Costa Mesa may, but shall not be obligated to, acquire the design or other work from Newport Beach by separate agreement. 13.3 Either party may terminate this Agreement without cause upon seven (7) calendar days notice, provided if Costa Mesa terminates this Agreement it shall reimburse Newport Beach for costs incurred by Newport Beach on Costa Mesa's behalf to date. 14. NOTICE 14.1 Any notice or other written instrument required or permitted by this Agreement to be given to either parry shall be deemed received when personally served or twenty-four Reimbursement Agreement Page 5 (24) hours after being deposited in the U.S. Mail, postage prepaid, registered or certified and addressed as follows: Costa Mesa: Attention: Ernesto Munoz, Director Public Works Department City of Costa Mesa 77 Fair Drive Costa Mesa, CA 92626 Phone: (714) 754 -5343 Newport Beach: Attn: Dave Webb, City Engineer Public Works Department City of Newport Beach 3300 Newport Boulevard PO Box 1768 Newport Beach, CA 92658 Phone: (949) 644 -3321 15. DEEMED APPROVAL Except as otherwise provided, any approval required to be given by either party pursuant to this Agreement shall be deemed given if no response to the party's request for such approval is received by the requesting party within fifteen (15) calendar days following the written request for such approval. 16. TIME OF PERFORMANCE Each of the parties agrees to perform all conditions of this Agreement in a timely manner reasonably necessary to carry out the spirit, intentions and objectives described in this Agreement whether or not expressly prescribed herein and no consent, agreement, approval, concurrence, decision, determination or action shall be unreasonably withheld by either party. 17.STANDARD CONDITIONS 17.1 Compliance With all Laws. The parties shall at their own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. 17.2 Waiver. A waiver by either party of any breach, of any term, covenant or condition contained herein shall not be deemed to be .a waiver of any subsequent breach of the same or any other term, covenant or condition contained herein, whether of the same or a different character. 17.3 Integrated Contract. This Agreement represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. Reimbursement Agreement Page 6 z 17.4 Conflicts or Inconsistencies. In the event there are any conflicts or inconsistencies between this Agreement and the exhibits attached hereto, the terms of this Agreement shall govern. 17.5 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Agreement or any other rule of construction which might otherwise apply. 17.6 Amendments. This Agreement may be modified or amended only by a written document executed by both parties and approved as to form by the City Attorney. 17.7 Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 17.8 Controlling Law And Venue. The laws of the State of California shall govern this Agreement and all matters relating to it and any action brought relating to this Agreement shall be adjudicated in a court of competent jurisdiction in the County of Orange. 17.9 No Attorney's Fees. In the event of any dispute or legal action arising under this Agreement, the prevailing party shall not be entitled to attorney's fees. 17.10 Counterparts. This Agreement may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which together shall constitute one and the same instrument. 17.11 Authori . The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by so executing this Agreement the parties hereto are formally bound to the provisions of this Agreement. [SIGNATURES ON NEXT PAGE] Reimbursement Agreement Page 7 I!) IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the dates written below. CITY OF NEWPORT BEACH, A California municipal corporation Date: CITY OF COSTA MESA, A California municipal corporation Date: By: By: Nancy Gardner Eric Bever Mayor Mayor ATTEST: Date: Bv: Leilani I. Brown City Clerk APPROVED AS TO FORM: CITY ATTORNEY'S OFFICI / (� -3r Aaron C. Har City Attorney ATTACHMENTS: Exhibit A: Reimbursement Agreement ATTEST: By: Brenda Green Interim City Clerk APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: � Thomas Duarte �I� City Attorney [END OF SIGNATURES] Engineers Construction Cost Estimate •..- ilk EXHIBIT A Reimbursement Agreement Page 9 I� CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT TnLE: Mh Street RebabRftaGon TOTAL C0NSMUC11ON COST CONTRACT No-* 5077 ENGINEERS ESTIMATE $409,000.00 PROJECT MANAGER: fttfkkArdfdq;o - B0)BU14t!{RYad�r Pam.1 5 nBd DESCRMON QUANTRY1 I UNIT AMOUNT 1 jMabMmdM&DmmbGllabn Lo IS I 52DA= ow 2 1gonftswAces >A IS I aksmm 534.800117 s . DaBtecm" sA t9 slopmoN MAO= 4 Remove and RemaWUCtarb &GrrnerperCtyofHB az-L 40 tF $30OO S12771f7 S and8 emnpwaSWcwatkperCtyorKSSn)- i:wd 267 SF 54.00 6 Rem tu udAkyAppmathperCkyor NBSTPIAH,Tj�paA 470 SF 515 S7.0B7�80 7 Re= *mand9aaom4ur20MawsyperIXyorCad, Mesa SID DWG NL$14 &811 270 SF 512.00 8 Renroveard RemmUW Drf&-way per My& NBSTD 1624 100 SF I 512.00 - Slz= 9 RemmmWRemn strrrclG=GUtm0VvnperCRy afRDSTD78S•L 490 SF $1250 to Rearovemw RanmskssrlwWw SF $39U0 . 11 Rerm "Remmbutt Oa6Aocmprr CltyofW 1814 9 Fit I S2000 12 Ramavc9kws&�dQc*vct0ab Amax Ramp permyorN9S m-L 1 EA i S2.7S0.00 19 RtrtpveR mpaWQm vct9demlkpwCltyorfl9 57D -1801, Rake fidslhr8 Manbofeto Grade 70D SF . $2A00 $2A0000 14 PouneTree6aot 1 FA $8r+ ss 6utaR600taurter 2D If $smm 16 tkW U@I Pxvermnt SF $9A3600 .17 CoIdd684 t'at�aMd ss,700 . Sr Soa.6 Sa876nD u CorMnsttACfevef0a8Cburse TWeM42 -FG 64,tOt1 60 7N 19 2'7NakAspMhPawn<nl0verby0 m IypeARHMGG LIM. TN sum m 04ntuuctAC8m0xnse Type lM- FG.64.1ot6• Boo. iN $70A0 Me®srr Dela 'oo96cee2 -8'mrb 100 tF 51.9.90tt Medten rDetafloaShedZ -Vmrb .100 V xl MedUn Dddiop Sheet2•Pavers 920 SF 575 02kyrtl ctStdewalk' ofN8$Tl> -U" 29D SE fi6A0 Bdplrrg lWky -Storm Grain Manhole. Rlke eas 2 6dsft tuty- 9ewerr Manhole. Raba to 9 EA $SA4= '. Repfaaal Gmde UftW WVaW6mmW2wer. RJmto m 26 EA ftaft ' 28 hWA!dMhft W7ty- WAWVatdttkt Robttb asRe4dre& ' 2 'FA . '29 rraftS44ft&5Wmm 1 IT sluo0ow 515 '..80 As-oum Real 1. tan-ro $88240 - EE -1 540800.00 - B0)BU14t!{RYad�r Pam.1 5 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT nne 3Sth Street RehabUltation Construction Costs - aty of Costa Mesa eOMRACf HO.: sort B(GTNW'S csnMAIM $99,008.49 M WWrMAN MX' PsokkAMNeP .... D �.. .• i© p i ©E MENEM=—., A i0�7� i iiMENNEN� 0 -... o>ai- � ©._.!+. ..... SEEMS Q i1 .... ... .:.. .:.. ...:......:.. . iE3ER"� MME... a i i E...,. .. IM iExNo MENOMINEE Moons Ka =l, .. MENOMINEE i iiMMEMEN� p .....:.....: .::.. 3 z E im ammo .... MY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT UrLF -'. 15th Stmet RehabMtattan ComtnKeon Costs - Nowport Beads mNfRACf NO.: 5077 tNG NMS OMMAM 869,287.68 P801BCf MANAGM PrUtdArtlNep Paget � lisil� - ii• .. lisii•� JJL JUsiE Q-:..:. ...... ... -.._. - ......:, ...: !jm ,Tar- .- li�� © _ ....... ....:......._. ,.. Q� NEEsi• D.... ._:,. :. �©si=-- sit mm`... i1t � � � � � D ©i lisi•� i!M Paget ��� i��i ������ _����L %������ C