Loading...
HomeMy WebLinkAbout05 - Bonita Creek Park Synthetic Field Turf Replacement - NOC and Acceptance of Contract No. 5856(A) CTY OF J+ - NEWPORT BEACH City Council Staff Report September 22, 2015 Agenda Item No. 5 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director- (949) 644-3330, dawebb@newportbeachca.gov PREPARED BY: Peter Tauscher, Civil Engineer PHONE: 949-644-3316 TITLE: Bonita Creek Park Synthetic Field Turf Replacement - Notice of Completion and Acceptance of Contract No. 5856(A) (ISP12/CAP09-0066) ABSTRACT: On April 14, 2015, the City Council awarded Contract No. 5856(A), Bonita Creek Park Synthetic Field Turf Replacement, to Byrom-Davey, Inc., for a total contract cost of $995,053.00 with a $99,947.00 allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following account: Account Description Account Number Amount Major Facilities Financing Plan 7417-C4002017 $1.006.933.94 Total: $1,006,933.94 5-1 DISCUSSION: Overall Contract Cost/Time Summary Actual Awarded Contract Final Cost at Contingency % Due to % Due to Amount Completion Allowance Contract Directed Unforeseen Change Change Change $995,053.00 $1,006,933.94 10% or less 1.2% -0.3% 1.5% Actual Time Allowed Contract Time (days) 90 0 Under - or Over + The work necessary for the completion of this contract consisted of providing temporary construction fencing, surveying, site furnishings, and erosion control/NPDES compliance; grading and earthwork; potholing utilities; constructing storm drain improvements, a synthetic turf drainage system, and concrete flat work; installing irrigation system and landscape materials; and all other incidental items of work as described in the contract documents required for general reworking and preparing the field sub-grade for the installation of the 157,354 square foot synthetic turf system. The actual synthetic turf material and installation was awarded to FieldTurf, Inc. on March 10, 2015. The project area included the football/soccer and softball fields at Bonita Creek Park. The contract was completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original Bid Amount: $ 995,053.00 Actual Cost of Bid Items Constructed: $ 992,207.00 Total Change Orders: $ 14,726.94 Final Contract Cost: $1,006,933.94 A total of five change orders were issued and the final construction contract cost was approximately 1.5 percent over the original contract amount. The change orders involved addressing the existing field lighting, changes to landscape irrigation and a credit for leaving the existing subdrain system in place. A summary of the project schedule is as follows: Estimated Completion Date per 2014 Baseline Schedule October 13, 2015 Project Awarded for Construction April 14, 2015 Contract Completion Date With Approved Extensions September 8, 2015 Actual Substantial Construction Completion Date September 4, 2015 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ("CEQA") pursuant to Section 15302 (replacement of existing facilities involving negligible expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: This agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. 5-2 The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. ATTACHMENTS: Description Attachment A - Project Location Mao 5-3 ATTACHMENT A O�\J 5� J�\ w BONITA CREEK PARK r D O D A A NTS �A v�oA CONSTRUCTION LIMITS BONITA CREEK PARK CITY OF NEWPORT BEACH SYNTHETIC FIELD TURF REPLACEMENT PUBLIC WORKS DEPARTMENT LOCATION MAP C-5856(A) 9/22/15 5-4