HomeMy WebLinkAbout11 - Central Library Clerestory RepairCITY OF
4 aEW PORT
NEWPORT REACH
City Council Staff Report
Agenda Item No. 11
October 23, 2012
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: City Manager's Office
Stephen G. Badum, Assistant City Manager
949 - 644 -3311, sbadumAnewportbeachca.gov
PREPARED BY: Stephen G. Badum, Assistant City Manager
APPROVED:
TITLE: Central Library Clerestory Repair — Amendment #5 to the Newport
Beach Civic Center Construction Contract
ABSTRACT:
Staff is requesting the approval and funding of an amendment to the construction
contract with C.W. Driver to replace and repair the existing clerestory of the Central
Library in conjunction with the current Library expansion project.
RECOMMENDATIONS:
1) Approve Amendment #5 to the Construction Manager at risk Contract with C. W.
Driver amending the Guaranteed Maximum Price to add the repair of the Central
Library Clerestory to the Civic Center project at a cost not to exceed $720,913
and authorize the Mayor and the City Clerk to execute the amendment.
1) Approve Budget Amendment No. 13BA -018 appropriating $720,913 to the
Newport Beach Civic Center Project Account No. 7410- C1002009 from Facilities
Replacement Fund reserves.
FUNDING REQUIREMENTS:
Upon approval of the budget amendment, sufficient funds will be available in Account
No. 7410- C1002009 for the repair of the Central Library clerestory.
Central Library Clerestory Repair— Amendment #5 to the Newport Beach Civic Center Construction Contract
October 23, 2012
Page 2
DISCUSSION:
Construction of the Newport Beach Civic Center includes a 17,000 square foot
expansion of the Newport Beach Central Library to provide a vital link between the Civic
Center and the Library. During the construction of the expansion, our Civic Center
contractor, C.W. Driver, removed portions of the existing library structure to tie in the
new construction. During this process, it was discovered that the clerestory wall on the
north face of the Central Library was improperly constructed and waterproofed. As such,
there is a concern about rainwater leakage where the new addition joins the existing
library. With the clerestory wall partially disassembled, staff requested a proposal to
replace the existing clerestory wall and windows.
The Central Library has had a long history of water leakage issues along the clerestory
wall. The City's Civic Center waterproofing consultant, Allana Buick & Bers (ABB),
believes that the problems stem from a combination of design issues and construction
workmanship associated with the construction of the library. The City's architect, Bohlin
Cywinski Jackson (BCJ), ABB, and C.W. Driver have worked closely together to
redesign the clerestory to eliminate these issues. The proposed design calls for a new
window system and structure that closely matches the original appearance.
Staff believes that this repair work is remedial work.to the Library building and should be
funded by the City's Facilities Master Plan, and not an expense of the Civic Center
project. The cost to repair and replace the existing clerestory wall is $720,913. With the
addition of this Library repair work, the total appropriation to date under the contract with
C.W. Driver is $106,504 „125.
CM @R Contract
Scope
Amount
Original
General Conditions /Basic Services
$7,169,255
Original
GMP #1 — Mass Grading and Shoring Wall
$7,336,439
Amendment #1
GMP #2 — Parking Structure Design/Build
$7,426,853
Amendment #2
GMP #3 — City Hall, Library Addition & Park
$82,374,384
Amendment #3
GMP #4 — San Miguel Pedestrian Bride
$1,000,000
Amendment #4
GMP #5 — Signage and deferred Electrical
$476,281
Existing contract Total
$105,783,212
Amendment #5
Existing Libra Repair
$720,913
New Total
$106,504,125
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this action is not subject to the California
Environmental Quality Act ( "CEQK) pursuant to Sections 15060(c)(2) (the activity will
not result in a direct or reasonably foreseeable indirect physical change in the
environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378)
of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it
z
Central Library Clerestory Repair — Amendment #5 to the Newport Beach Civic Center Construction Contract
October 23, 2012
Page 3
has no potential for resulting in physical change to the environment, directly or
indirectly.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
Submitted by:
Stephen G. Ba um
Assistant City Manager
Attachment: A. Amendment #5 — Newport Beach Civic Center and Park
B. Budget Amendment
AMENDMENT NO. FIVE TO CONSTRUCTION MANAGER AT RISK
CONTRACT WITH C.W. DRIVER, INC. FOR
NEWPORT BEACH CIVIC CENTER AND PARK
(CENTRAL LIBRARY CLERESTORY REPAIR)
THIS AMENDMENT NO. FIVE TO CONSTRUCTION MANAGER AT RISK
CONTRACT ( "Amendment No. FIVE "), is entered into as of this day of
, 2012, by and between the CITY OF NEWPORT BEACH, a California
Municipal Corporation ( "City "), and C.W. DRIVER, INC., a California Corporation whose
address is 15615 Alton Parkway, Suite 150, Irvine, California 92618 ( "CM "), and is
made with reference to the following:
RECITALS:
A. On June 7, 2010, City and CM entered into a Construction Manager at Risk
Contract ( "CM Contract ") for the Newport Beach Civic Center and Park Project
( "Project ").
B. On September 3, 2010, City and CM entered into Amendment No. One to the
CM Contract ( "Amendment No. One "), as contemplated in the CM Contract,
Article Six, Section 6.1.%e), to add the Design Build 450 stall parking garage and
to increase the Guaranteed Maximum Price ( "GMP ").
C. On February 22, 2011, City and CM entered into Amendment No. Two to the CM
Contract ( "Amendment No. Two ") for additional services not included in the CM
contract or Amendment No. One, to add the construction of the City Hall Office
Building, Central Library Expansion, Parks and miscellaneous items of work for
the Newport Beach Civic Center; to increase the CMP by $82,374,384.00 for a
total GMP of $104,306,931.00; and to update the insurance provisions consistent
with the City's election to implement an Owner Controlled Insurance Program
( "OCIP ").
D. On November 29, 2011, City and CM entered into Amendment No. Three to the
CM Contract ( "Amendment No. Three "), to reflect the City's option to construct
the San Miguel Pedestrian Bridge as part of Phase Three as originally
contemplated in the CM Contract, Article One, Section 1.3, and increase the
GMP to $105,306,931.00 utilizing $1,000,000.00 of the Owner's Contingency
along with $1,000,000.00 of the Construction Contingency to fund the costs of
construction.
E. On April 24, 2012, City and CM entered into Amendment No. Four to the CM
Contract ( "Amendment No. Four") for additional services not included in the CM
contract or prior amendments' to add the fabrication and installation of project
signing and the installation of dry utilities modifications to increase the GMP by
$476,281.00 for a total GMP of $105,783,212.00
4
F. City desires to enter into this Amendment No. Five for additional services not
included in the CM Contract, or prior Amendments and to increase the GMP by
$720,913.00 for a total GMP of $106,504,125.00.
G. City and Consultant mutually desire to amend the Contract, as provided below.
NOW, THEREFORE, it is mutually agreed by and between the undersigned
parties as follows:
1. SCOPE OF WORK
City and CM acknowledge that the above Recitals are true and correct and are hereby
incorporated herein by reference. Article Two of the CM Contract shall be
supplemented to include the Scope of Work dated October 10, 2012, which is attached
hereto as Exhibit A, and incorporated herein by reference. The City may elect to delete
certain tasks of the Scope of Work at its sole discretion.
2. GUARANTEED MAXIMUM PRICE
Section 6. 1.1 of the CM Contract shall be amended to increase the GMP to One
Hundred Six Million, Five Hundred Four Thousand, One Hundred Twenty -
Five Dollars and no/100 (106,504,125.00).
3. INTEGRATED CONTRACT
Except as expressly modified herein, all other provisions, terms, and covenants set forth
in the CM Contract as amended shall remain unchanged and shall be in full force and
effect.
C.W. DRIVER, INC.
Page 2
5
IN WITNESS WHEREOF, the parties hereto have executed this Amendment No.
Five on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S ? OFFICE
Date:
Rv
Aaron C. Harp
City Attorney
ATTEST:
Date:
By:
Leilani I. Brown
City Clerk
CITY OF NEWPORT BEACH,
A California municipal corporation
Date:
By:
Nancy Gardner
Mayor
CONSULTANT: C.W. DRIVER, INC., a
California Corporation
Date:
By:
John Thornton
Executive Vice President
Date:
By:
Bessie Kouvara
Chief Financial Officer
Attachments: Exhibit A — Scope of Work Dated October 10, 2012
C.W. DRIVER, INC. Page 3
G.W. Driver
BUILDERS SINCE 1919
October 10, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: FO -41 1.1: Existing Library Clerestory Revisions
Change Order Request No. 256
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.261.5100
Sent: Email / Hand
Please review this Change Order Request in the amount of $720,913 to demo existing
clerestory mullions, stucco at columns, replace clerestory, replace stucco columns and
construct temporary barricade at clerestory windows.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
1l1Mt#14r&k#XT7
Los Angeles Irvine
Authorization:
By:
Tide:
Date:
Signature above authorizes C. W Driver to proceed
pursuant to the terms of this Change Order Request.
�I
Onorio San Diego License No. 102
7
C.W. Driver
ItUIL.D F :RS SINCE: 1919
NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0256: F. 0.411 1411.1 - Library Existing Clerestory Replacement
10110,12
Item
Description
Contactor
Labor
Math
Subcontracts
Toral
001
Demolition of existing windows and pilasters
Miller Environmental
36,530
36.530
002
Additional cost to remove existing angle iron for installation of new HSS
Miller Environmental
3,023
3,023
002
Additional costs to install tube steel window support out of sequence
SME
22.988
22,988
003
Remove W 14x30 and replace with W 18x71 to maintain eonsistant look
SMHSouchwest
8.000
8,000
OD3
Remove existing WT at head
SMF/Southwest
15.000
15,000
004
Add f rework Oashings and shoe {metal.
CMF
15.161
15.161
005
Repairs to copper soft
CMF
10,000
10.000
006
Furnish and Install new clerestory windows
Tower Glass
230,000
230.000
007
Furnish and install new aluminum panels
Tower Glass
100,000
100,000
008
Temp support for existing column wraps
Superior Wall Systems
8901
890
009
Construct temporary partition behind clerestory
Superior Wall Systems
21,642
21.642
010
Reframe plaster pilasters I furnish and Install new lath and plaster
Superior Wall Systems
35,225
35,225
Oil
Remove temporary partition upon completion and restore finishes
Superior Wall Systems
25,000
25,000
Olt
Reinstall existing motorized roller shades
Contract Decor
7,500
7,500
013
Finish paint
Western Painting
15.000
15.000
014
Remove I restore fire protection as required
Underwriters
5,000
5,000
015
Rewire motorized shades I lights, etc
Rosendin Electric
5,000
5,000
016
Remove I restore fire alarm & security, retest and recertify uopn
completon
Rosendin I First Fire
5,000
5,000
016
Miscellaneous patch
Various
5,000
5,000
017
Testing
Smith Emery
15,000
15,000
018
CWD Direct expenses (see attached for breakdown)
C. W. Driver
24,568
20,8401
45,408
]Prime
Subtotals Direct Cost
24,568
20,8401
580,959
626,367
Contingency
Liability Ins. (0.71% of Cost)
Fee (3.25% of Cost+ Liab. Ins.)
Contr. Bond (0.65% of Cost+ Liab. Ins. + Fee)
62,637
4,892
22,393
4,624
TOTAL AMOUNT OF CHANGE ORDER REQUEST
720,913
Qualifications & Exclusions
1. Pricing assumes that existing copper soffit does not need to be replaced.
2. Price includes replacement of all clerestory windows between lines E and N at the North elevatrion of the existing library only.
We include warranty for all new work associated with this proposal. We cannot warrant the watertight integrity of the remainder of the existing library
exterior envelope.
Page 1 of 1
Miller Environmental, Inc.
Newport Beach Civic Center Park
COR #4 - PCO #256 - Demo Work @ Library windows
Job Name: Newport Beach Civic Center & Park (MEI Job No. 2941)
COR #4 - PCO #256 - Demo Work @ Library windows
Description
Units
Quantity
Unit
Price
Materials
pup84 kk%e
?t r:�KFb lr
�yryyy�1�Ey,,�x5ten�s'i''o�n
kp�E : i RNIM4��^pINIM"RN
6x20 FR Poly
Roll
3.00
$112.00
$336.00
4x20 FR Poly
Roll
0.00
$108.00
$0.00
4x20 Black Poly
Roll
0.00
$95.00
$0.00
420 Clear Poly
Roll
0.00
$98.00
$0.00
6x20 Clear Poly
Roll
0.00
$102.00
$0.00
Duct Tae
CS
1.00
$142.00
$142.00
Masking Tae
CS
0.00
$98.00
$0.00
Spray lue
CS
0.00
$25.50
$0.00
Protective Suits
CS
0.00
$70.00
1 $0.00
Standard Respirator Filters
Pk.
0.00
$5.00
$0.00
Organic Respirator Filters
Ea.
0.00
$6.25
$0.00
PAPR Respirator Filters
Ea.
0.00
$7.25
$0.00
Air Cassettes
Bx
0.00
$37.17
$0.00
Clear Bas
Roll
2.00
$75.00
$150.00
Printed Bas
Roll
0.00
$53.00
$0.00
Shower Filters
Ea.
0.00
$1.55
$0.00
1/2 Face Filters
Pr.
0.00
$1.98
$0.00
Glove Bas
Roll
0.00
$131.201
$0.00
Dorado Lead Strip 2021
Pl.
0.00
$165.00
$0.00
Enca sulant
Pl.
0.00
$47.00
$0.00
Fiberlock IAQ 2000 Fungicide
Ea.
0.00
$12.00
$0.00
4" Replacement Blades
Pk.
0.00
$2.10
$0.00
Knit Ras
CS
0.00
$26.00
$0.00
White Disposable Towels
CS
0.00
$22.06
$0.00
Peel Away SP -1
PI.
0.00
$74.50
$0.00
Saws All Blades
Pk.
3.00
$55.00
$165.00
Full Body Harness w/ Lanyard
Ea.
6.00
$125.001
$750.00
Lead Signs
Ea.
0.00
$0.60
$0.00
Cotton Gloves
Ea.
0.00
$1.25
$0.00
Gunn Leather Palm Gloves
Dz.
0.00
$17.19
$0.00
Safety Glasses
Ea.
0.00
$2.16
$0.00
Hudson Sprayer
Ea.
0.00
$13.97
$0.00
Smoke Test Kit
Ea.
0.00
$55.00
$0.00
Mastic Remover
Pl.
0.00
$39.00
$0.00
50' Water Hose
Ea.
0.00
$35.00
$0.00
Sprayer 3 allon
Ea.
0.00
$19.201
$0.00
Negative Air Primary Prefilter
Bx 1
0.00
$22.75
$0.00
Ne ative Air Secondary Prefilter
Bx
$38.83
$0.00
Subtotal Materials
y,
r
�. �o�.' ,�i
$1.543.00
$150.44
9.75 a
{Sales
�ryTax
�� y FL
LIMO � IR pi1i111wF E tK s+p0 iXkFYnMS:'IpA4Nl 'NM1WE
Labor
Straight Time
ff
{ '
�'•kl
�
��
r��
4
Foreman
hr
1 72.01 $53.001
$3816.00
Laborer
hr
432.0
$52.00
$22,464.00
Over Time
Foreman Overtime x 1.5
hr
0.0
$64.73
$0.00
Laborer Overtime x 1.5
hr
1 0.01
$62.15
$0.00
7/13/2012 9
Miller Environmental, Inc.
Newport Beach Civic Center Park
COR #4 - PCO #256 - Demo Work @ Library windows
Description
Units Quantity
Unit
Price
Extension
Subtotal Labor
Equipment
1 t - -' a e
fl
1
1.
$26,280.00
POSI`fINT1 °11,51%
Excavator 176,0001b
hr
0
$300.001
$0.00
460 LX Excavator 100,0001b - Operated
hr
0
$205.001
$0.00
Excavator 75,0001b
hr
0
$110.001
$0.00
Excavator 28,8001b
hr
0
$75.001
$0.00
7,500 Lb. Hydraulic Breaker
hr
0
$95.00
$0.00
966 Loader
day
0
$45.00
$0.00
Backhoe
hr
0
$55.00
$0.00
Water Truck 2 000 al
hr
0
$30.00
$0.00
Low Side End Dump
hr
0
$95.00
$0.00
PAPR Respirator
day
0
$20.00
$0.00
Diesel Fuel
gal
0
$6.00
$0.00
55. Gallon Drum
Ea.
0
$35.00
$0.00
Fork Lift
day
0
$105.00
$0.00
Saw Cutting w/0 erator
hr
0
$135.00
$0.00
Vec Loader - Operated
hr
0
$125.00
$0.00
Work Truck (1ton)
hr
0
$15.50
$0.00
Torch Kit with tools & fuel
day
2
$125.00
$250.00
Negative Air Machine
day
0
$50.00
$0.00
HEPA Vacuum
day
0
$50.00
$0.00
Airless Sprayer
da
0
$75.00
$0.00
Chop Saw
day
2
$85.00
$170.00
Air Compressor w /tools
day
0
$250.00
$0.00
Boom Lift
day
1
$300.00
$300.00
Air /Jack Hammers, . Rivet Boosters
day
5
$40.00
$200.00
Skid. Steer Loader
day
0
$200.00
$0.00
Grapple Bucket for Skid Steer
day
0
$80.00
$0.00
Generator and lights
day
0
$100.00
$0.00
Equipment
o-S �l
Subto ta[
i
' i.1 g�
.! 1I
5 @@
I
, $920j . 00
i
otracto
s�n
Aerial lift
LS
1.00
$1,800.00
$1,800.00
Waste Bin
LS
1.00
$450.00
$450.00
Scaffold
LS
1.00
$1,500.00
$1,500.00
LS
0.00
$0.00
$0.00
LS
0.00
$0.00
$0.00
LS
0.00
$0.001
$0.00
LS
0.00
$0.00
$0.00
LS
0.00
$0.00
$0.00
Subtotal Subcontractor
i .
..99°
,
A�
Ir+
i i°
1H
otii
z
'•
_.�
I
$3 750.00
i
6
I'�
F
E
4
[
� I� k.. �
Subtotal Cost"
s
°�
$32,643.44
Markup Material
10.00%
$169.34
Markup Labor
10.00%
$2,628.00
Markup Equipment
5.00%
$46.00
Marku Subcontractor
5.00%
I
�;
r
,i
$187.50
•' V �I� GChI�C NON E pllkfl! �l� 15+f �E�l ltll Q�aup
Subtotal' Chan a Order Request
I`nsurrka�nnacae
&�nnnBonds
I ;
2.40% a
MM' K M l
$35,674.29
:a!
s , ,,
E
$856.18
cY¢YFE�k3a�.q ?i' !2[e�RiI.A
f£1 FCf85Y!!Rif"
�
i!YIl!' AJNtl9t'�i�4dk�F
w
!
G
6p��R ��O E OR
Total Chan a Order Request.
.
,,
$36.530.47
7/13/2012 10
August 23, 2012
C. W. Driver
1100 Avocado Drive
Newport Beach, CA 92660
Attention: Mr. Robert Stewart
OR
e -mail: rstewart@cwdriver.com
Reference: Newport Beach Civic Center & Park
SM- Steel Contractors Project No. 0565
,--6
Subject: CW Driver Field Order #411.1, CWD RFI #11.40.1, Hand Install
HSS I Ox6, Seat Angles & Stiffeners (No CWD COR Number)
SME COR #233
Dear Robert,
We are hereby submitting our Change Order Request No. 233 for additional cost to had
set HSS 10x6, change column angle connections and add support plates for stud framing
as per CWD Field Orders 411.1 & 411. The total amount requested for this change to
scope is $22,988.00.
Documentation provided:
1. Attachment "A " - -- Listing of all applicable costs by working category.
2. Attachment "C " - -- Summary listing of field T &M daily tickets.
3. CWD Change Request Cover Sheet - -- Pricing and description.
Other specifics regarding this change:
1. We estimated crane setting of HSS I Ox6 members along the existing columns at 1
line after lower support angle was welded in place which would have taken (1)
hour with a (6) man raising gang.
2. These members had to be jerry- rigged in place by hand and with, chain falls.
3. The original setting angles had to be scrapped and replaced with L6x4xl/2.
4. New metal stud support plates were installed under the direction of CWD.
5. Prime painting and touch -up is by Western Painting.
SBO1 WEST WELLS PARK ROAD PHONE B01 .2BO. ❑%1 1
WEST JORDAN, LIT 64061 WWW.SMESTEEL.COM FAX BO1.2S0.346O11
C. W. Driver
Page 2 of 2
August 23, 2012
6. Detailing of changes per FO #411.1 & 411 is excluded.
7. Our field superintendent, Paul I3rietenbach, confirmed with the outside inspection
agency that the work completed met requirements of Field Order 411.1 and 411
prior to leaving site.
8. If additional work is required relative to the aforementioned field orders, then this
work will be addressed in a separate SME COR.
Your approval is requested within (20) calendar days from the date of this letter.
This quotation is based on the jobsite constraints and schedule requirements discussed to
date. We have not anticipated disruptions, changes in sequence, delays and/or
acceleration costs in this quotation.
If you have any questions, please call.
Sincerely,
SME STEEL CONTRACTORS
John Walter
Sr. Project Manager
5601 WEST WELLS PARK ROAD
WEST JORDAN, UT 6408
PHONE 801.2130.071 1'2
FAX 801 .280.3460
SME STEEL CONTRACTORS "Attachment A"
13
Customer: C.W. Driver Date: 8/23/2012
Project: Newport Beach Civic Center Project #: 0565
Reference:. CWD FO #411.1 RFI #1140.1, Revisions to Setting of HSS10x6 SME CDR #: 233
Item
-__ QescrI01l6n
Quanti VA'
il7nit
x
'. Rate; -
';Bull 7otafsL
2 Total!,`
Steel - Plate
612.00
Lbs
x
0.65
$397.80
Steel- WF
0.00
Lbs
x
0.63
$0'.00
Steel - An'le, bu out
1
Lot
x
1234.80
$1- ,234.80
Materials
Steel - Bent Plate
0.00
Lbs
x
0.76
$0.00
Total Material Weight Added
613.00
Lbs
$0.00
Bending / Rolling
0
Lot
x
0.00
$0.00
'Painting'
0
Lbs
x.
$0.32
50.00
Bolt Replacements
1
Lot
x
$0.00
$0:00
Welding Consumables
1
Lot
x
.$0:00
$0:00
$1,633
Tax
lax on Material
116331$
x
8.75% $142:85
$143
Drawings
Detailing (excluded)
Detailing (Overtime)
Engineering /Coordination
Data Input/Production Control
Drawing Reproduction (11x17)
Drawing Reproduction (full)
0
Hrs
x
$70.00
$0.00
$220
0
Hrs
x
$0.00
$0.00
4
Hrs
x
$56:00
$220:00
0
Hrs
x
$55.00
$0.00
0
D. s
x
0.00
$0.00
0
Dwgs
x
$0.00
$0.00
Shop Labor
Shop Labor
Shop Labor (Load)
Shop Labor (Blast 8 Paint)
0
Hrs
x
$55.001
$0.00
UJHrs
I x
I $55.00
$0.00
Freight
Freight (per load)
0
Loads
Lx
$1,460.001
$0.00
$0
0
Lbs
I x
Ji 0.13
0
Field Labor
Field Labor, Composite S.T.
Field Labor, Composite O.T.
Field Labor, Composite D.T.
Safety/ Quality Control
166.0
Hrs
x
$82.43
$13,663.38
$13,683
0.0
Hrs
x
$110.30
$0.00
0.0
Hrs
x
$133.30
$0.00
0.0
Hrs
x
$0.00
$0.00
0.0
Hrs
x
$82.43.
$0.00
Field
Equipment
Supplies
Crane
Forklift (offload)
Generator
Hilti Drill
JLG
Mag Drill
Scissorlift
Welder
Torch
Field Truck
Chain Fall
Service & Fuel
Miscellaneous supplies
-1.0
Hrs
x,
460.00
($480:00
$ 4,201
18.0
Hrs
x
56.10
$1,009:80
0.0
Hrs
x
23.24
$0.00
0.0
Hrs
x
12.50
$0.00
-12.0
Hrs
x
77.55
$930.60
0.0
Hrs
x,
16.35
$0.00
8.0
Hrs
x
19.94
$159.52
64.0
Hrs
x
22.00
$1,188.00
32.0
Hrs
x
11.00
$352.00
72.0
Hrs
x
6.20
$446.40
44.0
Lot
x
$5.60
" $246.40
1.0
Lot
x
529.77
$529.77
1.0
Lot
x
1660.00
$1,660.00
Sub Total (SME Work) _�
$19,_880
TM�
Subcontracts
Painting (touchup) (excluded)
f
Lot
x
$0:00
$0.00
$0•,
1
Lot
x
$0.00
$0.00
Sub Total Subcontracted Work
Overhead /Profit
Overhead on Subs
819;880.13 x 15% $2,982.02
$0.00 x 5% $0.00
ub Total S
S S ME Contract
$22,862
_
Bond Costs
$22;662
Lot
X
0.00551
$ 125.74
GRAND TOTAL
$22,988
Clarifications, Exclusions 8 Time Extensions:
See attached letter.
By: j. walter
13
SME ®FAIL SUMMARY SHEET
CWD Field Order 411.1, Connection Modification to HSS10x6 @ Library Curtain Wall
COR #233 ATTACHMENT 91C11
affil
23 -Aun
Date
SME 1W Field
DFAR Reg Truck
No. Hrs Hrs
Fk" lift
Hours
Chain Sc,lift
Fall' Drill
Hours Hours
JLG
Hours
Crane Torch Welder
Hours Hours Hours
®��
1�
11
11
11
11
11
1:
�
•1
1
11
11
1
11
11
•1
•1
����
1 1
• 1
1 1
1 1
1 1�
. 1
1: •
®'
��
1 1
1 1
1 1
1 1
1 1
: 1
• 1
����
1 1
1 1
/ 1
1 1
1 1
1 1
• 1
-----
-
-
-
-
--
Notes:
1. This work took place @ the Library along 1 line.
2. CWD provided elevation and dimensional location for setting of HSS10x6 per details 15&14/SR5.52.
3. The previously provided L5x5 per detail 14/SR5.52 has been changed to L6x4x1/2 per FO #411.1
4. All painting associated with work applicable to this change is by others.
5. We have provided a credit to crane set the HSS10x6 during normal sequential erection @ the Library.
C.W.Dfiver
BUILDERS SINCE 1919
RECEII%EU ' ' '
By Henry R Hamilton�at 5 37 pm, Jul3`f, ?0`121
Request For information
15615 Alton Parkway, Sulle 150
Irvino, CA 82618
Tel: 049.261.5100
Fox: 949.261.5167
Site: 1100 Avocado Ddve
Newport Beach, CA 92680
Fax 949.644.6392
Telephone 949.940.0516
Newport Beach Civic Center and Park Project
Mr. Josh Keller
Bohlin, Cywinski, Jackson
49 Geary Street, Suite 300
San Francisco, CA 94108
Fax No: 415.989.2101
Subject: Library - Clerestory Tube Steel and Beam Dimension Request
Question
Reference attachment, F0411, F0411.1 and RFI -1140
RFI #: 1140.1
July 27, 2012
RFI Initiated By. C.W. Driver
RFI Importance: Critical
Persuant to sheet ASK -584 of field order 411. 1, a dimension from centerline of existing beam to outside face of
6x10 tube steel is not indicated. Please provide a dimension from center of beam to outside face of 6x10 tube steel.
Please Respond By: 08103/12
Transmitted By: Kellar Harrell
Project Engineer
Response
See attached sketches from ARUP Structural. Dimensions should be verified with Curtain Wall subcontractor to
ensure they have adequate space for thier system and related waterproofing.
Responded By
Name: Josh Keller Company: Bohlin, Cywinski, Jackson Date: 7/31/2012
You are to proceed with the instructions contained herein. If these instructions involve
cost or schedule Impacts, please notify C.W. Driver within (7) days of receipt and await
direction before proceeding.
Copies:
Bruce Clemens, Anderson -Penna
Date Sent: 7 /31/12
Dennis Jean, Architectural Glass and Aluminum
Date Sent: 7131112
Bill Rodgers, Interwest Consulting Group
Date Sent 7/31/12
Roger Peterson, Interwest Consulting Group
Date Sent: 7 /31112
Henry Hamilton, Southwest Steel
Date Sent: 7/31112
15
Bohlin Cywinski Jackson
49 Geary Street, Suite 300
San Francisco, CA 94108
415.989.2100 Voice
415.989.2101 Fax
RFI Response
Date In: 07/27/12 Date Due: 08108/12 RFI No: 1140.1
Date Returned: 07/31/12
Project Name: Newport Beach Civic Center and Park
BCJ Project No: 08519
Submitted to: CW Driver Attn: Rick Shafer
15615 Alton Parkway, Suite 150, Irvine, CA 92618
RFl responses are hereby defined as clarifications or interpretations of the Contract Documents that do not Impact the project cost or project time.
Proceeding with the Work In accordance with the information contained In a RFI response constitutes agreement by the Construction Manager and
all parties affected by the response given that no change In the Contract Sum or Contract lime Is required by the RFI response. if the Construction
Manager or any other entity contends that a change in the Contract Sum or Contract Time Is warranted by this RFf response It shall notify the
Architect immediately and before performing any Work required by the RFI response.
Subject: Ubrary - Clerestory Tube Steel and Beam Dimension Request.
Discipline(s) Affected: ® Architectural
❑ Electrical
[]Landscape
❑ Plumbing
❑ Sustalnability
❑AV
❑Fire
❑Lighting
❑Security
❑Telecomm
❑Civil
❑Food Service
❑Mechanical
❑Structural
❑Waterproofing
Related Documents:
140.1 - Response .pdf
Response:
Please see attached for the RFI response.
Issued By: Josh Keller, BCJ
E
QDLReeFr- .• SIZLl- [R1pG I MEMB• INI
kETlS. Ey}g1D MEMB /A • • Ntt�6. I.RiFi GXIO
BP'[D Aa^G ED6E J �ZF- A7DSR�NG X66 LA P�'FO�MEO
U`NONN OAS}L1�) .� F6 Ism Sl'L P' �'i�lCAL RP'N
� LAAP F OVEp.
K�
CLEALL
N•
l�i[NINAiI W tlF'N
FEA.SiBLE �:CONStR y,/
Newport Beach Civic Center & Park
1IDDAmaCOA .Nff*pWBmcKMEEi
Im d1w F. 0. 411
D�1.,°' 6.-A-6
SILL PAW FLASHING
Oi¢v:1DLWemnm NEW o61�rjL.
eCl f4ojetl Lb. W5,9D
SWO DAM BP(OND
DOW QjMnSld J=kSM
oraed.'gDmaval CL i=W- s -TOruj W I A/D ow
lUr'°
CSADWU LNSVi )
A14D R ooF - %Fc:XlorJ
84-
s:, NL'1yr9
. - Ppy55U?e BF- GP3lL6r
7- PP,RtF- P9E55011e BAR' Fy.T. CEht.
SET rEj chu LEG P S,LL Ipwo
U= "T AUAILASL6 BY AGAR rlhS R-
--
FLASWW iN A W4 BED op
moym6 ALUM. C.NfiL PN5Tst
SLLONO S6A(pJr
oR -wee -m [RehgE mAswr
Cier -
UE(LTItAI
SLT PoK120 NfAi LEG aF SLLL
PAN PLASrMNG IN BVISL SEN
GDMPKCaSION Writ
LEG OF SILL PAN r-t* IMN6
_
r
-
- SELF- A0)1CiLING
AS SNewu.
'
[SHpYN IN CEp DA.91£DN
PtA5 " QAI
FLASHwG CPA+NIEDI
PAINT" ALA'` --� —�
COO[.rmfxpu mN6
ICI %I, Ga NT• 2¢-Fl� GSM
TERMINA ow BAR. WM
c ,
ALONG 51 .. TO PiCOO DE
vERm LAL INATON
Self F%U -17r DNt,MgliS �—
ALON6 -WP oFPVL. FI-r561WG .�
N
Per- SELF AD'1ER,u6
"MeNAp.
11EMn. �M1MLUALgON• PV f. P-WtI 6, / /.,.[..
+'
FLA"iu6
QDLReeFr- .• SIZLl- [R1pG I MEMB• INI
kETlS. Ey}g1D MEMB /A • • Ntt�6. I.RiFi GXIO
BP'[D Aa^G ED6E J �ZF- A7DSR�NG X66 LA P�'FO�MEO
U`NONN OAS}L1�) .� F6 Ism Sl'L P' �'i�lCAL RP'N
� LAAP F OVEp.
K�
CLEALL
N•
l�i[NINAiI W tlF'N
FEA.SiBLE �:CONStR y,/
Newport Beach Civic Center & Park
1IDDAmaCOA .Nff*pWBmcKMEEi
Im d1w F. 0. 411
D�1.,°' 6.-A-6
pip By .fC.,
Oi¢v:1DLWemnm NEW o61�rjL.
eCl f4ojetl Lb. W5,9D
DOW QjMnSld J=kSM
oraed.'gDmaval CL i=W- s -TOruj W I A/D ow
lUr'°
a aaaav,mq.�uun
A14D R ooF - %Fc:XlorJ
84-
s:, NL'1yr9
V
k0
t
� . J
Ll
a Ul
OILJ•
1
3
s �
tea° �
3
li_ 1
LID
V
� n
n
co
It
.S
t4
dry
a 5i
VL
�Z
Z
0
u1-
t�
ME
0
0
C
Do-
as
I
1i
tu
�• Z
-�
CL
.,.
:Q Q:-
IL
U
1 ^+
4--
i
_i
'd�
s
v
n
d�
0
Ic
AT
ARUP
2D Vyi
Sheet No. Rey.
Job Tide GVti �.�9vY�� WL)Vi / —ice BPAV2-Y Q. Rd.
Made By d`-t Dale ZD'Z Chd.
H,s 10",6w515
Z- pY, -x1 /Z x 2.0" E-o�-A , T4 a
FLA-m L,6 FAc C 0�- CAL
I
t
I
I
1
7
f
f
HOml tl 81MOdM3N 3011ILLil l
rc
21
SUBCONTRACTOR CHANGE REQUEST COVER SHEET
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBCONTRACTOR:
DATE:
CWD CDR / PCO NO.
SUBC. CDR NO.
SOURCE OF CHANGE'.
(Bulletin, Field Order, RI
Superior Wall Systems
5/14/2012
PCO # 21222
EWA # 12110
PCO # 21222
=1, etc.)
DESCRIPTION OF CHANGE
Provide temporary support for the existing column wraps at the library expansion
COST OF CHANGE: NO COST / ADD / DEDUCT $ 890.00
(circle one)
Subcontractor shall attach full labor, material and cost breakdown and associated backup documentation for
the above cost as required to fully explain the all components of the cost in accordance with Exhibit B, Item 17 .
allowable markups are as defined in Exhibit B, Item 18.
Upon acceptance of the above cost, Subcontractor shall execute a Subcontract Change Order which shall
constitute acceptance by Subcontractor that (a) The above price adjustment includes all costs associated with
the change(s) including but not limited to direct andlor indirect costs, damages and all overhead and profit for
any and all impacts and /or delays arising out of or relating to the changed work on the project, including any
schedule extension, compression or revised sequencing; (b) no further adjustment to this provided herein shall
be made; and (c) all the terms and conditions of the Subcontract, except as modified by this and any previous
Change Orders, shall remain in full force and effect and apply to the work as so changed.
Submitted by: Chris McGhie
Title: Senior Project Manager
Office Phone: 714.278.0000
Cell Phone: 714.519.8629
Email: cmcahieOsuoeriorwallsystems.com
22
SUBCONTRACTOR CHANGE REQUEST COVER SHEET
PROJECT:
NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBCONTRACTOR:
Superior Wall Systems
DATE:
6/11/2012
CWD COR / PCO NO.
N/A
SUBC. COR NO. RFC # 043
SOURCE OF CHANGE: As Requested
(Bulletin, Field Order, RFI, etc.)
DESCRIPTION OF CHANGE
Total cost to add a temporary wall and ceiling on top of the existing temporary wall.
COST OF CHANGE: NO COST / ADD / DEDUCT $ 21
(circle one)
Subcontractor shall attach full labor, material and cost breakdown and associated backup documentation for
the above cost as required to fully explain the all components of the cost in accordance with Exhibit B, Item 17.
allowable markups are as defined in Exhibit B, Item 18.
Upon acceptance of the above cost, Subcontractor shall execute a Subcontract Change Order which shall
constitute acceptance by Subcontractor that (a) The above price adjustment includes all costs associated with
the change(s) including but not limited to direct and /or indirect costs, damages and all overhead and profit for
any and all impacts and /or delays arising out of or relating to the changed work on the project, including any
schedule extension, compression or revised sequencing; (b) no further adjustment to this provided herein shall
be made; and (c) all the terms and conditions of the Subcontract, except as modified by this and any previous
Change Orders, shall remain in full force and effect and apply to the work as so changed.
Submitted by: Chris McGhie
Title: Senior Project Manager
Office Phone: 714.278.0000
Cell Phone: 714.519.8629
Email: cmcghie a)..suoedorwallsystems.com
23
/A^ln — -x'77 C�
June 11, 2012
Sa I rtor ALL SYSTEMS INC.
p
1232 East Orangethorpe Ave. - Fullerton, CA 92831 - (714) 278 -0000 - Fax (714) 278 -0090
Mr. David Edwards Via: Email
CW Driver Contractors
468 N. Rosemead Blvd.
Pasadena, CA 91107
RE: Newport Civic Center
Superior Job No. 558
RFC # 043
Gentlemen:
Please find below costs associated with this request for Change Order for the above referenced project.
Cost associated with Temp Wall.
RFC # 043 Total cost to add a wall and ceiling on top of the existing S 18,541.30
temporary wall at the Library.
15% 0 8 P $ 2,781.20
1.5% Bond $ 319.84
TOTAL Request for Change Order S 21,642.00
Qualifications
1 Pricing does not include overtime.
2 The price indicated is for this change only and does not include any compensation for costs which may
be incurred as a result of delays or accelerations.
3 Cost excludes, taping and insulation
4 Cost includes Drywall on the interior and densglass on the exterior
5 The price indicated is valid . for thirty (30) days.
Should you have any questions or require additional information, please call.
Sincerely,
Superior Wall Systems, Inc.
Chris McGhie
Senior Project Manager
Attachments:
24
SuperiorWall Systems
Bid Summary
Temp Wall
Bid No. 1
Selected Sections: 09250 Drywall
Selected Typical Areas:
Selected Areas: (unassigned), L01 Lower level, South Saddle, North Saddle, Library, 2nd Library, 1st Library, 2nd Fir DE, 2nd Fir F, 1st Fir F,
1st Fir DE, Basement, 1st Fir AB, 2nd Floor AB, 2nd Floor BC, 2nd Floor CD, 1st Fir BC, 1st Fir CD, L02 Upper level, EAST Library, Center
Library, WEST Library, 1st Floor, L03 Roof, CC00 Lower level, CC Exterior, CC01 1st level, Bay A, Bay B, BAy C, BAy D, Bay E, Bay F, CCO2
2nd level, CC03 Roof, Council 01 1st floor, Council 02 Roof
Estimator:
Job Class:
Job Status:
Bid DateRme: 11/17/2010 12:00:00 PM
Wage Type: Union Plans Date: 11117/2010
Job Site: 92663
Material 8 Labor Total: 18,541.30
Grand Total: $18,541.30
25
06/11/2012 6:58 am Page 1
Unit Pricing
No. Condition
Height Quantity
- -- - --- - -- -
Mat. a eta
Total Price
1 Add Temp wall vertical above existing temp wall
12'0" 156.83 LF
3.14 3.61 6.741 SF
12,693.09
2 Add Temp wall horizontal Lid above existing tamp
TO" 157.25 LF
4.28 8.11 12.40 / SF
5,848.21
wall
Material 8 Labor Total: 18,541.30
Grand Total: $18,541.30
25
06/11/2012 6:58 am Page 1
SuperiorWall Systems
Payroll Report
Temp Wall
Bid No. 1
Selected Sections: 09250 Drywall
Selected Typical Areas:
Selected Areas: (unassigned), L01 Lower level, South Saddle, North Saddle, Library, 2nd Library, tsl Library, 2nd Fir DE, 2nd Fir F, 1st Fir F, 1st Fir DE, Basement, 1st Fir AB, 2nd FloorF
2nd Floor BC, 2nd Floor CD, 1st Fir BC, 1st Fir CD, L02 Upper level, EAST Library, Center Library, WEST Library, 1st Floor, L03 Roof, CC00 Lower level, CC Exterior, CC01 1st level, Bay
Bay B, BAy C, BAy D. Bay E, Bay F. CCO2 2nd level, CC03 Roof, Council 01 1st floor, Council 02 Roof
Estimator: Job Status:
Job Class: Bid Date/Time: 11/17/2010 12:00:00 PM
Wage Type: Union Plans Dale: 11/1712010
Job Site: 92663
(Union)
Lay out (Union) 61.64 0.00 0.00 0.00 0.00 61.64 493.12 8.38 0.00 516.27
Totals 0.00 0.00 0.00 0.00 187.76 0.00 10,617.13
N
0611112012 6:58 am
Page 1
Hourly
Daily
Payroll Class
Base
Fees
Insurance
Tax
BURDEN -L
Wage
Wage
Hours
Per Diem
Gross Pay
ABOR
Drywall Framer
55.86
0.00
0.00
0.00
0.00
55.86
446.88
83.76
0.00
4,678.59
(Union)
Drywall Hanger
55.86
0.00
0.00
0.00
0.00
55.86
446.88
39.42
0.00
2,202.11
(Union)
GENERAL LABOR
55.86
0.00
0.00
0.00
0.00
55.86
446.88
12.88
0.00
719.36
(Union)
Hanger (Union)
55.86
0.00
0.00
0.00
0.00
55.86
446.88
29.42
0.00
1,643.51
Job Supervision "A°
61.64
0.00
0.00
0.00
0.00
61.64
493.12
13.91
0.00
857.30
(Union)
Lay out (Union) 61.64 0.00 0.00 0.00 0.00 61.64 493.12 8.38 0.00 516.27
Totals 0.00 0.00 0.00 0.00 187.76 0.00 10,617.13
N
0611112012 6:58 am
Page 1
SuperiorWall Systems
Section Markup
Temp Wall
Bid No. 1
Selected Sections: 09250 Drywall
Selected Typical Areas:
Selected Areas: (unassigned), L01 Lower level, South Saddle, North Saddle, Library, 2nd Library, 1st Library, 2nd Fir DE, 2nd Fir F, 1st Fir F,
tsl Fir DE, Basement, 1st Fir AB, 2nd Floor AB, 2nd Floor BC, 2nd Floor CD, 1st Fir BC, 1st Fir CD, L02 Upper level, EAST Library, Center
Library, WEST Library, 1st Floor, L03 Roof, CC00 Lower level, CC Exterior, CC01 1st level, Bay A, Bay B, BAy C, BAy D. Bay E, Bay F, CCO2
2nd level, CC03 Roof, Council 01 1st floor, Council 02 Roof
Estimator:
Job Status:
Job Class:
Bid Date/Time:
11/17/2010 12:00:00 PM
Wage Type: Union
Plans Date:
11117/2010
Job Site: 92663
Bid Material
Mat. Cost Code
Quantity
Unit Cost
Total Cost
1/2" COX FIR PLYWOOD, 1' x 1', (PLYI2CDFR 1)
895 - WOOD
320.00 SF
1.00
320.00
MATERIALS
Stud 3 -5/8 1 89 Cee, 9', (S35818C)
901 (METAL
389.19 LF
1.21
472.09
FRAMING)
Stud 3 -5 /8 18ga Cee, 12', (S35818C)
901 (METAL
1,552.65 LF
1.21
1,883.36
FRAMING)
Layout / LF„ (LO)
901 (METAL
314.08 LF
0.08
25.13
FRAMING)
Cont Angle for Framing, 4" 14 Ga, (AGL HVY GA)
901 (METAL
361.20 LF
1.27
460.16
FRAMING)
Track 3-5/8 18ga, 10', (T35818)
901 FRAMING
690.98 LF
1.07
735.90
MATERIAL
518° GP Densglas Gold Sheathing, 4' x 8', (DENSGOLD58)
902 (GYPSUM
2.589.12 SF
0.60
1,540.53
BOARD/
SHEATHING)
5/8" F/S Wallboard, 4' x 12', (X58)
902 DRYWALL
1,976.10 SF
0.25
494.02
5/8" F/S Wallboard, 4' x 9', (X58)
902 DRYWALL
495.34 SF
0.25
123.83
7116' #10,Teks„ (PHTEXT)
903 FASTENERS
013 Boxes 75.00
9.54
Pan Heads Tek Points„ (PHT)
FASTNER
1,130.70 EA
0.03
28.27
314 Concrete Pin /Load„ (SPC)
FASTNER
329.79 EA
0.30
98.94
Tek Screws 1- 114„ (DTS114)
FASTNER
0.35 Boxes 75.00
26.48
Screw 1 -1/4 Reg„ (DS114)
FASTNER
5,649.00 EA
0.03
141.22
Not
Bid Material Total:
6,359.48
Lab. Cost Code Wage Type
Quantity
Prod /Hour
Unit Cost
Total Cost
Hang ext sheathing (220 (HANG BOARD EXT)) Union
2,353.75 SF
80.00
0.70
1,643.51
HANG PLYWOOD (221 - HANG PLYWOOD) Union
320.00 SF
32.00
1.75
558.60
Layout (400 (LAYOUT)) Union
314.08 LF
37.50
1.64
516.27
Interior frame walls (411 FRAME INT WALLS) Union
314.08 LF
3.75
14.90
4,678.59
Hang int gyp walls (421 HANG GYP WALLS) Union
2,353.75 SF
80.00
0.70
1,643.51
Net Labor Total:
9,040.47
27
06/11/2012 6:58 am Page 1
Section Markup
Temp Wall
Bid No. 1
Grand Total: $18,541.30
28
06/11/2012 6:58 am Page 2
Material
Labor
Equipment
Other
Total
Not Totals
6,359.48
9,040.47
0.00
0.00
15,399.95
Stock
994.73
0.G0
-
-
994.73
Cleanup
0.00
719.36
-
-
719.36
Supervision
-
857.30
-
-
857.30
Escatallon
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
Tax/Burden
7.75%
569.95
0.00 %.
0.00
0.00%
0.00
0.00%
0.00
569.95
PerDiem
-
0.00
-
-
0.00
Sub Total
7,924.17
10,617.13
0.00
0.00
18,541.30
Overhead
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
Profit
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
Bid total
7,924.17
10,617.13
0.00
0.00
18,541.30
Grand Total: $18,541.30
28
06/11/2012 6:58 am Page 2
iS
OR
1 4!i
. .... ...... -- ----
. H
1_7
Al................
all
11H
all!
ILI
- — - — -- — - — - — " °-- __(n.• —._! J
i.
9
rl
LL
LO
LL
C3__
_j
Lo
CL
E
CO
(D
O.
E
.(n
.2
cn
x
0)
.a
(D
>
0
X
N
(D
O
.0
co
0
N
0
>
m
3:
ca
3
CL
OL
E
E
Fes—
(D
F—
'0
. .... ...... -- ----
. H
1_7
Al................
all
11H
all!
ILI
- — - — -- — - — - — " °-- __(n.• —._! J
i.
9
SUBCONTRACTOR CHANGE REQUEST COVER SHEET
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBCONTRACTOR: Superior Wall Systems
DATE: 7/19/2012
CWD COR / PCO NO. N/A
SUBC. CDR NO. RFC # 039 R1
SOURCE OF CHANGE: Requested by Kellar
(Bulletin, Field Order, RFI, etc.)
DESCRIPTION OF CHANGE
Plaster existing columns from the new library roof to the existing Library roof to include reframing the
columns.
COST OF CHANGE: NO COST / ADD / DEDUCT
(circle one)
3901
Subcontractor shall attach full labor, material and cost breakdown and associated backup documentation for
the above cost as required to fully explain the all components of the cost in accordance with Exhibit B, Item 17.
allowable markups are as defined in Exhibit B, Item 18.
Upon acceptance of the above cost, Subcontractor shall execute a Subcontract Change Order which shall
constitute acceptance by Subcontractor that (a) The above price adjustment Includes all costs associated with
the change(s) including but not limited to direct and /or indirect costs, damages and all overhead and profit for
any and all impacts and /or delays arising out of or relating to the changed work on the project, including any
schedule extension, compression or revised sequencing; (b) no further adjustment to this provided herein shall
be made; and (c) all the terms and conditions of the Subcontract, except as modified by this and any previous
Change Orders, shall remain in full force and effect and apply to the work as so changed.
Submitted by: Chris McGhie
Title: Senior Project Manager
Office Phone: 714.278.0000
Cell Phone: 714.519.8629
Email: cmeghie (o)suoeriorwallsystems.com
HE
S0
u n r vALL sysTEms INc.
1232 East Orangethorpe Ave. - Fullerton, CA 92831 - (714) 278 -0000 - Fax (714) 278 -0090
July 19, 2012
Mr. David Edwards Via: Email
CW Driver Contractors
468 N. Rosemead Blvd.
Pasadena, CA 91107
RE: Newport Civic Center
Superior Job No. 558
RFC # 039 R1
Gentlemen:
Please find below costs associated with this request for Change Order for the above referenced project.
Cost associated with existing Library plaster columns:
RFC # 039 Rl Total cost to replaster the existing columns from the new library $ 30,177.81
roof to the existing library roof to include framing.
15 %08P S 4,526.67
1.5% Bond $ 520.57
TOTAL Request for Change Order S 35,225.00
Qualifications
1 Pricing does not Include overtime.
2 The price indicated is for this change only and does not include any compensation for costs which may
be incurred as a result of delays or accelerations.
3 The price indicated Is valid for thirty (30) days.
Should you have any questions or require additional information, please call.
Sincerely,
Superior Wall Systems, Inc.
UW`'y�-�0-
Chris McGhie
Senior Project Manager
Attachments:
31
SuperiorWall Systems
Bid Summary
Plaster at Existing Library
Bid No. 1
Selected Sections: 09250 Drywall
Selected Typical Areas:
Selected Areas: (unassigned), L01 Lower level, South Saddle, North Saddle, Library, 2nd Library, 1st Library, 2nd Fir DE, 2nd Fir F, 1st Fir F,
1st Fir D£, Basement, 1st FlrAB, 2nd Floor AB, 2nd Floor BC, 2nd Floor CD, 1st Fir BC, 1st Fir CD, L02 Upper level, EAST Library, Center
Library, WEST Library, 1st Floor, L03 Roof, CC00 Lower level, CC Exterior, CC01 1st level, Bay A, Bay B. BAy C. BAy D, Bay E, Bay F. CCO2
2nd level, CC03 Roof, Council 01 1st floor. Council 02 Roof
Estimator. Job Status:
Job Class: Bid DaleRme: 11117/2010 12:00:00 PM
Wage Type: Union Plans Date: 11/17/2010
Job Site: 92663
Unit Pricing
No. Condition Height Quantity Mail.- Mail.- Lab _ _ Totaf Total Price
1 Existing plaster columns 14'0" 10.00 FA 1,369.78 1,648.01 3,017.78 / FA 30,177.81
Material & Labor Total: 30,177.81
Grand Total: $30,177.81
07/19/2012 12:41 pm Pagd33
SuperiorWall Systems
Payroll Report
Plaster at Existing Library
Bid No. 1
Selected Seclons: 09250 Drywal
Selected Typical Areas:
Selected Areas: (unassigned), L01 Lover level, South Saddle, North Saddle, Library, 2nd Library. Ist Library, 2nd Fir DE, 2nd Fir F, 1st Fir F, 1st Fir DE, Basement, 1st Fir AB, 2nd FloorF
2nd Floor BC, 2nd Floor CD, 1st Fir BC,1 st Fir CD, L02 Upper level, EAST Library, Center Library, WEST Library, 1 st Floor, L03 Roof, CC00 Lower level, CC Exterior, CC01 1 st level, Bay
Bay B, BAy C, BAy D, Bay E, Bay F, CCO2 2nd level, CC03 Roof, Council 01 1 st loor, Council 02 Roof
Estimator. Job Status:
Job Class: Bid Daterrime: 11117/2010 12:00:00 PM
Wage Type: Union Plans Date: 11 /1 712 010
Job Site: 92663
Payroll Class
Base.
Fees
Insurance
Tax
BURDEN -L
Hourly
Wage
Daily
Wage
Hours Per Diem
Gross Pay
ABOR
Drywall Framer
55.86
0.00
0.00
0.00
0.00
55.86
446.88
90.67
0.00
5,064.64
(Union)
Framer (Union)
55.86
0.00
0.00
0.00
0.00
55.86
446.88
8.00
0.00
446.88
GENERALLABOR
55.86
0.00
0.00
0.00
0.00
55.86
446.86
20.19
0.00
1,127.93
(Union)
Hanger (Union)
55.86
0.00
0.00
0.00
0.00
55.86
446.88
9.33
0.00
521.36
Job Supervision "N'
61.64
0.00
0.00
0.00
0.00
61.64
493.12
21.81
0.00
1,344.21
(Union)
Lather (Union)
55.86
0.00
0.00
0.00
0.00
55.86
446.88
85.40
0.00
4,770.44
Lay Out (Union)
55.86
0.00
0.00
0.00
0.00
55.86
446.88
10.00
0.00
558.60
Plasterer (Union)
54.00
0.00
0.00
0.00
0.00
54.00
432.00
49.00
0.00
2,646.00
Totals 0.00 0.00 0.00 0.00 294.40 0.00 16,480.05
W
W 07/19/2012 12:41 pm
Page 1
SuperiorWall Systems
Section Markup
Plaster at Existing Library
Bid No. 1
Selected Sections: 09250 Drywall
Selected Typical Areas:
Selected Areas: (unassigned), L01 Lower level, South Saddle, North Saddle, Library, 2nd Library, 1st Library, 2nd Fir DE, 2nd Fir F, 1st Fir F,
tat Fir DE, Basement, 1st FIrAB, 2nd FloorAB, 2nd Floor BC, 2nd Floor CD, 1st Fir BC, 1st Fir CD, L02 Upper level, EAST Library, Center
Library, WEST Library, 1st Floor, L03 Roof, CC0O Lower level, CC Exterior, CC01 tat level, Bay A, Bay B, BAy C. BAy D, Bay E, Bay F. CCO2
2nd level, CC03 Roof, Council 01 1st floor, Council 02 Roof
Estimator. Job Status:
Job Class: Bid Date/Time: 11/17/2010 12:00:00 PM
Wage Type: Union Plans Date: 11/17/2010
Job Site: 92663
Bid Material
Mat. Cost Code
Quantity
Unit Cost
Total Cost
Scaffolding Priced By SF, 1' x 1% (SCAF BY SF)
800
5,880.00 SF
1.25
7,350.00
(SCAFFOLDING)
Track 6 16ga DL, 10', (T616DL)
901 (METAL
200.00 LF
1.81
362.60
FRAMING)
Clips for Exterior Wall Framing, 2"x 2" x 3"x 16ga. Clips, (CLIPS) 901 (METAL
80.00 Each
7.83
626.40
FRAMING)
6005762 -54, 14', (S616C)
901 FRAMING
924.00 LF
1.98
1,827.67
MATERIAL
Layout/ LF„ (LO)
901
80.00 LF
0.08
6.40
5/8" GP Densglas Gold Sheathing, 4' x 8', (DENSGOLD58)
902 (GYPSUM
560.00 SF
0.60
333.20
BOARD/
SHEATHING)
7116" #10.Teks„ (PHTEXT)
903 FASTENERS
0.03 Boxes
60.00
1.94
Welding., (WELD)
903
320.00 EA
0.03
9.60
Double ply D paper super jumbo tek, 9' x 150', (D PAPER)
919 (LATH AND
560.00 SF
0.15
81.20
TRIM MAT)
Galvanized Metal Lath, 3.4'B" Paper, (LATH)
919 (LATH AND
63.00 SY
3.77
237.51
TRIM MAT)
Corner aid, 10', (AID)
919 (LATH AND
280.00 LF
0.40
111.16
TRIM MAT)
Finish Stucco - Float Finish, 3' x 3', (FINISHFLOAT)
920 (CEMENT
7.78 SY
9.72
75.60
PLASTER MAT)
Giboo Cement Additive, 250' x 9', (GIBCO)
920 (CEMENT
70.00 SY
0.60
42.00
PLASTER MAT)
Portland Cement„ (PORTLAND)
920 CEMENT
12.60 Baas
7.50
94.50
PLASTER
River Sand per Ton„ (SANOTON)
920 CEMENT
2.80 Ton
35.00
98.00
PLASTER
Tek Screws 1 -1/4„ (OTS114)
FASTNER
0.17 Boxes
75.00
12.60
Lath Head Tek Screw„ (LHTLATH)
FASTNER
1,624.00 EA
0.03
40.60
Lath Head Tek Screw„ (L-T)
FASTNER
560.00 EA
0.03
14.00
3/4 Concrete Pin/Load„ (SPC)
FASTNER
84.00 EA
0.30
25.20
Fibers„ (FIBERS)
STUCCO
70.00 SY
0.50
35.00
Casing Bead Galy, 112 exp. (MILCOR)
TRIM PLASTER
560.00 LF
0.31
170.80
Grace Ice & Water, 3' x 159, (ICE &WATER)
WATERPROOF
560.00 SF
0.79
442.40
Not Bid Material Total:
11,998.39
Lab. Cost Code Wage Type
Quantity
Prod /Hour
Unit Cost
Total Cost
Exterior slickers and clips (201 (EXTERIOR Union
80.00 EA
10.00
5.59
446.88
STICKERS AND CLIPS))
Weld Studs (208) Union
320.00 EA
30.00
1.86
595.84
Frame exi wall cell (211 EXTERIOR CEILINGS) Union
80.00 LF
1.00
55.86
4.468.80
07/1912012 12:41 pm Page 14
Section Markup
Plaster at Existing Library
Bid No. 1
Lab. Cost Code
Wage Type
Quantity
Prod /Hour
Unit Cost
Total Cost
Hang ext sheathing (220 (HANG BOARD EXT))
Union
560.00 SF
60.00
0.93
521.36
Lathing (241 (PAPER & LATHING))
Union
560.00 SF
100.00
0.56
312.82
Lathing (241 (PAPER & LATHING))
Union
63.00 SY
5.00
11.17
703.84
Waterproofing (242)
Union
560.00 SF
25.00
2,23
1,251.26
Plaster Trims (244 (PLASTER TRIMS))
Union
280.00 LF
18.75
2.98
834.18
Metal Trim Installation (250)
Union
560.00 LF
18.75
2.98
1,668.35
Scratch (300 SCRATCH)
Union
70.00 SY
10.00
5.40
378.00
Brown (301 (BROWN))
Union
70.00 SY
5.00
10.80
756.00
16120 Med. Sand Stucco Finish (303 (16/20 IVIED
Union
70.00 SY
2.50
21.60
1,512.00
SAND STUCCO FINISH))
Lay -out (400)
Union
80.00 LF
8.00
6.98
558.60
Net
Labor Total:
14,007.92
Material
Labor
Equipment
Other
Total
Net Totals 11,998.39
14,007.92
0.00
0.00
26,006.31
Stack 714.15
0.00
-
-
714.15
Cleanup 0.00
1,127.93
-
-
1,127.93
Supervision -
1,344.21
-
-
1,344.21
Escalation 0.00% 0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
Tax/Burden 7.75% 985.22
0.00%
0.00
0.00%
0.00
0.00%
0.00
985.22
PerOlem -
0.00
-
-
0.00
Sub Total 13,697.76
16,480.05
0.00
0.00
30,177.81
Overhead 0.00% 0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
Profit 0.00% 0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
Bid total 13,697.76
16,480.05
0.00
0.00
30,177.81
Grand Total: $30,177.81
07/19/2012 12:41 pm Page 25
IP
!
•I `- �III� —'
W
(Qri1
Ur -�
O
U)
E
_7
O
U
a_
N
N
(0
O_
m
C
N
X
W
-�d
Y}'
r!
i
ii
t
N
V`
C
a
Y y'
a
r
3�
b
i
1 A�iC
issm
7
P
T 3 ?97d
it S
! p3p3
x$j�E
R°$$�
3 � k3Y
Im
C. W. Driver
Dale:
09127112
1100
Unit Cost
CMF Project No.:
5704
Newport Beach, CA 92660
Newport Beach,
���
Contract No.:
22 -gage 28 Stainless Steel at Vert. Zee's 8 Counterflashing
Newport Boach Clvic_Center
1314
�r Cost Rofare c For.
Library
Evan Taylor
eUSYOTWOC70f2b1`iCat0r5 Other Ref.: Clerestory Flshng
Silo Phone: 949. 640-0516
S 2.00
FO 0411
Site Fa c 949-664.6392
CHANGE ORDER REQUEST NO.:
D29
Descrioiion of Work:
LF
fe
CAT
Ot .
Unit
Material Description
Unit Cost
C/C
Extension
S/S Flps
1778
LES
22 -gage 28 Stainless Steel at Vert. Zee's 8 Counterflashing
S 2.00
1314
5 3,556.00
9r6 Figs
119
LBS
22 age 2B Stainless Steel at Pilaster Bottoms
S 2.00
1314
S 238.00
Sealants
30
EA
Dow Coming 795 Silicone Sealant for Setting Fleshings
$ 8.99
1442
5 269.70
Fasteners
600
EA
08 and 010 Tek 5 Sheet Metal Screws
S 0.05
1448
5 30.00
Mkc
2
LBS
Solder
S 10.00
1468
$ 20.00
I
Fuel Surcharge
5 50.00
Hours
5
I
I
S -
Loss of Productivity
Subtotal Labor
Cost:
S 8,068.94
Mark Up:
Subtotal Malerlol
Cost:
$ 4,113.70
Sales Tax:
7.75%
S 318.81
Subtotal:
8 4,432.51
Mark U :
_
15.00% 1
_
5 684.68
matarlal Iowa S 6,097.39
CAT
Ot . I Unit
Labor Description
Unit Cost
C/C
1 Extension
Extension
2 1 Hours
Field / Detailing Labor
$ 74.85
$
1 $ 149.70
$
Shop
32 1 Hours
Fabrication
S 69.07
1110
5 2 210.24
-
_
60 Hours
- _
Field Sheelmetal Worker - Joumemen
_
Subtotal Equi .Cosa
6,409.80
Sales Tax:
4 Hours
Field Sheetmetal Worker- Foreman
S 74.85
-
1 $ 299.40
1 15.00% 1
- Hours
Field Labor I Clean Up Costa
$
Delivery Charge
$ 75.00
2014
Hours
I
Fuel Surcharge
5 50.00
Hours
S
I
I
S -
Loss of Productivity
Subtotal Labor
Cost:
S 8,068.94
Mark Up:
15.00%
$ 1,210.34
moor iovu: a y,zre.zu
CAT
Oty. Unit
Equipment Descri lion
Unit Cost
C1C
Extension
Extension
Hour
Small Tools 8 Consumables
$
1466
$
I Hour
Company Truck
S 5,00
I
It
- _
S
Travel Expenses Subsistence I Zone Pay)
Subtotal Equi .Cosa
S
Sales Tax:
B
Hour
Subtotal:
5
Mark Up:
1 15.00% 1
$
Equipment Total: 5
CAT
Ot .
Unit
Miscellaneous Description
Unit Coal
C/C
Extension
Hour
Small Tools 8 Consumables
$ 2.35
1466
$
I Hour
Company Truck
S 5,00
2015
It
- _
Day
Travel Expenses Subsistence I Zone Pay)
I
221!L.
5 -
B
Hour
Fabricaton uipment /Machinery
$ 34.40
I _
1923
$ 275.20
_
2
Hour
Delivery Charge
$ 75.00
2014
$ 150.00
Lot
Fuel Surcharge
5 50.00
2017
S
_
_
Lot
Loss of Productivity
$
3010
$
Misc. Subtotal
Cost'
$ 425.20
Mark U :
15.00%
Is 63.78
CMF. Inc.
Nick Pemberton - Project Manager
ACCEPTED
Signature and Title
MISc.Total: 5 488.99
a
5
)tat Sub. Cost: $
: Subs: $
Up 5DD%
$
Subcontractor Total: $
Total Talc 1610 $ 318.81
Bond: 1.99% S 295.83
TOTAL CDR (Rounded) $ 15,161
SCHEOULEIMPACT:
37
DETAIL SHEET
PROJECT: NP1-- L l PROJECT NO
DATE ORDERED: DATE REQUIRED: CHANGE ORDER NO:
MA7E�IAL'
0
s .
co 0
F
rI
tln
n
QTY:
rS
1�
s
ORDERED BV:
K t'-
r rS
r
/
C) `� J
V �
/g
38
City of Newport Beach NO. BA- 13BA•018
BUDGET AMENDMENT
2012 -13 AMOUNT: s7zo,s13.00
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates Increase in Budgetary Fund Balance
X Increase Expenditure Appropriations AND X Decrease in Budgetary Fund Balance
Transfer Budget Appropriations No effect on Budgetary Fund Balance
SOURCE:
from existing budget appropriations
from additional estimated revenues
qX from unappropriated fund balance
EXPLANATION:
This budget amendment is requested to provide for the following:
To increase expenditure appropriations for the Central Library clerestory repair. Funds will be transferred out of the Facilities
Replacement Fund and into the Civic Center Fund.
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Account
405 3605
REVENUE ESTIMATES (3601)
Fund /Division Account
9410 6000
EXPENDITURE APPROPRIATIONS (3603)
Amount
Description Debit Credit
Facilities Replacement Fund - Fund Balance $720,913.00
Description
Civic Center Fund - Transfer In
Signed: 4zadj /" /
Financ' pproval: Finance Director
Signed: CA— L
Administ pproval: City Manager
Signed:
City Council Approval: City Clerk
$720,913.00
Automatic
$720,913.00
$720,913.00
to — ll— I -),
Date
to
Date
Date
0
Description
Division
Number
9405
Facilities Replacement Fund
Account
Number
9900
Transfer Out
Division
Number
7410
Civic Center Fund
Account
Number
C1002009
Civic Center Construction
Division
Number
Account
Number
Division
Number
Account
Number
Division
Number
Account
Number
Signed: 4zadj /" /
Financ' pproval: Finance Director
Signed: CA— L
Administ pproval: City Manager
Signed:
City Council Approval: City Clerk
$720,913.00
Automatic
$720,913.00
$720,913.00
to — ll— I -),
Date
to
Date
Date