TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Ben Davis, Civil Engineer
PHONE: 949-644-3317
TITLE: Zone III Pump Station Variable Frequency Drive (VFD)
Replacement — Award of Contract No. 6278 (Project No. 16W16)
ABSTRACT:
Staff has received construction bids for the replacement of two (2) of the City's Variable
Frequency Drives (VFD) serving the Zone III Pump Station, and is requesting City
Council's approval to award the construction contract to Industrial Power and
Automation, Inc. of Temecula, California.
RECOMMENDATION:
a) Approve the project plans and specifications;
b) Approve Budget Amendment No. 16BA-019 appropriating $143,500.00 from the
unappropriated Water Enterprise fund to Account No. 70101-980000-16W16;
c) Award Contract No. 6278 to Industrial Power and Automation, Inc. for the Total
Bid Price of $129,500.00, and authorize the Mayor and City Clerk to execute the
contract; and
d) Establish a contingency of $13,000.00 (approximately 10% of Total Bid) to cover
the cost of unforeseen work not included in the original contract.
FUNDING REQUIREMENTS:
The Budget Amendment records and appropriates $143,500 in increased expenditure
appropriations from the Water Enterprise Fund unappropriated fund balance. Upon
approval of the budget amendment, there is sufficient funding for this work. Costs will be
expensed to the Capital Improvement Program project account in the Public Works
Department, Account No. 70101-980000-16W16; 16W16 -Construct -701 -Unassigned.
5-1
Zone III Pump Station Variable Frequency Drive (VFD) Replacement — Award of
Contract No. 6278 (Project No. 16W16)
December 8, 2015
Page 2
Vendor Purpose Amount
Industrial Power and Automation, Inc. Construction Contract $ 129,500.00
Industrial Power and Automation, Inc. Construction Contingency $ 13,000.00
Printing and Incidentals Unassigned $ 1,000.00
Total: $ 143,500.00
DISCUSSION:
At 10:00 a.m. on November 19, 2015, the City Clerk opened and read the following bid
for this project:
BIDDER TOTAL BID AMOUNT
Low Industrial Power and Automation, Inc. $ 129,500.00
The low bid amount is 14 percent below the Engineer's Estimate of $150,000. Although
staff only received one (1) bid, a comparison of the bid prices for each bid item shows
that the bid is very consistent with the Engineer's Estimate. A check of the contractor's
qualifications found that they have satisfactorily completed similar work for
municipalities in Orange and San Diego Counties.
VFDs are essential motor control devices for pumps which allow the motors to operate
at variable speeds resulting in significant energy savings. The ability to operate motors
at variable speeds, as opposed to a simple on/off function, allows the City to only use as
much energy as required to match demand, which reduces the amount of wasted
energy. In addition to energy savings, the life of pump impellers, bearings and seals are
greatly improved with the addition of VFDs.
The current Zone III Pump Station Variable Frequency Drives (VFDs), located at the
City's Big Canyon Reservoir (BCR) site, were installed in 2001 and have reached the
end of their design life. Two (2) of the four (4) VFDs recently failed and require
replacement. The Zone III Pump Station serves potable water to businesses and
residents in the higher elevation areas of the City which is generally located east of
Jamboree Road and north of East Coast Highway. The majority of the City's water
supply comes from local underground water that is pumped from the Orange County
aquifer and is stored at BCR. Water is then pumped again from BCR to higher elevation
areas (Zones III, IV and V). The City also has several Metropolitan Water District (MET)
connections which allows us to purchase imported water from MET. Although these
connections with MET improved our overall water system reliability and redundancy,
water purchased from MET is approximately three (3) times the cost of pumped
groundwater. These two (2) VFDs need to be replaced in a timely manner in order to
maximize our use and pumping of local groundwater.
5-2
Zone III Pump Station Variable Frequency Drive (VFD) Replacement — Award of
Contract No. 6278 (Project No. 16W16)
December 8, 2015
Page 3
Upon award of this construction contract, the contractor will start construction in January
2016 and will be allowed 150 consecutive working days to complete the work. The
extended duration is attributed to the long lead time needed to assemble and customize
the equipment as required by the contract documents. The new VFDs are scheduled to
be back in service by July 2016.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Class 2 Section 15302(c) (replacement
of existing utility systems involving no expansion of capacity) of the CEQA Guidelines,
California Code of Regulations, Title 14, Chapter 3, because it has no potential to have
a significant effect on the environment.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Location Map
Attachment B — Budget Amendment
5-3
m
0
PROJECT -
LOCATION ROJECTLOCATION
0
c �
ATTACHMENT A
O
q
Q�
H�
S R
D
ZONE III PUMP STATION VARIABLE
FREQUENCY DRIVE (VFD) REPLACEMENT
LOCATION MAP
a
BIG CANYON
RESEVOIR
N.T.S.
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-6278 12/8/15
5-4
ATTACHMENT B City of Newport Beach
BUDGET AMENDMENT
2015-16
EFFECT ON BUDGETARY FUND BALANCE:
Increase Revenue Estimates
X Increase Expenditure Appropriations AND
Transfer Budget Appropriations
SOURCE:
from existing budget appropriations
from additional estimated revenues
X from unappropriated fund balance
EXPLANATION:
NO. BA- 16BA-019
AMOUNT:1 $143,500.00
Increase in Budgetary Fund Balance
X Decrease in Budgetary Fund Balance
No effect on Budgetary Fund Balance
This budget amendment is requested to provide for the following:
To increase expenditure appropriations from the Water Fund for the construction contract related to the
two Variable Frequency Drives serving the Zone III Pumo Station.
ACCOUNTING ENTRY:
BUDGETARY FUND BALANCE
Fund Object Description
REVENUE ESTIMATES
Org Object Description
EXPENDITURE APPROPRIATIONS
Org
Number
Object
Number
Project
Number
Org
Number
Object
Number
Project
Number
Description
70101 Water Fund CIP
980000 Capital Improvement Project
16W16 Zone III Pump State VFD Replacement
of
Amount
Debit Credit
$143,500.00
Automatic System Entry.
Signed: G/
Financial Approval: FinarSce Director ` Date
Signed:
Administrative -Approval: City Manager v Date
Signed:
City Council Approval: City Clerk Date