HomeMy WebLinkAbout18 - Modifications to the Back Bay Landing Project Located at 300 East Coast Highway (PA2011-216) - PowerPoint (Staff)April 12, 2016
Item No. 18
BACK BAY LANDING MODIFICATIONS
City Council Public Hearing
April 12, 2016
General Project Background
Mixed -Use Waterfront Development
— 49 residential units
— 32,500 sf boat storage
— 61,534 sf visitor-serving/marine-related uses
CPaskl Public View To— Public 101 inaPublic Walkway
u VChICIC TllYil-prCUlld LACkCrS @i fiC52YCUlYfS l'
, Ci Walk
imar
Pry ,Airy -
Mobil ami
Fulclic BayfrCni
AcC
S.
Till
Mo
East Coast
General Project Background
The Back Bay Landing project involves two stages
of approvals:
1. Legislative Approvals (e.g., General Plan Amendment,
Coastal Land Use Plan Amendment, Code Amendment,
Planned Community Development Plan), and related lot line
adjustment and traffic study, which comprise the current
"proposed project"; and
2. Site Development Approvals (e.g., Site Development
Review, Coastal Development Permit), which will be pursued at
a later date for a future development on the project site.
Project Background
Legislative Approvals previously approved
and Environmental Impact Report Certified
— Planning Commission — December 2013
— City Council — February 2014
• City approvals contingent on CA Coastal
Commission (CCC) approval of CLUIPA
• CCC approved in December 2015 with
suggested modifications
• Approval pending City acceptance
• Planninry (`nmmiccinn - KAarrh 17th
Current Request
• Acceptance of CCC suggested modifications
• Modification of previously approved legislative
approvals for consistency with CCC suggested
modifications
— GPA, CLUPA, CA, and PCDP
• Revised Lot Line Adjustment
— Further improve site circulation
— Land use boundaries adjusted
PARCEL 3
(PM 93 111)
All
PARCEL 2;
PM 93-111}
Bayside Village
Mobile Home Park
Lct Linc
�—
Parking 8 Marineg .. •..
Equipment Storage
Under Coast Hwy Bridge
Sewer --
Pump Hous
jCCSD Prone
..A"
Legend
- Lot Line Adjustment Area
Back Bay Landing Mixed -Use Project Area
Project Area {Parcel 3)
Parcel 1 & 2 Boundary Line
^••.••. Existing PC -9 Boundary
......•• Proposed PC -9 Boundary Expansion
.• Storage Garages &
• . Marina/ Bayside Village
00,.• Guest Parking
PARCELI
jPM 93-111)
Vr
SACK BAY
_ANDING'
AXED -USE
)JEC`T-AREA"
N J
Source: Google Earth
ExiSTING CONDITION, PROJECT BOUNDARY 01
LOT LINE ADJUSTMENT8.30-2430-20
13
Revised Lot Line Adjustment
Area increases nominally from 0.304- to 0.387ac
l r
EYJSTWQ ..
r�
FAFKML LINE
� IAIII I�III � 1V� I
�s �w
I I 1 I ^ • �Mr
I4AII � VIII' � I I � +fff+ A
CCC Suggested Modifications CLUPA
Change Mixed -Use Horizontal (MU -H) to
Mixed Use -Water Related (MU -W)
• Prioritizes coastal dependent
and related uses
• No freestanding residential
• Portion of bayfront remains CM -B
*Lot Line Adjustment Included
CCC Suggested Modifications CLUPA
• Eliminated Public View Tower Exception
• Hazards Assessment (Policy 2.1.9-4)
• Sea Level Rise and Shoreline
Management (Policy 2.1.9-5)
• Enhanced Coastal Access
(Policies 2.1.9-2 and 2.1.9-3)
— Continuous bayfront connection around mobile home
— Connect to Newport Dunes trail to project area
Modified CLUPA
iH
EACH
• ..p
'^!---- FB L: A.
i
M.
,[y ♦ `„ LINDA
1 J ISLE
■
t
HA R80R
(7 r MA"D
ENi NINS[1LA ,E.�
k,
R
pA''Of LIS '.
.1 • ♦ 7 LIDOpay ISLAND
♦ ISLE isLAND '-♦
EWaoRT • • ilii r' o
pg - BA'LBOA ILi
♦ "' IyNEZ
FE
a A -
NEWPO 71,'
LITTLE -
CORONA -
♦
CAMEO '1
SHORE
City of Newport Beach, California (Harbor Area)
Local Coastal Program
Coastal Land Use Plan
MAP3.1 LCP45A—sRecHaM. m[d
3-40
{..
♦ y ;_
FE i
THE n
WEDGE m
m
FASHION
ISLAND
Coastal Access
and Recreation:
Map 3-1
(Map 3I If 3)
LEGEND
Public Beach Location
Public Beach Access Location
A Potential Access Point
Coastal Zone Boundary
ti Lateral Access
e\ • Potential Lateral Access
I"- Vertical Access
'•�✓ Potential Vertical Access
BlufRop Access
Potential Blufitop Access
December 12005
Modified General Plan Amendment
• MU -H to MUM2
• Prioritizes coastal dependent
and related uses
• No freestanding residential
• No change to density and
intensity
• Portion of bayfront remains
CM -13
* Lot Line Adjustment Included
Land Use Change:
Recreational and Marine Commercial
[CM �-5 FAR) to
RM
Mixed Use Water F2elaled
(MU -W2}
$, PR
1
rLand Use Change
Lot Line Adjustment Area_ RM
Multi -Unit Residential (RM 15 dulac) to
Mixed Use Water Related (MU -W2)
Anomaly 0
Nonresidential Only Mixed -Use
131,290 SF 171,289 SF
1:1 ratio
49 units
Anomaly
296 units
-� PaRT
04 ��
x
Modified Zoning Code Amendment
Revised PC boundary
to incorporate revised
LLA
Planned Community Development Plan
Purpose
establish zoning regulations governing
land use and development of the site
• provides a vision for land uses on the site
and establish design guidelines
• regulates long-term operation of the site
Ile Anza Bayside Marsh Re,nirtsu -
m� i` �rvistln M�
•�yyp PARCEL 3Plannin Ari)veNfawGasvel`� �1�1
ea 5 Parking Lot i °
6a
tia
P�
Plannin Area 3
° EXISTING PRIVATE MARINA
ACCESS AND BEACH
(®.659 ac)
Bayside Village
�. Mobile Horne Palk
,
Pukai;c Rn,,,i Newport Dunes
Waterfront
~ Resort & Marina
annin
i Hiannina Area 41
MARINA AND BAYSIDE VILLAGE
MOBILE HOME PARK STORAGE
AND GUEST PARKING
{0.541 ac}
Planning Area 2 -�-— —��,-
-RECREATIONAL& -.�� ~M=ast Coast Highway
MARINE COMMERCIAL
(0.642 ac)
��
EXHIBIT 2
PLANNING AREAS
This Planned Community includes five distinct
planning areas.
Parcel 3 Summary
P.A.
Description
Acres
Mixed -Use Area
5.215 ac
(North of CH center line)
Recreational & Marine
Commercial
0.642 ac
(South of CH center line)
Existing Private Marina Access
and Beach
0.659 ac
Marina and Bayside Village
Mobile Home Park Storage
0.541 ac
and Guest Parking
Submerged Fee -Owned Lands
(Area includes De Anza Bayside
24.457 ac
Marsh Peninsula)
Parcel 3 Total Area
31.514 ac
P LAN K I N G AREAS BACK BAYLANDING
az.oz.zalb NEWPORT BEACH, CAA
NTS
Kayak &—
Stand Up
Paddle Board
Rental,
--3tmrage
Coastal PubliCView Tower
& Vehicle Turn-AroundConnection
Previous Conceptual Site Plan
Public Walkway
MIte.Exlsting
Mrlakile Homes
Revisions to Planned Community
Development Plan
• Implement Coastal Commission modifications:
— Eliminate freestanding residential
— Eliminate view tower
— Standards for enhanced bayfront trail
— Incorporate requirements for preparation of sea level
rise/shoreline management and hazards plans
— Revised all exhibits
• Revised Architectural Theme
• Authorize OCSD pump station in PA 2
Public —
Bayfront
Access
t
Pearson's J
PoR r i. crai
4' 44' 64' 124' 164' 2d0
J 7
{
`eraice
eastGo Olt
��riwaY
Plan at Level below Bridge
-*v
Revised Conceptual Site Plan
Existing Gated
Marina Access
Previous Conceptual
Driveway Design
Public Pedestrian Promednade
& Marina Access
Proposed Conceptual
Driveway Design
Entry Location
(Moved approximately 45 ft
north o1 existing entry)
Revised Project Entry Location -
(Moved approximately 45 ft north of existing entry)
Addendum to Environmental Impact Report
• EIR certified by the City Council February 2014
• Addendum prepared to analyze project
modifications
• No new or substantially greater impacts
• No change in significance conclusions of EIR
e
Next Steps:
•California Coastal Commission- Final Approval
If approved, then:
For more information contact:
*Site Development Review (City)
*Coastal Development Permit (CCC) Jaime Murillo, Senior Planner
949-644-3209
jmurillo(a)_newportbeachca.gov