HomeMy WebLinkAbout5.0 - Staff Report_150 Newport Center Residential Project CITY OF NEWPORT BEACH
PLANNING COMMISSION STAFF REPORT
August 18, 2016 Meeting
Agenda Item No. 5
SUBJECT: 150 Newport Center Residential Project (PA2014-213)
150 Newport Center Drive
• General Plan Amendment No. GP2014-003
• Code Amendment No. CA2014-008
• Planned Community Development Plan No. PC2014-004
• Site Development Review No. SD2014-006,
• Tentative Tract Map No. NT2015-003 (County Tentative
Tract Map No. 17915)
• Development Agreement No. DA2014-002
• Environmental Impact Report No. ER2015-002
APPLICANT/OWNER: Newport Center Anacapa Associates, LLC
PLANNER: Makana Nova, Associate Planner
(949) 644-3249, mnova@newportbeachca.gov
PROJECT SUMMARY
The proposed project consists of the demolition of an existing 8,500-square-foot car-wash,
convenience market, and gas station to accommodate the development of a 6-story 45-
unit residential condominium building with three levels of subterranean parking. The
applicant, Newport Center Anacapa Associates, LLC, requests the following approvals:
• General Plan Amendment - to change the land use category from CO-R
(Regional Commercial Office) to RM (Multi-Unit Residential) and establish an
anomaly (Table LU2) designation for 45 dwelling units.
• Zoning Code Amendment - to change the Zoning District designation from OR
(Office Regional Commercial) to PC (Planned Community District) over the entire
site.
• Planned Community Development Plan - to establish a planned community
development plan (PC) over the entire project site that includes development and
design standards for 45 residential condominium units. The request also includes a
City Council waiver of the minimum site area of 10 acres. A height limit of 65 feet 6
inches with mechanical appurtenances up to 69 feet 6 inches is requested.
• Site Development Review - to allow the construction of 45 multi-family dwelling
units.
• Tentative Tract Map - to establish a 45-unit residential condominium tract on a 1.3
acre site.
• Development Agreement - review of a proposed development agreement that
would provide public benefits should the project be approved.
1
150 Newport Center
Planning Commission, August 18, 2016
Page 2
• Environmental Impact Report (EIR) - to address reasonably foreseeable
environmental impacts resulting from the legislative and project specific
discretionary approvals, the City has determined that an Initial Study and
Environmental Impact Report (EIR) are warranted for this project pursuant to the
California Environmental Quality Act (CEQA).
RECOMMENDATION
1) Conduct a public hearing; and
2) Adopt Resolution No. _ (Attachment No. PC 1) and attached Exhibits
recommending the City Council approve a reduced project height of 55 feet and:
• Certify Environmental Impact Report No. ER2015-002; and
• Approve General Plan Amendment No. GP2014-003, Code Amendment No.
CA2014-00808; Planned Community Development Plan No. PC2014-004, Site
Development Review No. SD2014-006, Tentative Tract Map No. NT2015-003
(County Tentative Tract Map No. 17915), and Development Agreement No.
DA2014-002; or
3) Provide direction to staff for an alternative recommendation and continue the
application to September 1, 2016.
INTRODUCTION
Project Site and Background
The subject property (Property) is located at 150 Newport Center Drive within the
Newport Center area and is located at the southwest corner of Newport Center Drive
and Anacapa Drive. The Property consists of a single parcel, which is 54,716 square
feet (1.3 acres) and an ingress/egress access easement to the south of the Property.
The Property is currently developed with an 8,500-square-foot car wash with ancillary
convenience market and service station. On August 6, 1970, the Planning Commission
approved Use Permit No. UP1461 for the construction of an automatic car wash with
gasoline sales. The property is currently designated by the Land Use Element of the
General Plan as OR (Regional Commercial Office) and OR (Office Regional
Commercial) under the Zoning Code, consistent with the existing use on the property.
Development to the north across Newport Center Drive is part of the Fashion Island
Shopping Center. To the east across Anacapa Drive, is a mix of office and retail
buildings, including the Edwards Big Newport Cinemas. The adjacent property to the
south and east is developed with six 2-story office buildings known as Gateway Plaza.
The Gateway Plaza development shares driveway access with the subject property,
where 150 Newport Center has a nonexclusive ingress/egress over the entire Gateway
Plaza property as part of their grant deed. Access to the project site primarily occurs at
the driveway immediately to the south of 150 Newport Center Drive.
2
150 Newport Center
Planning Commission, August 18, 2016
Page 3
VICINITY MAP
- 1vo
Subject
Property
+o;
a
GENERAL PLAN ZONING
t
LOCATION GENERAL PLAN ZONING CURRENT USE
ON-SITE CO-R (Regional OR (Office Regional Car Wash, Convenience
Commercial Office Commercial) Market, and Service Station
NORTH CR (RegionalPC-56 (North Newport Center, Fashion Island Shopping
Commercial Fashion Island Sub-Area) Center
SOUTH CO-R (Regional PC-56 (North Newport Center, Office Development
Commercial Office) Block 100 Sub-Area
EAST CO-R (Regional OR (Office Regional Office and Retail Businesses
Commercial Office) Commercial
CO-R (Regional PC-56 (North Newport Center,
WEST Commercial Office Block 100 Sub-Area) Office Development
3
150 Newport Center
Planning Commission, August 18, 2016
Page 4
Project Description
The proposed project consists of the demolition of an 8,500-square-foot car-wash and
gas station to accommodate the development of 45 condominium dwelling units on a
1.3 acre site (Project Plans- Attachment No. PC 18). The building is designed as a
single structure with two "enclaves" connected at the center. The exterior would be
comprised predominantly of a pre-cast concrete fagade, stainless steel finishes, and
glass. Massing off-sets, variations of roofline, varied textures, recesses, articulation, and
design accents on the elevations would be integrated in order to enhance the building's
architectural style. As proposed by the applicant, the building reaches an overall height
of 65 feet 6 inches to the top of the roof with mechanical appurtenances such as an
elevator override and heating and air conditioning equipment that extend up to 69 feet 6
inches feet in height measured from average grade.
Visitor, delivery, moving vehicle, and residential valet access to the project site would be
provided via two curb cuts with two-way drive aisle access from Anacapa Drive at the
eastern portion of the project site. Resident access to below-grade parking areas would
be provided via a single two-way curb cut to the south of the Property over an
ingress/egress access easement. Each unit will be provided with a 2-car garage and 25
guest parking spaces within a 3-level subterranean basement (two guest spaces are
provided at the entry level). The basement levels also include designated trash
enclosures for the storage of trash and recycling bins.
The residential units are designed as flats, which consist of 15 townhouse units at the
first and second level, nine units on levels three and four, eight units on level five and
four units on level 6. The units range in size between 1,645 square feet to 3,608 square
feet of gross floor area. Exterior access to the first floor units is provided from adjacent
walkways along the Newport Center Drive frontage with private patio areas leading up
to each entry. Common areas at the entry level include a dog run along the Newport
Center Drive frontage, as well as enhanced paving and planting areas. The upper level
of the building provides common recreational amenities including a roof-top pool and
clubhouse. The tract map will establish each unit for individual sale and easements to
accommodate the location of the proposed structures.
Planning Commission Public Hearing of July 21, 2016
Refer to the Planning Commission staff report and minutes from July 21, 2016
(Attachment No. PC 3 and 4), for a full discussion of the proposed legislative land use
amendments for the property including the General Plan Land Use Amendment and
designation of an anomaly for 45 dwelling units, Zoning Code Amendment, and Planned
Community Development Plan including a waiver of the 10-acre minimum and a
discussion of the proposed project height.
4
150 Newport Center
Planning Commission, August 18, 2016
Page 5
At the July 21, 2016 meeting, the Planning Commission asked staff to provide additional
land use options such as a mixed-use land use designation or the incorporation of the
Property into other nearby Planned Communities to better understand the implications
of selecting a specific land use for the property. The Planning Commission also asked
for additional information regarding the background of existing Planned Communities
that do not meet the 10-acre minimum and the Zoning Code history behind the 10-acre
minimum. Finally, the Planning Commission requested information regarding the history
of height limits in Newport Center. Following public comments and at the request of
staff, the public hearing was continued to August 18, 2016, to continue the discussion of
the proposed legislative amendments and review the project specific discretionary
applications and EIR.
It is important to note that a Zoning Amendment can be initiated in accordance with
Section 20.66.020 (Amendments) of the Zoning Code by the City Council, Planning
Commission, or by owners or authorized agents of property for which the amendment is
sought. All owners or their authorized agents must join in filing the application. This is a
private property owner application limited to 150 Newport Center Drive.
DISCUSSION
Land Use Options
As noted, at the July 21St meeting, the Planning Commission asked to consider the
possibility of other land use designations for the property.
General Plan Mixed Use Option
Mixed use designations in the Newport Center area utilize the MU-H3 (Mixed-Use
Horizontal) land use designation. The MU-H3 designation does not include a standard
development limit. Instead, MU-H3 properties are governed by Table LU2 (Anomaly
Table of the General Plan) which identifies the number of dwelling units and square
footage of nonresidential development specific to each property. Therefore, for the
purpose of this analysis another mixed-use land use designation may be considered
which would allow a range of 20.1-26.7 dwelling units/acre and nonresidential floor area
within a range of 0.25 to 0.5 floor area ratio (FAR). For the subject Property, this results
in a potential range of 25-33 dwelling units for the property and 13,721 to 27,443 square
feet of nonresidential floor area.
The mixed-use option provides for a greater intensity of development with the
incorporation of nonresidential floor area in addition to the residential dwelling units
requested by the applicant. The addition of nonresidential floor area to the proposed
residential project presents traffic, parking, land use, and utilities implications, which
would require the EIR to be revised and recirculated to incorporate and consider these
potential impacts. If the land use was designated as MU-H3 but limited to residential
dwelling units only under Table LU1, the EIR would not need to be recirculated since
5
150 Newport Center
Planning Commission, August 18, 2016
Page 6
this would not result in any physical changes to the project as proposed. In either case,
the project would need to be continued and re-noticed appropriately for this option.
Planned Community (PC) Zoning Options
The Planning Commission also requested information to consider incorporating the
Property into a nearby Planned Community, which would eliminate the need to waive
the 10-acre minimum for a standalone PC. The PC Zoning District and corresponding
10-acre minimum and waiver process have been in place since the 1970 Zoning Code.
Attachment No. PC 5 provides a menu of Zoning options to consider for the project.
There are 12 PC's within the Newport Center Statistical L1 area including:
• PC-17 (Corporate Plaza)
• PC-19 (San Joaquin Plaza)* [2.92 acres]
• PC-21 (Sea Island Apartments)**
• PC-27 (Newport Village)
• PC-28 (Block 400 Newport Center)
• PC-30 (Villa Point Apartments) **
• PC-40 (Corporate Plaza West)
• PC-46 (Block 500 Newport Center)* [4.37 acres]
• PC-47 (Armstrong Garden)* [1.11 acres]
• PC-47 (Newport Beach Country Club) **
• PC-54 (Santa Barbara Condominiums)* [4.25 acres], **
• PC-56 (North Newport Center)**
* PC does not meet the 10-acre minimum
** PC includes residential development
Of these PC's, four are less than 10 acres. PC-47 (Armstrong Garden) was originally
approved as a use permit in the "Unclassified" Zoning District in 1972. The use permit
conditions were later adopted as a Planned Community when the use permit was
amended in 1998. Two of these PC's (San Joaquin Plaza and Block 500 Newport
Center) were originally greater than 10 acres in size but were reduced in size in 2007
when portions of the PCs were removed and incorporated into the PC-56 (North
Newport Center Planned Community). PC-54 (Santa Barbara Condominiums), which is
developed with the Meridian townhomes, received a waiver of the 10-acre minimum in
2007. The resolution approving this waiver indicates that the development was viewed
in the larger context of the surrounding neighborhood, similar to the current Project
request.
Of these PC's, five currently allow for some form of residential development. Attachment
No. PC 6 provides identifies existing residential development standards such as density,
floor area ratio (FAR), and height within each PC and residential area within Statistical
Area L1 (Newport Center) as a means of comparison for the proposed development.
150 Newport Center
Planning Commission, August 18, 2016
Page 7
Staff recommends adoption of a waiver of the 10-acre minimum to create a separate
150 Newport Center Planned Community Development Plan with specific development
standards for the project as identified in Attachment No. PC 1, Exhibit E. Alternatively,
the project could be incorporated into the PC-56 (North Newport Center Planned
Community) as a separate sub-area or part of Block 100. This existing Planned
Community is immediately adjacent to the Property and a waiver of the 10-acre
minimum would not be necessary for this action. Note that heights in the PC-56 (North
Newport Center Planned Community) are measured from finished surface at the high
side of the property (170 feet NAVD88 elevation), which results in a 6-foot reduction of
the height measurement for the proposed Project. A draft redline of PC-56 incorporating
the project as a separate sub-area and as part of Block 100 are included as Attachment
Nos. PC 7 and 8, respectively.
Planned Community (PC) Development Standards
The proposed PC standards (Attachment No. PC 1, Exhibit E) are modeled after the RM
Zoning District regulations and the North Newport Center Planned Community
development standards with project specific standards designated for setbacks and
height. Table 1, below, provides a comparison between the RM Zoning District
standards and the applicant's requested Planned Community. The existing OR Zoning
District standards are included for reference, as applicable.
Table 1- Development Standards Comparison
OR District 150 Newport Center Does Proposed
Development Standard RM District Planned Community PC Comply
Standards (Existing) Standard (Proposed) With RM?
6,000 square Yes
Lot Size 10,000 square feet min. for 54,687 square feet(1.26
feet min. newly created acres)
corner lots
25 dwelling 45 dwelling units (35 No
Maximum N/A units (20 du/acre)
Density du/acre
Setbacks
Newport Newport Center Drive
Center Drive • 15 feet basement
15 feet • 24 feet building Yes, building
Front Anacapa Drive 20 feet Anacapa Drive setbacks
15 feet • 15 feet basement
. 22 feet 6 inches No,
building basement/podium
Western property line setbacks
20 feet 9 • 3 feet basement
Side 0 feet inches (8% of . 0 feet podium
avg. lot width) . 14 feet building
150 Newport Center
Planning Commission, August 18, 2016
Page 8
Table 1-Development Standards Comparison
OR District 150 Newport Center Does Proposed
Development RM District PC Comply
Standard Planned Community
Standards (Existing) Standard (Proposed) With RM?
South property line
Rear 0 feet 10 feet • 7 feet basement
• 22 feet building
• 32 feet for • 28 feet for
flat roofs flat roofs or
• 37 feet for parapet walls
sloped roofs • 33 feet for . 65 feet 6 inches for roof
DevelopmenSite
Site sloped roofs • 67 feet 6 inches for
t
Height Review: Development parapets No
• 50 feet forReview: • 69 feet for 6 inches
flat roofs or . 32 feet for mechanical
parapet flat roofs or appurtenances
roofs parapet roofs
• 55 feet for • 37 feet for
sloped roofs sloped roofs
163,260 sq. ft building
Maximum Floor area (133,671 of
Area 8,500 sq.ft. for 1 basement)
Buildable Area x non-residential (1.75 sq. ft. (4.39 FAL with required No
Floor Area Limit development (1.75 FAL) buildable area)
(FAL) (3.43 FAL with proposed
buildable area
Open Space
Common N/A 3,375 sq.ft. 10,636 sq.ft. Yes
75 sq.ft./unit
6,019 sq.ft. 30 sq.ft./unit(50% of
Private (assumes units)
(5% of gross floor N/A 120,393 sq.ft. ft sq./unit((50/o units)to 1,605 sq. Yes
12
area/unit) unit area) ft sq.
sq. ft. total (8.8%
of total unit sq.ft.)
Parking
Resident 90 spaces in private
(2 per unit N/A 90 spaces
covered) garages
Guest(0.5 per 25 spaces in surface Yes
unit) 23 spaces parking areas
Total N/A 113 spaces 115 spaces
96 sq. ft.
24 sq. ft. common refuse 331 sq. ft. common
Solid Waste and refuse 96 sq. ft. refuse
Recyclable 24 sq. ft. common 331 sq ft common Yes
Materials recycling recycling recycling
48 sq. ft. total 192 sq. ft. 662 sq. ft. common total
common total
150 Newport Center
Planning Commission, August 18, 2016
Page 9
1 Per Section 20.18.030, up to 200 square feet of floor area per required parking space devoted to
enclosed parking shall not be included in calculations of total gross floor area.
Site Access
The proposed project provides two driveways that serve the main building entrance along
Anacapa Drive and would primarily serve guests, residential valet, deliveries, and moving
vehicles. The applicant requests a waiver of Council Policy L-2 to utilize a radius curb cut
design along Anacapa Drive. Council Policy L-2 specifies that driveway approaches may
utilize a curb return design with a maximum curb radius of 25 feet and a driveway
approach bottom of greater than 35 feet only if the driveway serves an entrance to a
parking area or structure for more than 200 vehicles. Since the proposed parking structure
does not serve more than 200 vehicles a waiver of this policy is necessary to utilize this
curb return design. Public Works staff has reviewed this request and does not object to the
applicant's request.
The Gateway Plaza development to the south shares driveway access with the subject
property, where 150 Newport Center has a nonexclusive ingress/egress over the entire
Gateway Plaza property as part of their grant deed. Access to the project site primarily
occurs at the driveway immediately to the south of 150 Newport Center Drive.
Residential site access is proposed primarily through this southerly driveway.
Additionally, trash service is proposed within the southerly access drive, where scout
trucks would roll bins for pick-up within the 24-foot wide ingress portion of the driveway.
Public Works has reviewed the proposed circulation plan and determined that adequate
width is available for trash trucks and residential vehicles to simultaneously and safely
utilize the driveway for this purpose. The circulation plan is provided as Attachment No.
PC 9.
There are two existing pedestrian easements on the property, a 3-foot wide pedestrian
easement along Anacapa, which would be protected in place, and an 18-foot wide
pedestrian easement at the south edge of the property, which would be reduced to a 5-
foot width, consistent with the width of the proposed sidewalk area.
Public Works staff has reviewed the internal site circulation and determined that the
circulation plan is adequate. Conditions of approval are included in the draft resolution
(Attachment No. PC 1, Exhibit G) requiring a stop sign within the internal circulation
route of Block 100 to ensure that vehicles passing by can adequately see vehicles
exiting the residential parking structure.
Setbacks
The 150 Newport Center Planned Community proposes setbacks that are specific to the
design of the project. For each street frontage, the first floor level would be set back to
enhance pedestrian connections and provide a direct entry for each dwelling unit at the
ground level. The proposed development would provide increased setbacks and open
9
150 Newport Center
Planning Commission, August 18, 2016
Page 10
space standards compared to the existing commercial zone along Newport Center Drive
and Anacapa Drive. The OR (Office-Regional) Zoning District requires 15-foot setbacks
adjacent to street frontages and 0-foot setbacks alongside and rear property lines. The
proposed building would be setback a minimum distance of 20 feet front each street
frontage and 14 feet and 22 feet respectively along the west and south property
frontages.
The proposed setbacks are for the project site, allowing for sufficient openness and
vehicle circulation throughout the interior of the project site. While the basement and
podium level setbacks proposed are less than the RM Zoning District development
standards, these structures occur largely below grade and the building setbacks above
the podium level comply with both the RM and OR Zoning District setback
requirements.
Exceptions to the building setbacks for the podium/basement at the lower level
accommodate the parking garage and 3.5% grade differential that occur on the
Property. At the south end of the property where grade elevations are lower, the podium
levels would be regulated as basement walls and would not exceed elevations of 10
feet in height to the top of wall. Open guardrails with landscaping below would be
provided to improve the edge condition along the south and west podium walls adjacent
to Block 100.
Open Space/Amenities
The proposed PC would provide required common open space areas and residential
amenities at the entry level as required in the RM Zoning District (15 percent of the
buildable area). The site design provides 10,389 square feet of exterior outdoor
common open space at the entry and pool deck levels where a total of 3,375 square
feet are required (75 square feet/dwelling unit) under the RM development standards of
the Zoning Code.
Private open space would provide the same standards as are required for residential
dwelling units within the North Newport Center Planned Community (a minimum of 30
square feet with a 6-foot dimension for 50 percent of the dwelling units). The building
design provides 10,389 square feet of private open space where a minimum of 6,019
square feet are required under the RM development standards of the Zoning Code.
A minimum of 500 square feet of common indoor space is also provided, consistent with
the standards of the PC-56 (North Newport Center Planned Community).
Parking
A total of 90 residential garage parking spaces are required and provided by the
proposed project at a rate of two garage spaces per dwelling unit. In addition, 25 guest
parking spaces are required and provided at a rate of 0.5 space per dwelling unit with
10
150 Newport Center
Planning Commission, August 18, 2016
Page 11
two surplus parking spaces. The Public Works Department has reviewed the project's
vehicle circulation and determined that the proposed layout is sufficient to provide safe
and adequate vehicle access throughout the site including access for emergency
vehicles, delivery trucks, and individual trash pick-up.
Height
As stated in the July 21, 2016, Planning Commission staff report, staff recommends a
reduced project height of 55 feet to the top of the roof (five stories) with mechanical
appurtenances up to 61 feet. This alternative creates greater equity with the height limit
of 50 feet with mechanical appurtenances up to 60 feet established for the majority of
Block 100 and allowed in the North Newport Center Planned Community. The applicant
has provided a site plan and elevation reflecting the reduced height alternative, which
retains the setbacks of the proposed project (Attachment No. PC 16).
Floor Area/Floor Area Ratio (FAR)
The 6-story building proposed by the project applicant includes a total floor area of
141,013-square feet, resulting in a 2.57 FAR for the project. The reduced 5-story height
recommended by staff that retains the proposed setbacks includes a gross floor area of
131,878 square feet, resulting in a 2.41 FAR.
Residential Design
General Plan Land Use Policy LU 5.1.9 (Character and Quality of Multi-Family
Residential) requires that multi-family dwellings be designed to convey a high quality
architectural character in accordance with principles for building elevations, roof design,
and parking. Units at the first level provide direct access to patio areas and the adjacent
sidewalk/walkways where the entries are setback and elevated to ensure adequate
security. All proposed dwelling units incorporate high quality architectural treatments
and materials such as pre-cast concrete fagade, stainless steel finishes, and glass to
achieve a classically inspired architectural expression. Roof appurtenances such as the
elevator override and HVAC equipment areas have been consolidated at the upper level
to reduce the apparent scale of the proposed buildings and provide interest and variety.
Vertical architectural projections provide additional architectural variation and
modulation of the building at the upper levels. Enclosed parking garages within the
basement levels for each unit are incorporated into the integral unit design of the
building and are readily accessible from the internal stairway and elevator access. For
these reasons, staff believes the project would be fully consistent with Land Use
Element Policy LU 5.1.9.
General Plan Policy LU 6.14.5 Urban Form states,
"Encourage that some new development be located and designed to orient to the
inner side of Newport Center Drive, establishing physical and visual continuity
11
150 Newport Center
Planning Commission, August 18, 2016
Page 12
that diminishes the dominance of surface parking lots and encourages pedestrian
activity. (Imp 2.1, 3.1, 4.1)"
The proposed residential development would support the existing vision of Newport
Center, by providing a level of architectural expression that creates a strong sense of
place and connection to the existing surrounding resources and retail/professional office
environment afforded by Newport Center. The building architecture and articulation
bears a strong resemblance and architectural continuity with surrounding professional
office buildings throughout Newport Center.
The building would be oriented toward the adjacent street frontages, with pedestrian
access at grade with the adjacent streets. Townhouse units would provide direct entries
to Newport Center Drive. Additionally, the residential development would provide
landscape and other open space amenities such as a dog run along the Newport Center
Drive frontage, improving the pedestrian connection along this street. The building
design adjacent to Anacapa Drive would accommodate the primary guest entrance to
the building with two driveways, valet service, parcel delivery, and pedestrian access to
the main building lobby. The project site design does not include surface parking areas
and utilizes basement level parking for residential and guest parking.
Landscape
A total of 8,389 square feet of landscaped area is provided on-site, which will comply
with the requirements of Chapter 14.17 (Water-Efficient Landscaping) of the Municipal
Code.
Construction Management Plan and Haul Route
A detailed construction management plan is provided and has been reviewed by the
Public Works Department (Attachment No. PC 10). The project includes temporary lane
closures of Newport Center Drive and Anacapa Drive for the installation of temporary
tie-backs and construction staging. A street closure permit is required at the discretion
of Public Works and will not include full street closures or lane closures for durations
longer than two weeks. Lane closures will not be permitted during the holiday season.
The Coyote Canyon Landfill located at 20661 Newport Coast Drive is proposed as an
off-site truck staging area for trucks to queue prior to accessing the project site. Refer to
the haul route provided as Attachment No. PC 10, Exhibit "C".
Site Development Review-Findings
Redevelopment of the project site is subject to a site development review to determine
compliance with all applicable development standards of the proposed 150 Newport
Center Planned Community Text.
12
150 Newport Center
Planning Commission, August 18, 2016
Page 13
Pursuant to 20.52.080 (Site Development Review) of the Zoning Code, residential
developments of five or more units that are processed in conjunction with a tentative
tract map require a site development review by the Planning Commission. The required
findings for approval of a site development review must identify that: the project is
allowed within the subject Zoning District, that the project will not be detrimental to the
harmonious and orderly growth of the City, and that the project is in compliance with
applicable criteria including compliance with the General Plan, the Zoning Code, and
any applicable specific plan, the efficient arrangement of structures on-site, the
compatibility in terms of bulk, scale, and aesthetic treatment, the safety of pedestrian
and vehicular access, the adequacy of landscaping and open space area, and the
projection of significant public views.
In summary, the proposed land use changes at 150 Newport Center maximize the
efficiency of the project site and provide for a coordinated and comprehensive project
establishing an urban standard more consistent with the project's location within the
larger commercial and mixed-use Newport Center area. The project is designed to be
consistent with the proposed Planned Community Development Plan that would allow
45 residential units.
The height, bulk, and scale of the residential building is comparable to height limits on
surrounding properties and existing building heights in the southern half of Newport
Center. The building is designed to provide variation and modulation between enclaves
for visual interest. The front fagades include both vertical and horizontal off-sets and
utilize a variation of building materials to provide enhanced visual relief. The size,
design, location, and screening of mechanical equipment, outdoor lighting, and refuse
enclosures will comply with the requirements of Sections Section 20.30.020 (Buffering
and Screening), 20.30.070 (Outdoor Lighting), and 20.30.120 (Solid Waste and
Recyclable Materials Storage) of the Zoning Code, respectively.
The podium wall provides a buffer between the proposed residential units and the
adjacent commercial development to the south and west of the project site and is
designed to maintain privacy and protection for the residential tenants. All required
parking is provided on-site and the internal vehicle circulation has been designed to
accommodate and provide safe access for emergency vehicles, delivery trucks, and
refuse collections vehicles, as determined by the City Traffic Engineer. New street trees
will be provided along both street sides of Anacapa. The view from coastal view points
and corridors will not be changed significantly where the proposed development may be
visible beyond existing buildings and trees but will not obstruct coastal views. The
project results in a reduction of average daily traffic trips and water use when compared
to the existing car wash use on-site.
Staff believes facts to support the required findings exist to approve the Site
Development Review and they are included in the attached draft resolution for approval
(Attachment No. PC 1).
13
150 Newport Center
Planning Commission, August 18, 2016
Page 14
Tentative Tract Map
The proposed project includes a request to establish a 45-unit residential condominium
tract (Attachment No. PC 14). The tract map will also modify existing pedestrian
easements at the south end of the project site to accommodate the proposed project.
Section 14.24.020 (Dwelling Unit and Business Structure Sewer Connection Required)
requires each dwelling unit to maintain individual water meter and sewer connections. The
project has received a waiver of this requirement from the Municipal Operations Director
since the units are located in one building and will together connect to the existing water
and sewer systems.
Section 19.12.070 (Required Findings for Action on Tentative Maps) of the City of
Newport Beach Municipal Code provides required findings for approval of a tentative
tract map. These findings include: consistency with the General Plan and any applicable
specific plan, that the site is physically suitable for development, that proposed
improvements are not likely to cause substantial environmental damage to fish, wildlife,
or their habitat, or cause serious health problems, that the project will not conflict with
easements, a "land project", solar access and passive heating requirements, the City's
share of the regional housing need, or the discharge of waste into the sewer system,
and finally, that the project will conform with the public access and recreation policies of
the Coastal Act.
In summary, the Tentative Tract Map provides for the development of a cohesive
planned community with a pattern of dwelling unit orientations and vehicle circulation
that provide a pedestrian-friendly environment with strong connectivity to adjacent
commercial and office areas. The site has a gentle sloping condition and the building
design accommodates this slope with a podium wall at the south and west edge and larger
building setbacks above the podium. The site is safe and suitable for development. Under
existing conditions, the project site and surrounding land areas are fully developed with
urban uses and do not contain sensitive biological resources. The vegetation that occurs
on-site is ornamental in nature, including trees and ornamental shrubs, groundcover, and
vines growing on the existing building's facades and screen walls. A Mitigation Measure is
provided in the Mitigation Monitoring and Reporting Program (MMRP) to ensure the
adequate protection of nesting birds during the construction process.
The General Plan estimates that future traffic noise exposure will be 65 dB CNEL to the
nearest residential facades to Newport Center Drive and identifies that residential uses
are normally compatible or compatible with noise insulation features included in the
design. With appropriate noise control measures under conventional construction and
design of the proposed project (e.g., closed windows, fresh air supply systems or air
conditioning), the interior noise levels would comply with the City and State interior
noise standard of 45 dB CNEL for residential units.
24
150 Newport Center
Planning Commission, August 18, 2016
Page 15
Public Works staff has reviewed the proposed tentative map and believes it is
consistent with the Newport Beach Subdivision Code (Title 19) and applicable
requirements of the Subdivision Map Act. Public improvements, consisting of the
reconstruction of the curb, gutter, and sidewalks, two new driveways along the Anacapa
Drive frontage, and street trees will be required of the applicant per the Municipal Code
and the Subdivision Map Act. A common sewer and water connection will be provided
for the project as approved by the Public Works Department that will connect to an
existing 12-inch main in Anacapa Drive.
For the reasons noted above, staff believes the required findings for the Tentative Tract
Map can be made.
Development Agreement
General Plan Policy LU6.14.8 (Development Agreements) requires the execution of
Development Agreements for residential projects that include 50 or more residential
units or use the residential 450 units identified in Table LU2 (Anomaly Locations). The
Development Agreement is intended to define the improvements and benefits to be
contributed by the developer in exchange for the City's commitment for the number,
density, and location of the housing units.
While the proposed project does not utilize the 450 units identified in the General Plan,
the applicant has requested a development agreement. The applicant is proposing that
the development agreement has a term of 10 years from the date of recording the
document. The applicant has also proposed a public benefit fee of $67,000 per each
residential unit, to be made at the time of issuance of the certificate of occupancy. A
copy of the draft Development Agreement is provided as Attachment No. PC 1, Exhibit
«F„
Unless otherwise provided by the development agreement, the ordinances, rules, plans
and policies of the City of Newport Beach which govern permitted uses of land, the
density of development, and the design, improvement and construction standards and
specifications, applicable to development of the property subject to the development
agreement, shall be those ordinance rules, plans and policies in force at the time of
execution of the agreement.
Environmental Impact Report-Responses to Comments
Prior to making a recommendation on the proposed project, the Planning Commission
must first review, consider, and recommend City Council certification of the Environmental
Impact Report (EIR), SCH No. 2016011032. The DEIR is comprised of the Notice of
Preparation (NOP), Initial Study (IS), Environmental Analysis, Alternatives Analysis, and
Appendices.
15
150 Newport Center
Planning Commission, August 18, 2016
Page 16
The City contracted with T&B Planning, Inc., an environmental consulting firm, to
prepare an Initial Study and Draft Environmental Impact Report (DEIR) for the proposed
project in accordance with the CEQA and the State CEQA Guidelines. The DEIR was
routed to the Planning Commission in advance of this staff report to allow additional time
to review the report. A copy of the DEIR was also made available on the City's website
(http://www.newportbeachca.aov/cegadocuments), at each Newport Beach Public Library,
and at the Community Development Department at City Hall.
Based upon the analysis of the Initial Study, the environmental categories within which
the project would have either no impact or less than significant impact were:
Agricultural/Forest Resources, Greenhouse Gas Emissions, Hydrology/Water Quality,
Mineral Resources, Population/Housing, Public Services, Recreation, and
Utilities/Service Systems.
The following environmental topics were identified as potentially affected by the
implementation of the proposed project: Aesthetics, Air Quality, Biological Resources,
Cultural Resources, Geology/Soils, Hazards/Hazardous Materials, Land Use/Planning,
Noise, and Transportation/Traffic. These topics were the subject of the DEIR analysis,
and potential impacts were identified. The document recommends the certificationion of
17 mitigation measures to reduce the potentially significant adverse effects to a less than
significant level. These mitigation measures are identified in the Mitigation Monitoring and
Reporting Program, which is included as Attachment No. PC 1, Exhibit "B".
The draft EIR considers several project alternatives. Should the Planning Commission
choose to recommend either the reduced height project alternative requested by the
applicant (65 feet 6 inches to top of roof) or the further reduced project height
recommended by staff (55 feet to top of roof), the environmental impacts of both of these
options are considered or less significant than the impacts discussed in the EIR. On the
basis of the analysis provided in the draft EIR, City staff has concluded that the project
would not have a significant impact on the environment. The draft EIR reflects the
independent judgment of the City and recognizes project design features, standard
construction and engineering practices, and review and reevaluation of future projects as
the means to avoid potential impacts. The project site does not include any sites on an
Environmental Protection Agency hazardous waste site list pursuant to Government Code
Section 65962.5.
The draft EIR was completed and circulated for a mandatory 45-day public-review period
that began on May 13, 2016, and concluded on June 27, 2016. A total of 26 comments
were received from interested parties. The consultant, T&B Planning, and staff have
prepared detailed written responses to each of the comments received on the adequacy of
the DEIR (Attachment No. PC 11). Corrections and additions to the DEIR have also been
prepared in an Errata, which incorporates additional or revised information required for the
preparation of responses to certain comments (Attachment No. PC 12). The revisions do
not alter any impact significance conclusion disclosed in the DEIR, and therefore, do not
10
150 Newport Center
Planning Commission, August 18, 2016
Page 17
warrant recirculation of the DER for public review. The revisions to the DER will be
incorporated into the Final EIR, if certified.
Summary
Staff believes that the facts associated with the subject property and reduced project
height (55 feet to top of roof and 61 feet with appurtenances) support the proposed land
use amendments and required findings for the project. The project would result in the
redevelopment of an aging commercial development with a new residential project that
is consistent with the General Plan goals and policies for development of the Newport
Center area. Although not currently zoned for residential use, the proposed land use
change creates a high quality residential project that is complementary to the
surrounding commercial uses within Newport Center.
The project exhibits high quality architectural treatment of the building and given the
constraints of the property, the recommended height (55 feet to top of roof and 61 feet
with appurtenances) and setbacks are reasonable and consistent with the General Plan
policies and proposed Planned Community development standards. The resulting
setbacks are consistent with the development pattern and setback standards within
Newport Center and enhance pedestrian connections along the project's street
frontages. The recommended height (55 feet to top of roof and 61 feet with
appurtenances) results in a development that is compatible and consistent with the
surrounding neighborhood in terms of bulk and scale.
Therefore, staff recommends Planning Commission recommend City Council adoption
of the EIR, approval of the proposed legislative land use changes and Planned
Community Development Plan waiver of the 10-acre minimum, and approval of the
discretionary applications with a reduction in the overall project height from that
requested by the applicant. Staff believes that the residential land use for the proposed
project is appropriate and recommends a reduced project height (55 feet to top of roof and
61 feet with appurtenances) for compatibility with existing building heights and surrounding
height limits.
In conclusion, the August 18, 2016, public hearing will provide the opportunity for
additional project discussion. Staff and the applicant will be available to answer questions
from the Planning Commission and the public, and if warranted, the Planning Commission
may provide direction to staff and/or take action to accept staffs recommendation as
reflected in the draft resolution.
ALTERNATIVES
Should the Planning Commission choose to recommend approval of a different General
Plan Land Use or Planned Community/Zoning District, the project should be continued to
September 1, 2016 to allow the application to be re-noticed to reflect the contemplated
action. The following alternatives are available to the Planning Commission:
17
150 Newport Center
Planning Commission, August 18, 2016
Page 18
1. Recommendation of Denial: If the Planning Commission believes that there are
insufficient facts to support the land use amendments, the Planning Commission
may recommend City Council denial of the application as provided in the
attached draft resolution for denial (Attachment No. PC 2).
2. Recommendation to Incorporate into PC-56: If the Planning Commission believes
that there are insufficient facts to waive the 10-acre minimum to establish a
Planned Community, the Planning Commission may suggest incorporating the
development standards for the proposed project into the PC-56 (North Newport
Center Planned Community) as a separate sub-area or as part of the Block 100
sub-area or a different planned community. Drafts of PC-56 reflecting both
options are included as Attachments PC 6 and PC 7. If the Planning Commission
chooses this option, the item should be continued to the September 1, 2016,
meeting, to allow for a proper public noticing and for the drafting of a revised
resolution incorporating appropriate findings and/or conditions.
3. Recommendation for RM Zoning: The Planning Commission may recommend
that the proposed project site be rezoned to the RM (Multiple Residential) Zoning
District and conform to the development and height standards of this zone.
Maximum heights would be limited to 28 feet in height or 32 feet (for flat roofs) in
accordance with the Zoning Code. If the Planning Commission chooses this
option, the item should be continued to the September 1, 2016, meeting, to allow
for a proper public noticing and for the drafting of a revised resolution
incorporating appropriate findings and/or conditions.
4. Recommendation to Modify Project Design: The Planning Commission may
suggest specific changes that are necessary to alleviate any concerns such as
the project height, resulting in abrupt changes in scale, or architectural
consistency with the project. The Planning Commission may suggest a lower or
higher height such as the 65-foot 6-inch alternative requested by the applicant up
to the maximum 75-foot 6-inch, 49 dwelling unit project contemplated by the draft
EIR.
5. Recommendation for Other Zoning: The Planning Commission may recommend
that the proposed project site be rezoned to another Zoning District or PC and
conform to the development and height standards of this zone. Maximum heights
would be limited in accordance with the Zoning Code or PC for this District. If the
Planning Commission chooses this option, the item should be continued to the
September 1, 2016, meeting, to allow for a proper public noticing and for the
drafting of a revised resolution incorporating appropriate findings and/or
conditions.
18
150 Newport Center
Planning Commission, August 18, 2016
Page 19
Public Notice
Notice of this hearing was published in the Daily Pilot, mailed to all owners of property
within 300 feet of the boundaries of the site (excluding intervening rights-of-way and
waterways) including the applicant and posted on the subject property at least 10 days
before the scheduled meeting, consistent with the provisions of the Municipal Code.
Additionally, the item appeared on the agenda for this meeting, which was posted at
City Hall and on the City website.
Letters submitted by the public to date are provided as Attachment No. PC 13. Since
the July 21, 2016, Planning Commission meeting, three additional public comments
have been received in opposition to the Project.
Prepared by: Submitted by:
MakaAa N a r n la Wisnest i, ICP, Deputy Director
Associate Planner
ATTACHMENTS
PC 1 Draft Resolution with Findings and Conditions
PC 2 Draft Resolution for Denial
PC 3 Planning Commission Packet from July 21, 2016
PC 4 Planning Commission Minutes from July 21, 2016
PC 5 Menu of Zoning Options
PC 6 Residential Development in Statistical Area L1 (Newport Center)
PC 7 PC-56 (North Newport Center PC) Separate Sub-Area, Redlined
PC 8 PC-56 (North Newport Center PC) Incorporate into Block 100, Redlined
PC 9 Site Circulation Plan
PC 10 Construction Management Plan
PC 11 EIR Response to Comments
PC 12 EIR Errata
PC 13 Public Comments
PC 14 Tract Map No. 17915
PC 15 Reduced Height Project Plans (5-stories)
PC 16 Project Plans (6-stories)
:\Users\PLN\Shared\PA's\PAs - 2014\PA2014-213\PC 08-04-2016\PA2014-213 PC Report 08-
04-2016.docx05i25n5
19
V�
Q�
`-�
�,P
��
��
�P
,`�O
��
��
�o