HomeMy WebLinkAbout08 - 19th Street Tide Gate RetrofitQ�EVVFp�T CITY OF NEWPOR,71,� BEACH C'9CIFORN`P C ty CouncH Staff Report .Agenda Item No. 8 May 22, 2012 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Tom Sandefur, P.E., Associate Civil Engineer APPROVED: A �� TITLE: 19th Street Tide Gate Retrofit — Award of Contract No. 4773 ABSTRACT: Staff received favorable construction bids for the 19th Street Tide Gate Retrofit and is requesting City Council's approval to award the work to Palp Inc., (dba Excel Paving Company). RECOMMENDATIONS: 1. Approve the project drawings and specifications; 3. Award Contract No. 4773 to Excel Paving Company for the total bid price of $182,501.00 and authorize the Mayor and City Clerk to execute the contract; and 4. Establish a contingency of $27,375.00 (approximately 15 percent) to cover the cost of unforeseen work. FUNDING REQUIREMENTS: The current adopted budget includes sufficient funding in the following accounts for the award of this contract. The following funds will be expensed: Proposed uses are as follows: Account Description Account Number Amount General Fund 7012- C2502006 $ 109,876.00 Tide and Submerged Lands 7231- C2502006 $ 100,000.00 Total: $ 209,876.00 19th Street Tide Gate Retrofit — Award of Contract No. 4773 May 22, 2012 Page 2 Vendor Purpose Amount Excel Paving, Inc. Construction Contract $ 182,501.00 Excel Paving Inc. Construction Contingency 27,375.00 Total: $ 209,876.00 DISCUSSION: The tide vault at 19th Street serves as the terminus for the storm drain line that drains 19th Street and Balboa Boulevard from 19th Street to 16th Street. The significant depth of the outlet pipe draining into the Bay requires a tide gate. Without the gate, the low lying areas of 19th Street and Balboa Boulevard would flood during high tide events. During combination high tide and rain events, the system is quickly overwhelmed and Municipal Operations field crews stage pumps at the end of 19 h Street to prevent street flooding. The project proposes to remove the existing electric tide valve and install a new passive tide valve. A similar valve operates at Pearl Avenue and has been successful in reducing the need for human intervention during high tide events. In addition, the project will install a submersible pump in the tide vault. The pump will operate according to the level of water in the vault and drain the storm drain system on occasions where rain and high tides make flooding possible. The pump will eliminate the need to pull portable pumps to the site during rain and tide events. The pump control panel is being installed in a fashion that allows for future integration into the City's Supervisory Control and Data Acquisition ( SCADA) system. The SCADA system permits an operator to monitor the pump from a central terminal or via handheld electronics. At 9:00 A.M. on May 9, 2012, the City Clerk opened and read the following bids for this project: BIDDER Low Palp Inc, dba Excel Paving, Inc. 2 Atlas Allied, Inc. 3 Fleming Environmental, Inc. 4 GCI Construction, Inc. 5 4 -Con Engineering, Inc. 6 AToM Engineering Construction, Inc. TOTAL BID AMOUNT $182,501.00 $194,550.00 $202,560.00 $214,858.00 $223,950.00 $291,398.00 The low total bid amount is 1.5 percent below the Engineer's Estimate of $185,350. The low bidder, Excel Paving, Inc., possesses a California State Contractors License Classification "A" as required by the project specifications. A check of the contractor's references indicates satisfactory completion of similar projects for other public agencies. The work necessary to complete this contract consists of removing the existing tide gate, vault lid, motor, and controls; furnishing and installing Tideflex check valves, submersible trash pump, piping, and sidewalk; connecting to existing electrical facilities, 19th Street Tide Gate Retrofit — Award of Contract No. 4773 May 22, 2012 Page 3 adding irrigation lines and control equipment, replacing existing walls relocating existing handrails, relocating existing street light, and installing planting material. Pursuant to the Contract Specifications, the Contractor will have 100 consecutive working days to complete the shop drawings and procure the materials and 25 consecutive working days to install the work. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(d) (Restoration of deteriorated facilities to meet current safety standards) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). Submitted by: aaum Director A. Location Map 0 I ll N LOCATION MAP 19TI -I STREET TIDEGATE RETROFIT CONTRACT NO. 4773 PROJECT LOCATION �9 L N z ® ❑ ®� a BALBOA BLVD ® z J