Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
01 - Appendix H
APPENDIX H CLIMATE CHANGE CalEEMod Version: CalEEMod.2011.1.1 Newport Banning Ranch buildout 060911 Orange County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric City Park 28 Acre Hotel 75 Room Condo/Townhouse ..................................................... ............................... 222 Dwelling Unit Condo /Townhouse High Rise ..................................................... ............................... 730 Dwelling Unit Single Family Housing 4Z3 Dwelling Unit Regional Shopping Center 75 1000sgft 1.2 Other Project Characteristics Urbanization Urban Climate Zone 8 1.3 User Entered Comments Wind Speed (m /s) 2.2 Precipitation Freq (Days) 30 Utility Company Southern California Edison Project Characteristics - All operational, most const; arch coating and paving run separately. Land Use - Lot acreages and population from project description and Section 4.7 Construction Phase - All phases from project plan. Paving and arch coating calculated separately. Off -road Equipment - Build 1 - 1 Crane, 3 forklift, 1 generator, 2 welder, 2 trac /loader /backhoe Off -road Equipment - Build 2 - 1 Crane, 3 forklift, 1 generator, 2 welder, 2 trac /loader /backhoe Off -road Equipment - Build 3 - 1 Crane, 3 forklift, 1 generator, 2 welder, 2 trac /loader /backhoe Date: 6/28/2011 1 of 29 Off -road Equipment - Equipment from project plan; Grading 2- 2 Excavator, 1 grader, 1 dozer, 1 scraper, 2 trac /loader /backhoe Off -road Equipment - Equipment from project plan; Grading 3- 2 Excavator, 1 grader, 2 dozer, 1 scraper, 2 trac/loader /backhoe Off -road Equipment - Equipment from project plan; Grading 1- 2 Excavator, 1 grader, 1 dozer, 1 scraper, 2 trac /loader /backhoe Off -road Equipment - Equipment from project plan; Rem 1- 1 Excavator, 1 grader, 2 dozer, 1 scraper, 2 trac/loader /backhoe Off -road Equipment - Equipment from project plan; Rem 2- 1 Excavator, 1 grader, 2 dozer, 1 scraper, 2 trac /loader /backhoe Off -road Equipment - Equipment from project plan; Rem 3- 1 Excavator, 1 grader, 1 dozer, 1 scraper, 2 trac /loader /backhoe Trips and VMT - Worker /vendor trips calculated from CaIEEMod Appx A factors Grading - Export and acreage of disturbance from project description Vehicle Trips - Weekday trip rates from traffic analysis. Sat and Sun rates from default ratios. Soccer field and tennis court trips included in City Park Woodstoves - No wood stoves or wood fireplaces. Gas FP in all SF and 90% of condo /townhouse. Energy Use - Water And Wastewater- Water use from project WSA in EIR Section 4.15; res grouping may vary but all H2O included. Solid Waste - Solid waste generation rates from project study; substantially higher than defaults. Landfill gas data for Bowerman landfill from OCWaste. Land Use Change - Data per bio resources analysis Construction Off -road Equipment Mitigation - Engine mitigation - Roughly 50% Tier 3 and 50% Tier 4 Dust mitigation - per Rule 403 Mobile Land Use Mitigation - 1,375 du /150 acres - conservative inclusion of 50 acres local parks 206 du below market rate Diversity- res, retail, parks all on site Mobile Commute Mitigation - Area Mitigation - Energy Mitigation - Water Mitigation - Sequestration - Sequestration new trees estimate by FORMA 2 of 29 2.O Emissions Summary 21 Overall Construction Unimiticlated Construction 2.2 Overall Operational Unmitigated Operational 3 of2S Exhaust Fugitive Exhaust Total CO21 CH4 N20 CO2e PMj I jPM10Tota1j I I 65 5 2.2 Overall Operational Unmitigated Operational 3 of2S 0.00 0.00 0.00 0 0 i 70242 i 702 42 i 3.07 0.09 Mitigated Operational 2.3 Vegetation Vegetation ROG NO. CO s02 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PMi0 PM10 PM2.5 PM2.5 I Total Category tons/yr M /yr Area 8.46 0.24 2094 . 0.00 0.00 0.18 0.00 0.18 956.18 956.18 0.05 0.02 962.48 Energy .....................................i....................... 0.24 ' 2.05 i 0.95 ...............i............... i 0.01 i i 0.00 0.17 ........... ........ .....a...................:..... i 0.00 0.17 .......... ... .. .................._.......... 4,914.65 .... 4,914.65 ................. 0.16 ................... 0.09 4,945.02 l Mobe . 214. ...................i........... 1520 ........................._..... 75.96 0.1] 1222 0.85 18.0] 026 074 1.01 S 12,35].]0 i 12.35]70; E 0.50 ' 0.00 12368.25 Waste .................. e................... ................... '................... ................... n............... ...i...................i....... 0.00 ............ n .................. a........ 0.00 0.00 ...........:................... 0.00 q................... e.................. i. ................ a ................... 0.00 Water .................. b...................... i ............................... E _ i................... i b.................. e................... 0.00 ; e....... ............ 0.00 e .................. a...................:.................. ; 0.00 i 0.00 b........ ...........e..................e [ ; 606.97 i 606.97 i 246 0.07 r 680.56 Total 30.18 17.49 97.85 0.18 17.22 0.85 18.42 0.26 0.74 1.36 18,835.50 ##k # ## ## 39.76 0.18 # ##### ## 2.3 Vegetation Vegetation 3.0 Construction Detail 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment 4 of 29 ROG NOx I CO s02 CO2e Category tons MT New Trees Vegetation Land .................. e .................... ............................... ... 5,761.60 - 2,198.13 Total 3,563.47 3.0 Construction Detail 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment 4 of 29 Use DPF for Construction Equipment Water Exposed Area 3.2 Remediation 1 - 2014 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive PM1 0 Exhaust PM10 PM10 TOtal Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e Category PM 10 PM10 tonslyr PM10 PM2.5 PM2.5 PM2.5 MT/yr Fugitive Dust Off -Road ..................................... 0.89 i 7.18 i................... i 4.05 i............. ......i........................ i 0.01 j 1.07 0.00 ...... .......:..................:.... 0.33 1.07 i 0.33 0.57 ........... ....:.................:...... j 0.00 j 0.33 0.57 j 033 0.00 0.00 .......... i 741.66 i���741.66 1 r 0.00 0.07 � 0.00 0.00 1 0.00 743.78 Total 0.89 7.18 4.05 0.01 1.07 0.33 j 1.40 j 0.57 0.33 0.90 741.86 741.66 0.07 0.00 743.18 Unmitigated Construction Off -Site 3.3 Grading Phase I - 2014 Unmitigated Construction On -Site ROG NOz CO S02 Fugitive Exhausl PM10Total Fugitive Exhaust PM25 eio -0O2 NBIO -0O2 Total CO2 CH4 N20 CO2e _ PM 10 PM10 PM70 PM10 PM2.5 PM2.5 PM2.5 Total Category G6tegory tons /yr Fugitive Dust 0.67 000 MT /yr 0.36 0.00 Hauling 003 8.28 0.18 000 2.26 001 2.27 000 001 0.01 46,26 46.26 0.00 0.00 46.28 Vendor ....... ...........e................... 0.00 0.00 ..... ............................... i 0.00 0.00 ......... .........e..................e.. 0.00 000 i ................. e................... e...... ............ a................... 0.00 0.00 0.00 i 000 a.............. ..... e......... .........i ...... ............ <.. .................... i 000 0.00 0.00 0.00 0.00 Worker .................. b................................................................ 0.01 0.01 ; 0.09 0.00 ............................e....... 0.02 0,00 ............ e .......... ......... b.. ........... ..... d...... ............. 0.02 0.00 0.00 0,00 :.................. b ................... b ............... ...e ....... ........... b.. 16.02 i 16.02 i 0.00 0.00 16.04 Total 0.04 0.29 0.27 0.00 2.28 0.01 2.29 0.00 0.01 0.01 62.28 62.28 0.00 0.00 62.32 3.3 Grading Phase I - 2014 Unmitigated Construction On -Site 5 of 29 ROG NOx CO S02 Fugitive Exhaust PM10TOtal Fugitive Exhaust PM2.5 Bio -0O2 Neio -0O2 Total CO2 CH4 N20 CO2e PM 10 PM10 PM2.5 PM2.5 Total Category tonslyr MT /yr Fugitive Dust 0.67 000 0.67 0.36 0.00 0,36 0.00 0.00 0.00 0.00 0.00 Off -Road .................. a............. ...... 0.48 3.80 ...... .............................. 5................... n.......... ........e...................i.. ................. e.................. d................... 2.28 0.00 0.18 0.18 0.18 0.18 i.................. d................... e.................. i ...... ............a......0........... i 409.75 i 409.75 i 0.04 0.00 410.57 5 of 29 Total 048 1 3.80 1 2 2 1 0.00 1 0.67 1 0.18 1 0.85 1 0.36 1 0.18 1 0.54 1 409.75 1 409.75 1 0.04 0.00 410.57 Unmitigated Construction Off -Site 3.3 Grading Phase I -2015 Unmitigated Construction On-Site ROG NOx CO S02 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Category I I I PMi0 PM10 PM2.5 PM2.5 Total Fugitive OUSt Off -Road ..................? 0.44 ............................................. 3.42 2.n ..............................? o.00 Category 0.67 ..... o.1s 0.36 ?................... 0.00 ?.................. l.15 0.36 ........................................ ' 01s tonslyr 0.00 _ " " "li.lia " " " 0.00 _ " "'ii.00' " "" 0.00 ao2ss Total 0.44 MT/yr 2.17 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 000 000 0.00 0.00 0.00 .................. b..................................... 0.00 0.00 Ventlor .................. j 0.00 ......... ............................u.. 0.00 000 ............. ............................... 0.00 E 0.00 0.00 ooa s.00 oso .....0 ...... ........................:..... oso 000 ..... ...... .................. 000 soo ..... 000 o.00 dCO2e Worker ................................................ 0.01 0.01 ' o.os ..............................- o.00 - 0.01 € o.00 O.o1 - oso - .. o.00 - ...................:..... boa .......... .... ..... 10.1............ 1o.1s _ � �� � ����� _ o.00 o.o0 Total 0.01 0.01 0.06 0.00 0.01 0.00 0.01 0.00 0.00 0.00 10.15 10.15 0.00 0.00 3.3 Grading Phase I -2015 Unmitigated Construction On-Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive PM10 Exhaust PM10 PM10 TOtal Fugitive PM2.5 Exhaust PM2.5 I P102.5 Total Sio- CO 2 NBio- CO2 Total CO2 CH4 N20 CO2e Category I I tonslyr PM7a PM10 PM2.5 MTlyr Total Fugitive OUSt Off -Road ..................? 0.44 ............................................. 3.42 2.n ..............................? o.00 0.67 0.00 ..... .............?......0...... a1s 0.67 ..... o.1s 0.36 ?................... 0.00 ?.................. l.15 0.36 ........................................ ' 01s 000 0.00 _ _ i"" dSz.° 2' a'"":"' a" oiiiid "': 0.00 _ " " "li.lia " " " 0.00 _ " "'ii.00' " "" 0.00 ao2ss Total 0.44 3.42 2.17 0.00 0.67 0.16 0.83 0.36 0.16 0.52 402.24 402.24 0.04 0.00 402.99 Unmitigated Construction Off -Site 6 of 29 ROG NOx CO 502 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2 5 Bio- CO2 NBio- CO21 Total CO2 CH4 N20 CO2e I I I PM7a PM10 PM2.5 PM2.5 I Total I Category tons /yr MT /yr Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ventlor .................. b..................................... 0.00 0.00 0.00 .................. j 0.00 ......... ............................u.. 0.00 000 ................. e................... e.................. d................... 0.00 0.00 0.00 0.00 i........... ........e...................b.................. z ......0 ..........v......0........... 0.00 0.00 .00 0.00 0.00 6 of 29 0.00 0.00 005 0.00 0.07 0.00 0.01 0.00 0.00 0.00 9.74 9.74 0.00 0.00 3.4 Remediation 2 - 2014 Unmitigated Construction On -Site _ ROG NO. CO S02 Fugitive PM70 Exhaust PM10 PM10ToMJ Fugitive PM2.5 Exhaust PM2.5 PM25 Total eio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e Category tons/yr I I I tans/yr PM10 PM25 PM25 MT/yr 1 Fugitive Dust Off-Roatl ...................................................................... 0.34 ' 2.76 1.55 ............................... p 0.00 1.60 000 ... ............................... 0.73 160 0.13 0.87 ........... ....................._ 000 0.13 087 ..................p..... 0.13 0.00 575 .......... ....:....284.5.....: p 284.59 ', ���284.59���'������0.03����� 0.00 0.00 .......... 0.00 ����� 000 285.17 Total 0.3d 2.76 1.55 0.00 1.60 0.13 1.73 0.87 0.13 1.00 284.59 284.59 0.03 0.00 285.17 Unmitigated Construction Off -Site 3.4 Remediation 2 - 2015 Unmitigated Construction On -Site ROG NOx CO 802 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2,5 Bio -0O2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr I I I PMta PM10 PM25 PM25 Total 1 I Category tons /yr MTlyr Hauling 0.01 0.07 0.05 0.00 0.87 0.00 0.87 0.00 0.00 0.00 1170 1170 i 0.00 0.00 11.70 ventlor o ao 0 00 0.00 0 00 ............ i '666 0.00 ...................:...................:.... o ao 0 00 ..............;................ 0 00 o.0a 6 .06 o ao aoo ............. 0.00 0.00 worker . ........_ 000 . ......... 6.00 ........[. 6.6a 0.00 ........'...... 6.01 a.00 001 .............:...... 0.06 6.66 0.66 6 1 6.15 o.o0 0.00 6.15 Total 0.01 0.07 0.09 000 0.88 0.00 0.88 0.00 0.00 0.00 17.85 17.85 0.00 0.00 17.85 3.4 Remediation 2 - 2015 Unmitigated Construction On -Site 7 of 29 ROG NOx CO 802 Fugitive PMtO Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust 1.60 0.00 1.60 0.87 0.00 0.87 Om 0.00 0.00 0.00 0.00 7 of 29 0.95 7.52 4.40 0.01 0,34 0.34 0.34 0,34 i 840.84 i 840.84 i 0.08 0.00 Unmitigated Construction Off -Site 3.5 Building Construction Phase I - 2015 Unmitigated Construction On-Site ROG NOx CO S02 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category PM10 PM10 I PM2.5 PM2.5 Total Off -ROatl 0.55 138 2.70 0.00 Category 0.21 0.21 021 421.21 421.21 tons /yr 0.00 422.74 Total 0.55 3.38 MTlyr 0.00 0.21 Hauling 0.02 0.18 0.12 0.00 2.56 0.01 2.56 0.00 0.01 0.01 34.72 34.72 0.00 0.00 34.74 Ventlor ..................!................... 0.00 0.00 i.......... ...............o:oo............ 0.00 _ _ ..............................!..................!..... 0.00 000 0.00 _ .............!................. 0.00 _ 0.00 ........................................ 0 00 - 0 00 - 0.00 - 0.00 - ' 0.00 0.00 Worker .................. 0.01 e................... 0.01 e................... E 0.10 i...... .............e................. E 0.00 E .. e .................. i............... 0.02 F 0 00 E ...e..................,........ 0.03 E 0.00 .........e...... E 0.00 .............E..... 0 00 .......... ....d. ......:..................; F E 17.7fi E 17.76 E 0.00 0.00 17.78 Total 0.03 0.19 0.22 0.00 2.58 0.01 2.59 0.00 0.01 0.01 52.48 52.48 0.00 0.00 52.52 3.5 Building Construction Phase I - 2015 Unmitigated Construction On-Site Unmitigated Construction Off -Site 8 of 29 ROG NOx I CO I S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Si.- CO2 NBio- CO2 I Total CO2 CH4 I N20 CO2e Category tonslyr MTlyr Off -ROatl 0.55 138 2.70 0.00 021 0.21 0.21 021 421.21 421.21 0.04 0.00 422.74 Total 0.55 3.38 2.70 0.00 0.21 0.21 0.21 0.21 421.21 421.21 0.04 0.00 422.14 Unmitigated Construction Off -Site 8 of 29 Total 0.11 1 043 1 1.00 1 0.00 1 a20 1 0.02 1 0.23 1 0.01 1 0.02 1 0.02 1 204.61 1 204.61 1 0.01 0.00 204.]9 3.5 Building Construction Phase I - 2016 Unmitigated Construction On -Site _ ROG NO. I CO I S02 Fugitive PM70 Exhaust PM10 P 10 Total Fugitive PM2.5 Ezhaust PM2.5 PM25 Total eio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Pi tonslyr PM2.5 PM2.5 MTlyr 6i= Off Road 0.55 337 292 001 020 0.20 020 020 459.98 459.98 0 04 0 00 1 460.91 Total 0.55 3.37 2.92 0.01 0.20 0.20 0.20 0.20 459.96 459.96 0.04 0 00 460.91 Unmitigated Construction Off -Site 3.5 Building Construction Phase 1 - 2017 Unmitigated Construction On -Site ROG NOx CO S02 Fugitive Exhaust PM10 Total Fugitive Exhaust I PM2.5 Bio- CO2 Total CO2 CH4 N20 CO2e CO2e Category Pi PM10 PM2.5 PM2.5 Total 6i= Off -Road 0.37 2.30 Category 0.00 0.13 0.13 0.13 tonslyr 4.7 34167 0.03 r 0.00 344.30 Total MTlyr 2.30 2.16 Hauling 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 000 OOo 0.00 0.00 0.00 0.00 Vendor ......... e ......... 0.04 ; ................... 0.36 i................... ; 0.27 e....... ............i.................q F 0.00 ; .. ' .................. e.............. 0.03 0.01 .....e...................e..... 0.04 0.00 0.07 0.01 .......... 77.03 E .............. 77.03 ?..... ............q.................. E 0.00 0.00 77.06 Worker .................. e................... 0.07 0.07 i......................... 0.73 .............i................. 0.00 .. e ..................:.................. 0.20 0.01 0.21 e............. .....:..................e...... 0.01 0.01 ............i..... 0.02 .......... .... e .... ..............:....142.......e. E 142.49 .. 142.49 .................q E 0.07 ................. 0.00 142.63 Total 0.11 0.43 1.00 0.00 0.23 0.02 0.25 0.01 0.02 0.03 219.52 219.52 0.01 0.00 219.69 3.5 Building Construction Phase 1 - 2017 Unmitigated Construction On -Site 9 of 29 ROG NOx CO S02 Fugitive Pi I Exhaust PM10 PM10Tolal Fugitive PM2.5 I Exhaust PM2.5 PM25 Total 2--- NBio -0O2 Total CO2 CH4 N20 CO2e Category tonslyr MTlyr Off -Road 0.37 2.30 2.16 0.00 0.13 0.13 0.13 0.13 4.7 34167 0.03 r 0.00 344.30 Total 0.37 2.30 2.16 0.00 0.13 0.13 0.13 0.13 343.67 343.67 0.03 1 0 00 344.30 9 of 29 Unmitigated Construction Off -Site 3.6 Remediation 3 - 2015 Unmitigated Construction On -Site ROG NOx CC 502 Fugitive Exhaust PM10TOtal Fugitive Exhaust PM2.5 Bio -0O2 NBio- CO21 TOtal CO2 CH4 N20 CO2e Category PM10 PM10 I PM2.5 PM2.5 Total I I Fugitive Dust Off -Roatl .................. 0.25 i...................1....................... 1.92 1.16 Category 1.20 0.00 _ _ ...................... ?......0 oos 1.20 09...... o.OS 0.65 _ ........... ?.... ......... 0.00 _ _ � o.os tonslyr 0.00 0.00 .......... _ _ ���������� ����� z2T2s 22t2s 0.00 _ 0.02 0.00 _ . 0.0o 0.00 zz1.7o Total M lyr 1.92 1.16 Hauling 0.00 0.0D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ventlor .............................................................. 0.02 0.25 0.19 0. 00 .............................. 0.02 i 001 i 0.03 000 i 001 0.31 .......... i i 57.70 i 5770 i Orly) i 0.00 5773 Worker ..................? 0.05 ................... i 0.05 i................... i 0.51 i....................................... 0.00 ? ..... .............?......0..... 0.15 0.01 ...... i 0.16 ?......0........... i 0.01 ?..... . _ ...... .........................:..... i 0.01 i 0.01 ...._.... _ ..... :���'104.15 :104 _ X15 _ _ :������0.00 0.00 104.25 Total 0.07 0.30 0.70 0.00 0.17 0.02 0.19 0.01 0.02 0.02 161.85 161.85 0.00 0.00 161.98 3.6 Remediation 3 - 2015 Unmitigated Construction On -Site Unmitigated Construction Off -Site 10 of 29 ROG NOx CO 802 Fugitive PM10 Exhaus[ PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2,5 Total Bio-0O2 NBio- CO2 Tow] CO2 CH4 N20 CO2e Category tonslyr MT /yr Fugitive Dust Off -Roatl .................. 0.25 i...................1....................... 1.92 1.16 ............................... o.DO 1.20 0.00 _ _ ...................... ?......0 oos 1.20 09...... o.OS 0.65 _ ........... ?.... ......... 0.00 _ _ � o.os 0.65 o.os 0.00 0.00 .......... _ _ ���������� ����� z2T2s 22t2s 0.00 _ 0.02 0.00 _ . 0.0o 0.00 zz1.7o Total 0.25 1.92 1.16 0.00 1.20 0.09 1.29 0.65 0.09 0.74 221.29 22129 0.02 0.00 221.70 Unmitigated Construction Off -Site 10 of 29 Total 0 0 1 0 02 1 0.04 1 0.00 1 0.44 1 0.00 1 0.44 1 0 00 1 0 00 1 0.00 8.92 1 8.92 1 0.00 0.00 802 3.6 Remediation 3 - 2016 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive PM Exhaust PM10 PM10TOlal Fugitive PM2.5 Exhaust PM2.5 PM2,5 Total Bio -0O2 NBio- CO2 Total CO2 CH4 N20 CO2e Category I I tons/yr PM10 PM10 PM2.5 M /yr Total I I Fugitive Dust Off -Road ..................................................................... 0.91 6.96 ' d.dd .........................:..... 0.01 7.20 0.00 .... ............................... 0.32 1.20 _ i 0.32 065 _ ........... .... i 0.00 _ ?..... ............. 0.32 0.65 ........................................ •........................ i 0.32 0.00 0.00 ......... i 875.09: 875'09:......0.07..... 0.00 - 0.00 . 0.00 F876,65 Total 0.91 6.96 4.44 0.01 1.20 0.32 1.52 0.65 0.32 0.97 875.09 875.09 0.07 0.00 Unmitigated Construction Off -Site 3.6 Remediation 3 - 2017 Unmitigated Construction On-Site ROG NOx CO 502 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO21 Total CO2 CH4 N20 CO2e I I I PM10 PM10 PM2.5 I'l I Total I I I Category tons /yr tons /yr MT /yr MT /yr 1.20 0.00 Hauling 0.01 0.07 0.05 0.00 1 .71 0.00 1.71 0.00 0.00 0.00 15.50 15.50 i 0.00 0.00 15.51 Vendor ..................-................... o.go o.00 i................................ o.00 ............................... 0.00 .............:............ 0.00 0.00 ......:..................:..... 0.00 0.00 0...........:...... o.00 ............:..... 0.00 .......... .... a............ ......c..................a..... o.00 0.00 0.00 0.00 0.00 Worker ................................................................ 0.01 0.01 i 0.10 .............................._ 0.00 i ........................................... 0.03 0.00 i 0.03 .............................._ i 0.00 0.00 i 000 .......... i 19.28 11928 0.600.00 19.27 Total 0.02 0.08 0.15 0.00 1.74 0.00 1.74 0.00 0.00 0.00 34.76 34.76 0.00 0.00 34.78 3.6 Remediation 3 - 2017 Unmitigated Construction On-Site 11 of 29 ROG NO. CO S02 Fugitive Exhaust PM10 Total Fugitive Exhaust PM25 Bio- CO2 NBio- CO21 Total CO2 CH4 N20 CO2e PM10 PM10 PM2.5 PM2.5 I I I I Category tons /yr MT /yr Fugitive Dust 1.20 0.00 1.20 0.65 0.00 0.65 000 0.00 0.00 0 00 0.00 Off -Road .................. 0.21 i................... i................... i................... i ...................i........... ......c ' 159 1.07 0.00 0 07 ..................e.... 0.07 ........... ....i.................o...... 0.07 .............:..... 0 07 .......... ....a.... 217.93 E 217.93 E 0.02 0.00 218.30 11 of 29 Total 0.21 1 1.59 1 1.07 1 0.00 1 1.20 1 0.07 1 1.27 1 0.65 1 0.07 1 0.72 1 217.93 1 217.93 1 0.02 0.00 278.30 Unmitigated Construction Off -Site 3.7 Grading Phase 2 - 2016 Unmitigated Construction On-Site ROG NOx CO S02 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Category I I I PMi0 PM10 PM2.5 PM2.5 Total Fugitive OUSt Off -Road ..................?.................................................. 0.43 3.22 I ............................... 0.00 Category 0.68 0.15 0.36 _ ........... .... 0.00 _ ..... 0.15 0.36 ........................................ f11 tonslyr 0.00 _ 0.00 _ 0.00 474.24 Total 0.43 MT/yr 2.16 0.00 Hauling 0.00 0.02 0.01 0.00 0.43 000 0.43 0.00 0.00 000 387 3.87 0.00 0.00 .................. b..................................... 0.00 0.00 Ventlor .................. j 0.00 ......... ............................u.. 0.00 000 ............. ............................... 0.00 F 0.00 0..........._ ........................ o.BO ooa 0........... o.ao ?......0.........._ o.BO ............. ........................:..... o.BO _ 000 .......... - ...... ............................... ..... 000 - Ooo - ..... oBO - . o.00 d3.87 Worker 0.00 0000 0.02 0.00 0.07 0.00 E 0.01 0.00 0.00 000 . 4.69 469 0.00 0.00 Total 0.00 0.02 0.03 0.00 0.44 0.00 0.44 0.00 0.00 0.00 8.56 8.56 0.00 0.00 3.7 Grading Phase 2 - 2016 Unmitigated Construction On-Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive PM10 Exhaust PM10 PM10 TOtal Fugitive PM2.5 Exhaust PM2.5 I P102.5 Total Sio- CO 2 NBio- CO2 Total CO2 CH4 N20 CO2e Category I I tonslyr PM7a PM10 PM2.5 MTlyr Total Fugitive OUSt Off -Road ..................?.................................................. 0.43 3.22 I ............................... 0.00 0.68 0.00 _ . .................0.15.......... 0.15 i 0.68 0.15 0.36 _ ........... .... 0.00 _ ..... 0.15 0.36 ........................................ f11 000 0.00 _ _ :413.51:413.51:0.030.00 0.00 _ 0.00 _ 0.00 474.24 Total 0.43 3.22 2.16 0.00 0.68 0.15 0.83 0.36 0.15 0.51 413.51 413.51 0.03 0.00 414.24 Unmitigated Construction Off -Site 12 of 29 ROG NOx CO 502 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2 5 Bio- CO2 NBio- CO21 Total CO2 CH4 N20 CO2e I I I PM7a PM10 PM2.5 PM2.5 I Total I Category tons /yr MT /yr Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ventlor .................. b..................................... 0.00 0.00 0.00 .................. j 0.00 ......... ............................u.. 0.00 000 ................. e................... e.................. d................... 0.00 0.00 0.00 0.00 i........... ........e...................b.................. z ......0 ..........v......0........... 0.00 0.00 .00 0.00 0.00 12 of 29 0.00 0.00 005 0.00 0.01 0.00 0.01 0.00 0.00 0.00 9,74 974 0.00 0.00 3.7 Grading Phase 2 - 2017 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Total Fugitive Exhaust PM25 Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e CO2e Category I LCO Off -Road PM10 PM10 420.22 PM2.5 PM2.5 Total Category , tonslyr - M /yr MT /yr Fugitive Dust Hauling 0.00 0.00 0.00 0.68 0.00 0.68 0.36 0.00 0.36 0.00 1 0.00 0.00 0.00 0.00 Off -Road .................. a....... ............i.................. 0.39 2.86 i 2.05 ..................................... 0.00 b..................b i 0.13 i ...... ............. i................... i ...... ............ d....... 0.13 i i 0.13 ............ 0,13 >.................. d....... ............ >.................. i..... 0.......... d.. i 402.24 i 402.24 i 0.03 0.00 402.90 Total 0.39 2.86 2.05 0.00 0.68 0.13 0.81 0.36 0.13 0.49 402.24 40224 1 0.03 1 0.00 402.90 Unmitigated Construction Off -Site 3.8 Building Phase 2 - 2017 Unmitigated Construction On -Site ROG NOx CO S02 Fugitive Exhaust PM10 Total Fugitive Exhausl Pil Bio- CO 2 NBio- CO2 Total CO2 CH4 N20 CO2e CO2e Category I I Off -Road PM10 PMio 420.22 PM2.5 PM2.5 Total Category tons /yr MT /yr Hauling 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 000 000 0.00 0.00 0.00 0.00 Vendor ..................?........................................... 0.00 0.00 .............................._ 0.00 - 0.00 0.00 - 0.00 0.00 - ........................................ 0.00 0........... °0,00 0.00 _ 0.00 _ ������������� 0.00 _ 0.00 _ 0.00 0.00 Worker ................................................................. 0.00 0.00 i 0.00 0.05 i 0.05 ............................... 0.00 € o.00 i 0.01 0.01 0.00 0.00 0.01 0.00 ....................:..... 0.00 0.00 .......... ........... 9.27 .................. 9.27 . .................. 0.00 .................... 0.00 9.28 Total 0.00 0.00 0.05 0.00 0.01 0.00 0.01 0.00 0.00 0.00 9.27 9.27 0.00 0.00 9.28 3.8 Building Phase 2 - 2017 Unmitigated Construction On -Site 13 of 29 ROG I NOx I CO I S02 Fugitive PMio Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Bio-0O2 NBio -0O2 Total CO2 CH4 N20 CO2e Category tonslyr MTlyr Off -Road 0.45 2.80 2.64 0.00 0.16 0.16 0.16 0.16 E 419.45 E 419.45 E 0.04 0.00 420.22 13 of 29 Total 0.45 1 2.80 1 2.64 1 0.00 1 0.16 1 0.16 1 0.16 1 0.16 1 419.45 1 419.45 1 0.04 0.00 420.22 Unmitigated Construction Off -Site 3.8 Building Phase 2 - 2018 Unmitigated Construction On -Site ROG NOx CO S02 Fugitive Exhaust PM10 Tolal Fugitive Exhaust PM2.5 eio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category I I PM1a PM10 I PM25 PM25 I Toial 1 Off Road 0.45 2.79 I 0.01 Category 0.15 0.15 0.15 E 459.98 S 459.98 tonslyr 0.00 1 460.75 Total 0.45 2 .79 MT /yr 0.01 0.15 Hauling 000 100 0.00 0.00 000 0.00 0.00 0.00 000 000 000 0.00 0.00 0.00 0.00 Vendor ...... ............i.................. 0.09 0.88 .................. 0.67 .................. 0.00 ........... ........i•..................n................... 0.07 0 03 4 ................... 4 .................. d ................... 0.10 0.01 0.03 0 03 .................... 4 ................... 4 .................. 4 .................. 4 . . ��.���������� i 202.48 i 202.48 i 0.00 0.00 202.57 Worker ..................}..... ............................... 0.21 0.19 2.17 i...................i 0.01 ..................i................... i................... 0.64 0.02 i................... e.................. 4.. ............................... O.fi7 0.03 0.02 0 .05 .... d ................... L .................. i.................. d.................. . i 445.49 i 445.49 i 0.02 0.00 0 445.92 Total 0.30 1.07 2.84 0.01 0.71 0.05 0 .77 0.04 0.05 0.08 64].9] 647.9] 0.02 0.00 648.49 3.8 Building Phase 2 - 2018 Unmitigated Construction On -Site Unmitigated Construction Off -Site 14 of 29 ROG NO. CO S02 Fugitive PM10 Exhaus[ PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM25 Total Rio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tonslyr MT /yr Off Road 0.45 2.79 2.86 0.01 0.15 0.15 0.15 0.15 E 459.98 S 459.98 E 0.04 0.00 1 460.75 Total 0.45 2 .79 2.86 0.01 0.15 0.15 0.15 0.15 459.98 459.98 0 04 0 00 460.75 Unmitigated Construction Off -Site 14 of 29 Total 0.31 1 1.09 1 2.89 1 0.07 1 0.79 1 0.06 1 0.83 1 0.07 1 0.05 1 0.06 700.90 1 700.90 1 0.02 0.00 101.42 3.8 Building Phase 2 - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive PM Exhaust PM10 PM10Total Fugitive PM2.5 I Exhaust I Evil PM2,5 Total Bio -0O2 NBio- CO2 TotaICO2 CH4 N20 CO2e Category tons/yr PM10 PM2.5 M /yr Total Off -Road 0.41 2.54 2.84 0.01 0,13 0.13 0.13 0,13 459.96 459.98 0.03 0.00 460.69 Total 0.41 2.54 2.84 0.01 0.13 0.13 0.13 0.13 459.98 459.98 0.03 0.00 460.69 Unmitigated Construction Off -Site 3.8 Building Phase 2 - 2020 Unmitigated Construction On -Site ROG NOx CO S02 Fugitive Exhaust PM10 TOtal Fugitive Exhaust PM2.5 Bio -0O2 NBio- CO2 Total CO2 CH4 N20 CO2e Category PM10 PM10 PM2.5 PM2.5 Total Off -Road 0.03 0.20 0.25 0.00 Category 0.01 0.01 001 40.53 40.53 torl 0.00 40.59 Total 0.03 0.20 MT/yr 0.00 0.01 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Ventlor ................................................... 0.08 0.84 ............................... 0.64 0.00 _ _ 0.08 0 03 0.10 _ 0.00 _ _ 0.02 0.03 .......... _ .............. 223.20 _ ................. 223.20 _ ..... 0.00 _ 0.00 223.28 Worker .................. 0.21 e................... 0.18 e................... ' 2.Ofi e........ ...........e................... ' 0.01 E i• ..................;..................;............ 0.77 F 003 0.73 ......:........................ 0.01 0.02 .............E..... 0.03 .......... .... e............ ...... E 466.70 :..................e..... 468.10 ... .........� E 0.02 .................. 0.00 469.12 Total 0.29 1.02 2.70 0.01 0.79 0.06 0.83 0.01 0 04 0.06 691.90 691 90 0 02 0.00 692.40 3.8 Building Phase 2 - 2020 Unmitigated Construction On -Site 15 of 29 ROG NOx CO S02 Fugitive PM70 I Exhaust PM10 PM10 Total Fugitive PM2.5 I Exhaust PM2.5 PM2.5 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e Category tons /yr MTlyr Off -Road 0.03 0.20 0.25 0.00 001 0.01 0.01 001 40.53 40.53 0.00 0.00 40.59 Total 0.03 0.20 0.25 0.00 0.01 0.01 0.01 0.01 40.53 40.53 0.00 I 0.00 40.59 15 of 29 Unmitigated Construction Off -Site 3.9 Grading Phase 3 - 2015 Unmitigated Construction On -Site ROG NOx CC 502 Fugitive Exhaust PM10TOta[ Fugitive Exhaust PM2.5 Bio -0O2 NBio- CO21 TOWI CO2 CH4 N20 CO2e Category PM10 PM10 I PM2.5 PM2.5 Total I I Fugitive Dust Off -Roatl .................. 0.3] i...................1................... 2.66 2.04 Category 0.68 0.00 _ _ ...................... ?......012...... 0.12 0.68 0.12 0.36 _ ................... ?..... 0.00 _ _ � 0.12 tonslyr 0.00 0.00 .......... _ _ ������ �������� ��� � 409.]5 � 409.75 0.00 _ � 0.03 0.00 _ 0.00 0.00 410.39 Total M lyr 2.66 2.04 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.06 0.00 Ventlor .....................................i...................i...... 0.01 0.07 0.05 0. 00 ............................... ............: 001 i 0.Do ........ .............................:. i 0.01 000 .. .....:...................i..... i.....0 X00 O.DO .......... i .... a ...................:..... 1s.72 19 ]2....p..................r..... o.DD E.O.O. 0. 19.72 Worker .................. 0.02 _................... i 0.01 i................... i 0.17 €....................................... 0.00 _.................. 0.06 0.00 i 0.06 i 0.00 .. ................000......:..... i 0.00 i 0.00 ..... :����40.52 :.................. 40.52 :������0.00 0.00 40.56 Total 0.03 0.08 0.22 0.00 0.07 0.00 0.07 0.00 0.00 0.00 60.24 60.24 0.00 0.00 60.28 3.9 Grading Phase 3 - 2015 Unmitigated Construction On -Site Unmitigated Construction Off -Site 16 of 29 ROG NOx CO 802 Fugitive PM10 Exhaus[ PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2,5 Total Bio-0O2 NBio- CO2 Tow] CO2 CH4 N20 CO2e Category tonslyr MT /yr Fugitive Dust Off -Roatl .................. 0.3] i...................1................... 2.66 2.04 F.... ...............i............... 0.00 0.68 0.00 _ _ ...................... ?......012...... 0.12 0.68 0.12 0.36 _ ................... ?..... 0.00 _ _ � 0.12 0.36 0.12 0.00 0.00 .......... _ _ ������ �������� ��� � 409.]5 � 409.75 0.00 _ � 0.03 0.00 _ 0.00 0.00 410.39 Total 0.37 2.66 2.04 0.00 0.68 0.12 0.80 0.36 0.12 0.48 409.75 409.75 0.03 0.00 410.39 Unmitigated Construction Off -Site 16 of 29 Total 0.00 1 0.00 1 0.04 1 0.00 1 0.01 1 0.00 1 0.01 1 0.00 1 0.00 1 0.00 1 9.24 1 9.24 1 0.00 0.00 9.25 3.9 Grading Phase 3 - 2019 Unmitigated Construction On -Site _ ROG NO. CO S02 Fugitive PMi0 Exhaust PM10 P tO TOlaI Fugitive PM2.5 Ezhaust PM2.5 PM25 Total eio -0O2 NBio- CO2 Total CO2 CH4 N20 CO2e 6ai�ory tons /yr I I I tons /yr PM10 PM25 PM25 MT/yr 1 Fugitive Dust Off-Roatl .................. 0.35 ......................................... ' 2.40 1.98 ............................... i 0.000.11 0.68 000 ....i . .........................i.... 0.68 0.11 i 0.36 ........... ....i..... 000 0.11 ......: 0.11 0.36 ..................:..... 0.11'405.99'40599'0.030.00 0.00 0.00 -7-7 .......... .00 0.00 000 40fi.58 Total 0.35 2.40 1.98 0.00 0.68 0.11 0.79 0.36 0.11 0.47 405.99 405.99 0.03 0.00 406.58 Unmitigated Construction Off -Site 3.10 Building Phase 3 - 2019 Unmitigated Construction On -Site ROG NOx CO 802 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2,5 Bio -0O2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons /yr I I I PMta PM10 PM25 PM25 Total 1 I Category tons /yr MTlyr Hauling 0.00 0.00 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 i 0.00 0.00 0.00 0.00 0.00 ventlor ..................................... o ao 9 09 i...... .............F................. 0.00 _�..................._...... 0 00 9 00 0.99 o ao 9 00 9 00 o.9a o.9a o ao 9. 00 ............. 0.09 0.00 Worker . ........_ 000 . ......... U.00 ........[................... 0.04 0.00 ................... '.................. :. 0.01 0.00 ........:...... 001 .............:...... 100 090 009 8.97 8.97 0.00 0.00 8.98 Total 0.00 0.00 0.04 0.00 0.01 0.00 071 0.00 0.00 0.00 8.97 8.97 0.00 0.00 8.98 3.10 Building Phase 3 - 2019 Unmitigated Construction On -Site 17 of 29 ROG I NOx I CO I S02 Fugitive PM1 0 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e Category tons /yr MTlyr Off -Road 0.38 2.32 2.59 0.00 0.12 0.12 0.12 0.12 E 419.45 E 419.45 E 0.03 0.00 420.09 17 of 29 Total 0.38 1 2.32 1 2.59 1 0.00 1 0.12 1 0.12 1 0.12 1 0.12 1 419.45 1 419.45 1 0.03 0.00 420.09 Unmitigated Construction Off -Site 3.10 Building Phase 3 - 2020 Unmitigated Construction On -Site ROG NOx CO 502 Fugitive Exhaust PM10 Tolal Fugitive Exhaust PM2.5 eio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category I I PM1a PM10 I PM25 PM25 I Total 1 Off -Road 0.38 2.32 I 0.01 Category 0.11 0.11 all ; 461.75 E 461.75 tonslyr 0.00 462.39 Total 0.38 2.32 MT /yr 0.01 0.11 Hauling 000 100 0.00 0.00 000 0.00 0.00 0.00 000 000 000 0.00 0.00 0.00 0.00 Vendor ...... ............i.................. 0.06 0.80 .................. 0.61 .................. 0.00 .......... ......... i....... ........... n................... 0.07 0 02 4 ................... 4 .................. 4 ................... 0.10 0.00 0.02 0 02 .................... 4 ................... 4 .................. 4 .................. d . . i 212.38 i 212.38 i 0.00 0.00 212.45 Worker .................. b..... ............................... 0.20 0.17 1.95 i............................ 0.01 ............................i.. 0.67 0.02 ....0........... 4......0........... 4.....0........... i ................._:................... 0.69 0.01 0.02 0,03 d................... i 443.88 i 443.88 i 0.02 0.00 � � 444.28 Total 0.28 0.97 2.56 0.01 0.74 0.04 0.79 0.01 0.04 0.05 656.26 656.26 0.02 0.00 656.73 3.10 Building Phase 3 - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO. I CO I 502 Fugitive PM10 Exhaust PM10 PM10 TOtal Fugitive PM2.5 Exhaust PM2.5 PM2.5 I I Bid- CO2 I NBio- CO21 Total CO2 CH4 I N20 CO2e Category tons /yr PM10 PM2.5 MTlyr Total Off -Road 0.38 2.32 2.83 0.01 0.11 0.11 0.11 all ; 461.75 E 461.75 E 0.03 0.00 462.39 Total 0.38 2.32 2.83 0.01 0.11 0.11 0.11 0.11 461.75 461.75 0.03 0.00 462.39 Unmitigated Construction Off -Site 18 of 29 ROG NOx CO 502 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 Tofal CO2 CH4 N20 CO2e PM10 PM10 PM2.5 PM2.5 Total Category tonslyr Ml Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 i 0.00 0.00 Vendor .................. b.....................................>.................. 0.08 0.83 0.63 0.00 1_........ .........e..................4................... 4................... b .................. b............................ 0.08 0.02 0.10 0.00 0.02 0.03 ... ........ b................... a .................. a.................. a................... i 234.35 i 234.35 i 0.00 0.00 234.43 18 of 29 0:21 m 0.17 2.01 0.01 0.74 0.03 0.76 0.01 0.02 0.04 i 479.38 i 479.38 i 0.02 0.00 3.10 Building Phase 3 - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG I NOx I CO I S02 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM25 Total Bio- CO2 Nelo- CO2 Total CO2 CH4 N20 CO2e Category I I I tonstyr PM10 458.76 PM2.5 PM2.5 [yr Off -Road 0.34 2.09 2.80 0.01 0.10 0.10 0.10 0.10 459.98 459.98 0.03 0.00 460.56 Total 0.34 2.09 2.80 0.01 0.10 0.10 0.10 0.10 459.98 459.98 0.03 I 0.00 460.56 Unmitigated Construction Off -Site 3.10 Building Phase 3 - 2022 Unmitigated Construction On -Site ROG NO. CO S02 Fugitive Exhaus[ PM10 Total Fugitive Exhaust PM25 Bio- CO2 NBio- CO2 Tura] CO2 CH4 N20 Category tonslyr I I I PM10 I PM10 458.76 PM2.5 PM2.5 Total Category tons /yr MT/yr Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Vendor .................. 0.06 e................... 0.78 i................... 0.59 i.... ..6...........i................ 0.00 .. . e .................. e.................. 0.08 0.02 0.10 e............. .....e..................e...... 0.00 0.02 .............i..... 0,02 .......... .... e .............. ..... E 233.97 :..............o...... 233.97 E 0.00 0.00 d470,75 Worker .................. 0.20 e................................................. 0.16 1.88 ......i_.................e..... 0.01 ............. e.................. 0.73 0 03 0.76 e....... ............................... 0.01 0.02 e.................. 0 04 :..... ....e......70.3....... .......... E 470.36 E ....................... 470.36 E 0.02 0.00 Total 0.28 0.94 2.47 0.01 0.81 0.05 0.86 0.01 0.04 0.06 704.33 704.33 0.02 0.00 3.10 Building Phase 3 - 2022 Unmitigated Construction On -Site 19 of 29 ROG NOZ I CO I S02 Fugitive PM1a I Exhaust PM70 PM10 Tolal Fugitive PM2.5 I Exhaust PM2.5 1 PM25 1 Sio- CO2 Total I NBio- CO2 Total CO2 CH4 N20 I CO2e Category tonslyr MTlyr Off -Roatl 0.32 1.89 2.78 i 0.01 0.08 0.08 0.08 008 458.22 45822 0.03 0.00 458.76 19 of 29 Total 0.32 1 1.89 1 2.78 1 0.01 1 0.08 1 0.06 1 0.08 1 0.08 1 458.22 1 45812 1 0 03 0 00 456]6 Unmitigated Construction Off -Site 3.10 Building Phase 3 - 2023 Unmitigated Construction On -Site ROG NOx CO 502 Fugitive Exhaust PM10 Tolal Fugitive Exhaust PM2.5 eio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category I I PM1a PM10 I PM25 PM25 I Total 1 Off -Road 0.28 1.66 I 0.01 Category 0.07 0.07 0.07 E 440.60 E 440.60 tonslyr 0.00 441.08 Total 0.28 1.66 MT /yr 0.01 0.07 Hauling 000 100 0.00 0.00 000 0.00 0.00 0.00 000 000 0.00 0.00 0.00 0.00 0.00 Vendor ...... ............i.................. 0.07 0.74 .................. O.Sfi .................. 0.00 .......... .........i..................n................... 0.08 0 02 4 ................... 4 .................. d ................... 0.10 0.00 0.02 0 02 .................... 4 ................... 4 .................. 4 .................. 4 . . ��.���������� i 233.58 i 233.58 i 0.00 0.00 233.64 Worker .................. b..... ............................... 0.19 0.15 1.77 i............................ 0.01 ............................i... 0.73 0.03 ................ 4................... 4.................. i................._: 0.76 0.01 0.02 0 ,04 ................... d ................... b .................. i.................. d.................. . i 460.86 i 460.86 i 0.02 0.00 0 461.23 Total 0.26 0.89 2.33 0.01 0.81 0.05 0.86 0.01 0.04 0.06 694.44 694.44 0.02 0.00 694.87 3.10 Building Phase 3 - 2023 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO. I CO I 502 Fugitive PM10 Exhaust PM10 PM10 TOtal Fugitive PM2.5 Exhaust PM2.5 PM2.5 I I Bid- CO2 I NBio- CO21 Total CO2 CH4 I N20 CO2e Category tons /yr PM10 PM2.5 MTlyr Total Off -Road 0.28 1.66 2.66 0.01 0.07 0.07 0.07 0.07 E 440.60 E 440.60 E 0.02 0.00 441.08 Total 0.28 1.66 2.66 0.01 0.07 0.07 0.07 0.07 440.60 440.60 0.02 0.00 441.08 Unmitigated Construction Off -Site 20 Of 29 ROG NOx CO 502 Fugitive Exhaust PM10 Total Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e PM10 PM10 PM2.5 PM2.5 Total Category tonslyr Ml Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 i 0.00 0.00 Vendor .................. b................... 0.0] 0.69 ................... 0.51 >.................. 0.00 1_........ .........e..................4................... e................... b.................. b.......................... 0.08 0.02 0.10 0.00 0.02 0.02 . . a ............. ..... a.................. a................... .............4................. i 225.06 i 225.06 i 0.00 0.00 225.12 20 Of 29 0.13 1.60 0.01 0.70 0.03 0.73 0.01 0.02 0,03 i 436.28 i 436.28 i 0.02 0.00 4.0 Mobile Detail 4.1 Mitigation Measures Mobile Increase Density Increase Diversity Integrate Below Market Rate Housing Improve Pedestrian Network 4.2 Trip Summary Information ROG NOx CO I 802 Fugitive PM1a Exhaust PM10 PM10 Tolal Fugitive PM2.5 Exhausl PM2.5 PM2.5 Total eio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e ategory Condo/Townhouse .................70................. 2,579.64 2,801.64 e.................................. 2375.40 e.................................. e....................................... tons/yr 2,795,821 Condo /Townhouse High Rise ...................................... 8,482.60 9,212.60 d.................................. 7811.00 d..................................;....................................... /yr 9,193,465 Hotel Mitigated Unmitigated 2148 ........_ 29.85 ; 15.20 ...... ........................................................................ 19.22 + 75.96 98.87 p 0.17 0.26 1722 0.85 26..50 1.25 18.07 27 75 0.26 0.41 0.74 ........... .:...... 1.08 1.01 '1 49 ; 12,357.70:12,357.70: i 18,527.14E 18,527.14; 0.50 i 0.71 0.00 0.00 12,368.25 18,54200 Total NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT City Park 1,0707 .ifi 1,070.16 d.................................. 10 .16 d............................. s....................................... 1,527,518 992,8370 Condo/Townhouse .................70................. 2,579.64 2,801.64 e.................................. 2375.40 e.................................. e....................................... ............................... 4,301,477 2,795,821 Condo /Townhouse High Rise ...................................... 8,482.60 9,212.60 d.................................. 7811.00 d..................................;....................................... ............................... 14,144,495 9,193,465 Hotel ...................................... 735.00 736.50 d..................... 535.50 d. a...................................................................... ............................... 984,299 639,762 Regional Shopping Center ...................................... 11,265.00 . ............ . 13,110.00 ................................. 6621.00 € . 14,265,920 9,272,388 Single Family Housing . . ................ . . . . . . . . . . . . .......... 8,096.22 . . . . . . ..................... . . . . . . . . . . . . . . . . . . . . .. . . . . . . 8,527.68 ............. . .......... . . . . . . . . . . . . . . . . . . . . . . . . . . : . . ...................................................... 7419.42 . . . . . . . . .. . . . 13,428,567 8,728,136 Total 32,228.62 35,458.58 25,832.48 48,652,276 1 31,622,409 4.3 Trip Type Information 5.0 Energy Detail 5.1 Mitigation Measures Energy Exceed Title 24 5.2 Energy by Land Use - NaturalGas Unmitigated 22 of 29 ROG NO. CO S02 Fugitive PM10 Exhaust PM10 IPM1 a Total Fugitive PM2.5 Exhaust I PM2.5 PM2.5 Total Sio -0O2 NBio- CO21 Total CO2 CH4 N20 CO2e Category tons /yr MT /yr Electricity Mitigated Electricity .................. .................................................................... 0.24 ........................ 0.25 i................... I ' 2.05 ............................... ' 2.15 E................... I 0.95 E 1.00 i................. ............ E ............................... p 0.01 ... ............................... F 0.01 0.00 .......... . ........... ......- I F 0.00 ............. 000 _ E F 0.00 0.00 ................... 0.00 _ ......0.......... ' 0.1] _ 0.17 5................... .... .... _ ........... I _ ........... 0.00 ...........' ................... 5..... . 0.00 ....... ...... ? _ ........................................ ..... I 0.00 _ _ � � � ��������� ��������� 0.00 0.00 0,00 0.17 ���������������� 0.17 ; 2,549.07 .......... 2,565.21 _ '��������������������� 2,365.59 .......... _ ���������� ���������� E 2,472.20E ; 2,549.07: 2,565.21 _ .................... 2,365.59 _ 2,472.20E 0.12 0.12 ! ............................... 0.05 ! 0.05 0.04 0.04 _ 0.04 _ 0.05 2,565.04 2,581.29 2,3]9.98 2,487.25 NaturalGas .. NaturalGas Total NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 5.2 Energy by Land Use - NaturalGas Unmitigated 22 of 29 1.78867e +007 i 0.10 0.82 0.35 0.01 0.00 0.07 0.00 0.07 i 954.50 i 954.50 i 0.02 0.02 Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGas Use ROG NOx CO 502 Fugitive Exhaust PM10Tota Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 TotaICO2 CH4 N20 CO2e 0.00 Conde/Townhouse ............................ e................... 939884 i................... ................... n....... ........... :................... i 2]3.38 i _.... .............: i 0.01 _ ................. 0.00 PM10 PM10 I .. .................. L........................ 3.09061e +006 i PM2.5 PM2.5 I Total I 904.60 Hotel ............................ b................... 1.0988e +006 ................... ................... b .................. e....................................... i 319.61 i I I Land Use kBTU ............................ ........ I .......... 960000 ............................................................. i................... i................... .................. .... 279.24 0.01 0 0.00 tons /yr Single Family ....................?................... 2.72978e +006 ............ _ .................. i...... i................... i................... ?...... . j 794.01 r .............:......... 0.04 MT /yr 798.99 Total City Park 0 0.00 i 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 III Contlo/�ownhouse ............................................................ 5.44109e +006 I 0.03 ........................................... 0.25 0.11 0.00 ? ................... i............... .....i......0........... 0.00 ?...... ............ a 0.02 ................... 0.00 o.................... 0.02 a...... 290.36 290.36 0.01 0.01 292.12 Condo /townhouse .................. e................... 1.78919e *007 E 0.10 1............................. 0.82 ......... 0.35 :.................. 0.01 :.. ................. I........................... 0.00 ............ :.................. e...... 0.07 ............. 0.00 i... .................:.................. 0.07 e.................. e................... F 954.78 E e....... 954.78 E ............i.................. 0.02 0.02 960.59 Hotel ............................ `................... 3.72863e +006 � 0.02 ................... ' 0.18 ........:..... .....0.15 0.15 0...........:.... 0.00 .......... .....e_ .................. 0.00 _................e.... .......... ....: 0.01 ............ ......:...................:.... 0.00 0.01 .......... ....:.... ... ...e F 198.97 E ................... .:..... 198.97 E ............e.................. 0.00 0.00 200.18 Regional She Regional Shopping pping ...................... ......e........................ 150000 150000 0.00 0.00 001 ........................:..... 0�01 0.01 ...........:.... 0.00 .......... . ....e_ .................._...... 0.00 0.00 .......... :.... .......... 0.00 i 0.00 0.00 0.00 0.00 0.00 .......... ...........8.0............8.00 : 8.00 ....................................... 8.00 0.00 .................. 0.00 8.05 Single Family ............................ e................... t71178e *007: 0.09 e................... i...... 079 .............:............. 0.34 ..... 0.01 :................... 1.................... i................... 0.00 e .................. e................... 0.06 0.00 .................... 0.06 91347 913.47 0.02 0.02 919.03 Total 0.24 2.05 0.96 0.02 0.00 0.16 0.00 0.16 2,365.58 2,365.58 0.05 0.05 5.3 Energy by Land Use - Electricity Unmitigated 23 of 29 Electneity Use ROG NOx I CO I 502 Total CO2 CH4 N20 CO2e Land Use kWh tonsyr m City Park 0 0.00 0.00 0.00 0.00 Conde/Townhouse ............................ e................... 939884 i................... ................... n....... ........... :................... i 2]3.38 i _.... .............: i 0.01 _ ................. 0.00 275.10 CondolTOwnhouse .. .................. L........................ 3.09061e +006 i ............................... e.................. d........................ i 898.97 i .............. 0.04 _....0........... 0.02 904.60 Hotel ............................ b................... 1.0988e +006 ................... ................... b .................. e....................................... i 319.61 i i 0.01 ................... 0.01 321.61 Regional Shopping ............................ ........ I .......... 960000 ............................................................. i................... i................... .................. .... 279.24 0.01 0 0.00 280.99 Single Family ....................?................... 2.72978e +006 ............ _ .................. i...... i................... i................... ?...... . j 794.01 r .............:......... 0.04 ...... 0.01 798.99 Total 2,565.21 0.11 0.04 2,581.29 23 of 29 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Use Low VOC Paint - Residential Interior Use Low VOC Paint - Residential Exterior Use Low VOC Paint - Non - Residential Interior Use Low VOC Paint - Non - Residential Exterior Use only Natural Gas Hearths 6.2 Area by SubCategory 24 of 29 ROO NO. CO S02 Fugitive Exhaust PM10 Total Fugitive Exhausl PM25 Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e I I I PMi0 PM10 PM2.5 PM2.5 Total Category tons/yr M /yr Mitigated 8.46 0.24 2094 . 0.00 0.00 0.18 0.00 0.18 956.18 956.18 0.05 0.02 962.48 Unmitigated .................. a................... 8.46 0.24 i.................. i 2094 i.................. i 0.00 i i......... .........e............. ..... i.. i 0.00 i ........... ................ i.... .... e................. d...................5.... 0.18 i i 0.00 i 0.18 .......... .... a .................. a ................. e i i 956.16 i 956.18 i 0.05 0.02 962.48 Total NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 6.2 Area by SubCategory 24 of 29 Unmitigated Mitigated ROG NOx CO S02 Fugitive PMia Exhaust PM10 PM10 TOtal Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio -0O2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tonslyr PM19 PM2.5 PM2.5 MTlyr Architectural 0.88 ............. ...... 6.fl6 ......0.09 ........................ ..................e................... 0.63 : ................... I ................... I i...................€...... :....20.93 .... :....................................... F I .... . ...... i.................. 5........... .........................e..... ? 0.00 0.00 ...... F COO ' . : 000 . ? 0,00 0.00 0.00 I ......00.... ... .... .. :.... ................. ........... i 0.12 ? 000 000 I . :......000 ..... . ? 0.00 0.00 o.fl0 O.Ofi 0.12 0.00 ooa ..... ...._.... ....e E .99.8 .......... 34.20 E 0.00 o.00 921.98 34.20 0.00 ............................... 0.09 E 0.02 E 0.03 GOO 0.00 0.02 0.00 000 009 927.59 34.89 Consumer Protlucis Hearth Landscaping Total 6.46 0.24 20.94 0.00 0.00 0.18 0.00 0.18 956.18 956.18 0.05 0.02 962.48 Mitigated 7.0 Water Detail 7.1 Mitigation Measures Water Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 25 of 29 ROG NO. CO S02 Fugitive Exhaust PM10 Tolal Fugitive Exhaust PM25 Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PMt0 PM19 PM2.5 PM2.5 Total Subcategory tonslyr MTlyr Architectural 0.88 0.00 0.00 0.00 0.00 0.00 0.00 non 0.00 0.00 Consumer Products .................. 6.86 i................... i e................... i i............. ............................... i i .......................... i 000 .........................i..... 0.00 0.00 non .......... don 0.00 0.00 0.00 0.00 Hearth .................. g................... 0.09 i 0.00 i....................................?.......... i 0.01 0.00 .........e..................i...... i 0.00 ............. a................... g.................. d............. ...... 9.06 o.eo O,Ofi i.................. d........ ...........e..................e ...... ............a......0........... i 921.98 i 921.98 i 0.02 0.02 927.59 Landscaping .................. ;..................._..................;..... 0.63 0.24 i 2093 ..... ........ i......... 0.00 i .........5..................5.. i 000 i ................;.... .... a.................. a................... . ........... 0.12 0.00 i O.t2 >.... .......... ..... ..... ..........._w.................e i i 34.20 i 34.20 i 003 0.00 34.89 Total 8.46 0.24 20.94 0.00 0.00 0.18 0.00 0.18 956.18 956.18 0.05 0.02 962.48 7.0 Water Detail 7.1 Mitigation Measures Water Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 25 of 29 Use Water Efficient Irrigation System 7.2 Water by Land Use Unmitigated ROG NOx I CO SO2 Total CO2 CH4 I N2O CO2e. Category tonslyr MTlyr Mitigated Unmitigated .................. i................... e................... 606.97 i................... e................... 702.42 2.46 i..... 307 007 0.09 680.56 794.O6 Total NA NA NA NA NA NA NA NA 7.2 Water by Land Use Unmitigated Mitigated 26 of 29 Indoor /Outdoor ROG NOx CO S02 Total CO2 CH4 N2O CO2e Use I I I Land Use Mgal tors /y, M I /yr City Park 0146.2636 i 149.50 i 0.01 0.00 150.44 Condeffownhouse . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . .................................................. 37.4777120.808] . .................. . . . . ........ i i P09�fi1 ........ ............i......0........... 1.15 0.03 243.74 ContlolTOwnhouse ............................?................... 39.1326! i................... i........... ........ ?.................. ?... ......... i 218.86 ....... .............i................. 1.20 0.03 254.50 ....._ 2172..& 6 ........................... i................... E ................... s.................. s.................................... i................. Hotel 4,30652! 20 20.45 0.13 0.00 24.34 ........ L264. 0. ........................... i................... i........................................................ i......... ...........i................... Regional Shopping 0.8058991 3.83 0.02 0.00 4.56 ...... Q. 26. 6. 6.7....... & ...................i .................. i................... e.................. d................... i ...................i .................. Single Family 17.9113/ i 100.18 i 0.55 0.02 116,49 Total 702.43 3.06 0.08 794.07 Mitigated 26 of 29 8.0 Waste Detail 8.1 Mitigation Measures Waste CategoryNear 8.2 Waste by Land Use Unmitigated ROG NOx I CO I 502 Total CO2 CH4 I N2O CO2e tonslyr MTlyr Mi[iga[etl Unmitigated .................. -................... i................... i........... ........ ip#kH#NkkNE 36.59 i 0.00 i....................... iH##pf!#tt# #: 36.59 0.00 q#NH##k#N k##kJl#k#ft Total NA NA NA NA NA NA NA NA 8.2 Waste by Land Use Unmitigated 9.0 Vegetation 9.1 Vegetation Land Change Vegetation Type 9.1 Net New Trees Species Class ROG NOx I CO 502 Total CO2 CH4 I N20 CO2e Category tons MT Unmitigated E 3,563.47 F 0.00 0.00 3,563.47 Total NA NA NA NA NA NA NA I NA 9.1 Vegetation Land Change Vegetation Type 9.1 Net New Trees Species Class 28 of 29 Number of Trees ROG NOx CO S02 Total CO2 CH4 N20 CO2e tons MT Juniper 700 E 24.20 E 0.00 0.00 24.20 28 of 29 29 of 29