HomeMy WebLinkAbout01 - Appendix MAPPENDIX M
CUMULATIVE PROJECTS
Appendix M
Cumulative Proiects
CUMULATIVE PROJECTS
To determine which projects may contribute to cumulative impacts, the City of Newport Beach
(City) considered known projects within Newport Beach and the adjacent jurisdictions and
special districts. To address regional growth, adopted plans such as OCP -2006, General Plans,
and development projects are used in the cumulative impact analysis. Adjacent jurisdictions
were contacted to determine if "related projects' should be considered in the cumulative
analysis; an initial list was provide to each jurisdiction. This information was then sent to the
jurisdictions with a request for confirmation that the list was comprehensive or, if it was found
not to be comprehensive, with a request to identify projects that had not been included on the
list.
The cumulative study area varies from one environmental topic to another depending upon the
nature of impacts related to the topic. For example, cumulative aesthetic considerations
encompass only the surrounding areas with direct views of the Project site, while air quality is a
regional issue that is analyzed on a broader scale. With respect to greenhouse gas (GHG)
emissions, this environmental issue was not required to be addressed in CEQA documents until
the State CEQA Guidelines were amended in March 2010. Although the topic of climate
change /greenhouse gas emissions was not evaluated in earlier CEQA documents, projects
were contributing greenhouse gas emissions. Because of the global nature of the climate
change problem, most projects will not result in GHG emissions that are individually significant
(CAPCOA 2009). Therefore, while not all CEQA documents for projects evaluated potential
GHG impacts, the presumption of this EIR's cumulative impact analysis is that the majority if not
all projects included in the cumulative study area incrementally contribute to cumulative GHG
impacts whether or not addressed in their respective CEQA documents.
The provision of fire protection services is based on a combination of existing City of Newport
Beach fire services and use of mutual aid. The City participates in Central Net, an automatic
mutual aid system with the cities of Costa Mesa, Santa Ana, and Huntington Beach, and the
OCFA. Together, these cities and the County provide personnel to any emergency. The closest
emergency response unit is dispatched to the emergency, regardless of jurisdictional boundary.
As such, all projects in the cities of Newport Beach and Huntington Beach would be assumed in
the cumulative analysis for fire protection services.
COUNTY OF ORANGE
The following projects were identified by the County of Orange for consideration in the
cumulative analysis for the Newport Banning Ranch Project. Although some of these projects
are located within the jurisdictional boundaries of cities, the County of Orange is the lead
agency. The projects are in various stages of processing and completion (see Exhibit 5 -1 in
Section 5.0, Cumulative Impacts).
COUNTY OF ORANGE PROJECTS WHERE CONSTRUCTION HAS BEEN INITIATED OR
COMPLETED
Huntington Beach Wetlands Restoration Project
The Huntington Beach Wetlands contain a series of marshes that are separated by roads and
bound by the Huntington Beach and Talbert flood - control channels located at Brookhurst Street
and Magnolia Street approximately one mile west of the Newport Banning Ranch Project site.
The Huntington Beach Wetlands are connected to the Pacific Ocean by the Talbert ocean
entrance channel. The project includes restoration of Talbert Marsh, Brookhurst Marsh,
RAProjecsWewport W0150raft EIRWppedix M- 082311.dm M -1 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Magnolia Marsh (not including Upper Marsh), and Talbert Ocean Channel, for a total of
approximately 130 acres. The project also includes maintenance dredging of Talbert Marsh and
the Talbert Ocean Channel two times after construction. Discretionary actions required include a
Section 1602 Streambed Alteration Agreement from the California Department of Fish and
Game (CDFG), Sections 10 and 404 Nationwide permits from the U.S. Army Corps of
Engineers (USAGE), Regional Water Quality Control Board (RWQCB) Section 401 certification,
Coastal Development Permit (CDP) from the California Coastal Commission, conditional use
permit, encroachment permit (County and State Parks), and approval from the State of
California Department of Oil and Gas (DOGGR). Potential impacts from this project were
evaluated in an Initial Study /Mitigated Negative Declaration (IS /MND). The Final IS /MND was
approved in December 2007. Construction of Phase 1 was completed in March 2009;
construction of Phase 2 started in September 2009 and is scheduled to be completed in
2011. The IS /MND identifies that the project would not exceed significance thresholds with
respect to the following environmental topics: aesthetics, agriculture, air quality, cultural and
scientific resources, geology and soils, hazards and hazardous materials, hydrology and water
quality, land use and planning, mineral resources, population and housing, public services,
recreation, transportation and circulation, and utilities and service systems. The IS /MND lists the
following significant impacts that would result from project implementation; however, with the
implementation of mitigation measures, all impacts would be reduced to a less than significant
level.
• Biological Resources: Although the net result of the project would include an increase
in eelgrass habitat, the temporary loss of 0.4 acre of eelgrass is considered a potentially
significant impact. Implementation of mitigation measures would reduce the potential
loss of eelgrass during dredging to a less than significant level.
Noise: The project may result in audible short-term and intermittent increases in noise
levels during dredging, grading, and periodic maintenance operations. With
implementation of mitigation measures and compliance with the City of Huntington
Beach's noise regulations, noise impacts would be reduced to a less than significant
level.
Conclusions: Although eelgrass habitat is a sensitive resource and would be temporarily
impacted as a part of the Huntington Beach Wetlands Restoration Project, the Newport Banning
Ranch Project does not include eelgrass habitat. Therefore, the proposed Newport Banning
Ranch Project would not cumulatively contribute to an impact on eelgrass. With respect to
construction noise, the Wetlands Restoration Project is scheduled to be completed in 2011 prior
to any construction activities on the Newport Banning Ranch Project site. No cumulative noise
impacts would occur. Therefore, the Huntington Beach Wetlands Project is not included in the
cumulative impact assumptions for Newport Banning Ranch.
COUNTY OF ORANGE PROJECTS WITH APPROVED CEQA DOCUMENTATION
Edinger Storm Channel Improvement Project
The Edinger Storm Channel Improvement Project is located within the cities of Westminster and
Huntington Beach in the northwestern portion of Orange County. The project includes the East
Garden Grove - Wintersburg Channel from Woodruff Street to Interstate 405 (1 -405) and the
Edinger Storm Channel. The project proposes to install 2 additional, 66 -inch reinforced concrete
pipes underneath 1 -405 and a double 9 -foot by 9 -foot reinforced concrete box under Edinger
Avenue. The existing trapezoidal channel would be replaced with a larger capacity, 20- foot -wide
by 10- foot -deep reinforced concrete rectangular channel from 1 -405 to Edinger Avenue and a
R: \Proje \New oftMlViDraft EIRV ppmdix M- 082311.dm M -2 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
20- foot -wide by 9- foot -deep reinforced concrete rectangular channel from Edinger Avenue to
1,765 feet upstream of Edinger Avenue. Discretionary actions include a Section 1602
Streambed Alteration Agreement (CDFG), Section 404 Nationwide permit (USACE), and
Section 401 Certification (RWQCB). The IS /MND was approved on July 15, 2009; an
Addendum to the MND was approved on April 20, 2010. The IS /MND identifies that the project
would not exceed significance thresholds with respect to the following environmental topics:
land use and planning, agriculture, population and housing, cultural and scientific resources,
recreation, mineral resources, hazards, public services, and utilities and service systems. Based
on the IS /MND, the following significant impacts were identified; measures were proposed to
mitigate these impacts to a less than significant level.
• Aesthetics: The project would result in short -term, nighttime lighting during construction.
With implementation of mitigation that requires minimal wattage and construction - related
lighting to be directed downward and oriented away from adjacent residential areas, this
impact would be reduced to a less than significant level.
• Geology and Soils: Demolition and excavation activities from channel improvements
would expose soils to short -term erosion by wind and water. The project would be
subject to the requirements set forth in the National Pollutant Discharge Elimination
System ( NPDES) Storm Water General Construction Permit for construction. Following
compliance with the NPDES permit and recommended mitigation, soil erosion impacts
would be reduced to a less than significant level.
• Hydrology and Water Quality: The project would result in a discharge of sediments
and pollutants into surface waters entering the Edinger Channel. This impact would be
mitigated to a less than significant level with incorporation of Best Management
Practices (BMPs) and implementation of Orange County Standard Conditions of
Approval.
• Biological Resources: Project activities are proposed within "Waters of the U.S. ".
Mitigation that requires USACE, RWQCB, and CDFG permits to be obtained prior to
commencement of construction activities would reduce biological resource impacts to a
less than significant level.
• Transportation and Circulation: The project would result in temporary vehicular
construction impacts to streets in the project area. With implementation of mitigation that
requires the preparation of a Construction Management Plan and a Traffic Control Plan,
construction - related impacts to streets in the project area would be reduced to a less
than significant level.
• Air Quality: No significant air quality impacts are anticipated as a result of project
implementation. However, to ensure that potential construction - related emissions are
reduced, several measures prescribed by South Coast Air Quality Management District
(SCAQMD) Rule 403 would be incorporated during project construction.
• Noise: The project would result in short-term construction noise impacts. With
implementation of mitigation measures and compliance with applicable noise ordinances
and County of Orange Standard Conditions of Approval, construction noise impacts
would be reduced to a less than significant level.
Conclusions: All of the identified impacts are construction related and would be mitigated to a
less than significant level and would not coincide with potential impacts associated with the
RtlProje s\New oMJ0150raft EIRWppmdix M- 082311.dm M -3 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
proposed Project. Therefore, the Edinger Storm Channel Improvement project is not included in
the cumulative impact assumptions for Newport Banning Ranch.
U.S. Coast Guard Bulkhead Replacement Project
The site is located in the southeastern portion of Newport Bay near the Newport Harbor
Entrance Channel and adjacent to the U.S. Coast Guard Station located at 1911 Bayside Drive
in the Corona del Mar area of the City of Newport Beach. The project includes the construction
of a new 174 -foot section of tied back bulkhead; renovations of the guest docks and guide piles;
dredging of approximately 1,200 cubic yards (cy) of material beneath the proposed dock
systems; construction of new storm drain infrastructure; and replacement of pavement to
support the service load requirements of the facilities. Discretionary actions include a Coastal
Development Permit from the California Coastal Commission. The IS /MND was approved on
March 11, 2008; the project was completed in 2011. The IS /MND identifies that the project
would not exceed significance thresholds with respect to the following environmental topics:
land use and planning, agriculture, population and housing, geology and soils,
transportation /circulation, air quality, aesthetics, cultural and scientific resources, recreation,
mineral resources, hazards, public services, and utilities and service systems. The following
significant impacts are identified in the IS /MND:
• Hydrology and Water Quality: Water quality impacts may occur as a result of the
project. Construction activities (e.g., dredging, demolition of the parking lot) would result
in water quality impacts but not to a level that would violate water quality standards or
waste discharge requirements. However, as part of a future project (replacement of the
existing Coast Guard Station), it is anticipated that sediment and pollutant discharge into
surface waters would occur in the future as the existing Coast Guard Station is replaced.
The effect of these discharges on water quality from the future Coast Guard Station
project would be minimized through compliance with current regulatory requirements
imposed on this project. Consequently, impacts related to water quality would be
reduced to a less than significant level.
• Biological Resources: The project would result in the direct loss of eelgrass vegetation.
Mitigation at a 1.2:1 ratio based on the Southern California Eelgrass Mitigation Policy
prescribed by the National Marine Fisheries Service (1991), as amended, would offset
eeigrass impacts to a less than significant level.
• Noise: The project would result in potentially significant construction noise impacts.
Implementation of mitigation measures would reduce construction noise impacts to a
less than significant level.
Conclusions: Although eelgrass habitat is a sensitive resource and would be impacted as a
part of the Bulkhead Replacement project, the Newport Banning Ranch Project does not include
eelgrass habitat. Therefore, the proposed Newport Banning Ranch Project would not
cumulatively contribute to an impact on eelgrass. With respect to construction noise, the
Bulkhead Replacement site is approximately four miles east of the Newport Banning Ranch
Project site; there would not be a cumulatively increase in construction noise between the two
projects due to their distance from each other. No cumulative noise impacts would occur.
Because the project sites are in different watersheds, there would not be a cumulative
contribution to any effects to the respective watersheds. Both projects would be required to
mitigate to water quality impacts. Therefore, the Bulkhead Replacement project is not included
in the cumulative impact assumptions for Newport Banning Ranch.
RAProje sv4ewportW015�raft EIRWppe dix M- 082311.do M-4 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
CITY OF NEWPORT BEACH
The following projects were identified by the City of Newport Beach for consideration in the
cumulative analysis for the Newport Banning Ranch Project. The potential cumulative projects
are depicted in Exhibit 5 -2 of Section 5.0, Cumulative Impact Analysis, and are summarized
below.
CITY OF NEWPORT BEACH PROJECTS WHERE CONSTRUCTION HAS BEEN INITIATED
OR COMPLETED
Hoag Memorial Hospital Presbyterian Master Plan Update
The project site is an existing facility located at One Hoag Drive in the City of Newport Beach.
The existing Hoag Memorial Hospital Presbyterian Master Plan allowed for up to 1,343,238 sf of
development at Hoag, inclusive of the Upper and Lower Campuses. The project proposes to
reallocate up to 225,000 sf of previously approved (but not constructed) square footage from the
Lower Campus to the Upper Campus. The maximum allowable building area on the Upper
Campus would be 990,349 sf (if all 225,000 sf is reallocated), and the maximum allowable
building area on the Lower Campus would be 577,889 sf (if no square footage is reallocated).
However, in no event would the combined total building areas of both the Upper and Lower
Campuses be allowed to exceed 1,343,238 sf. Discretionary actions include a General Plan
Amendment, Planned Community Text amendment, and Development Agreement amendment.
A Supplemental EIR to Final EIR No. 142 (certified in 1992) was certified and the project
approved on May 13, 2008. No new project construction has started. The topics listed below
were found to be less than significant or would be mitigated to a level considered less than
significant with the adopted Mitigation Program in Final EIR No. 142 and therefore were not
addressed in the Supplemental EIR: agricultural resources, biological resources, cultural
resources, geology and soils, hazards and hazardous materials, hydrology and water quality,
mineral resources, population and housing, and public services and utilities. Based on the
Supplemental EIR, the following significant impacts are identified:
• Aesthetics: Final EIR No. 142 found that shade and shadow effects would contribute to
a significant and unavoidable land use impact but that as an individual project effect,
shade and shadow impacts were considered less than significant. The Supplemental
EIR found that the proposed Master Plan Update project would not result in any new
significant visual impacts either prior to or after mitigation.
Final EIR No. 142 noted that with the transfer of allowable square footage from the
Lower Campus to the Upper Campus there is the potential for increased lighting on the
Upper Campus. However, the incremental change would not be substantial because of
the limited size of the Upper Campus and existing development. Continuous lighting on
the site is required because it is a 24 -hour operation and because of arriving patients
and visitors who may not be familiar with the site layout. Conditions already placed in the
Master Plan require that the lighting system for all buildings and the window systems for
buildings on the western side of the Upper Campus minimize light spillage and glare to
the adjacent residential areas. Ongoing implementation measures would reduce the
potential lighting impacts on adjacent uses. Lighting was not identified as a significant
lighting impact.
• Land Use: Consistent with the conclusions of Final EIR No. 142, the Supplemental EIR
found that the proposed Master Plan Update project would result in significant impacts to
existing residential development west of the Upper Campus. The proposed amendment
RAProje s\New oMJ0150raft EIRV ppmdix M- 082311.dm ivi -5 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
to the Master Plan would not alter or make these impacts more severe. Therefore, while
the project would cause a significant and unavoidable land use impact, it would not
constitute a new impact.
• Transportation and Circulation: Final EIR No. 142 found that all traffic impacts would
have the potential to be mitigated to a level considered less than significant. No new
significant traffic impacts have been identified associated with the proposed Master Plan
Update project. Consistent with the conclusions of Final EIR No. 142, the project's
contribution and all project- specific cumulative traffic, circulation, and parking impacts
would be mitigated to a level considered less than significant.
• Air Quality: Consistent with the findings of Final EIR No. 142, the proposed Master Plan
Update project would result in air pollutant emissions that exceed the SCAQMD's
construction thresholds. The proposed mitigation program would reduce
construction - related emissions, but not to a level considered less than significant.
Therefore, short-term construction air quality impacts, including potential human health
implications, would be considered a significant and unavoidable impact. In addition, the
proposed Master Plan Update project's operations would result in emissions of carbon
monoxide (CO), VOCs, and nitric oxides (NOx), which would exceed the SCAQMD-
established operational phase thresholds. The proposed mitigation measures would
reduce these impacts, but not to a level considered less than significant. Therefore, long-
term construction air quality impacts, including potential human health implications,
would be a significant and unavoidable impact.
• Noise: The proposed changes to the allowable noise levels would potentially result in
higher noise levels at the nearby residences. Mitigation measures have been
recommended, and it has been determined that no other feasible mitigation exists that
would reduce impacts from the loading dock area to below the limits defined in the City's
Noise Ordinance. The proposed project would cause noise to exceed the Noise
Ordinance criteria in the vicinity of the loading dock area even after application of the
feasible mitigation measures. Therefore, the proposed changes would result in
significant and unavoidable adverse impacts.
Conclusions: Hoag Hospital is located approximately one mile to the east of the Newport
Banning Ranch Project site. The sites are not within the same viewshed; therefore, the identified
Hoag Hospital site - specific shade and shadow aesthetic impacts would not be considered
cumulatively significant. However, because of the proximity of the Hoag Hospital Campus to the
Project site, the potential cumulative effect of increased night lighting is assumed in the Newport
Banning Ranch EIR. The land use and noise impacts identified for Hoag Hospital are site -
specific and therefore would not be considered cumulatively significant. Although an
amendment to the General Plan was required, it did not change the allowable land uses or the
amount of development permitted at the Hoag Medical Campus. As a result, the Hoag project is
considered in the cumulative analysis through use of the "build out of the General Plan
assumptions.
North Newport Center Planned Community
Fashion Island, Block 500, Block 600, and San Joaquin Plaza are located in Newport Center in
the City of Newport Beach. The City of Newport Beach Municipal Code allows a "Planned
Community District" to address land use designation and regulations in Planned Communities.
The proposed project is the adoption of the North Newport Center PC Text, which incorporates
Fashion Island, Block 600, and portions of Block 500 and San Joaquin Plaza owned by The Irvine
RtlProje MNew oMJD150raft EIRV ppmdix M- 082311.dm M -6 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
Company (Applicant) into a single Planned Community District. Concurrently, the existing Block
500 PC Text and the San Joaquin Plaza PC Text would be amended to remove identified portions
of Block 500 and San Joaquin Plaza from their respective Planned Community Districts, and the
Newport Beach Zoning Code would be amended to remove Block 600 from the Administrative
Professional Financial zoning district.
All environmental impacts have been previously analyzed as part of the Newport Beach General
Plan EIR, which was prepared and certified pursuant to State and City CEQA Guidelines. Minor
additions and /or clarifications needed to make the previous document adequate to cover the
actions that were proposed as part of the North Newport Center Project, are documented in an
Addendum (November 2007) to the City of Newport Beach General Plan 2006 Updated Final
Program EIR.
Pursuant to Section 15162 of the CEQA Guidelines, the City of Newport Beach has determined,
on the basis of substantial evidence in the light of the whole record, that the North Newport
Center Project does not propose substantial changes to the project; no substantial changes
would occur which would require major revisions to the General Plan EIR due to the
involvement of new significant environmental effects or a substantial increase in the severity of
previously identified significant effects; and no new information of substantial importance has
been revealed since the certification of the General Plan EIR.
Conclusions: Because the North Newport Center project would result in no new impacts that
were not previously addressed in the City of Newport Beach General Plan 2006 Updated Final
Program EIR, this project would be assumed in the background assumptions set forth in the
City's General Plan and is considered in the Newport Banning Ranch cumulative analysis.
Newport Beach City Hall and Park Development
The project site, located at 1100 Avocado Avenue, is situated between Avocado Avenue and
MacArthur Boulevard. The project site is approximately 20 acres and composed of 3 parcels
(northern, central, and southern). The northern parcel and the central parcel, both of which are
currently vacant, are separated by San Miguel Drive. The southern parcel is occupied by the
Newport Beach Public Library located at 1000 Avocado Avenue; the Library would remain after
project implementation.
The project would result in the relocation of City Hall (with the exception of the Fire Station),
including all City employees and functions currently at City Hall at 3300 Newport Boulevard. The
project includes construction and operation of (1) an approximate 90,000 -sf City Hall building,
meeting hall, and Council Chambers; (2) a 450 -space parking structure; (3) an approximate
20,000 -sf expansion of the Newport Beach Central Library; and (4) a public park. The park is
proposed to include both natural and more formal park features. A dog park would be located in
the northern section of the park. The central portion of the proposed park, located south of San
Miguel Drive but north of the proposed City Hall structures, would be largely organized around
the existing wetland area and the steep slopes that form its sides. Within the wetlands area,
invasive exotic planting would be removed and efforts would be made to improve water quality.
A pedestrian bridge over San Miguel Drive is also proposed to link the central and northern
parcels. Discretionary actions include design plans, a lot line adjustment, an exemption from
zoning code and an amendment to PC 27. The Final EIR was certified and the project approved
on November 24, 2009. Construction is anticipated to start in April 2010 with completion of the
project in late 2012 /early 2013. The EIR evaluated and determined that the following impacts
would be less than significant: hydrology and water quality, population and housing, public
services and utilities, and recreation. The EIR identified the following significant impacts:
RtlProje MNew oftMlViDraft EIRV ppmdix M- 082311.dm M -7 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Land Use and Planning: Prior to mitigation, the project would result in a potentially
significant short-term land use compatibility impact related to air quality and noise during
construction activities. These impacts would be less than significant with implementation
of the recommended mitigation.
• Traffic and Circulation: The addition of project - generated trips would potentially result
in a significant cumulative impact at the Bayside Drive /Coast Highway intersection under
the "Forecast General Plan Buildout with Project' traffic scenario. Implementation of the
recommended mitigation measure would reduce the cumulative traffic impact at Bayside
Drive /East Coast Highway to a less than significant level during the AM peak hour. The
project would also result in intersection impacts during construction. Mitigation requiring
the preparation and implementation of a Construction Area Traffic Management Plan
would reduce impacts to a less than significant level. The project would result in sight
distance impacts; however, implementation of the recommended mitigation measures
would reduce these impacts to less than significant levels.
• Aesthetics: Proposed sources of light would change existing nighttime views from
adjacent areas by introducing light and glare during nighttime hours. Recommended
mitigation measures that require the City to prepare a lighting plan, perform a
photometric study, and conduct an inspection prior to occupancy would reduce potential
impacts of new lighting to less than significant levels, and no additional mitigation would
be required.
• Air Quality: Construction - related project emissions would cause temporary increases in
pollutant concentrations that would contribute to the continuing violations of the federal
and State maximum concentration standards. SCAQMD daily emissions thresholds for
NOx and reactive organic compounds (ROCS) and the localized significance threshold
(LST) for PM10 would be exceeded. Mitigation measures would reduce NOx, ROCs, and
PM10 emissions; however, even with implementation of all available mitigation
measures, project impacts related to construction emissions would remain significant
and unavoidable.
• Biological Resources: Project implementation would have a significant adverse impact
on Coulter's saltbush. Implementation of the recommended mitigation measure would
reduce project - related impacts to Coulter's saltbush to a less than significant level.
Although the possibility of northern harriers nesting on site is considered to be unlikely,
impacts to northern harriers would be considered significant if they were found to be
actively nesting on site. The City would be required to comply with the federal Migratory
Bird Treaty Act (MBTA) in order to reduce potential impacts to this species to a less than
significant level. Overall, the project would result in the direct loss of approximately
88 percent of the total native habitat; this is considered a significant adverse impact.
Compliance with the provisions of the NCCP /HCP would reduce project - related impacts
to wildlife habitat on site to a less than significant level. Wildlife would also potentially be
subject to the adverse effects of construction activities, including noise and physical
disruption. Implementation of the recommended mitigation measure would protect
nesting birds during construction activities and reduce potential adverse effects to
nesting birds to a less than significant level.
Grading and construction work would potentially result in incidental or accidental
discharge of materials into jurisdictional areas, which would be a significant project
impact. Implementation of the recommended mitigation measures would reduce the
RAProje sWewportW0150raft EIRWppedix M- 082311.do M -8 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
potential impacts related to incidental or accidental discharge of materials into
jurisdictional areas associated with the two drainages to a less than significant level.
• Cultural Resources: Project activities would have the potential to disturb or otherwise
impact known and unknown archaeological and paleontological resources.
Implementation of recommended mitigation measures would reduce project impacts to a
less than significant level. One human burial was discovered on site. Although no
additional human remains are known to be on site or are anticipated to be discovered,
precautionary mitigation — including the recommended mitigation measure that would
require compliance with Section 4050.5 of the Health and Safety Code in the unlikely
event that human remains are encountered during project grading —would be required to
reduce potentially significant impacts to a less than significant level.
• Geology and Soils: Geotechnical constraints including strong seismic ground shaking
generated by seismic activity, slope instability and an adverse bedrock structure, and
corrosive and expansive soils are potentially significant impacts. With implementation of
the recommended mitigation measures, potential project impacts related to geology and
soils would be reduced to a less than significant level.
• Global Climate Change: While the project is substantially consistent with federal, State,
and local plans designed to reduce greenhouse gas (GHG) emissions, the project would
emit more than 6,000 metric tons of carbon dioxide equivalent (CO2e) per year during
project operation and is considered to have a cumulatively considerable contribution to
the cumulative GHG impact. The construction emissions in this project would contribute
to the project's overall emissions, which have been determined to represent a
cumulatively considerable contribution to the cumulatively significant global impact of
climate change. The emissions related to on -site energy demands and other operational
on -site direct and indirect emissions would be minimized because of the project's
heightened energy efficiency for the proposed new buildings when compared to
conventional building techniques.
• Hazards and Hazardous Materials: The project would require demolition of an existing
structure that would have the potential to contain asbestos - containing materials (AGMs),
lead -based paints (LBPs), and /or polychlorinated biphenyls (PCBs). The project would
include a generator and an aboveground fuel storage tank for the Emergency
Operations Center (EOC) backup generator, resulting in a potential hazard to employees
or visitors to the Civic Center. Implementation of the recommended mitigation measures
would reduce these impacts to a less than significant level.
If the proposed development is identified as a presumed hazard, the Federal Aviation
Administration (FAA) would potentially require further aeronautical study or allow the City
to reduce the height of the proposed improvements. With implementation of the
recommended mitigation measure, potential impacts to people working in the project
area (resulting from the project's proximity to John Wayne Airport) would be less than
significant.
• Noise: The project would result in construction - related noise impacts associated with
excavation, grading, and construction of buildings on the project site. The EIR also
identified traffic noise impacts to on -site uses as potentially significant. These impacts
would be reduced to less than significant levels with incorporation of the recommended
mitigation measures.
RAProje s\Newportllg150raft EIRWppe dix M- 082311.do M -g Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Conclusions: The City Hall project is consistent with the City's General Plan. The site - specific
project impacts (geology /soils, hazards /hazardous materials, and cultural resources) identified
for the City Hall project would generally be confined to the project site and would be mitigated to
a less than significant; the site is approximately five miles northeast of the Newport Banning
Ranch site. Therefore, site - specific impacts would not be considered cumulatively significant.
With respect to biological resources, both sites are within the Central - Coastal NCCP /HCP and
would be considered as a part of the Project's cumulative study area for biological resources.
The City Hall EIR identifies that compliance with the NCCP /HCP minimization and mitigation
measures would mitigate the impacts to less than significant. With respect climate change, the
City Hall project incorporates Project Design Features (PDFs) to reduce greenhouse gas
emissions associated with the project to a less than significant level. The Newport Banning
Ranch Project will consider the City Hall project in its cumulative analysis of GHG emissions.
The project is anticipated to result in a cumulatively significant net increase of criteria pollutants
for which the project region is in nonattainment; therefore, this approved project would be in
SCAQMD background assumptions for regional air quality emissions within the air basin.
Additionally, this project is included in the Newport Banning Ranch's analysis of cumulative
traffic impacts. The project is also assumed in background assumptions for fire protection
services. In summary, the City Hall project is assumed in the background assumptions set forth
in the City's General Plan and is considered in the Newport Banning Ranch cumulative analysis.
Newport Beach Learning Center — Coast Community College District
The project would develop a 3 -story learning facility on an approximate 3.4 -acre property
located along the western side of Monrovia Avenue and north of the terminus of 15th Street at
1505 -1533 Monrovia Avenue in the City of Newport Beach. The project includes the
construction of an approximate 67,000 -sf building. The learning facility would include
22 classrooms, an art gallery, 5 college -art classrooms, an activity room, 2 performance rooms,
2 computer labs, 2 science rooms, faculty and administrative offices, and a large student lounge
with kitchen facilities. The project would require the demolition of several structures on the site.
Grading would be balanced on the site; therefore, no soil material is proposed to be imported or
exported. Discretionary actions include approval of a parcel map and traffic study. The IS /MND
and the project were approved in August 2009; however, pursuant to the City's Traffic Phasing
Ordinance, a traffic study is required. The traffic study and parcel map were approved by the
City on April 22, 2010. The project is currently under construction. The IS /MND identifies that
the project would not exceed significance thresholds with respect to the following environmental
topics: agriculture, geology and soils, hazards and hazardous materials, hydrology and water
quality, land use and planning, mineral resources, population and housing, public services,
recreation, and utilities and service systems. The IS /MND identifies the impacts listed below as
potentially significant; measures are identified to mitigate these impacts to a less than significant
level.
Aesthetics: The project would create a substantial new source of light and glare.
Compliance with recommended mitigation measures would reduce the impacts to a less
than significant level.
Biological Resources: The project would potentially interfere with migratory nesting
birds, resulting in a potentially significant impact. In addition, the removal of four street
trees within the right -of -way of Monrovia Avenue would create an inconsistency with City
Council Policy G -1, which protects trees within the public right -of -way; this was
considered a potentially significant impact. Compliance with the recommended mitigation
measures would reduce these impacts to a less than significant level.
RAProje s\Newportll015�raft EIRWppe dix M- 082311.do M -10 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Transportation and Circulation: The project would contribute to a significant
cumulative impact on the intersection of Superior Avenue at 17th Street in the City of
Costa Mesa. Implementation of the recommended mitigation measure would reduce the
impact to a less than significant level.
• Air Quality. During construction, the project would generate increased levels of volatile
organic compounds (VOCs), oxides of nitrogen (NOx), and particulate matter with a
diameter less than 10 and 2.5 microns in diameter (PM10 and PM2.5, respectively).
Implementation of recommended mitigation measures would reduce these emissions to
a less than significant level.
• Noise: The project would result in interior noise levels that would exceed the State's 45
A- weighted decibel (dBA) Community Noise Equivalency Level (CNEL) interior noise
standard for classrooms, resulting in a potentially significant impact. The project would
result in potentially significant construction - related noise and construction - related
vibration impacts. Implementation of the recommended mitigation measures would
reduce these impacts to a less than significant level.
• Cultural Resources: The project would require demolition of a residential structure that
is more than 45 years old, which would constitute a potentially significant impact to a
historical resource. The project would also have the potential to expose undiscovered,
buried archaeological resources and unique paleontological resources during ground -
disturbing activities. Implementation of the recommended mitigation measures would
reduce these impacts to a less than significant level.
Conclusions: The Learning Center project did not require a General Plan Amendment and is
therefore assumed in the background assumptions set forth in the City's General Plan. The
Newport Beach Learning Center site is adjacent to the Newport Banning Ranch site and would
be within the cumulative study area of the proposed Project for all of the environmental topics.
Rhine Channel Contaminated Sediment Cleanup
The clean -up project involves the dredging of approximately 150,000 cubic yards of
contaminated sediments within portions of Lower Newport Harbor, specifically from the Rhine
Channel and nearby areas bayward of Marina Park, the American Legion Post and 15th Street.
Sediment would be transported by ocean barge for disposal and beneficial reuse within the
approved Port of Long Beach Middle Harbor Redevelopment Project confined aquatic disposal
facility. The City approved the IS /MND and the project on July 27, 2011. Dredging commenced
in July 2011 and is expected to be completed in December 2011.
The IS /MND identified that the project would not exceed significance thresholds with respect to
the following environmental topics: agriculture and forest resources, cultural resources, geology
and soils, hazards and hazardous wastes, land use and planning, mineral resources, population
and housing, public services, recreation, transportation and traffic, and utilities and service
systems. Based on the IS /MND, the significant impacts listed below are identified; measures are
identified to mitigate impacts to a less than significant level:
• Aesthetics: No indirect operational effects to aesthetics have been identified.
Cumulative impacts to aesthetics would be primarily associated with the potential for
localized turbidity during dredging activities and the presence of dredging equipment
during federal maintenance dredging in Lower Newport Bay (LNB). The cumulative
impacts to the visual character of the project site and its surroundings resulting from the
RtlProje MNew oMJD150raft EIRV ppmdix M- 082311.dm M -11 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
presence of construction equipment are not expected to be significant, because the size
and number of equipment in LNB would not increase during the federal maintenance
dredging project. Measures to isolate turbidity would also be taken for all future projects.
• Biological Resources: Sensitive bird species would be temporarily excluded from the
immediate work area due to increased localized turbidity and noise and the presence of
construction equipment. This exclusion is not expected to have a measurable effect on
their foraging capabilities because of the relatively small size of the area in comparison
to the rest of Newport Bay. Also, the high baseline level of use of the project area
already discourages use by sensitive bird species. Impacts to marine mammals are
expected to be less than significant.
• Greenhouse Gas Emissions: Based on SCAQMD threshold, GHG emissions
generated by the project would not result directly or indirectly in a significant impact on
the environment. In addition, the proposed project does not conflict with any adopted
plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs.
• Air Quality: After consultation with the SCAQMD, the City would mitigate air quality
impacts (i.e., the exceedance of NOx regional threshold) below the significance level by
offsetting the impact through the purchase of Mobile Source Emission Reduction Credits
(MSERCs). MSERCs are created when high- emitting vehicles are retired, and these
credits are considered by the SCAQMD to be an acceptable method to mitigate
construction emissions. NOx emissions would be mitigated by purchasing MSERCs for
every pound of NOx emissions in excess of the significance threshold for each day of
the construction period. The total amount of MSERCs required to fully mitigate
construction NOx emissions to less than significant levels is estimated to be
approximately 3,969 pounds.
• Hydrology and Water Quality. Turbidity is the most likely direct impact to water quality;
this impact would be temporary and localized and would result in less than significant
impacts to water quality. Compliance with proposed BMPs and permit conditions would
avoid and minimize significant impacts to water quality. In the long term, improved water
quality in LNB would result from removal of the contaminated sediments.
• Noise: The project would potentially expose persons to noise levels in excess of
standards established in the City Community Noise Ordinance during allowable
construction hours. All dredging and pile- driving activities would be completed during the
hours permitted by the Ordinance. Therefore, elevated noise levels would not result in a
significant impact. During pile removal and replacement activities, the project would
expose persons to increased noise levels. Based on the distance of the pile driving to
the upland structures, the temporary and intermittent nature of the pile driving, and the
ongoing noise and vibrations generated by marine - related and upland activities, these
impacts are less than significant.
Conclusions: The dredging project would occur approximately 1.5 miles southeast of the
Newport Banning Ranch Project site. Construction activities (i.e., dredging and transport of
sediment) are proposed to occur from July 2011 to December 2011. Therefore, this project
would be completed prior to commencement of the Newport Banning Ranch Project. Therefore,
the project would not contribute to any construction - related impacts. The project would not
contribute to any cumulative impacts and would not be assumed in the cumulative impact
analysis for the Newport Banning Ranch Project.
R: \Projects \Newportllg15\ raft EIRWppe dix M- 082311.do M -12 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
CITY OF NEWPORT BEACH PROJECTS WITH APPROVED CEQA DOCUMENTATION
919 Bayside Drive
The project site is located at 919 Bayside Drive in the City of Newport Beach, and the project
proposes to develop 17 individual residential lots; 1 common recreational lot with a possible
pool and trellis structure; 2 landscape /open space lots; and waterfront and dock lots.
Discretionary actions include a code amendment, use permit, tentative tract map, and coastal
development permit. The IS /MND was approved in 2008. The IS /MND identifies that the project
would not exceed significance thresholds with respect to the following environmental topics:
aesthetics, agriculture, air quality, biological resources, cultural and scientific resources,
hydrology and water quality, land use and planning, mineral resources, population and housing,
public services, recreation, transportation and circulation, and utilities and service systems.
Based on the IS /MND, the following significant impacts are identified:
• Geology and Soils: The project has the potential to be subject to ground shaking,
liquefaction, and lateral spread. However, implementation of standard conditions and
mitigation measures identified in the IS /MND would reduce the impacts to a less than
significant level.
• Hazards and Hazardous Materials: Demolition activities associated with project
development would result in exposure to asbestos - containing materials and lead -based
paint. In addition, the potential for accidental hazardous materials release during
demolition was identified. The implementation of mitigation measures identified in the
IS /MND would reduce these impacts to less than significant levels.
• Noise: The project would result in short -term construction - related impacts. The existing
perimeter wall along Bayside Drive, which provides noise attenuation to current
residents, would be replaced by a new 6- foot -high perimeter wall. Mitigation would
reduce construction - related noise impacts to a less than significant level.
Conclusions: The 919 Bayside Drive project site is located approximately three miles to the
southeast; the identified noise impacts would be mitigated to less than significant and would not
be cumulatively significant. The geology and soils and hazards and hazardous materials
impacts identified for the project would generally be confined to the site and would be mitigated
to less than significant. The 919 Bayside Drive project did not require a General Plan
Amendment and is therefore assumed in the background assumptions set forth in the City's
General Plan and the cumulative background assumptions for the Newport Banning Ranch
Project.
AERIE
The project site is located at 201 -207 Carnation Avenue and 101 Bayside Place in the Corona
del Mar community of the City of Newport Beach. The project allows for the demolition of the
existing residential structures on the 1.4 -acre site; the development of 8 residential
condominium units; and the replacement, reconfiguration, and expansion of the existing
gangway platform, pier walkway, and dock facilities on the site. Discretionary actions include a
General Plan Amendment, coastal land use plan amendment and coastal development permit,
zone change, tract map, and modification permit. The Final EIR was certified and the project
approved by the City on July 14, 2009. A Coastal Development Permit from the California
Coastal Commission has been approved. Based on the EIR, the following significant impacts
are identified:
R: %Proje MNew oMJ0150raft EIRWppe dix M- 082311.do M -13 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Land Use and Planning: The project is consistent with the applicable land use and
coastal land use plans. In addition, the project is also compatible with the existing land
uses in the area. No significant long -term land use impacts are anticipated, and no
mitigation measures are required. Short -term land use compatibility impacts associated
with construction - related air quality impacts would be reduced to a less than significant
level through the incorporation of mitigation measures.
• Geology and Soils: Project construction would be affected by existing geologic and
geotechnical engineering factors, including regional seismicity, bedrock, corrosive soils,
and erosion. Project implementation would be exposed to storm waves associated with
the passage of winter pre - frontal storm winds and southern hemisphere swell that
typically occurs in the summer months. Extreme wind waves are expected to exceed the
maximum wave heights, resulting in potential damage to moored vessels and /or docking
facilities. This would be a potentially significant impact. Implementation of the standard
conditions and proposed mitigation measures identified in the EIR would reduce
potential soils, geologic, and related wave - induced impacts to less than significant
levels.
• Hydrology/Water Quality: Project implementation would result in a reduction in storm
water flows generated on the project site. Although no significant project - related impacts
would occur, the existing deficient catch basin would be upgraded to ensure that
adequate capacity exists to accommodate storm flows within the drainage area. Project
implementation would not result in a significant impact on the water surface elevations
for 100 -year storm flows. The incorporation of BMPs identified in the Water Quality
Management Plan (WQMP) and Construction Management Plan in addition to the storm
drainage /flood - control facilities proposed in the vicinity of the project would reduce the
amount of potential project - generated pollutants that enter the surface flows to the
"maximum extent practicable ", as required by the RWQCB. No additional mitigation
would be required.
• Hazards and Hazardous Materials: Project implementation would demolish the existing
residential structures occupying the site, which would affect materials that contain
detectable amounts of asbestos - containing materials. Implementation of the standard
conditions and mitigation measures identified by the City and other agencies with
jurisdiction would ensure that potential hazards and hazardous materials impacts would
be avoided or reduced to a less than significant level.
• Biological Resources: Implementation of the Construction Management Plan, included
as mitigation, would ensure that potentially significant impacts to both terrestrial and
marine resources are avoided. Implementation of mitigation measures would reduce
potential impacts to a less than significant level.
• Transportation and Circulation: All of the potential construction - related traffic impacts
would be avoided through implementation of mitigation measures and measures
identified in the Construction Management Plan. No significant long -term impacts are
anticipated, and no mitigation measures are required.
• Noise: The project would increase noise levels associated with construction activities.
Implementation of noise reduction measures identified in the Construction Management
Plan, mitigation measures, and compliance with Section 10.26.035 of the City of
Newport Beach Municipal Code would reduce construction - related noise levels but not to
RAProje s\Newportllg150raft EIRWppe dix M- 082311.do M -14 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
a less than significant level. Project- related construction noise would result in an
unavoidable, short. -term significant impact.
Cultural Resources: Although the Monterey Formation may yield fossils, the standard
condition requiring paleontological monitoring would reduce impacts to a level
considered less than significant. No significant impacts to archaeological or historic
resources would occur as a result of project implementation.
Conclusions: For the environmental topics listed where a potentially significant impact would
occur (land use and planning, geology and soils, hazards and hazardous materials, biological
resources, transportation and circulation, noise, and cultural resources), it should be noted that
the AERIE project site is located approximately five miles east of the Newport Banning Ranch
Project site. Because of the distance between the two sites and that all project impacts would be
mitigated to a less than significant level, AERIE's project impacts would not be considered
cumulatively significant. The two sites are located in different watersheds; the identified water
quality impacts associated with the AERIE project would be mitigated to a less than significant
level and would not exceed legal water quality and hydrology standards and requirements.
Because the impact would be mitigated on -site and to a less than significant level, this impact
would not be cumulatively significant. Therefore, this project is included in the cumulative impact
assumptions for Newport Banning Ranch for fire protection services, regional air quality
emissions, and GHG emissions.
Beauchamp
The project involves the development of a 5 -unit residential development at the Peninsula Point
Racquet Club located at 2000 -2016 East Balboa Boulevard on the Balboa Peninsula in the City
of Newport Beach. The project requires a General Plan Amendment and a Local Coastal
Program (LCP) Amendment. Discretionary actions required include a general plan amendment,
and coastal land use plan. A Draft IS /MND was prepared and released for public review on
January 12, 2010. The City Council hearing approved the IS /MND and the project on May 25,
2010. The Coastal Development Permit has been approved by the California Coastal
Commission. The IS /MND identifies that the project would not exceed significance thresholds
with respect to the following environmental topics: aesthetics, agricultural resources, air quality,
biological resources, cultural resources, geology and soils, land use and planning, mineral
resources, population and housing, public services, recreation, and transportation /traffic. Based
on the IS /MND the following significant impacts were identified; measures were proposed to
mitigate these impacts to a less than significant level. No cumulatively significant impacts were
identified.
Hazards and Hazardous Materials: Implementation of the project would result in the
demolition of two tennis courts and an existing clubhouse built in the early- 1960s. As a
result, asbestos - containing building materials or lead -based paint may be present.
Mitigation measures have been provided to ensure proper disposal of hazardous
materials, if discovered.
• Hydrology and Water Quality: Mitigation measure have been provided to ensure that
the project would not violate water quality standards or waste discharge requirements.
The project would also prepare a Water Quality Management Plan (WQMP). The site is
within the Newport Bay Watershed.
RAProje s\NewportU0150raft EIRWppe dix M- 082311.do M -15 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Noise: Noise from construction has the potential to cause annoyance at nearby
receptors; therefore, noise control measures have been recommended to reduce the
noise levels to the extent practicable.
• Utilities and Service Systems: The project would not require or result in the
construction of new stormwater drainage facilities or expansion of existing facilities.
However, mitigation measures have been provided to reduce impacts related to
stormwater to a less than significant level.
Conclusions: The Beauchamp project site is located approximately four miles southeast of the
Newport Banning Ranch Project site. The identified construction noise impacts would not occur
proximate to the Newport Banning Ranch Project site, construction noise would not be
considered cumulatively significant. The site - specific hazards and hazardous materials impacts
identified for the project would generally be confined to the project site and would be mitigated
to less than significant; therefore, this impact would not be considered cumulatively significant.
With respect to water quality, the two sites are located in different watersheds. The Beauchamp
site is located in the Newport Bay Watershed and the Newport Banning Ranch site is located
within the Talbert Watershed. Because the identified water quality impacts associated with the
Beauchamp project would be mitigated to a less than significant level and the project sites are
located in different watersheds, the impact would not be cumulatively significant. Therefore, this
project is included in the cumulative impact assumptions for Newport Banning Ranch for fire
protection services, regional air quality emissions, and GHG emissions.
Hyatt Regency Newport Beach Expansion
The project is located at 1107 Jamboree Road and proposes an expansion of the existing Hyatt
Regency Newport Beach Hotel. The project proposes to improve the existing hotel by adding
88 new timeshare units; a 24,387- square -foot, 800 -seat ballroom /meeting building; a 10,072 -
square -foot spa and new pool; and a 2 -level parking garage. Discretionary actions include a use
permit, parcel map, modification permit, development agreement, and coastal development
permit. The Final EIR was certified and the project was approved by the City on February 24,
2009; the applicant is pursuing the Coastal Development Permit from the California Coastal
Commission. The EIR evaluated and determined that the following impacts would be less than
significant: aesthetics, air quality, agricultural, hydrology and water quality, land use and
planning, and public services. Based on the EIR, the following significant impacts are identified:
• Biological Resources: Construction - related activities would have the potential to cause
a temporary adverse impact on coastal California gnatcatchers nesting in preserved
areas of coastal sage scrub adjacent to the project site. Therefore, the project would be
required to comply with the Natural Community Conservation Plan /Habitat Conservation
Plan (NCCP /HCP), which includes construction - related minimization and mitigation
measures that minimize impacts to the coastal California gnatcatcher and other coastal
sage scrub species. In addition, project development would potentially impact migratory
birds and raptor foraging habitat. Implementation of mitigation measures would reduce
impacts to a less than significant level.
• Cultural Resources: Development of the proposed project would have the potential to
impact archeological and /or paleontological resources, including the disturbance of
human remains. Implementation of mitigation measures would reduce impacts to a less
than significant level.
RAProje s\Newportllg15�raft EIRWppe dix M- 082311.do M -16 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Geology and Soils: The project site is subject to potential seismic - related hazards,
including unstable geologic and soils conditions. Implementation of mitigation measures
would reduce impacts to a less than significant level.
• Hazards and Hazardous Materials: Design and mitigation measures detailed in the fire
protection plan (FPP) would minimize potential risks associated with the proposed
project. Impacts associated with hazards and hazardous material would be reduced to a
less than significant level.
• Noise: Construction activities associated with the proposed project would significantly
elevate the daytime noise environment in the vicinity of noise - sensitive residential and
recreational uses. This impact would be considered significant and unavoidable.
• Transportation and Circulation: The project's valet parking component would
potentially result in an on -site parking impact. In addition, temporary construction
impacts associated with the proposed project would result in a significant impact to the
Jamboree Road /San Joaquin Hills intersection. Implementation of mitigation measures
would reduce impacts to a less than significant level.
Conclusions: The Hyatt Regency project did not require an amendment to the General Plan.
The hotel site is approximately four miles to the east of the Newport Banning Ranch Project site.
The identified construction noise impacts would be significant and unavoidable; however,
because they would not occur proximate to the Newport Banning Ranch Project site,
construction noise would not be considered cumulatively significant. The site - specific project
impacts (geology /soils, hazards /hazardous materials, and cultural resources) identified for the
project would generally be confined to the Hyatt Regency site and would be mitigated to less
than significant; therefore, they would not be considered cumulatively significant. Both the Hyatt
Regency and the Newport Banning Ranch sites are within the boundaries of the NCCP /HCP
and would be considered as a part of the Project's cumulative study area for biological
resources, as well as fire protection services, regional air quality, and GHG emissions. In
summary, the Hyatt Regency project is assumed in the background assumptions set forth in the
City's General Plan and is considered in the Newport Banning Ranch cumulative analysis.
LDS Rectory
The LDS Rectory project site is located at 2300 Bonita Canyon Drive in the City of Newport
Beach. The project applicant, the Church of Jesus Christ of Latter Day Saints (LDS), proposes
to construct a rectory with a 2,316 -sf project footprint, which consists of 1,825 sf of living space
and a 491 -sf, attached 2 -car garage. The site consists of the project footprint as well as a fuel
modification buffer zone adjacent to the project footprint, which extends 40 feet to the nearest
property line. Including the fuel modification buffer zone, the project site is approximately
6,066 sf. Discretionary actions include a use permit and site plan review from the City. The
IS /MND was approved on November 19, 2009. The IS /MND identifies that the project would not
exceed significance thresholds with respect to the following environmental topics: agriculture, air
quality, mineral resources, noise, population and housing, public services, recreation,
transportation and circulation, and utilities and service systems. Based on the IS /MND, the
significant impacts listed below are identified; measures are identified to mitigate impacts to a
less than significant level:
Land Use and Planning: In order to ensure compliance with General Plan policies,
mitigation measures have been identified in the IS /MND to ensure that sensitive and rare
RAProje s\Newportllg150raft EIRWppe dix M- 082311.do M -17 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
resources would be protected from significant disruption and that impacts related to land
use General Plan policies would remain less than significant.
Aesthetics: The development of a rectory, similar to a single -unit dwelling, would result
in light and glare sources similar to other dwellings in the community. However, in order
to mitigate the potential impact to the adjacent environmental study area (ESA),
mitigation measures are required to reduce impacts related to light and glare to a less
than significant level.
Geology and Soils: With adherence to geotechnical design considerations and site
grading and site preparation recommendations as described in the IS /MND, project
implementation would not result in significant impacts related to geology and soils on the
site.
Hydrology and Water Quality: A tributary to a drainage system that flows to the San
Joaquin Reservoir and the Upper Newport Bay exists along the eastern edge of the
proposed fuel modification zone. Mitigation has been identified to ensure that the
impacts to this tributary would be mitigated to a level that is less than significant. In
addition, any alterations to possible drainage features located in the fuel modification
zone would require mitigation in order to reduce impacts to a less than significant level.
Mitigation measures, including implementation of planting plan and criteria for plant
selection in order to minimize the impact of soil erosion within the fuel modification area,
have also been provided.
Hazards and Hazardous Materials: The project site is within an area designated for
high fire susceptibility. Mitigation measures have been provided to ensure that impacts
related to the risk of loss, injury, or death involving wildland fires remain less than
significant.
Biological Resources: During the biological survey, several sensitive species were
identified as potentially occurring within the fuel modification zone of the project site. A
biological survey will be performed to clearly identify the boundary of this feature in
relation to existing vegetation communities. In addition, a tributary to a drainage system
leading to the San Joaquin Reservoir and Upper Newport Bay exists at the eastern edge
of the fuel modification zone. The Central /Coastal Subregional NCCP designates the
Bonita Canyon Creek and Reservoir adjacent to the subject property as a Habitat
Linkage area. With the implementation of mitigation measures, potential impacts related
to biological resources would be reduced to a level considered less than significant.
Cultural Resources: Mass grading of the project site was completed and was
monitored by a certified Archaeologist, as required by the Mitigation Monitoring Plan
developed for the site in 1992. It is unlikely that any significant archaeological resources
would be found during pre - grading soil removal tasks; however, mitigation measures
have been provided to ensure that impacts related to archaeological and paleontological
resources remain less than significant.
Conclusions: The LDS Rectory project did not require an amendment to the General Plan. The
site is approximately six miles to the northeast of the Newport Banning Ranch Project site. For
the environmental topics listed where a potentially significant impact would occur (land use and
planning, aesthetics, transportation and circulation), the IS /MND indicates that that all project
impacts would be mitigated to a less than significant level; these project impacts would not be
considered cumulatively significant. The site - specific project impacts (geology /soils,
RtlProje MNew oMJ0150raft EIRV ppmdix M- 082311.do M -18 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
hazards /hazardous materials, and cultural resources) identified for the project would generally
be confined to the project site and would be mitigated to less than significant; therefore, they
would not be considered cumulatively significant. Both the LDS Rectory and the Newport
Banning Ranch sites are within the boundaries of the NCCP /HCP and would be considered as a
part of the Project's cumulative study area for biological resources, as well as regional air quality
and GHG emissions. In summary, the LDS Rectory project is assumed in the background
assumptions set forth in the City's General Plan and is considered in the Newport Banning
Ranch cumulative analysis.
Marina Park
The project site, located in the southwestern portion of the City of Newport Beach, is
approximately 10.45 acres and situated between Balboa Boulevard and Newport Bay, and
between 15th Street on the east and 191h Street on the west. The project would redevelop the
site to provide additional public recreational and community activities facilities. The project
includes three phases. In Phase 1, the mobile home park would be demolished and converted
to open space with coastal access improvements Phase 2 would convert the open space to turf.
Phase 3 would consist of the construction of a multipurpose building at the Balboa Center
complex, a sailing program building at the Balboa Center complex, a new Girl Scout House,
parking areas, a park with tennis and basketball courts, beach, any 23 -slip marina. Proposed
development includes a public park and beach with recreational facilities; restrooms; a new Girl
Scout House; a public short-term visiting vessel marina and sailing center; and a new
community center with classrooms, and ancillary office space.
Discretionary actions include a general construction activity storm water permit, coastal
development permit, Section 401 certification, and Section 1602 agreement, jurisdictional
review, and a permit from the U.S. Army Corps of Engineers for dredging, filling, and structures
in waters of the U.S. A previous Draft EIR for the project was prepared and released for public
review in February 2009. After considering public and agency comments on the February 2009
Draft EIR, and in view of project modifications that have occurred since release of the Draft EIR,
the City decided to prepare and recirculate a new Draft EIR. The new Draft Recirculated EIR
( DREIR) released for public review on January 25, 2010. The Final EIR was certified and the
project approved by the City on May 11, 2010. The project requires a Coastal Development
Permit from the California Coastal Commission as well as other regulatory permits. Construction
is proposed to start mid -year 2012 and be completed in 2014.
The DREIR evaluated and determined that the following impacts would be less than significant:
aesthetics, land use and planning, public services, transportation and traffic, and utilities and
service systems. The DREIR identifies the following significant impacts:
• Air Quality: The project would result in construction - related air emissions that would
exceed SCAQMD regional significance thresholds. Additionally, the project has the
potential to conflict with or obstruct implementation of the applicable air quality plan. The
project may violate an air quality standard or contribute substantially to an existing or
projected air quality violation. Incorporation of recommended mitigation measures would
reduce these impacts to a level considered less than significant.
• Biological Resources: The project would affect marine biological habitats and
resources, intertidal habitats, and nesting birds. These impacts would be reduced to a
less than significant level through implementation of the recommended mitigation
measures.
RAProje s\Newportll015�raft EIRWppe dix M- 082311.do M -19 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Cultural Resources: Project construction activities are not anticipated to result in
potential significant impacts to resources of concern to Native American groups and to
archaeological resources. However project implementation would contribute to potential
significant cumulative impacts to paleontological resources. Implementation of
recommended mitigation measures would ensure that impacts would remain less than
significant.
• Geology and Soils: The near - surface soils beneath the project site, which consist of
loose to medium - density hydraulic fills and bay deposits, would be subject to liquefaction
and ground settlement during seismic events resulting in a significant impact. These
potential impacts would be reduced to a less than significant level with implementation of
the recommended mitigation measures. The beach area of the project site along
Newport Bay is likely vulnerable to lateral spreading and would have the potential to
result in a significant impact on the proposed buildings. Implementation of recommended
mitigation measures would reduce this impact to a less than significant level.
• Hazards and Hazardous Materials: Construction activities may result in a significant
hazardous materials impact related to the discovery, removal, and disposal of hazardous
demolition debris, however the long -term activities of the project would not use or
dispose of any hazardous materials of reportable quantities in its typical operations. With
mitigation, impacts associated with Project demolition activities would not result in
significant hazardous materials impact related to asbestos and lead -based paint.
• Hydrology and Water Quality: Implementation of the project may result in short-term
water quality impacts during construction activities. In the long -term, operation of the
project may cause poor water quality in the Newport and West Lido channels due to
poor water quality in the proposed marina. The proposed project would include various
BMPs to reduce pollutants and protect the quality of the water entering Newport Bay.
Implementation of recommended mitigation measures would reduce impacts to less than
significant levels.
• Noise: The project may result in a substantial temporary or periodic increase in
ambience noise levels in the project vicinity of the levels existing without the project
Implementation of recommended mitigation measures would reduce impacts to less than
significant levels.
Conclusions: Because the sites are located approximately two miles apart, construction -
related noise would not be cumulatively significant. The site - specific project impacts
(geology /soils and hazards /hazardous materials) identified for the project would generally be
confined to the project site and would be mitigated to less than significant; therefore, they would
not be considered cumulatively significant. The Marina Park project could have significant air
quality impacts for which the project region is in nonattainment; therefore, this approved project
would be in SCAQMD background assumptions for regional air quality emissions within the air
basin. The project will also be considered in the cultural resources cumulative impact analysis.
With respect to water quality, the two sites are located in different watersheds. The Marina Park
site is located in the Newport Bay Watershed and the Newport Banning Ranch site is located
within the Talbert Watershed. Because the DREIR finds that identified water quality impacts
associated with the project would be mitigated to a less than significant level and the project
sites are located in different watersheds, the impact would not be cumulatively significant.
Therefore, this project is not included in the cumulative impact assumptions for Newport
Banning Ranch. Although marine and intertidal habitats are sensitive resource and would be
impacted as a part of the Marina Park project, the Newport Banning Ranch Project site is not
RtlProje s\New oMJ0150raft EIRV ppmdix M- 082311.dm M -20 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
located adjacent to the coast or bay and would not impact marine biological resources. The
Marina Park project is consistent with the City's General Plan and did not require a General
Plan Amendment. In summary, the project is assumed in the background assumptions set forth
in the City's General Plan and is considered in the Newport Banning Ranch cumulative analysis.
Meoonigal Residence
The project site is located at 2333 Pacific Drive in the City of Newport Beach. The project
applicant proposes to construct a 3,566 -sf, single - family residence. The proposed residence
would consist of 3 levels: 1,827 sf on the first floor; 934 sf on the second floor; and 805 sf on the
uppermost level (which includes a 428 -sf, 2 -car garage). Discretionary actions required included
a modification permit and a variance. The IS, dated May 8, 2009, evaluated and determined that
the following impacts would result in less than significant impacts and would not require further
evaluation in the Draft EIR: agricultural resources, recreation, utilities, geology and soils,
hydrology /water quality, noise, cultural resources, mineral resources, public services and
facilities, population and housing, hazards and hazardous materials, air quality, and
transportation /traffic. The Final EIR was certified and the project was approved on January 10,
2010; the project has not been constructed. The following significant impact is identified in the
EIR:
• Aesthetics: The project has been redesigned to conform to the building and
development standards prescribed in the R -1 zoning district and to avoid significant
visual impacts. Mitigation measures, which require the dedication of a view easement to
ensure that views through the site would be preserved, were identified in the EIR. With
implementation of the recommended mitigation measures, impacts would be reduced to
a less than significant level.
Conclusions: The project site is located approximately five miles southeast of the Newport
Banning Ranch Project site in Corona del Mar. Therefore, this project is included in the
cumulative impact assumptions for Newport Banning Ranch for regional air quality, GHG
emissions, and fire protection services.
Newport Bay Marina
The project site is located at 2300 Newport Boulevard in the City of Newport Beach. The
proposed project consists of a mixed -use development with approximately 36,000 sf of
commercial uses and 27 residential units and a partial subterranean garage. Discretionary
approvals include a coastal development permit, use permit, site plan review, vesting tentative
tract map, and approvals by the Regional Water Quality Control Board (RWQCB), California
Department of Fish and Game (CDFG) and U.S. Army Corps of Engineers (USACE). The Final
EIR was certified and the project approved on December 7, 2006; the project has not been
constructed. Based on the EIR, the following significant impacts are identified:
• Aesthetics: Project design features would provide for mitigation of the loss of views
from Newport Boulevard by retaining the view corridor and providing new public access
and pedestrian viewing areas of the bay along the waterfront. In addition, mitigation
measures identified in the EIR would reduce aesthetic impacts including light and glare
to a less than significant level.
• Air Quality: During demolition and excavation, NOx emissions would exceed
significance thresholds primarily due to the trucks that would haul demolition debris and
excavated dirt from the project site. Mitigation measures have been incorporated into the
RAProje s\New oMJDlViDraft EIRV ppmdix M- 082311.do M-21 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
EIR to reduce the number of truck trips and daily vehicle miles so that emissions would
remain below the significance thresholds. As a result, impacts would be reduced to a
less than significant level.
• Biological Resources: Impacts to biological and marine resources would result from
removal of bulkheads, docks, and pilings, the dredging of a portion of the channel, the
filling of a slipway, and indirect effects from turbidity in the water column caused by
construction of the proposed project. With implementation of mitigation measures
identified in the EIR related to preservation and restoration of the slipway, biological and
marine resource impacts would be reduced to a less than significant level.
• Cultural Resources: The proposed project involves the demolition of all buildings on-
site, some of which have been identified as historic resources. Mitigation measures have
been identified in the EIR to mitigate for impacts related to these historical resources;
however, because these resources are eligible for the California Register under Criteria
1 and 3, these measures would not reduce project impacts to below the level of
significance. Therefore, the proposed project would result in significant and unavoidable
impact related to historic resources.
• Geology and Soils: Recommended mitigation measures identified in the EIR would
reduce potential geology and soils impacts to a less than significant level.
• Hazards and Hazardous Materials: The proposed project involves the transport and
disposal of hazardous materials from waste located in sediment near slipways.
Mitigation measures presented in the EIR would reduce any potential impacts
associated with hazards and hazardous materials to a less than significant level.
• Hydrology and Water Quality: The proposed project is located within a 500 -year flood
hazard area. Due to close proximity of the project site to the Pacific Ocean, the site has
the potential to experience impacts related to flood hazards. With implementation of
recommended mitigation measures identified in the EIR, the proposed project would not
result in any impacts to hydrology, flood hazard, or water quality.
• Noise: The proposed project has the potential to result in short-term construction related
noise impacts. However, with implementation of recommended mitigation measures
identified in the EIR, all potential noise impacts would be reduced to a less than
significant level.
• Public Services: Recommended mitigation measures identified in the EIR would reduce
potential public service impacts to a less than significant level.
• Utilities and Service Systems: Although significant impacts to utilities are not
anticipated, mitigation measures have been provided in the EIR to ensure that impacts
would be less than significant if underground utility lines are encountered during
construction and that service to the proposed project would be provided.
Conclusions: Because the sites are located approximately two miles apart, construction -
related noise would not be cumulatively significant. The site - specific project impacts (cultural,
geology /soils, and hazards /hazardous materials) identified for the project would generally be
confined to the project site and would be mitigated to less than significant; therefore, they would
not be considered cumulatively significant. The project could have significant air quality impacts
for which the project region is in nonattainment; therefore, this approved project would be in
RtlProje s\New oMJ0150raft EIRV ppmdix M- 082311.do M -22 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
SCAQMD background assumptions for regional air quality emissions within the air basin. With
respect to water quality, the two sites are located in different watersheds. The Marina Park site
is located in the Newport Bay Watershed and the Newport Banning Ranch site is located within
the Talbert Watershed. Because the EIR finds that any water quality impacts associated with
the project would be mitigated to a less than significant level and the project sites are located in
different watersheds, the impact would not be cumulatively significant. Therefore, this project is
not included in the cumulative impact assumptions for Newport Banning Ranch. Although
marine and intertidal habitats are sensitive resource and would be impacted as a part of the
project, the Newport Banning Ranch Project site is not located adjacent to the coast or bay and
would not impact marine biological resources. The need for a General Plan Amendment was not
identified. As a result, traffic impacts would be taken into consideration through use of the "build
out of the General Plan" assumptions that will be incorporated into the cumulative traffic
analysis. In summary, the Newport Bay Marina project is assumed in the background
assumptions set forth in the City's General Plan and is considered in the Newport Banning
Ranch cumulative analysis.
Newport Business Plaza
The project site is located at 4699 Jamboree Road and 5190 Campus Drive in Newport Beach.
The project proposes a 1 -story bank, two 3 -story office buildings, and a 2 -level parking
structure. Discretionary actions required include a General Plan Amendment, Koll Center
Newport Planned community text amendment, and tentative parcel map. The City Council
approved the project on January 25, 2011. The IS /MND identifies that the project would not
exceed significance thresholds with respect to the following environmental topics: agricultural
and forest resources, air quality, greenhouse gas emissions, hydrology and water quality, land
use and planning, mineral resources, population and housing, public services, recreation, and
utilities and service systems. Based on the IS /MND, the following significant impacts were
identified; measures were proposed to mitigate these impacts to a less than significant level. No
significant cumulative impacts were identified.
Aesthetics: The project site is located in an area that currently developed with a mix of
commercial, office, and residential uses, as well as open space. The existing parking lot
is lighted for nighttime parking for safety purposes. Any lighting associated with the
proposed project would generally be similar to the existing lighting in the area. Mitigation
has been incorporated to ensure that the proposed project would not add substantial
amounts of lighting to the area. Impacts would be less than significant with mitigation.
• Biological Resources: Although the existing ornamental trees on site are not
anticipated to provide important habitat, the removal of ornamental trees on site could
reduce the number of stopover locations or nesting sites for migratory birds. Mitigation is
proposed to reduce the impact on migratory birds should the trees be removed during
migration season. Impacts would be reduced to a less than significant level.
Cultural Resources: It is highly unlikely the proposed project would disturb buried
significant prehistoric archaeological resources and /or paleontological resources.
However, mitigation measures have been provided to reduce impacts associated with
the proposed project to a less than significant level.
Geology and Soils: Highly expansive soils have been determined on site, which have
the potential to damage the foundation of the proposed business plaza. However,
mitigation measures have been incorporated to reduce impacts associated with
expansive soils on site to less than significant.
RtlProje s\New oMJ0150raft EIRV ppmdix M- 082311.do M -23 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Hazards and Hazardous Materials: Implementation of the proposed project may
require the disposal of hazardous substances as a result of the demolition of two existing
office buildings. However, mitigation measures have been provided, which require
proper handling, transport, and disposal of any hazardous materials, if discovered, as
directed by the City. Impacts are considered less than significant with mitigation.
In addition, the proposed project would be within the height restriction zone for the John
Wayne Airport and the notification area of the FAR Part 77 Imaginary Surfaces
aeronautical obstruction area. The proposed project would require notification to the FAA
in accordance with Section 77.13 of the FAR because the proposed project would
exceed the notice criteria for 77.13(a)(2) by 13 feet (Federal Aviation Administration
2010). Therefore, the project could result in a change of air traffic patterns, including
either an increase in traffic levels or a change in location that would result in substantial
safety risks. Impacts would be considered less than significant with mitigation.
• Noise: Construction of the proposed project would result in a temporary increase in
noise levels. As a result, mitigation measures have been incorporated to reduce
construction noise levels. Impacts from construction would be less than significant with
mitigation incorporated.
• Transportation and Traffic: As stated previously, the project site is located within the
boundaries of the AELUP for John Wayne Airport. The proposed project would require
notification to the FAA in accordance with Section 77.13 of the FAR because the
proposed project would exceed the notice criteria for 77.13(a)(2) by 13 feet (Federal
Aviation Administration 2010). The proposed project has the potential to result in a
change of air traffic patterns, including either an increase in traffic levels or a change in
location that would result in substantial safety risks. However, impacts would be
considered less than significant with the incorporation of mitigation.
Conclusions: The project site is approximately seven miles northeast of the Newport Banning
Ranch Project site. It is reasonable to assume that construction and completion of the bank and
office project could precede the commencement of the Newport Banning Ranch Project.
Therefore, the project would not contribute to any construction - related impacts. The site - specific
project impacts (biological, cultural [paleontological]) resources, geotechnical, and hazardous
materials) identified for the project would generally be confined to the project site and would be
mitigated to less than significant. Therefore, the project would not be considered in the
cumulative analysis for Newport Banning Ranch with the exception of traffic, and background
regional air quality emissions and cumulative GHG. The Newport Business Plaza is assumed as
a cumulative project in the Newport Banning Ranch traffic analysis, regional air quality, GHG
emissions, and the fire protection assumptions.
PRIES Office Building B
The project would require a General Plan Amendment to increase the maximum allowable
entitlement by 11,544 gsf for an allow development limit of 1,071,690 gsf and an amendment to
the Koll Center Planned Community Text to increase the maximum allowable entitlement in
Office Suite B by 9,917 net sf for an allowable building area of 977,720 net sf. The project
proposed the construction of two levels of office space over a ground -level parking structure.
The project is located at 4300 Von Karman Avenue. Discretionary actions required include a
general plan amendment and planned community text amendment. The IS /MND and the project
were approved on February 22, 2011.
RAProje sv4ewportW0150raft EIRWppe dix M- 082311.do M -24 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Based on the IS /MND, the project would have the following significant impacts; measures are
identified to mitigate impacts to a less than significant level:
Biological Resources: Although the existing ornamental trees on site are not
anticipated to provide important habitat, the removal of ornamental trees on site could
reduce the number of stopover locations or nesting sites for migratory birds. Mitigation is
proposed to reduce the impact on migratory birds should the trees be removed during
migration season. Impacts would be less than significant with mitigation incorporated.
• Cultural Resources: Mitigation measures have been provided to ensure that impacts to
paleontological resources on site would be mitigated to a less than significant level.
Geology and Soils: Exposed on -site soils would be subject to soil erosion during
construction. The required grading includes grading, fill, drainage, and erosion control
standards that would be applied to the corresponding construction activity. The project
would be required to implement standard erosion control measures and construction
best management practices (BMPs) that would minimize impacts. Impacts would be less
than significant with mitigation. Subsurface on -site soils have a medium expansion
potential that could potentially damage the foundation of the proposed building or create
a risk to employees. Impacts would be less than significant with the incorporation of
mitigation.
• Hydrology and Water Quality: The project- specific WQMP would provide BMPs
appropriate to the proposed project to ensure that any water quality impact would be
reduced to a less than significant level.
Noise: Project construction is anticipated to occur over eight months. In addition to
compliance with the City's Municipal Code construction restrictions, noise measures
have in order to ensure a less than significant impact on sensitive receptors.
Utilities and Service Systems: During construction, runoff from the project site would
be managed by BMPs and as directed in the City's stormwater protection requirements.
BMPs would be incorporated into the proposed project as part of a SWPPP to prevent
discharges of polluted stormwater from construction sites from entering the storm drains.
Storm runoff generated through project operations would be diverted to the infiltration
trench and catch basin per the Preliminary WQMP. The proposed project would not
require or result in the construction of new stormwater drainage facilities or expansion of
existing facilities. Impacts would be less than significant after mitigation
Conclusions: The project site is approximately five miles northeast of the Newport Banning
Ranch Project site. Construction of the office project is anticipated to begin in fall 2010 and
completed in summer 2011 which would precede the commencement of the Newport Banning
Ranch Project. Therefore, the project would not contribute to any construction - related impacts.
The site - specific project impacts (biological, cultural [paleontological] resources, and water
quality) identified for the project would generally be confined to the project site and would be
mitigated to less than significant. With respect to water quality, the two sites are located in
different watersheds. Because the IS /MND finds that identified water quality impacts associated
with the office project would be mitigated to a less than significant level and the project sites are
located in different watersheds, the impact would not be cumulatively significant. The project is
included in the cumulative assumptions for fire protection, traffic, background regional air quality
emissions, and GHG emissions.
R: \Projects \Newportll015\ raft EIRWppe dix M- 082311.do M -25 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Santa Barbara Condominiums
The project site is located on Santa Barbara Drive in the City of Newport Beach. The project
consists of 3 proposed residential structures including 79 condominium units totaling
approximately 205,232 net sf. The project also contains an approximate 97.23- gross - square-
foot subterranean parking structure with a total of 201 parking spaces on site. The project site
totals 4.25 acres, and would provide approximately 1.8 acres of open space and approximately
0.5 acre of recreational area. Discretionary actions include a General Plan Amendment, local
coastal program land use plan amendment, code amendment, parcel map, tentative tract map,
modification permit, and coastal development permit. The IS /MND was approved in January
2006. The CDP has been approved by the Coastal Commission. The IS /MND identifies that the
project would not exceed significance thresholds with respect to the following environmental
topics: aesthetics, agriculture, biological resources, hazards and hazardous materials, hydrology
and water quality, land use and planning, mineral resources, population and housing, and
recreation. Based on the IS /MND, the significant impacts listed below are identified; measures
are provided to mitigate these impacts to a less than significant level:
• Geology and Soils: Design and construction of the project would include applicable
building codes to reduce potential impacts associated with expansive soils. However,
mitigation measures would need to be incorporated to further reduce liquefaction
hazards associated with loose surficial soils at the project site.
• Transportation and Circulation: Implementation of mitigation measures would allow
roadways and intersections to operate and maintain acceptable levels of service and
would further reduce potential traffic- related impacts to a less than significant level. In
addition, to ensure that all City requirements for parking areas on -site are met, mitigation
measures were identified.
• Air Quality: The application of paintings and coatings has the potential to produce
reactive organic gas (ROG) emissions that exceed the SCAQMD threshold. However,
with implementation of mitigation measures, this impact would be reduced to a less than
significant level.
• Noise: Implementation of the project would result in short -term, construction - related
noise increases. Additionally, long -term increased noise levels would potentially result
from the introduction of residential uses and associated vehicle traffic along adjacent
roadways. Mitigation measures provided in the IS /MND would reduce potential noise
impacts associated with the project to a less than significant level.
• Cultural Resources: There is the potential for archeological and /or paleontological
resources to exist at the project site. Therefore, any adverse impacts related to buried
archeological and /or paleontological resources would be reduced to a less than
significant level with the incorporation of mitigation measures identified in the IS /MND.
• Public Services: The project would be required to pay a school impact fee of $378,449.
Development of the project site would require payment of these fees prior to the
issuance of grading permits. Payment of fees would reduce potential impacts on school
services to a less than significant level.
• Utilities and Service Systems: While adequate water supplies would be available to
service the project, implementation of water conservation measures provided by the City
RAProje s\Newportllg150raft EIRWppe dix M- 082311.do M -26 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
of Newport Beach would reduce demand for groundwater, surface water, and imported
water supplies.
Conclusions: The Santa Barbara condominiums would be constructed approximately four
miles northeast of the Newport Banning Ranch Project site. The IS /MND for the condominium
project identifies that all project impacts would be mitigated to a less than significant level;
therefore, these project impacts would not be considered cumulatively significant. The site -
specific project impacts (geology /soils and cultural resources) identified for the project would
generally be confined to the project site. The Santa Barbara Condominium project is assumed in
the cumulative impact analysis for fire protection services, the Project's Traffic Phasing
Ordinance (TPO) analysis, background regional air quality emissions, and GHG emissions.
Sunset Ridge Park
The project site is located within the incorporated boundary of the City of Newport Beach and in
unincorporated Orange County within the City's Sphere of Influence. The City proposes to
develop the approximate 18.9 -acre site with active and passive recreational uses and to
construct an access road from West Coast Highway to the park through Newport Banning
Ranch. No nighttime lighting, other than for public safety, is proposed. Discretionary actions
include site plan approval. The Draft EIR was released for public review on October 27, 2009.
The Final EIR was certified and the project approved by the City Council on March 23, 2010.
The EIR evaluated and determined that the following impacts would be less than significant:
agricultural resources, mineral resources, population and housing, public services and utilities,
and recreation. Based on the Final EIR, the following potentially significant impacts are
identified; all other environmental impacts addressed in the Final EIR would be less than
significant:
Geology and Soils: Although the project site is not located within a designated Alquist-
Priolo Earthquake Fault Zone, strong seismic ground shaking associated with regional
earthquake activity at the site can be expected. The City of Newport Beach General Plan
and the California Department of Mines and Geology (CDMG) (1998) indicate that there
is some on -site potential for landslides under seismic conditions. With the incorporation
of the Mitigation Program identified in the EIR, impacts to geotechnical resources would
be less than significant.
Hazards and Hazardous Materials: Remedial activities would have the potential to
release contaminants, predominantly hydrocarbons, into the air during soil- disturbance
activities due to aeration during handling (i.e., earth moving) of the existing contaminated
soils. Implementation of the mitigation program identified in the EIR would mitigate any
potentially significant impacts related to hazardous materials to a less than significant
level.
Biological Resources: The project would result in the removal of natural habitat,
including coastal sage scrub. California gnatcatchers have been identified within the
project study area, which occurs within the Santa Ana River Mouth Existing Use Area of
the Central /Coastal Subregion NCCP /HCP. With implementation of the mitigation
program, potential impacts to biological resources would be reduced to a level
considered less than significant.
• Transportation and Circulation: With implementation of the standard conditions and
mitigation addressed in the EIR, all traffic study intersections would continue to operate
RAProje sv4ewpoMJ0150raft EIRV ppmdix M- 082311.dm M-27 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
at acceptable levels of service. Implementation of the project would not result in any
significant impacts related to circulation or access and therefore would not significantly
impact any emergency response evacuation plans. Impacts would be mitigated to a less
than significant level.
• Air Quality and Greenhouse Gas Emissions: Potential impacts related to air quality
and global climate change would be less than significant except for (1) a potential for
NOx emissions to exceed SCAQMD mass daily thresholds if soil is exported to an off -
site location distant from the project site and (2) exposure of sensitive receptors to PM10
and PM2.5 emissions during the mass grading phase, which would exceed local air
quality standards. Each of these would be considered a significant and unavoidable
impact which would cease upon the completion of construction.
• Noise: Construction equipment would have the potential to generate temporary noise
impacts well above the existing ambient noise levels. Due to the low existing noise levels
and the proximity of the noise - sensitive receptors, construction would result in a
temporary significant increase in ambient noise to the residences adjacent to the site.
Therefore, construction of the project would result in unavoidable, short-term significant
impacts that would cease upon completion of construction.
• Cultural Resources: Grading activities have the potential to impact significant unknown
resources, including paleontological resources. With implementation of the mitigation
program, potential impacts to cultural and paleontological resources would be reduced to
a less than significant level.
Conclusions: The Sunset Ridge Park project site proposes to use part of the Newport Banning
Ranch property for a vehicular access road to the park and for stockpiling of excess cut
material. The park project would be considered in the cumulative analysis for the Newport
Banning Ranch EIR.
CITY OF NEWPORT BEACH PROJECTS WITHOUT APPROVED CEQA DOCUMENTATION
KolllConexant Conceptual Plan: Uptown Newport Villaae Specific Plan
The proposed project site is located at 4343 Von Karman Avenue and 4311, 4321, and 4343
Jamboree Road in the City of Newport Beach. The project proposes the demolition of
approximately 441,127 sf of existing industrial and office uses and the redevelopment of the 25-
acre site with residential and mixed -use development. Approximately 1,504 housing units,
11,600 sf of neighborhood- serving uses, a Central Park and two pocket parks totaling 2 acres,
and parking (required by the Specific Plan and Zoning Code). A new street system grid would
be developed to provide circulation throughout the project site. The proposed project is
consistent with the City's General Plan and would not require a General Plan Amendment. As a
result, traffic impacts would be taken into consideration through use of the "build out of the
General Plan" assumptions that will be incorporated into the cumulative traffic analysis.
The City released a Notice of Preparation of an EIR on May 28, 2010. The Initial Study notes
that the project could have significant environmental impacts associated with the following
topics which will be addressed in the EIR: aesthetics, air quality, biological resources, cultural
resources, geology and soils, greenhouse gas emissions, hazards and hazardous materials,
hydrology and water quality, land use, noise, population and housing, public services,
recreation, transportation, and utilities and service systems. Environmental documentation has
not been prepared for this project; the project is on hold at the request of the applicant.
RtlProje MNew oMJ0150raft EIRWppmdix M- 082311.do M -28 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
However, because this proposed project is considered consistent with the City's General Plan it
would be included in the General Plan's background assumptions used as well in the Newport
Banning Ranch EIR.
Mariner's Medical Arts
The project site, located at 1901 Westcliff Drive, proposes approximately 12,250 sf in
10 medical office suites in 3 buildings ranging from 2,350 sf to 9,000 sf equaling approximately
12,763 sf. The existing Mariner's Medical Arts Building has been determined eligible for listing
on the National Register of Historic Places. No CEQA documentation has been completed for
this project. Should the project proceed, it is anticipated that the CEQA documentation would
address the following topics: aesthetics, land use, geology and soils, water quality,
transportation and circulation, air quality, GHG emissions, noise, public services and utilities,
and historic resources. The Medical Arts project is included in the Traffic Impact Analysis as a
cumulative project. Although no CEQA documentation has been prepared for this project,
because it is included in the City's cumulative traffic assumptions, it is also included in the
cumulative assumptions for fire protection, regional air quality, and GHG emissions. With
respect to historic resources, no significant historical resources (structures) were identified on
the Newport Banning Ranch. Therefore, the Medical Arts project is not included in the
assessment of cumulative historic resources.
Mariner's Pointe
The project is located at 200 -300 West Coast Highway in the City of Newport Beach. The
project proposes development of a 23,015 sf, two -story commercial building and a three -story
parking structure. Project approvals would include a General Plan Amendment to increase the
allowable floor to land area ratio (FAR); a conditional use permit to allow roof -top parking,
modify the off - street parking requirements, and to establish a parking management plan for the
site; a variance to allow the building to encroach into the rear yard setback; a Modifisatiea
pepm;t tG alle , an Frh*tArt,,r;;I fe;U6-Fe to a Ped the height limit and site development review
to allow the building and parking structure to exceed the height limit.
The PIaR. iR9 r.,,, FRi6619R'6 aI s th.. 124419 ;;Ad project was approved have been
appealed-tej y the City Council on August 9, Based on the
IS /MND, the significant impacts listed below are identified; measures are identified to mitigate
impacts to a less than significant level:
• Biological Resources: The project would remove ornamental trees that could provide
foraging and nesting habitat for birds. The project would be required to comply with the
requirements of the Migratory Bird Treaty Act (MBTA); adherence to the MTBA
regulations would ensure that if construction occurs during the breeding season,
appropriate measures would be taken to avoid impacts to nesting birds. Impacts would
be less than significant with incorporation of mitigation.
• Cultural Resources: There is the potential for archeological and /or paleontological
resources to exist at the project site. Therefore, any adverse impacts related to buried
archeological and /or paleontological resources would be reduced to a less than
significant level with the incorporation of mitigation measures identified in the IS /MND.
• Geology and Soils: The project requires excavation and grading of the site and
trenching for the installation and connection of underground utilities. Some erosion may
result from grading and construction operations; it is not anticipated that substantial soil
RtlProje MNew oftMlViDraft EIRV ppmdix M- 082311.dm M -29 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
erosion would occur due to the relatively flat topography and the developed nature of the
site. With the adherence to regulations and implementation of mitigation, impacts would
be less than significant.
• Noise: The project would potentially expose persons to noise levels in excess of
standards established in the City Community Noise Ordinance during allowable
construction hours. Compliance with identified measures would mitigate impacts to a
less than significant level.
• Traffic: The project would generate traffic during construction and may require the
temporary relocation of a bus stop; this impact is considered temporary and the project
would have to comply with a Construction Traffic Management Plan and coordinate with
the Orange County Transportation Authority with respect to the bus stop.
Conclusions: The retail and office project would occur approximately two miles east of the
Newport Banning Ranch Project site. Construction activities are proposed to occur over a 12-
month period starting in fall 2011. Therefore, this project would be completed prior to
commencement of the Newport Banning Ranch Project. Therefore, the project would not
contribute to any construction - related impacts. The project would not contribute to any
cumulative impacts and would not be assumed in the cumulative impact analysis for the
Newport Banning Ranch Project with the exception of fire protection, regional air quality, and
GHG emissions.
Newport Beach Country Club
The project site is located at 1600 -1602 East Coast Highway in the City of Newport Beach. The
proposed project involves demolition of the existing tennis and golf clubhouses and the
construction of a new 3,735 sf tennis clubhouse and 35,000 sf golf clubhouse and ancillary
facilities (i.e., cart barn). The project also proposes to construct 27 short-term visitor - serving
units (bungalows) and bungalow spa /fitness area and concierge and guest meeting facilities;
and five single - family residential dwelling units (villas) on the project site. Discretionary
approvals include a General Plan Amendment, Planned Community text adoption, transfer of
development rights, approval -in- concept for coastal development permit, vesting tentative tract
map (tennis component), development agreement, and temporary use permit. The IS /MND was
released for public review on September 20, 2010 for a 30 -day public review period; no action
has been taken on the CEQA documentation or the project.
The IS /MND identified that the project would not exceed significance thresholds with respect to
the following environmental topics: aesthetics, agriculture and forest resources, air quality,
biological resources, greenhouse gas emissions, hydrology and water quality, mineral
resources, population and housing, public services, recreation, and utilities and service
systems. Based on the IS /MND, the significant impacts listed below are identified; measures are
provided to mitigate these impacts to a less than significant level.
• Geology and Soils: Implementation of the proposed project has the potential to result in
exposure of on -site soils to erosion. However, mitigation measures provided in the
IS /MND would ensure that erosion and sedimentation would be minimized and would
reduce potential impacts to a less than significant level.
• Hazards and Hazardous Materials: The proposed project involves demolition of
existing facilities. In order to mitigate for potential impacts related to hazardous
materials, a comprehensive asbestos - containing materials and lead -based paint survey
RAProje s\NewpoMJ0150raft EIRWppmdix M- 082311.dm M -30 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
shall be conducted prior to construction activities. In addition, all construction related
activities shall comply with the California Code of Regulations Section 1532.1 in
accordance with the applicable provisions of the California Health and Safety Code.
Impacts would be reduced to a less than significant level.
• Noise: As a result of project implementation, potentially significant short-term,
construction noise impacts are anticipated in the event that a rock crushing operation is
located on the project site in order to use on -site materials as fill. However, mitigation
measures provided in the IS /MND would reduce potential noise impacts associated with
the potential rock crushing operation to a less than significant level.
• Transportation/Traffic: Implementation of the proposed project has the potential to
result in short-term traffic impacts related to site preparation and construction activities.
More specifically, during the construction phase, there will be periods of time when
heavy truck traffic would occur that has the potential to result in congestion along East
Coast Highway. Mitigation measures are proposed in the IS /MND to minimize the level
of impact associated with construction - related traffic to a less than significant level.
Conclusions: The Newport Beach Country Club is located approximately four miles southeast
of the Newport Banning Ranch Project site. Construction of the project is proposed to start in
September 2011 and take approximately three years (September 2014). Site remediation on the
Newport Banning Ranch site is anticipated to start in early 2014 with grading starting in fall
2014. Therefore, the majority of construction activities associated with the Country Club would
be completed prior to activities on the Newport Banning Ranch site. Because of the timing and
distance between the two project sites, the Country Club project would not contribute to
construction - related impacts. The project is assumed in the cumulative impact analysis for the
Newport Banning Ranch Project for fire protection, background regional air quality emissions,
and GHG emissions.
Newport Beach Country Club (International Bay Club)
The project site is located at 1600 -1602 East Coast Highway in the City of Newport Beach. The
proposed project involves the demolition of the existing golf course and clubhouse and the
construction of a new 51,213 sf golf clubhouse and ancillary facilities (i.e., cart barn and bag
storage). In addition to existing clubhouse facilities, the new clubhouse would also include a
fitness center. Discretionary approvals include General Plan Amendment, Planned Community
text adoption, temporary use permit, development agreement, and approval -in- concept for
coastal development permit. The IS /MND was released for public review on October 8, 2010 for
a 30 -day public review period. The IS /MND identified that the project would not exceed
significance thresholds with respect to the following environmental topics: aesthetics, agriculture
and forest resources, air quality, biological resources, greenhouse gas emissions, hydrology
and water quality, land use, mineral resources, population and housing, public services,
recreation, and utilities and service systems. Based on the IS /MND, the significant impacts
listed below are identified; measures are provided to mitigate these impacts to a less than
significant level.
• Cultural Resources: Although no significant cultural resources impacts are anticipated,
a Native American representative indicated that the project site is located in an area
where several cultural resources sites have been discovered. Therefore, the City would
require a qualified archaeologist/paleontologist to be present during grading activities.
RAProje s\Newportll015�raft EIRWppe dix M- 082311.do M -31 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Geology and Soils: Implementation of the proposed project has the potential to result in
exposure of on -site soils to erosion. However, mitigation measures provided in the
IS /MND would ensure that erosion and sedimentation would be minimized and would
reduce potential impacts to a less than significant level.
• Hazards and Hazardous Materials: The proposed project involves demolition of
existing facilities. In order to mitigate for potential impacts related to hazardous
materials, a comprehensive ACM and LBP survey shall be conducted prior to
construction activities. In addition, all construction related activities shall comply with the
California Code of Regulations Section 1532.1 in accordance with the applicable
provisions of the California Health and Safety Code. Impacts would be reduced to a less
than significant level.
• Noise: As a result of project implementation, potentially significant short-term,
construction - related noise impacts are anticipated. Potential noise impacts may occur as
a result of demolition of existing structures and grading activities, foundation and parking
lot construction, and building construction. However, mitigation measures provided in the
IS /MND would reduce potential construction - related noise impacts to a less than
significant level.
• Transportation/Traffic: Implementation of the proposed project has the potential to
result in short-term traffic impacts related to site preparation and construction activities.
More specifically, during the construction phase, there will be periods of time when
heavy truck traffic would occur that has the potential to result in congestion along East
Coast Highway. Mitigation measures are proposed in the IS /MND to minimize the level
of impact associated with construction related traffic to a less than significant level.
Conclusions: The golf course Club is located approximately four miles southeast of the
Newport Banning Ranch Project site. It is anticipated that the majority of construction activities
associated with the Country Club would be completed prior to activities on the Newport Banning
Ranch site. Because of the timing and distance between the two project sites, the Country Club
project would not contribute to construction - related impacts. The project is assumed in the
cumulative impact analysis for the Newport Banning Ranch Project for background regional air
quality emissions, GHG emissions, and fire protection.
Old Newport General Plan Amendment
Located at 328, 332, and 340 Old Newport Boulevard, the project proposes to demolish
3 existing buildings totaling 14,012 sf and construct a new 25,000 -sf medical office building.
Project implementation would require the following approvals: a General Plan Amendment to
increase the floor area to land area ratio (FAR) permitted for the subject sites from 0.5 FAR to
1.0 FAR; a use permit to allow the building to exceed the 32 -foot base height limit up to the
maximum height limit of 50 feet; a modification permit to encroach into the 5 -foot rear yard
setback with below -grade parking; authorization to use 8 on- street parking spaces to satisfy the
total parking requirement; and approval of a traffic study pursuant to the City's traffic phasing
ordinance. Discretionary actions required included a modification permit, traffic study, use
permit, and a general plan amendment. The project and IS /MND were adopted by the City
Council on March 9, 2010; the project has not been constructed. The IS /MND identifies that the
project would not exceed significance thresholds with respect to the following environmental
topics: agriculture, biological resources, geology and soils, land use and planning, mineral
resources, population and housing, public services, and recreation. Based on the IS /MND, the
RAProje s\Newportllg15�raft EIRWppe dix M- 082311.do M -32 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
significant impacts listed below are identified; measures are identified to mitigate impacts to a
less than significant level:
• Aesthetics: Lighting associated with development of the project would be similar to
existing lighting in the area. However, mitigation measures have been provided to
ensure a less than significant impact to the residential uses located adjacent to the
project site.
• Air Quality. Mitigation measures have been provided to ensure that construction
emissions remain below a level of significance, thus further ensuring that the project
would be consistent with the AQMP. In addition, even though the project would be well
below the City's threshold for significant greenhouse gas emissions, mitigation measures
to reduce greenhouse gas emissions have been provided.
• Cultural Resources: Mitigation measures have been provided to ensure that impacts to
any buried resources on site would be mitigated to a less than significant level.
• Hazards and Hazardous Materials: The potential exists for asbestos, PCBs and lead
paint to be encountered in the existing buildings on the site, as well as other hazardous
materials routinely used and occasionally improperly stored in commercial and
residential buildings. In addition, because of the proposed medical office use portion of
the project, some medical supplies and medical waste would be stored in the proposed
medical office component. Mitigation measures have been provided to ensure that
impacts related to hazardous materials would be mitigated to a less than significant
level.
• Hydrology and Water Quality: The project- specific WQMP would provide BMPs
appropriate to the proposed project to ensure that any water quality impact would be
reduced to a less than significant level.
• Noise: Mitigation measures have been provided requiring the use of sonic pile driving or
caisson drilling in order to ensure a less than significant impact on surrounding
residences.
• Traffic and Circulation: Old Newport Boulevard, in addition to existing parking design
presents potential circulation issues that could present a potential traffic hazard.
Mitigation measures have been provided to eliminate any potential hazards related to
traffic and /or parking to a less than significant level.
• Utilities and Service Systems: The project would increase the demand for City water
and generation of sewage treatment. It is anticipated that the existing water and sewer
mains and sewage treatment plant capacity are adequate to accommodate the potential
demands for domestic water and potential increase in sewage that would be generated
by the project. However, mitigation measures identified include requiring the Applicant to
prepare and submit water system and sanitary sewer system demand studies would to
ensure adequate capacity. With implementation of mitigation measures, potential
impacts to City water and sewage treatment would be mitigated to a less than significant
level.
Conclusions: The project site is approximately one mile east of the eastern boundary of the
Newport Banning Ranch Project site. Construction of the Old Newport project is anticipated to
be completed prior to commencement of the Newport Banning Ranch Project. Therefore, the
RAProje s\New oftMlViDraft EIRV ppmdix M- 082311.do M -33 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
project would not contribute to any construction - related impacts including noise and air quality.
The site - specific project impacts (geology /soils, cultural resources, and hazards /hazardous
materials) identified for the project would generally be confined to the project site and would be
mitigated to less than significant. With respect to water quality, the two sites are located in
different watersheds. The Old Newport site is located in the Newport Bay Watershed and the
Newport Banning Ranch site is located within the Talbert Watershed. Because the DREIR finds
that identified water quality impacts associated with the project would be mitigated to a less than
significant level and the project sites are located in different watersheds, the impact would not
be cumulatively significant. The project is located in the traffic and the utilities /service systems
study area for the proposed Project and would be considered in the cumulative analysis for
these topics as well as background assumptions for fire protection, regional air quality
emissions, and GHG emissions.
RAProje s\NewportU0150raft EIRWppe dix M- 082311.do M -34 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
CITY OF COSTA MESA
The following projects were identified by the City of Costa Mesa for consideration in the
cumulative analysis for the Newport Banning Ranch Project. The projects are depicted in Exhibit
5 -3 in Section 5.0, Cumulative Impact Analysis, and are summarized below.
CITY OF COSTA MESA PROJECTS WHERE CONSTRUCTION HAS BEEN INITIATED OR
COMPLETED
Costa Mesa Housing Element Update
The City of Costa Mesa prepared a Supplemental EIR to the General Plan Program EIR for the
updated 2008 -2014 Housing Element. The Supplemental EIR does not change the
environmental conclusions of the original Program EIR, nor does it identify any new impacts or
mitigation measures. Rather, it provides supplemental information to make the original Final
Program EIR adequate for the updated Housing Element. Discretionary actions include a
general plan amendment. The Final Supplemental EIR was certified and the Housing Element
update approved in August 2008. The Costa Mesa General Plan Land Use Element identifies
40,577 dwelling units (19,122 single - family units and 21,455 multi- family units) in 2020 with a
projected increase to 42,469 units (19,576 single - family units and 22,893 multi - family units) by
2020.
The following environmental topics were addressed in the original Final Program EIR and
remain unchanged and did not require further analysis: aesthetics, agricultural resources, air
quality, biological resources, cultural resources, geology and soils, hazards and hazardous
materials, mineral resources, and noise. The Supplemental EIR evaluated the following topics
and found them to be less than significant: land use, population and housing, recreation, and
public services and utilities. Based on the Supplemental EIR, the following significant impact is
identified:
• Transportation and Circulation: As discussed in the General Plan Program EIR, two
significant and unavoidable impacts are associated with implementation of the proposed
2000 General Plan with respect to traffic and transportation. The first impact is that traffic
volume /capacity impact along Gisler Avenue west of Harbor Boulevard would remain
significant and unavoidable in the short -term until and if the proposed Gisler Bridge is
omitted from the OCTA MPAH and the City's Master Plan of Highways (MPH). The
second impact is that implementation of the City's MPH would result in significant and
unavoidable land use impacts related to land and structure acquisition to accommodate
the improvements identified in the City's MPH. The environmental impacts are not
increased in severity due to implementation of the 2008 -2014 Housing Element.
Therefore, the environmental analysis of the General Plan Program is still applicable,
and the environmental conclusions remain unchanged.
Conclusions: The identified significant transportation and circulation impact would not be
considered cumulatively significant because Gisler Avenue /Harbor Boulevard is not in the
proposed Project's traffic study area. However, some of the land uses associated with
implementation of the City's MPH are located in the traffic study area of the proposed Project
and therefore, would be considered as background assumptions in the cumulative analysis.
RAProje s\NewportU0150raft EIRWppe dix M- 082311.do M -35 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
The Enclave Apartment Homes
The site is located in northeastern Costa Mesa and borders the City of Santa Ana. This site is
bound by Sunflower Avenue to the north, Anton Boulevard to the south and the east, and
Sakioka Drive to the west and is approximately six miles northeast of the Newport Banning
Ranch Project site. The project allowed for the development of 890 multi - family residential units
on a 40.3 acre vacant lot. The project consists of studios and 1- and 2- bedroom units in forty -six
3 -story buildings. Parking is provided in garages on the ground floor and surface parking lots
along the internal private street. The project includes a leasing and main recreation center. A
second recreation area (which includes a pool, pool house, and spa) is also located on the site.
Construction for this project has been completed. Discretionary actions include a master plan.
The IS /MND is tiered off of the information, analysis, and conclusions for the Costa Mesa 2000
General Plan EIR Program EIR No. 1049. The IS /MND identifies that the project would not
exceed significance thresholds with respect to the following environmental topics: aesthetics,
agriculture, biological resources, cultural and scientific resources, geology and soils, hazards
and hazardous materials, hydrology and water quality, land use and planning, mineral
resources, population and housing, public services, recreation, transportation and circulation,
and utilities and service systems. The IS /MND and the project were approved on July 5, 2006;
the construction of the project has been completed and is occupied. Based on the IS /MND, the
following significant impacts are identified; measures are proposed to mitigate impacts to a less
than significant level:
• Air Quality: Construction - related emissions associated with the project would result in a
significant and unavoidable impact after mitigation; however, a significant construction -
related emissions impact was previously acknowledged in the General Plan EIR. In
addition, long -term, operational emissions associated with the project would result in an
overall increase in mobile and stationary source emissions that exceed the SCAQMD air
quality standards and remain significant and unavoidable after mitigation. However, a
significant long -term operations - related emissions impact was previously acknowledged
in the General Plan EIR.
• Noise: Construction activity associated with the project would comply with the City of
Costa Mesa Noise Ordinance in order to reduce noise impacts to a less than significant
level. In addition, the General Plan EIR determined that development associated with
implementation of the overall General Plan would contribute to an existing exceedance
of the City's noise standard on Sunflower Avenue from Anton Boulevard to Main Street
(east of the project site). Although General Plan policies would reduce this impact, there
are no feasible mitigation measures available to reduce the impact to a less than
significant level.
Conclusions: The project has been constructed therefore, the short-term construction - related
air quality and noise impacts would not be considered cumulatively significant. Because of the
distance between the two project sites, the long -term significant noise impact would not be
cumulatively significant. The project is within the background assumptions of the SCAQMD for
fire protection, regional air quality, and cumulative GHG emissions.
Estancia High School Athletic Stadium Complex
Located at 2323 Placentia Avenue, the project would develop a 2,500 - person capacity athletic
stadium complex at the Estancia High School campus. The Estancia High School Athletic
Stadium Complex MIND (SCH No. 2003051082) was adopted on July 8, 2003. An Addendum to
the IS /MND was prepared, which was approved in October 2007; construction was completed in
RtlProje MNew oMJ0150raft EIRV ppmdix M- 082311.dw M -36 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
April 2008. The addendum relies on the environmental analysis contained in the IS /MND and its
purpose is to address a revision to the project which includes the partial elimination of the six -
foot -tall masonry wall originally proposed along the school site's entire southern boundary.
Instead of stretching along the entire length of the school's southern perimeter, the wall would
terminate 50 feet west of the southern parking area. Because hard court areas would be used
for parking during capacity events, the southern parking area is considered to include all paved
hard court areas adjacent to the school's southern boundary. The Addendum to the IS /MND
identifies that the project would not exceed significance thresholds with respect to the following
environmental topics: agriculture, cultural and scientific resources, geology and soils, land use
and planning, mineral resources, noise, population and housing, recreation, and utilities and
service systems. Based on the Addendum, the following significant impacts are identified;
measures mitigated the impacts to a less than significant level:
• Aesthetics: To ensure that impacts from light and glare are less than significant,
mitigation was provided to avoid impacts to individual homeowners. The amended
project would not result in a level of impact greater than that determined by the project's
adopted IS /MND. Therefore, the originally proposed mitigation measures would remain
adequate to ensure that all impacts remain less than significant.
• Hydrology and Water Quality: Runoff from project development has the potential to
degrade local water quality and possibly impact the vernal pool wetlands located directly
to the west and northwest of the stadium site within Fairview Park. However, mitigation
measures provided in the IS /MND ensured all water quality related impacts remained
less than significant. The revised project did not result in a level of impact greater than
determined by the project's adopted IS /MND. Therefore, the originally proposed
mitigation measures remained adequate to ensure that all impacts remain less than
significant.
• Hazards and Hazardous Materials: The football field observation tower may be
demolished to accommodate the new stadium. Mitigation measures have been provided
to ensure that the demolition of this structure would not result in the release of lead -
based paint into the environment. In addition, to ensure that the fire station is not
adversely impacted by the operation of the proposed stadium, the IS /MND included
mitigation measures which require the School District to cooperate with the Costa Mesa
Fire Department. The revised project would not result in a level of impact greater than
determined by the project's adopted IS /MND. Therefore, the originally proposed
mitigation measures remain adequate to ensure that all impacts remain less than
significant.
• Biological Resources: The U.S. Fish and Wildlife Service (USFWS) performed a
review of the project and all potential fairy shrimp or vernal pool impacts associated with
the stadium's construction and operation. Mitigation measures have been provided to
reduce potential impacts to biological resources to a less than significant level. The
revised project would not result in a level of impact greater than determined by the
project's adopted IS /MND. Therefore, the originally proposed mitigation measures were
adequate to ensure that all impacts remain less than significant.
• Transportation and Circulation: To ensure the project does not substantially increase
potential traffic hazards, the IS /MND provided mitigation to reduce traffic impacts to a
less than significant level. The revised project would not result in a level of impact
greater than determined by the adopted IS /MND. Therefore, the originally proposed
RAProje sv4ewportW0150raft EIRWppe dix M- 082311.do M -37 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
mitigation measures remain adequate to ensure that all impacts remain less than
significant.
Air Quality: Construction - related emission levels would not conflict with or obstruct
implementation of the air quality plan as long as the project sponsor complies with all
applicable SCAQMD Rule 403 (Fugitive Dust) requirements in connection with project
construction. Mitigation measures have been provided to ensure the project's
compliance with SCAQMD Rule 403. The revised project would not result in a level of
impact greater than determined by the project's adopted IS /MND. Therefore, the
originally proposed mitigation measures remained adequate to ensure that the project's
air quality impacts remain less than significant.
Noise: Construction activities have the potential to create a substantial temporary or
periodic increase in ambient noise levels. To ensure that temporary construction noise is
less than significant, mitigation measures have been provided. The revised project would
not result in a level of impact greater than determined by the project's adopted IS /MND.
Therefore, the originally proposed mitigation measures remained adequate to ensure
that all impacts remain less than significant.
Public Services: The District's authority to regulate traffic does not extend off of the
school site and the assistance of the Costa Mesa Police Department for traffic control
and enforcement on public streets may be required before and after any major events.
To ensure that impacts to the Police Department are less than significant, mitigation
measures were provided in the IS /MND. The revised project would not result in a level of
impact greater than determined by the adopted IS /MND. Therefore, the originally
proposed mitigation measures remain adequate to ensure that all impacts remain less
than significant.
Conclusions: The project was completed in 2008; therefore, any construction related /short-
term impacts (hydrology and water quality, hazards and hazardous materials, biological
resources, air quality, noise) would no longer be applicable for consideration in the proposed
Project's cumulative analysis. The identified site - specific impacts (aesthetics, transportation,
and circulation) are generally confined to the site and are mitigated to less than significant and
are therefore not considered cumulatively significant. The impact to public services, specifically
the Costa Mesa Police Department, would be long -term because the impact would occur before
and after major events. Because the Costa Mesa Police Department would not serve the
Newport Banning Ranch Project and all of the impacts to the Police Department are mitigated to
less than significant; this impact is not considered cumulatively significant. Therefore, this
project is included in the cumulative impact assumptions for Newport Banning Ranch for fire
protection, background regional air quality emissions, GHG emissions, and night lighting.
SoBECA Urban Plan
The SoBECA urban plan area covers a 39 -acre located south of Baker Street, east of SR -73,
and north of the intersection of SR -73 and SR -55 in the City of Costa Mesa approximately five
miles northeast of the Newport Banning Ranch Project site. SoBECA is a City- initiated
development incentive program to encourage new development and revitalization as part of an
overall vision to allow mixed -use development in the Bristol Street Corridor area. Discretionary
actions include a general plan amendment, zoning code amendment, rezone, and urban plan.
Adopted in April 2006, the SoBECA Urban Plan serves as a "regulating plan" that establishes
provisions for mixed -use development and residential development in the mixed -use overlay
district. The Stonesthrow on Victoria project, a Master Plan for 30 3 -story detached homes on a
RtlProje MNew oMJ0150raft EIRV ppmdix M- 082311.dm M -38 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
1.68 -acre site with 17.8 dwelling units per acre, is included as part of the SoBECA Urban Plan.
The Mixed -Use Overlay District and SoBECA Urban Plan IS /MND was adopted in August 2006.
The IS /MND identifies that the project would not exceed significance thresholds with respect to
the following environmental topics: aesthetics, agriculture, biological resources, cultural and
scientific resources, geology and soils, land use and planning, mineral resources, population
and housing, recreation, transportation and circulation, and utilities and service systems. Based
on the IS /MND, the following significant impacts are identified; measures are identified to
mitigate impacts to a less than significant level:
Hydrology and Water Quality: Implementation of best management practices (BMPs)
and compliance with mitigation measures identified in the IS /MND would reduce
short -term, construction - related impacts to a less than significant level. In addition,
mitigation measures identified in the IS /MND would reduce potential drainage impacts as
they relate to erosion and siltation to a less than significant level.
Hazards and Hazardous Materials: There are three sites listed as Hazardous Waste
and Substance Sites by the State of California Department of Toxic Substances Control
within the vicinity of the Mixed -Use Overlay and SoBECA Urban Plan area project area.
A Phase I Environmental Assessment would be required for all proposed residential and
mixed -use projects under the Urban Plan. A developer on a contaminated site would be
required to perform any necessary remediation and obtain the necessary environmental
clearances from the State Department of Toxic Substances Control and County of
Orange Health Care Agency to reduce impacts to a less than significant level.
Air Quality: Project - related construction activities have the potential to expose
surrounding sensitive receptors to airborne particulates and fugitive dust. However,
construction impacts would be temporary and of short duration. Therefore, mitigation
measures provided in the IS /MND would reduce short -term air quality impacts to a less
than significant level.
• Noise: Construction associated with the development of the Urban Plan would result in
relatively high noise levels and annoyance to sensitive receptors. Therefore, mitigation
measures provided in the IS /MND would reduce short -term, construction - related noise
impacts to a less than significant level. In addition, site - specific acoustical analyses shall
be required for each new development under the Urban Plan to evaluate the potential
long -term traffic noise impacts.
Public Services: As development of the project area occurs, fire protection service
needs and emergency personnel and police protection services shall be monitored on a
project - specific case. The inclusion of project design features related to safety hazards
(fire protection) and security measures (police protection) would minimize any
emergency response - related impacts and police personnel /resource impacts to a less
than significant level. Mitigation measures identified would ensure that the City of Costa
Mesa Police Department and Fire Department review and approve the developer's
project design features to ensure adequate security and safety standards are met. With
implementation of mitigation measures, potential impacts to fire protection and police
services would be mitigated to a less than significant level.
Conclusions: As described above, this project is the guiding plan for development with
SoBECA area of the City of Costa Mesa. Site - specific environmental impacts such as hazards
and hazardous materials would be mitigated to a less than significant level, they would not be
considered cumulatively significant. The project is not in the same watershed as the proposed
RtlProje MNew oMJ0150raft EIRV ppmdix M- 082311.do M -39 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
Project; therefore, this impact would not be cumulatively significant. The Stonesthrow on Victor
project within SoBECA is included in the cumulative development assumptions for the Newport
Banning Ranch traffic study. Because of the distance between the two project sites,
construction noise from one site would not be audible at the other site or sensitive receptors in
the area. As such, the project is not assumed in the cumulative analysis of noise. Although both
sites are within the same air basin, the City of Costa Mesa has only identified short -term
construction - related air quality impacts associated with this project. However, because the
SoBECA Urban Plan area and the Project site are within the same air basin, the project is
included in the background regional air quality assumptions for the proposed Project's
cumulative air quality analysis. Police protection services would not be cumulatively significant
because the Costa Mesa Police Department does not serve the Newport Banning Ranch site.
Because the proposed Newport Banning Ranch Project would use mutual air for fire protection
services, the City of Costa Fire Department may be affected by the Project and is addressed in
the Newport Banning Ranch EIR. This project is included in the cumulative impact assumptions
for Newport Banning Ranch with respect to background regional air quality emissions, GHG
emissions, and fire protection.
Westside Urban Plan
The project area is located include the westside area of Costa Mesa and generally bound by
Fairview Park and the Costa Mesa Golf Club to the north, the Santa Ana River to the west, the
City of Newport Beach (adjacent to the Newport Banning Ranch Project site) to the south, and
Harbor Boulevard and Superior Avenue to the east. The area contains approximately 1,788
acres, or 2.8 square miles. The project is a City- initiated development incentive program that
encourages new development and revitalization in the Mixed -Use Overlay District as part of an
overall vision to allow mixed -use development in westside Costa Mesa.
The Westside Specific Plan was prepared in October 2000. While this planning document was
not formally adopted, some of the revitalization strategies have been used to stimulate area -
wide improvement. The Westside Implementation Plan was adopted in March 2005. Three
Urban Plans were created to establish overlay zones in specific areas of the westside: The
project consists of three Urban Plans: 19 West Urban Plan (103 acres); Mesa West Bluffs Urban
Plan (227 acres); and Mesa West Residential Ownership Urban Plan (283 acres). The Urban
Plans provide a framework for major private market reinvestment and improvements. Adopted in
April 2006, the Westside Urban Plans serve as "regulating plans" that establish provisions for
mixed -use development and residential development in the mixed -use overlay district. In 2008,
the City of Costa Mesa considered various amendments to the Urban Plans but decided to
initiate amendments one at a time, and not as a collective group of changes to the Urban Plans.
Discretionary actions include a general plan amendment, zoning code amendment, rezone,
urban plan, and residential ownership plan. In 2009, the City of Costa Mesa approved an
amendment to the Mesa West Bluffs Urban Plan. The Mesa West Urban Plan is the subject of a
previously approved IS /MND in April 2006. The Mesa West Urban Plan Amendment was
determined to be exempt from CEQA pursuant to Section 15061(9b)(30 [general rule]) of the
CEQA Guidelines.
The Final IS /MND and project were approved in August 2006. The IS /MND identifies that the
project would not exceed significance thresholds with respect to the following environmental
topics: aesthetics, agriculture, biological resources, cultural and scientific resources, geology
and soils, land use and planning, mineral resources, population and housing, recreation,
transportation and circulation, and utilities and service systems. Based on the IS /MND, the
following significant impacts are identified; measures are identified to mitigate impacts to a less
than significant level:
RtlProje s\New oMJD150raft EIRV ppmdix M- 082311.do M-40 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Hydrology and Water Quality: Implementation of BMPs and compliance with mitigation
measures identified in the IS /MND would reduce short-term, construction - related
impacts to a less than significant level. In addition, mitigation measures identified in the
IS /MND would reduce potential drainage impacts as they relate to erosion and siltation
to a less than significant level.
• Hazards and Hazardous Materials: There are five sites listed as Hazardous Waste and
Substance Sites by the State of California Department of Toxic Substances Control
within the vicinity of the Overlay District. A Phase I Environmental Assessment would be
required for all proposed residential and mixed -use projects in commercial and industrial
areas. Future development on a contaminated site would require the necessary
remediation and environmental clearances from the State Department of Toxic
Substances Control and County of Orange Health Care Agency to reduce impacts to
below a level of significance.
• Air Quality: Project - related construction activities would have the potential to expose
surrounding sensitive receptors to airborne particulates and fugitive dust. However,
construction impacts would be temporary and of short duration. Therefore, mitigation
measures provided in the IS /MND would reduce short-term air quality impacts to a less
than significant level.
• Noise: Construction associated with the development of the Urban Plan areas would
result in relatively high noise levels and annoyance to sensitive receptors. Therefore,
mitigation measures provided in the IS /MND would reduce short-term, construction -
related noise impacts to a less than significant level. In addition, site - specific acoustical
analyses shall be required for each new development under the Urban Plan areas to
evaluate the potential long -term traffic noise impacts.
• Public Services: As development of the project area occurs, fire protection service
needs and emergency personnel and police protection services shall be monitored on a
project- specific case. The inclusion of project design features related to safety hazards
(fire protection) and security measures (police protection) would minimize any
emergency response - related impacts and police personnel /resource impacts to a less
than significant level. Mitigation measures identified would ensure that the City Police
Department and Fire Department review and approve the developer's project design
features to ensure adequate security and safety standards are met. With implementation
of mitigation measures, potential impacts to fire protection and police services would be
mitigated to a less than significant level.
Conclusions: As described above, this project is the guiding plan for development in the
westside Costa Mesa. Site - specific environmental impacts such as hazards and hazardous
materials would be mitigated to a less than significant level, they would not be considered
cumulatively significant. Police services would not be considered cumulatively significant
because the City of Costa Police Department does not serve the proposed Project site.
Because the Westside Costa Mesa project is ongoing and borders the Newport Banning Ranch
Project site, applicable topics including aesthetics, traffic, air quality, GHG emissions, fire
protection, and noise would be considered in the background cumulative assumptions for
Newport Banning Ranch.
RAProje s\NewportU0150raft EIRWppe dix M- 082311.do M-41 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Westside Lofts Mixed -Use Development
The site is located at 1640 Monrovia Avenue in the City of Costa Mesa less than '/4 -mile east of
the Newport Banning Ranch Project site. The project required a Master Plan (PA- 07 -20) and
Vesting Tentative Tract Map (VT- 16999) to develop 151 residential condominiums, 5 live /work
units, 6 industrial office buildings totaling approximately 42,000 sf, and associated infrastructure
on approximately 6.8 acres. The project was approved on November 13, 2007. The site has
been graded but construction has not commenced. The IS /MND identifies that the project would
not exceed significance thresholds with respect to the following environmental topics:
aesthetics, agriculture, biological resources, cultural and scientific resources, land use and
planning, mineral resources, population and housing, public services, recreation, transportation
and circulation, and utilities and service systems. Based on the IS /MND, the following significant
impacts are identified; measures are proposed to mitigate impacts to a less than significant
level:
• Geology and Soils: Short-term impacts related to soil erosion would result from
excavation and grading required for project development. Compliance with the most
recent building codes and the addition of erosion control measures identified in the
IS /MND would mitigate any potential hazards from unstable soils to a less than
significant level.
• Hydrology and Water Quality: There is potential for erosion to occur during project
demolition and construction. However, BMPs for erosion control would be required in
accordance with mitigation provided in the IS /MND.
• Hazards and Hazardous Materials: Hazardous materials would be removed and
transported during excavation, demolition, and construction of the project. Hazardous
materials would be transported and disposed of in accordance with the project's Draft
Response Plan. Compliance with the Response Plan would reduce construction - related
impacts to a less than significant level.
• Air Quality: The level of dust emission generated from soil disturbance during project
construction would exceed SCAQMD thresholds. However, with implementation of the
Standard Air Pollution Control Measures listed in the IS /MND, fugitive dust emissions
from construction activities would be reduced to a less than significant level. In addition,
short -term impacts to air quality from architectural coating application would not exceed
SCAQMD emission thresholds; however, mitigation measures provided in the IS /MND
would further reduce the release of ozone precursors.
• Noise: Construction - related activities associated with the project would be required to
comply with the City's Noise Ordinance and mitigation measures identified in the
IS /MND. Therefore, potential noise impacts related to construction would be mitigated to
a level less than significant.
Conclusions: The identified site - specific impacts (geology and soils, hazards and hazardous
materials) are generally confined to the site and are mitigated to less than significant and are
not considered cumulatively significant. Because of the proximity of the two sites and timing for
construction of the Westside Lofts project is unknown, the project would be considered in the
background cumulative assumptions for topics including fire protection, traffic, air quality, GHG
emissions, noise, and aesthetics.
RAProje s\NewportU0150raft EIRWppe dix M- 082311.do M-42 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
CITY OF COSTA MESA PROJECTS WITH APPROVED CEQA DOCUMENTATION
North Costa Mesa High -Rise Residential
The project proposes the construction of five high -rise towers on separate sites; all are located
north of 1 -405 and are generally bound by Sunflower Avenue to the north, Bristol Street to the
west, Sakioka Drive to the east, and 1 -405 to the south located approximately six miles
northeast of the Newport Banning Ranch Project site. The five sites are (1) Segerstrom Town
Center, located at 3400/3420 Avenue of the Arts; (2) the Orange County Museum of Art, located
at 605 Town Center Drive; (3) The Californian at Town Center, located at 580 Anton Boulevard;
(4) Symphony Towers, located at 585 Anton Boulevard; and (5) Pacific Arts Plaza, located at
675 Anton Boulevard. The project proposes the demolition of existing structures and minor
modification /substitution of unbuilt entitlements for the construction of new high -rise residential
structures that collectively total 1,269 dwelling units which include commercial /retail uses.
Discretionary approvals include amendments to the General Plan, North Costa Mesa Specific
Plan, and Zoning Code, AELUP consistency determination, FAA Part 77 — No Hazard
Determination, preliminary/final master plans, and tentative tract map /tentative parcel map. The
Final EIR was certified and the project was approved in December 2006. None of the projects
have been constructed. The Planning Commission approved a two -year extension for Site 3,
The Californian at Town Center, from April 24, 2009 to April 24, 2011. In addition, Site 4,
Symphony Towers, was approved on October 7, 2007, with a vesting map that is automatically
approved for five years in accordance with State law. The EIR evaluated and determined that
the following impacts would result in less than significant impacts: agricultural resources,
biological resources, cultural resources, land use, mineral resources, population and housing,
traffic and circulation, and utilities and service systems. Based on the EIR, the following
significant impacts are identified:
• Aesthetics: Implementation of the project would result in shade and shadow impacts on
adjacent uses. Sites 1, 2, 3, and 4 would cast shadows onto nearby residential uses
during the Winter Solstice. However, this shade and shadow impact would not be
considered a significant impact under the City's threshold of significance. Therefore,
impacts would be considered less than significant. In addition, implementation of the
project would introduce additional light and glare impacts within the project area.
Implementation of the conditions of approval identified in the EIR would reduce light and
glare impacts to a less than significant level.
• Aviation: Compliance with the conditions of approval identified in the EIR would ensure
that aviation impacts are reduced to a less than significant level. In addition, the EIR
concludes that the proposed structures at requested heights would not exceed John
Wayne Airport's circling minimums. Given that the FAA's determination is currently
pending on these projects, any further conclusions would be speculative and premature.
• Geology and Soils: The project would potentially be subject to significant geologic
impacts. Implementation of the mitigation measures identified in the EIR would reduce
potential geologically related impacts to a less than significant level.
• Hydrology and Water Quality: The long -term operation and short-term construction
activities associated with the five project sites would have the potential to result in
significant adverse water quality and drainage impacts. Implementation of the mitigation
measures identified in the EIR would reduce water quality and drainage impacts to a
less than significant level.
RAProje s\Newportllg150raft EIRWppe dix M- 082311.do M-43 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Hazards and Hazardous Materials: During demolition and construction operations,
hazardous materials associated with on -site buildings could be present. The project
would not involve the use of hazardous materials in its day -to -day operations.
Implementation of the proposed mitigation measures identified in the EIR and
compliance with federal, State, and local regulations regarding the handling and disposal
of hazardous material would reduce impacts due to hazards and hazardous materials to
a less than significant level.
• Air Quality: Construction activity impacts would exceed SCAQMD significance
thresholds for ROG and NOx due to the application of architectural coatings and heavy
equipment /vehicle exhaust emissions. This impact would be significant and unavoidable.
In addition, project - related operational emissions will exceed SCAQMD significance
thresholds for ROG due to area source (consumer product) emissions. This impact
would be significant and unavoidable.
Noise: Construction operations associated with the project would significantly increase
existing noise levels. Project features and implementation of conditions of approval and
mitigation measures identified in the EIR would reduce potentially significant impacts to
a less than significant level.
• Public Services: The project would result in a significant impact related to library
services due to an existing identified deficiency in library space per capita based on the
Orange County Public Library standard.
Conclusions: The North Costa Mesa High -Rise site is located approximately five miles to the
northeast and is not located within the viewshed of the proposed Project; therefore, the
identified site - specific aesthetic impacts would not be considered cumulatively significant. The
Newport Banning Ranch Project is not subject to the AELUP because of its distance to John
Wayne Airport or other airport; therefore, this impact would not be cumulatively significant. The
identified geology /soils and hazards /hazardous materials impacts are generally confined to the
site and are mitigated to less than significant; therefore, they are not considered cumulatively
significant. The project is not in the same watershed as the proposed Project and is outside of
the hydrologic cumulative study area; therefore, this impact would not be cumulatively
significant. Because of the distance between the two sites, the identified noise impacts would
not be cumulatively significant. Because the project impacts air quality would remain significant
and unavoidable they are assumed in regional air quality basin assumptions. The City of
Newport Beach has its own library system and is not affiliated with the Orange County Public
Library (OCPL) system which is identified to be significantly impacted by the North Costa Mesa
High Rise Project. Therefore, because the residents of the proposed Newport Banning Ranch
Project are anticipated to use the Newport Beach library system, this identified cumulatively
significant impact to the OCPL would not be considered cumulatively significant. The project is
included in the cumulative impact assumptions for Newport Banning Ranch for fire protection,
regional air quality, and GHG emissions.
Wyndham Boutiaue Hotel /High -Rise Residential Project
The project site is located at 3350 Avenue of the Arts in the City of Costa Mesa. The project
involves the reuse of the project site as a mixed -use development with both hotel and residential
uses. The existing Wyndham Hotel would be renovated to create a boutique hotel; the existing
parking structure would be demolished; a 23 -story high -rise residential tower would be
constructed; and a new 7 -level parking structure serving both the hotel and the residential tower
would be constructed east of the new residential tower. Discretionary actions required include a
RtlProje MNew oMJ0150raft EIRV ppmdix M- 082311.dm M-44 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
general plan amendment, specific plan amendment, final master plan, and vesting tentative tract
map. The Final EIR was certified and the project approved in November 2007; the project has
not been constructed. The EIR evaluated and determined that the following impacts would result
in less than significant impacts: agricultural resources, biological resources, cultural resources,
land use, mineral resources, population and housing, recreation, traffic and circulation, and
utilities and service systems. The Final EIR identifies the following significant impacts:
• Aesthetics: Implementation of the project would result in shade and shadow impacts on
adjacent sensitive residential uses. This would be considered a significant and
unavoidable impact. In addition, implementation of the project would introduce additional
light and glare impacts within the project area. However, implementation of the
conditions of approval identified in the EIR would reduce light and glare impacts to a less
than significant level.
• Geology and Soils: Implementation of the standard conditions and proposed mitigation
measures identified in the EIR would ensure that potential soils, geologic, and related
seismic and ground shaking impacts would be reduced to a less than significant level.
Therefore, no significant impacts are anticipated.
• Hydrology and Water Quality: The long -term operation and short-term construction
activities associated with the project would have the potential to result in significant
adverse water quality and drainage impacts. However, impacts related to hydrology and
water quality would be reduced to a less than significant level with implementation of
mitigation measures identified in the EIR.
• Hazards and Hazardous Materials: During demolition and construction, the project
would have the potential to expose workers to ACMs. Implementation of mitigation
measures identified in the EIR and compliance with federal, State, and City regulations
regarding the handling and disposal of hazardous materials would reduce impacts to a
less than significant level.
• Air Quality: Project emissions from construction activities would exceed the SCAQMD's
thresholds of significance for NOx and would expose sensitive receptors to these
pollutants. Mitigation would reduce emissions, but not to a level below SCAQMD
thresholds. Therefore, short-term construction air quality impacts would be considered
significant and unavoidable. In addition, ROG emissions associated with painting and
asphalt paving would exceed the SCAQMD's thresholds of significance. Mitigation would
reduce emissions, but not to a level below SCAQMD thresholds. Therefore, ROG
emissions would remain significant and unavoidable.
• Noise: On -site activities and equipment would have the potential to significantly impact
off -site residences. In addition, residential units would potentially be subject to interior
noise levels that exceed 45 CNEL. Therefore, implementation of the mitigation program
identified in the EIR would reduce noise impacts to a less than significant level.
• Public Services: The project would result in an increase in demand for fire protection
and police service calls. In addition, the project would result in an increase in usage
demand for neighborhood and recreational facilities in the City of Costa Mesa.
Implementation of the mitigation program identified in the EIR would reduce impacts
related to public services to a less than significant level.
RAProje s\Newportllg15�raft EIRWppe dix M- 082311.do M-45 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
Conclusions: The project is located approximately six miles to the northeast and is not located
within the viewshed of the proposed Project; therefore, the identified site specific aesthetic
impacts would not be considered cumulatively significant. The identified geology /soils and
hazards /hazardous materials impacts are generally confined to the site and are mitigated to less
than significant; therefore, they are not considered cumulatively significant. The project is not in
the same watershed as the proposed Project and is outside of the hydrologic cumulative study
area; therefore, this impact would not be cumulatively significant. Because of the distance
between the two project sites, the identified noise impacts would not be cumulatively significant.
Because the project impacts air quality would remain significant and unavoidable they are
assumed in regional air quality basin assumptions. Police services would not be considered
cumulatively significant because the City of Costa Mesa Police Department does not serve the
proposed Project site. The project is included in the cumulative impact assumptions for Newport
Banning Ranch with respect to fire protection, regional air quality, and GHG emissions.
Mesa Verde Senior Housing
The project site is located on the southwest corner of Harbor Boulevard at Adams Avenue in the
City of Costa Mesa. The project proposes to rezone a 21.22 -acre commercial site from C -1S
(Shopping Center) and C2 (General Business) to POC (Planned Development Commercial)
zone. The project required approval of a Master Plan to develop a 7.55 -acre vacant portion of
the site with 230 senior housing units in two, 2- to 4 -story structures, 258 parking spaces, and a
maximum 52 foot building height. The project was approved on December 7, 2010 but has not
been constructed. The IS /MND evaluated and determined that the following impacts would
result in less than significant impacts: aesthetics, agriculture and forest resources, air quality,
biological resources, cultural resources, greenhouse gas emissions, hazards and hazardous
materials, hydrology and water quality, land use, mineral resources, population and housing,
public services, recreation, traffic and circulation, and utilities and service systems. The IS /MND
identifies the following significant impacts:
• Geology and Soils: The project would potentially be subject to significant geologic
impacts related to unstable or expansive soils. Implementation of the mitigation
measures identified in the IS /MND would reduce potential geologic impacts to a less
than significant level.
• Noise: The project has the potential to result in noise impacts related to construction,
interior noise, and the proposed loading dock. However, implementation of the mitigation
program identified in the IS /MND would reduce noise impacts to a less than significant
level.
Conclusions: The project is located approximately 3 miles to the west. The identified
geology /soils and hazards /hazardous materials impacts are generally confined to the site and
are mitigated to less than significant; therefore, they are not considered cumulatively significant.
Furthermore, noise generated by this project is exclusive to the Mesa Verde Senior Housing
Project and is not anticipated to be considered cumulatively considerable with respect to the
Newport Banning Ranch Project. The project is included in the cumulative impact assumptions
for Newport Banning Ranch for fire protection, regional air quality, and GHG emissions.
RAProje s\NewportU0150raft EIRWppe dix M- 082311.do M-46 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
CITY OF HUNTINGTON BEACH
The following projects were identified by the City of Huntington Beach for consideration in the
cumulative analysis for the Newport Banning Ranch Project. The projects are depicted in Exhibit
5 -4 of Section 5.0, Cumulative Impact Analysis, and are summarized below.
CITY OF HUNTINGTON BEACH PROJECTS WHERE CONSTRUCTION HAS BEEN
INITIATED OR COMPLETED
Briahtwater Specific Plan and Annexation
The 2005 Brightwater project site is located at Warner Avenue and Los Patos Avenue in
unincorporated Orange County. The majority of the project site is located in the County of
Orange (105.3 acres), with approximately 0.60 acres of the project site located within the City of
Huntington Beach. The 2005 Brightwater project proposes the development of 349 single - family
dwelling units on approximately 67.9 acres of the project site. An additional nine proposed
dwelling units are located within the City of Huntington Beach. The 2005 Brightwater project
also included a buried water supply reservoir and pump station on 0.3 acres, and 37.1 acres of
Open Space and Conservation Area to protect three environmentally sensitive habitat areas
(ESHA) designated under the California Coastal Act, and to provide additional open space
areas and trails. However, it was subsequently determined that the buried water supply
reservoir and pump station were not required as water was provided by the City.
In 2002, after approval of a project consisting of a total of 388 single - family dwelling units that
were analyzed in the FSEIR, the project Applicant submitted an application to the California
Coastal Commission for a coastal development permit to develop the 379 single - family homes
that were within the jurisdiction of the County of Orange. Because the County did not have a
certified Local Coastal Program (LCP) for this area, the authority to approve development under
the Coastal Act rested with the California Coastal Commission. In October 2004, the Coastal
Commission held a hearing to consider Applicant's coastal development permit (CDP)
application. At that hearing the Coastal Commission identified a number of suggested
modifications that would provide greater consistency with Coastal Act policy.
The 2005 Brightwater Project includes several changes to the project evaluated in the 2002
FSEIR. Most of these changes were in response to the Coastal Commission's suggested
modifications to the Applicant's CDP application. In January 2005, in response to the
modifications identified by the Coastal Commission, the Applicant revised the proposed project
and submitted a CDP application which reflected the changes in response to the Coastal
Commission's recommended modifications, including but not limited to: reducing the number of
single - family homes from 379 to 349 homes; increasing the buffer area between the residential
development and eucalyptus ESHA and burrowing owl ESHA to a minimum of 150 feet;
eliminating or modifying features to avoid impacts to southern tarplant ESHA and burrowing owl
ESHA; eliminating the parking lot and extension of Bolsa Chica Street to avoid filling the existing
borrow site; and the residential development was set back 100 feet from the top of the borrow
site slope.
In April 2005, the California Coastal Commission held a public hearing and approved CDP 5 -05-
020 for Applicant's revised Brightwater development project subject to 27 special conditions.
Subsequent to that approval, the Applicant submitted an application to amend the approvals
granted by the County in 2002 to reflect the revised Brightwater development project that was
approved by the Coastal Commission. On October 5, 2005, the County of Orange approved an
Addendum to Subsequent EIR No. 551, which was prepared to cover the Amended Master
RtlProjec New oMJ0150raft EIRV ppmdix M- 082311.dw M-47 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
Site /Area Plan and project Site Plans (2005 Brightwater Project) that reflected the project under
conditions of California Coastal Commission CDP No. 5-05-020. The California Coastal
Commission issued CDP No. 5 -05 -020 for Brightwater in December 2005 for 349 single - family
homes on approximately 68 acres and habitat protection /restoration on approximately 37 acres.
An IS /Negative Declaration (ND) was also prepared for the project subsequent to the FSEIR,
which analyzes potential impacts associated with the project and involves three components:
(1) annexation of the project into the City of Huntington Beach; (2) prezoning for portions of the
project located within the County's jurisdiction; and (3) rezoning for the portions of the site
located within the City from Residential Low Density to Specific Plan. In addition to the
105.3 -acre site, the project site analyzed in the IS /ND includes 0.6 acre that is located within an
undeveloped area in the City's jurisdiction between the project site and the existing Sandover
project. The majority of this area will be incorporated into the Specific Plan area, allowing for
4 additional homes to be built beyond the 349 homes that the Coastal Commission has already
approved, subject to receiving required entitlements. In addition, the Specific Plan identifies two
additional lots for future home construction also subject to receiving required entitlements. A
small portion of the area that will be annexed will be prezoned to Residential Low Density (RL)
instead of Specific Plan so that one additional lot can be incorporated into the Sandover project.
All of these additional units were previously analyzed in the Subsequent EIR that was certified
by the County. All environmental topics evaluated in the IS /ND were determined to be less than
significant or to not have an impact. No significant impacts were identified in the IS /ND.
Exhibit A to City of Huntington Beach Resolution 05 -07, is the Findings and Statement of
Overriding Considerations for the 2005 Addendum and 2002 FSEIR. Based on the findings, the
following impacts were evaluated and determined to be less than significant impact: agricultural
resources, mineral resources, and population and housing. The following is a summary of the
significant impacts evaluated in the 2002 FSEIR with an evaluation of whether the 2005
Brightwater project alters the 2002 FSEIR findings:
• Land Use: Implementation of the project design features and standard conditions
identified in the FSEIR or as amended in the Addendum would ensure that identified
potential land use impacts would be reduced to a less than significant level. Therefore,
no significant impacts would result.
• Geology and Seismicity: Implementation of the project design features and standard
conditions identified in the FSEIR or as amended in the Addendum would ensure that
potential geology and seismicity impacts would be reduced to a less than significant
level. Therefore, no significant impacts would result.
• Surface and Groundwater Hydrology. Implementation of the project design features
and standard conditions identified in the FSEIR or as amended in the Addendum would
ensure that potential surface and groundwater hydrology impacts would be reduced to a
less than significant level. Therefore, no significant impacts would result.
• Water Quality: Implementation of the project design features and standard conditions
identified in the FSEIR or as amended in the Addendum would ensure that potential
surface and water quality impacts would be reduced to a less than significant level.
Therefore, no significant impacts would result.
• Traffic and Circulation: The project would have a significant long -term adverse impact
on traffic at the intersection of PCH and Warner Avenue. This intersection would
experience a measurable traffic contribution (based on both County and City
RAProje s\Newportllg150raft EIRWppe dix M- 082311.do M-48 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
performance criteria) from the project and is projected to operate at LOS F. This impact
would be considered significant and unavoidable.
Air Quality: The 2005 Brightwater project would result in three significant and
unavoidable air quality impacts. First, the project would result in a potentially significant
short-term construction related impact from the operation of construction equipment.
Peak grading and construction emissions would exceed SCAQMD thresholds for the
criteria pollutants NOx and PM10. This impact would be considered significant and
unavoidable.
Second, fugitive dust emissions associated with demolition, land clearing, exposure,
vehicle and equipment travel on unpaved roads, and cut and fill operations would
exceed the SCAQMD threshold of 150 pounds per day. As a result, nearby sensitive
receptors and workers may be exposed to blowing dust. This impact would be
considered significant and unavoidable.
Third, emissions from on -site area sources would exceed the emission threshold for
ROC established by the SCAQMD. Emissions from project - related mobile sources would
exceed the operational thresholds for CO, ROC, and NOx established by the SCAQMD.
This impact would be considered significant and unavoidable.
• Noise: Implementation of the project design features and standard identified in the
FSEIR or as amended in the Addendum would ensure that potential noise quality
impacts would be reduced to a less than significant level. Therefore, no significant
impacts would result
Biological Resources: The 2005 Brightwater project would result in the following
beneficial impacts to biological resources through implementation of project design
features: (1) provide for protection of habitat areas and restoration and long -term
protection of native grassland and coastal sage scrub areas; (2) permanently protect on-
site wetlands in natural open space; and (3) permanently protect on -site southern
tarplant community through creation of a seasonal pond environmental protection area.
In addition, through implementation of project design features and standard conditions,
the 2005 Brightwater project would result in less than significant impacts to
invertebrates, amphibians, reptiles, mammals, upland birds, lowland birds and habitats,
and loss of foraging habitat in the uplands. Lastly, the 2005 Brightwater project would
increase the potential for the invasion of exotic species from landscaped areas;
however, this impact would be mitigated to less than significant with implementation of
the recommended mitigation measure. All biological resources impacts would be
reduced to less than significant with implementation of project design features, standard
conditions, and mitigation.
Aesthetics: Residential development would permanently alter the undeveloped
appearance of the Bolsa Chica Mesa within the public viewsheds as seen from Pacific
Coast Highway near Warner Avenue and Pacific Coast Highway at the State Ecological
Reserve Overlook, adjacent to Inner Bolsa Bay and along Los Patos Avenue at Bolsa
Chica Street. This impact would be considered significant and unavoidable.
Cultural Resources: Implementation of the project design features and standard
conditions identified in the FSEIR or as amended in the Addendum would ensure that
potential cultural resources impacts would be reduced to a less than significant level.
Therefore, no significant impacts would result.
RAProje s\NewpoMJ0150raft EIRV ppmdix M- 082311.dm M-49 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Paleontological Resources: Implementation of the standard conditions identified in the
FSEIR or as amended in the Addendum would ensure that potential paleontological
resources impacts would be reduced to a less than significant level. Therefore, no
significant impacts would result.
• Recreation: Implementation of the project design features and standard conditions
identified in the FSEIR or as amended in the Addendum would ensure that potential
recreation impacts would be reduced to a less than significant level. Therefore, no
significant impacts would result.
• Hazards: Implementation of the project design features and standard identified in the
FSEIR or as amended in the Addendum would ensure that potential hazards impacts
would be reduced to a less than significant level. Therefore, no significant impacts would
result.
• Public Services and Utilities: The nearest paramedic van is located at Station 48 in
Seal Beach which would result in a paramedic response time of 15 minutes to the
project site. Although the nearest fire station is located in Sunset Beach, the Orange
County Fire Authority (OCFA) estimates that standard response times may be
exceeded. Implementation of the 2005 Brightwater project would result in emergencies
and fire service needs that are beyond the current response capabilities of the OCFA.
Implementation of mitigation that require the Applicant to provide evidence to the County
that adequate provisions have been made to provide fire protection and emergency
medical services to the project area would reduce the impact to less than significant.
Conclusions: The project is located approximately eight miles to the northwest and is not
located within the proposed Project study area for the following environmental topics: land use,
aesthetics, recreation, noise, public services (with the exception of fire protection) and utilities,
and recreation. Therefore, none of these anticipated environmental impacts would be
cumulatively significant. Because the Brightwater project and the proposed Project are located
approximately 8 miles apart, even though both projects may contribute traffic given the
dispersion of traffic between Warner Avenue and Superior Avenue, it is unlikely that there would
be a cumulative load on PCH. The project is anticipated to result in a cumulatively significant net
increase of criteria pollutants for which the project region is in nonattainment; therefore, this
approved project would be in SCAQMD background assumptions for regional air quality
emissions within the air basin. The cumulative impact analysis includes this project in the GHG
emissions assessment. Anticipated site - specific impacts (e.g. geology and seismicity, hazards,
cultural resources, and paleontological resources) impacts would generally be confined to the
site and would be mitigated to less than significant; therefore, they would not be considered
cumulatively significant. The project is not in the same watershed as the proposed Project and
is not in the same hydrologic cumulative study area; therefore, surface and groundwater
hydrology and water quality impacts impact would not be cumulatively significant. Biological
impacts to resources would be included in the cumulative assumptions for the proposed Project.
Huntington Beach Downtown Specific Plan Update
The site covers an area of approximately 336 acres located in downtown Huntington Beach.
The project consists of an update to the existing Downtown Specific Plan (DTSP) document.
The DTSP Update is a City- initiated proposal to update Specific Plan No. 5 — Downtown
Specific Plan. The project would reconfigure the existing 11 Specific Plan districts into
7 districts; modify development and parking standards; incorporate design guidelines; and
provide recommendations for street improvement, public amenities, circulation enhancements,
RtlProje s\New oMJ0150raft EIRV ppmdix M- 082311.dm M -50 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
infrastructure and public facility improvements, and parking strategies. The project also
proposes revised parking requirements and modified parking ratios; the elimination of the
Downtown Parking Master Plan concept; a Cultural Arts Overlay in the northern portion of the
DTSP area on the site of the existing Main Street Branch library; a Neighborhood Overlay on 1"
and 2nd Street between Walnut Avenue and Orange Avenue; and the elimination of the
Resource Production Overlay in District 8 of the existing DTSP although provisions for
continued oil recovery remain in the proposed DTSP Update. The DTSP Update proposes to
accommodate future development in the downtown area and contemplates the following net
new development potential in the DTSP area. Discretionary actions required include a general
plan amendment and local coastal program amendment. The Final EIR was certified and the
project approved in November 2009. The project was reconsidered by City Council and
approved in January 2010. Based on the EIR, the following significant impacts are identified:
• Air Quality: Short -term construction activities would result in NOx emissions that would
exceed SCAQMD thresholds. In addition, long -term regional air quality impacts,
including ROG and PM10 emissions associated with the project would continue to
exceed SCAQMD thresholds. Both short-term construction impacts and long -term
regional air quality impacts would be considered significant and unavoidable.
• Cultural Resources: Development associated with the project would have the potential
to result in demolition or removal of significant historical resources. Therefore, impacts to
historical resources would be potentially significant and unavoidable.
• Noise: Construction activities associated with pile driving would be considered
significant and unavoidable.
• Public Services: Project implementation would potentially require additional fire
personnel, facilities, and /or equipment in relation to future development of the proposed
Specific Plan Update. Therefore, impacts related to fire protection would be considered
significant and unavoidable.
• Utilities and Service Systems: Project implementation would potentially increase water
usage in relation to future development of the proposed Specific Plan Update. Therefore,
each development project proposed as a result of adoption of the DTSP would need to
be evaluated to determine that adequate water supplies are available to support the
proposed development. Incorporation of mitigation measures provided in the EIR would
reduce impacts related to utilities and services to a less than significant level.
Conclusions: The project is located approximately four miles to the northwest of the Newport
Banning Ranch site. Because of the distance between the two sites, short-term construction
related impacts associated with this project would not be included in the cumulative assessment
of potential impacts associated with the Newport Banning Ranch Project. With respect to
significant and unavoidable fire protection impacts, the Newport Banning Ranch Project
assumes the use of City of Newport as well as mutual aid services for fire protection and is
therefore included in the cumulative impact analysis. No other significant public services and
utilities impacts have been identified for the project. Because the Newport Banning Ranch
Project would not significantly impact historic resources, no cumulative impact would occur. The
project is anticipated to result in a cumulatively significant net increase of criteria pollutants for
which the project region is in nonattainment; therefore, this approved project would be in
SCAQMD background assumptions for regional air quality emissions within the air basin and
well as the cumulative assumptions for GHG emissions. The Downtown Specific Plan project is
also assumed in the cumulative traffic assumptions for Newport Banning Ranch.
RtlProje MNew oMJ0150raft EIRV ppmdix M- 082311.do M -51 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Newland Street Residential
The project site, located at 21471 Newland Street (south of Lomond Drive, west of Newland
Street, and north of the terminus of Hamilton Avenue), would develop and subdivide a former
industrial site into a residential development with 204 multi - family residential units and an
approximate 2 -acre public park. The site is approximately four miles northeast of the Newport
Banning Ranch Project site. The site was formerly used as an oil pipeline and storage tank
terminal, for which decommissioning and remediation has been completed. A portion of the site
is currently operating as a recreational vehicle (RV) and boat storage facility, which would be
removed and replaced with the proposed new uses. Discretionary actions include a general plan
amendment, zoning map amendment, tentative tract map, conditional use permit, and final tract
map. The Final EIR was certified in August 2006 and the project has been completed. Based on
the Initial Study prepared for the project, the following potential environmental impacts were to
be addressed in the EIR:
• Land Use and Planning: The project would require a General Plan Amendment and
impacts to surrounding areas would result due to intensification of uses at the project
site. Mitigation measures are expected to reduce the project - related impacts to a less
than significant level.
Aesthetics: The project would transform the site from a vacant parcel and RV /boat
storage lot into a residential development. It is anticipated that the project would
constitute an overall aesthetic improvement over existing uses; however, the visual
character of the project area, including shade and shadows generated by the proposed
development, would be substantially modified due to the increased development density.
As feasible, mitigation measures would be identified. This would be considered a
potentially significant impact.
Geology and Soils: The site is located near the active Newport- Inglewood Fault zone.
Seismically induced shaking and liquefaction have the potential to occur. Soil erosion
and topographical changes would also result with the project. Mitigation measures are
expected to reduce geologic and seismic impacts to a less than significant level.
Hydrology and Water Quality. The project would potentially cause runoff that would
adversely affect water quality and short-term, construction - related water quality impacts.
Mitigation measures would reduce the project - related impacts to water quality to a less
than significant level. The project site is located within a 100 -year flood hazard area and
in an area where the possibility of a tsunami is considered moderate by the City's
General Plan. The project's location in a 100 -year flood hazard area and the possibility
of tsunami are considered potentially significant impacts.
• Hazards and Hazardous Materials: There is the potential for unknown contamination at
the RV /boat storage lot portion of the project site. Mitigation measures would be
expected to reduce the project - related impacts to a less than significant level.
Biological Resources: A wetland preserve is located adjacent to the project site;
therefore, there is potential for special status species that are commonly associated with
wetland habitat to transiently exist on the project site and /or in the surrounding area. In
addition, surface runoff from the project would potentially indirectly affect the off -site,
adjacent wetland habitat and associated sensitive species. The EIR would evaluate
these potential impacts, and mitigation measures would be expected to reduce the
project related impacts to a less than significant level.
RAProje s\New oMJ0150raft EIRV ppmdix M- 082311.do M -52 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Population and Housing: Because the site was not previously planned for residential
development, future population changes associated with the project have not been
anticipated in local or regional population growth projections. This would be considered a
potentially significant impact.
Recreation: The project includes a two -acre public park. However, using the current
park per capita ratio for the City (5 acres per 1,000 persons), a 2.73 acre public park
would be required to serve the project's new residents. The proposed 2 -acre public park
on site would not meet this standard to serve the approximate 547 additional residents.
Demand for other recreational facilities such as public beaches and related facilities
would also increase. Mitigation measures would be expected to reduce the project
related impacts to a less than significant level.
Transportation and Circulation: The project is expected to result in increased trip
generation, changes to the volume -to- capacity ratio on roads, and congestion at
intersections. Mitigation measures would reduce project - related transportation and
circulation impacts to a less than significant level. The proposed site access and design
of associated left turn pockets along Newland Street would be considered a potentially
significant impact. Parking and alternative transportation are considered less than
significant impacts.
Air Quality. The project is located within a nonattainment air basin, and there is the
potential for significant impact. During grading and construction activities, impacts would
be elevated. In addition, project operation would result in increased vehicular trips in the
area. The EIR would include an air quality analysis based upon SCAQMD standards and
mitigation measures that would avoid or reduce potential impacts.
Noise: Site grading and construction activities would generate short-term noise impacts.
Mitigation measures would reduce project - related noise impacts to a less than significant
level. Ground -borne vibration has the potential to occur during certain construction
activities; however, this impact would be considered less than significant. The project
would also result in long -term operational and traffic noise, which would be considered a
potentially significant impact.
• Cultural Resources: Although the site has been disturbed due to previous uses, site
grading and soil remediation activities, archaeological resources are known to occur in
the project vicinity. Mitigation measures would reduce project - related cultural resources
impacts to a less than significant level.
• Public Services: The project would increase demand on fire and police protection
services in the area. This would be considered a potentially significant impact. The
demand on school services and park facilities would also be increased. Mitigation
measures would reduce project - related impacts to public services to a less than
significant level.
Utilities and Service Systems: The project would result in the need for expansion of
the existing utilities and service systems. The EIR would provide an analysis of the
projects potential impacts on wastewater, water supply, water treatment facilities,
drainage, and solid waste collection (landfill capacity). It is expected that impacts would
be reduced to less than significant levels with implementation of mitigation measures.
RAProje sv4ewportW0150raft EIRWppe dix M- 082311.do M -53 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Conclusions: The project is located approximately four miles to the northwest and is not
located within the proposed Project study area for the following environmental topics: land use,
aesthetics, recreation, noise, public services (with the exception of fire protection), recreation,
utilities and service and systems. Therefore, none of these anticipated environmental impacts
would be cumulatively significant. This residential project is included in the cumulative
development assumptions for the Newport Banning Ranch traffic analysis. The project is
anticipated to result in a cumulatively significant net increase of criteria pollutants for which the
project region is in nonattainment; therefore, this approved project would be in SCAQMD
background assumptions for regional air quality emissions within the air basin and would be
assumed in the cumulative background assumptions for GHG emissions. Anticipated site -
specific impacts (e.g. geology and soils, hazards and hazardous materials, and cultural
resources) impacts would generally be confined to the site and would be mitigated to less than
significant; therefore, they would not be considered cumulatively significant. Additionally, the
project sites are located in different regional watersheds. Therefore, identified water quality
impacts would not be cumulatively significant. Biological impacts to wetlands and wetland
resources would be included in the cumulative assumptions for Newport Banning Ranch.
Newland Street Widening
The project would widen Newland Street from Pacific Coast Highway to Hamilton Avenue,
widen the reinforced concrete bridge at Huntington Channel, install storm drain improvements in
Newland Street, and raise the profile of Newland Street to improve traffic visibility. The proposed
widening would also address stopping sight distance deficiency by raising the road grade at the
Huntington Channel and providing a left -turn lane at the intersection of Newland Street and
Edison Way. No additional travel lanes are proposed, and Newland Street would remain a
single lane of travel in each direction after project completion. As part of the widening, two
existing streetlights would be relocated, and three additional streetlights, similar to those
existing, would be installed along the eastern side of Newland Street. An IS /MND was prepared
as part of Environmental Assessment 05 -05 for the project, which was approved in April 2007.
The City project is under construction. The IS /MND states that the project would not exceed
significance thresholds with respect to the following environmental topics: land use and
planning, transportation and circulation, public services, population and housing, utilities and
service systems, geology and soils, mineral resources, aesthetics, hydrology and water quality,
hazards and hazardous materials, cultural resources, air quality, noise, recreation, and
agricultural resources. The following potentially significant impact is identified in the IS /MND;
measures are proposed to mitigate the impact to a less than significant level:
Biological Resources: The project would affect 0.16 acre of habitat under CDFG
jurisdiction. Tidal habitat (0.07 acre) and habitat in the ditch (0.09 acre) would be offset
at a ratio of at least 1:1 by paying $11,350 to the Santa Ana River Mitigation Bank. With
payment of fees, the adverse impacts to wetlands would be reduced to a less than
significant level.
Conclusions: The identified biological resources impact would be cumulatively significant
because the loss of habitat could contribute to the cumulative loss of habitat under CDFG
jurisdiction in the region.
Ocean View High School Expansion
The project would allow for the expansion of facilities at Ocean View High School, located at
1701 Gothard Street in the City of Huntington Beach. Modifications to Ocean View High School
would include the construction of an Olympic -sized swimming pool, additional bleachers at the
RtlProje s\New oMJ0150raft EIRV ppmdix M- 082311.dm M -54 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
existing track, construction of 20 classrooms to be used for adult education, and the relocation
of Coast High School. The IS /ND and the project were approved on June 2, 2009. Based on the
ND, no potentially significant impacts were identified, and no mitigation would be required.
Construction has been completed.
Conclusions: Because construction has been completed and no potentially significant impacts
were identified, the Ocean View High School Expansion Project would be included in the
cumulative impact assessment for Newport Banning Ranch with respect to fire protection,
background regional air emissions, and GHG emissions.
Pacific City
The project is located on a 32 -acre site that is bound by Pacific Coast Highway, 15t Street,
Huntington Street, and Atlanta Avenue. The project would allow for the development of the
property with approximately 660,000 sf of hotel, retail, entertainment, dining, and office uses
and 516 multi - family residences. Discretionary actions required include a master site plan,
master plan tentative tract map, coastal development permit, and conditional use permit. The
Final EIR was certified and the project approved in June 2004. Entitlements have been
approved. Grading and excavation for the project was started but the project is on hold. The EIR
evaluated and determined the following impacts would be less than significant: agricultural
resources, land use and planning, mineral resources, and utilities and service systems. Based
on the EIR, the following significant impacts are identified:
• Aesthetics: The project will create a new source of substantial glare in the area
because the proposed structures range from two to eight stories in height. The westward
orientation of the primary facade will be subject to and will reflect direct afternoon
sunlight. This impact will be reduced to a level considered less than significant with
mitigation requiring the use of non - reflective facade treatments such as matte paint or
glass coatings.
• Geology and Soils: The project will be located in a seismically active region, and
conditions underlying the project site will potentially include seismically induced
groundshaking, liquefaction, soil expansion, unstable soils, and settlement. These
impacts will be considered less than significant after mitigation, which requires
compliance with the recommendations from the Preliminary Geotechnical Investigation.
Recommendations incorporated into the grading plan for the project include measures to
address seismic hazards and foundation design and the requirement that the project be
built in accordance with seismic design provisions.
• Hydrology and Water Quality: The project will result in the placement of additional
structures in an area of low to moderate tsunami risk. Policies in the General Plan —
including identification of tsunami - susceptible areas; the requirement that developers,
builders, or property owners undertake specific measures during initial construction to
prevent or reduce damage from tsunami hazards; participation in the National Weather
Service or other system for local tsunami warnings; and provision of information to the
public regarding tsunami areas and emergency response plans —will reduce potential
tsunami impacts. In addition, the City of Huntington Beach Emergency Management
Plan identifies an evacuation site for the area in the event of a tsunami incident. The
developer, builder, or property owner of the project will be required to conform to the
requirements of the Coastal Element of the City's General Plan by defining and
implementing specific measures during initial construction to prevent or reduce damage
from tsunami hazards. In the absence of these measures, impacts from tsunamis would
RtlProjec New oMJ0150raft EIRV ppmdix M- 082311.dm M -55 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
be potentially significant. In addition to standard City requirements, implementation of
the recommended mitigation measure to address impacts associated with tsunami risks
will be implemented. Impacts associated with tsunami risk would be reduced to a less
than significant level.
• Hazardous Materials: Because of the former oil activities located on the project site,
exposure of construction personnel and the public to hazardous substances has the
potential to occur. The risk for residual contamination of the soil resulting from
polychlorinated biphenyls (PCB) leakage exists and will be considered potentially
significant. Abandoned oil wells at the site would possibly be located above the
proposed floor grade of project structures. These abandoned oil wells will need to be cut
and re- abandoned. Therefore, impacts associated with risks from existing abandoned oil
wells on the project site are considered potentially significant. In addition to standard City
requirements, implementation of mitigation measures will reduce this impact to a less
than significant level.
• Biological Resources: Project implementation has the potential to result in impacts on
special status plant species. The southern tarplant, vernal barley, and Coulter's
goldfields have a limited potential to occur on the site. Although general botanical
surveys failed to identify any of these species on site, there is a potential for these
species to inhabit areas of the site or become established on site after the general
surveys were performed. Construction and operational activities on the project site have
the potential to disturb these resources if present. Because these plants are listed as
special status species, removal of these species would be a potentially significant
impact. However, implementation of mitigation will reduce this impact to a less than
significant level.
• Population and Housing: The project would increase the population on the project site
by 1,419 residents. In addition, the development of visitor- serving commercial uses
would indirectly increase the population by approximately 601 persons. In compliance
with Community Redevelopment Law and City policy, the project is required to provide
78 affordable units; however, the project will provide 39 affordable housing units. This
impact is reduced to a less than significant level with mitigation, which requires the
applicant to prepare an Affordable Housing Program that details the provisions for either
on- or off -site affordable housing (or a combination of the two) that meet the
requirements of Community Redevelopment Law and City requirements.
• Recreation: The project is required to provide 6.9 acres of parkland. The project
includes 11.06 net acres of open space which includes 1.78 acres of private open space
and 9.28 net acres of common open space. The common open space would include five
key recreational which would be situated throughout the residential portion of the
proposed project for a total of 2.50 acres, the largest of which would total 2.04 acres.
However, the project does not specifically dedicate the 2.04 acres of recreational area
as parkland to the City. Without adequate provision of parkland and /or payment of fees,
impacts will be potentially significant. Implementation of mitigation requiring the applicant
to comply with City parkland requirements will reduce this impact to a less than
significant level.
• Transportation and Circulation: The project has the potential to significantly affect the
operating conditions of the Warner Avenue and Pacific Coast Highway intersection by
increasing traffic volume. Implementation of mitigation that requires a fair share
RAProje sV4ewportllg15�raft EIRWppe dix M- 082311.do M -56 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
contribution for traffic impacts will reduce impacts, but not to a level considered less than
significant. Therefore, this impact remains significant and unavoidable.
Air Quality: Peak construction activities associated with the project will generate
emissions that exceed SCAQMD thresholds for NOx during the site excavation and
grading phase and for VOC and NOx during the peak construction phase. In addition,
daily operation of the project has the potential to generate emissions that exceed
SCAQMD thresholds. Air quality impacts associated with construction activities remain
significant and unavoidable after implementation of mitigation measures.
• Noise: Future exterior noise levels at the project site have the potential to exceed the
City's 60 dBA Day -Night Average Sound Level (Ld„) standard for outdoor activity areas,
resulting in a potentially significant impact. In addition to standard City requirements,
implementation of recommended mitigation measures will reduce potentially significant
operational noise impacts to a less than significant level.
• Cultural Resources: The project site has been determined to have paleontological
sensitivity. Earth- disturbing activities, such as grading and excavation, have the potential
to damage or destroy these paleontological resources. Two archaeological sites have
been identified on the project site. In addition, the potential exists for additional,
unanticipated archaeological resource discoveries during ground- disturbing activities
associated with the project. Although no burials are known to be associated with the
known archaeological sites on the project site, the potential for encountering burials in
archaeological contexts also exists. Therefore, the potential for discovering unknown
paleontological or archaeological resources or burials exists and would be a potentially
significant impact. Implementation of mitigation will reduce impacts to less than
significant levels.
• Public Services: Due to the large -scale nature of the development —which includes a
complex of buildings with subterranean structures, multiple access points, and multiple
buildings over the 31 -acre property— impacts to fire protection services would be
potentially significant. Implementation of mitigation measures that include enhanced fire
protection features will reduce impacts to fire protection services to a less than
significant level. The project will generate approximately 175 new students in the
Huntington Beach City School District ( HBCSD), which will increase demands on the
HBCSD and potentially result in a significant impact. Implementation of mitigation that
requires payment of school impact fees will reduce this impact to a less than significant
level.
Conclusions: The project is located approximately three miles to the west and is not located
within the proposed Project study area for the following environmental topics: aesthetics, noise,
public services (with the exception of fire protection), and recreation. Therefore, none of these
environmental impacts would be cumulatively significant. The project would result in a
cumulatively significant net increase of criteria pollutants for which the project region is in
nonattainment; therefore, identified air quality impacts would be considered in the cumulative
analysis. Pacific City would also be included in the cumulative assumptions for GHG. Identified
site - specific impacts (e.g. geology and soils, hazards and hazardous materials) would generally
be confined to the site and would be mitigated to less than significant; therefore, they would not
be considered cumulatively significant. Cumulative hydrology and water quality impacts
resulting from the Pacific City project were determined to be less than significant because
stormwater flows are not expected to increase significantly overall, and because the project
would result in a decrease in flows to the Atlanta Stormwater Pumping Station, which would be
RAProje s\New oMJD150raft EIRV ppmdix M- 082311.do M -57 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
a beneficial effect; Pacific City is in a different watershed. Identified hydrology impacts included
placement of additional structures in an area of low to moderate tsunami risk; however, this is
considered a site - specific impact and would not be considered cumulatively significant. Pacific
City is also included in the cumulative development assumptions used for the Newport Banning
Ranch traffic study. The project is consistent with regional growth projections and mitigation
would be provided to meet the minimum affordable housing requirements. Therefore, because
the impact would be mitigated within the City of Huntington Beach, this impact would not be
cumulatively significant. Fire protection services, biological resources, background regional air
quality, and GHG emissions are addressed in the cumulative assumptions for the proposed
Project.
CITY OF HUNTINGTON BEACH PROJECTS WITH APPROVED CEQA DOCUMENTATION
Beach and Edinger Corridors Specific Plan
The Specific Plan site extends along Beach Boulevard from the coastal zone boundary in the
south to Edinger Avenue then along Edinger Avenue from Beach Boulevard westward to
Goldenwest Street in the City of Huntington Beach and approximately seven miles from the
Project site at its nearest point. The total acreage of the Specific Plan is approximately
459 acres. The proposed Specific Plan is intended to implement a clear and comprehensive
vision for growth and change along Beach Boulevard and Edinger Avenue. In particular, the
project is designed to coordinate private and public investment activities that would enhance the
visual quality and economic vitality of primary commercial corridors in the City. Discretionary
actions required include a general plan amendment, zoning text amendment, and zoning map
amendment. The Final EIR was certified and project approved in March 2010. Approved
projects within the Beach and Edinger Corridors Specific Plan Area include the Murdy
Commons Mixed -Use Project, located at 7441 Edinger Avenue on the northeast corner of
Edinger and Gothard Street. Consistent with the Specific Plan the Murdy Commons project
allows for up to 984 du and 60,000 sf of commercial area. The Specific Plan EIR evaluated and
determined that the following impacts would be less than significant: agricultural resources,
hazards and hazardous materials, land use and planning, mineral resources, population and
housing, public services. The following significant impacts are identified:
• Aesthetics: The project would result in shade and shadow impacts on nearby
light- sensitive uses. In addition, the project would introduce new sources of light and
glare into the project vicinity that would potentially adversely affect daytime or nighttime
views in the area. However, mitigation measures would reduce aesthetic impacts to a
less than significant level.
• Geology and Soils: Compliance with applicable State and City regulations and
implementation of mitigation measures identified in the EIR would reduce geologic
impacts, including soil stability, to a less than significant level.
• Hydrology and Water Quality. With implementation of code requirements, existing
regulations, and mitigation measures identified in the EIR, impacts related to hydrology
and water quality, including storm water runoff, would be considered less than
significant.
• Biological Resources: Project construction would have a substantial adverse effect,
either directly or through habitat modifications, on birds protected under the Migratory
Bird Treaty Act. In addition, project implementation would have a substantial adverse
RAProje s\Newportllg15�raft EIRWppe dix M- 082311.do M -58 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
effect on federally protected wetlands as defined by Section 404 of the Clean Water Act.
However, mitigation measures would reduce impacts to a less than significant level.
• Recreation: Project implementation would have the potential to result in the construction
of recreational facilities at the time of future development and /or redevelopment.
Therefore, recreational impacts are considered significant and unavoidable.
• Transportation and Circulation: Under Year 2013 and 2016 conditions, operation of
the project would cause an increase in traffic, which is substantial in relation to the
existing traffic load and capacity of the street system. Therefore, impacts related to 2013
and 2016 traffic conditions would be significant and unavoidable.
• Air Quality: The project would contribute substantially to an existing or projected air
quality violation for criteria air pollutants. In addition, implementation of the project would
result in a cumulatively considerable net increase of criteria pollutants for which the
project region is in nonattainment under an applicable federal or State ambient air quality
standards. Therefore, impacts related to air quality would be significant and unavoidable.
• Noise: Project implementation would have the potential to generate or expose persons
or structures to excessive groundborne vibration. Therefore, construction impacts would
be significant and unavoidable.
• Cultural Resources: Construction activities associated with implementation of the
project would cause a substantial adverse change in the significance of a historical
resource pursuant to Section 15064.5 of the CEQA Guidelines. Therefore, impacts
related to historical resources would be significant and unavoidable.
• Utilities and Service Systems: Project implementation would generate an additional
demand for water, which would require water supplies in excess of existing entitlements
and resources or result in the need for new or expanded entitlements. Therefore,
impacts related to water supply would be significant and unavoidable.
Conclusions: The project is located approximately seven miles to the west at its nearest point
to the Newport Banning Ranch Project site. Construction - related air quality emissions and noise
would not occur proximate to the Newport Banning Ranch Project site; therefore, these project -
specific effects would not be considered cumulatively significant. Aesthetic impacts associated
with this project would not occur proximate to the Newport Banning Ranch Project site. The site -
specific project impacts (geology /soils, hazards /hazardous materials, and cultural resources)
identified for the project would generally be confined to the project site and would be mitigated
to less than significant with the exception of historic resources. Because the Newport Banning
Ranch Project would not significantly impact historic resources, no cumulative impact would
occur. The project is not in the same watershed as the proposed Project and is not in the same
hydrologic cumulative study area; therefore, hydrology and water quality impacts impact would
not be cumulatively significant. Both projects would have impacts on wildlife and wetlands; the
project would be considered as a part of the Project's cumulative study area for biological
resources. Although the project would have a significant unavoidable impact with respect to
water supply, the two projects are served by different water districts; therefore, this project is not
in the cumulative analysis of water supply. The project is assumed in the cumulative analysis for
fire protection, background regional air quality, and GHG emissions.
RAProje s\NewportU0150raft EIRWppe dix M- 082311.do M -59 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Edison Park Master Plan
The City of Huntington Beach Community Services Department proposes to (1) establish a Park
Master Plan to reconfigure existing open space areas; (2) construct additional recreational
amenities, including bocce ball courts and a skate park; (3) reconfigure an existing 132 -space
parking lot along Magnolia Street and provide 124 additional parking spaces; (4) construct a
new 120 -space parking facility along Hamilton Avenue; (5) install 9 fitness /wellness exercise
stations; (6) install new landscape and hardscape improvements including fencing around the
existing fire station and walking paths; and (7) install 4 lighted practice soccer fields and a
lighted multi - purpose field. The Master Plan is proposed to be implemented in four construction
phases over eight years. An IS /MND was prepared as part of Environmental Assessment
2008 -001 and approved in June 2009. The IS /MND identifies that the project would not exceed
significance thresholds with respect to the following environmental topics: agriculture, air quality,
cultural and scientific resources, geology and soils, hazards and hazardous materials, hydrology
and water quality, land use and planning, mineral resources, noise, population and housing,
public services, transportation and circulation, and utilities and service systems. The IS /MND
identifies the following potentially significant impacts, which would be reduced to a less than
significant level with mitigation:
• Aesthetics: The removal and relocation of 206 mature trees would substantially
degrade the visual character of the site. The relocated trees and the new landscape and
hardscape features are proposed to enhance the existing park amenities, and removed
trees would be replaced on a 2:1 basis. Implementation of mitigation would reduce the
potentially significant impact to the visual character of the site to a less than significant
level.
• Biological Resources: The project would result in the removal of 201 mature trees and
the relocation of 5 mature trees located on site, resulting in a potentially significant
impact. Implementation of mitigation would reduce this impact to a less than significant
level.
• Recreation: The project would expand and alter existing recreational uses within Edison
Park and would require the removal of 201 mature trees, resulting in a potentially
significant adverse physical effect on the environment. With implementation of biological
resources mitigation, this impact would be reduced to a less than significant level.
Conclusions: The Edison Park site is located approximately two miles west of the Newport
Banning Ranch site. Because the existing 40 -acre Edison Park is a Huntington Beach
community park intended to serve City residents and the Newport Banning Ranch Project
includes park facilities, this project is not included in the cumulative impact analysis with the
exception of fire protection, regional air emissions, and GHG emissions.
Goodell Property Pre - Zoning and Annexation
The project site is located at the terminus of Bolsa Chica Street, south of Los Patos Avenue, in
an unincorporated area of Orange County. The proposed project involves the pre- zoning and
annexation of approximately 6.2 acres of property at the request of the Orange County Local
Agency Formation Commission (LAFCO) in conjunction with the annexation of the Brightwater
Specific Plan, which resulted in the site becoming an unincorporated "island ". Discretionary
actions include a zoning map amendment and annexation into the City of Huntington Beach. A
recirculated IS /MND was prepared as part of Environmental Assessment 2008 -017 for the
project, which was approved in November 2009. The IS /MND identifies that the project would
RtlProje MNew oftMlViDraft EIRV ppmdix M- 082311.do M -60 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
not exceed significance thresholds with respect to the following environmental topics: land use
and planning, population and housing, geology and soils, hydrology and water quality, air
quality, transportation and traffic, mineral resources, hazards and hazardous materials, noise,
public services, utilities and service systems, aesthetics, and recreation. Based on the IS /MND,
the significant impacts listed below are identified; measures are identified to mitigate impacts to
a less than significant level:
Biological Resources: In order to minimize erosion and sediment deposition in wetland
areas within the vicinity of the project site, standard practices would be implemented to
reduce impacts to less than significant. In addition, biological surveys conducted in June
2009 confirmed the presence of southern Tarplant on the site. Implementation of a
Tarplant relocation program would mitigate impacts related to future development. As
such, mitigation is proposed to reduce potential impacts to southern Tarplant to a less
than significant level.
Cultural Resources: The proposed project would not directly result in impacts to
cultural resources, however it would establish zoning that would allow for future
development of the site. Mitigation measures would be required prior to any proposal for
future development. Implementation of mitigation would reduce potential impacts to
cultural resources to less than significant.
Conclusions: The southern Tarplant, while not listed as threatened or endangered by any
State or federal agency, is listed as endangered by the California Native Plant Society.
Therefore, because of its endangered status and its presence on the Goodell property and the
Newport Banning Ranch Project site, the Goodell project would be assumed in the cumulative
biological resources analysis for Newport Banning Ranch. While mitigation measures have been
identified to reduce potential cultural impacts to less than significant, this project would be
considered in the cumulative impact analysis. The project is also assumed in the cumulative
analysis for fire protection, background regional air quality, and GHG emissions.
Pacific View Mixed -Use
Located at 620 North Pacific Coast Highway (northeastern corner of Pacific Coast Highway and
7th Street), the project would construct a 4 -story, 35 -foot tall, 12,922 -sf, mixed -use visitor -
serving /residential development. Proposed uses would include 4,082 sf of commercial space on
the ground floor and 7 residential units consisting of 4,472 sf on the second floor and 4,367 sf
on the third floor. The project includes a variance to allow a fourth floor in lieu of the maximum
allowed number of three floors for purposes of providing common open space within a roof top
deck. The project would not result in unavoidable adverse impacts. Discretionary actions include
a coastal development permit, conditional use permit, and variance. An IS /MND was prepared
as part of Environmental Assessment 2008 -011 for the project, which was approved in
December 2008. The IS /MND states that the project would not exceed significance thresholds
with respect to the following environmental topics: land use /planning, transportation /traffic,
public services, population /housing, biological resources, utilities /service systems, mineral
resources, aesthetics, cultural resources, air quality, noise, recreation, and agricultural
resources. The following potentially significant impacts are identified in the IS /MND; measures
are identified to mitigate impacts to a less than significant level:
• Geology and Soils: Geotechnical constraints were identified in the geotechnical report
prepared for the project. Specifically, there is the potential at the foundation level (below
the subterranean parking structure) for expansive soil risk on the project site. In addition,
unstable foundations would potentially exist from existing fill soils as well as differential
RAProje s\NewpoMJ0150raft EIRV ppmdix M- 082311.dm M -61 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
settlement of soils occurring on site and affecting foundation materials. Impacts related
to soil expansion potential, unstable soils, and settlement would be potentially significant
unless mitigated. Implementation of the recommended mitigation measure would reduce
these impacts to a less than significant level.
• Hydrology and Water Quality: Though the project would not present a substantial
impact to the groundwater supply, implementation of the recommended mitigation
measure would further reduce these impacts to a less than significant level.
• Hazards and Hazardous Materials: Two abandoned and capped oil wells are located
on the project site. Grading and excavation of the site would potentially result in damage
to the existing abandoned oil wells. In addition, the oil wells may have affected some
nearby soils on the project site. Construction activities such as grading and excavation
for the proposed underground parking structure would potentially expose workers to
contaminated soils and other hazards associated with abandoned oil wells.
Implementation of the recommended mitigation measures would reduce these impacts
to a less than significant level.
Conclusions: The project site is located approximately four miles to the northwest. Geology
and soils and hazards /hazardous materials impacts would generally be confined to the site and
would be mitigated to less than significant; therefore, they would not be considered cumulatively
significant. The project is not in the same watershed as the proposed Project and is outside of
the hydrologic cumulative study area; therefore, anticipated hydrology and water quality impacts
would not be cumulatively significant. The Huntington Beach Wetlands Project is included in the
cumulative impact assumptions for Newport Banning Ranch with respect to cumulative traffic,
fire protection, regional air quality, and GHG emissions.
Parkside Estates
Final EIR No. 97 -2, approved in 2002, was prepared for the original project, which included a
50 -acre development with 170 single - family residences, an 8 -acre park and dedicated
conservation open space. In 2008, project plans were modified to preserve more wetlands;
therefore, the revised project proposes 111 residential units, no park, and 23 acres of
conservation open space. Entitlement plan amendments and subsequent entitlements, including
preparation of an Addendum to Final EIR No. 97 -2, were approved in June 2009. The revised
project would not result in new significant environmental impacts to air quality, nor is there a
substantial increase in the severity of impacts to aesthetics /light and glare from that described in
certified Final EIR No. 97 -2. There are no alternatives to the project or additional mitigation
measures that would substantially reduce one or more significant impacts pertaining to air
quality as identified in Final EIR No. 97 -2. The revised project would not result in new significant
environmental impacts from that described in the certified Final EIR No. 97 -2. Final EIR
No. 97 -2 evaluated and determined that the following impacts were less than significant:
agricultural resources, hazards and hazardous materials, mineral resources, population and
housing, and recreation. Discretionary actions include annexation, general plan amendment,
zoning map amendment, tentative tract map, conditional use permit, coastal development
permit, and local coastal program amendment. Final EIR No. 97 -2 identified the following
potentially significant impacts:
• Land Use Compatibility (Housing Element): The project would result in impacts
related to the provision of affordable housing. Implementation of recommended
mitigation requiring the applicant to designate ten percent of the proposed units as
affordable would ensure that no inconsistencies with the City's Affordable Housing policy
RtlProje MNew oMJ0150raft EIRV ppmdix M- 082311.dm M -62 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
occur; therefore, potentially significant impacts would be reduced to a less than
significant level. Mitigation would remain applicable to the revised project and would
therefore be consistent with the City's Affordable Housing policy. The revised project
would not result in new significant environmental impacts to land use compatibility, nor is
there a substantial increase in the severity of impacts to land use compatibility from that
described in certified Final EIR No. 97 -2.
• Aesthetics: The Final EIR concluded that the project would result in potentially
significant aesthetic impacts due to the reduction of viewable open space areas, the
project's location in proximity to County - proposed trails, and an increase in on -site light
and glare. Implementation of mitigation would reduce these impacts to a less than
significant level. The revised project would not result in new significant environmental
impacts to aesthetics /light and glare, nor is there a substantial increase in the severity of
impacts to aesthetics /light and glare from that described in certified Final EIR No. 97 -2.
• Earth Resources: Final EIR No. 97 -2 concludes that the project would result in
potentially significant impacts related to settlements of peat deposits within the upper
five feet, mildly to severely corrosive soils, soils with low shear strength, and soils
shrinkage. In addition, the EIR determined that subsidence of adjacent properties along
the project's northern property boundary would occur due to dewatering, resulting in
potential groundwater impacts. Implementation of mitigation measures would reduce this
impact to a less than significant level. The revised project would not result in new
significant environmental impacts to earth resources, nor is there a substantial increase
in the severity of impacts to earth resources from that described in certified Final EIR
No. 97 -2.
• Hydrology: The Final EIR concludes that the project would result in potentially
significant impacts to drainage, flooding, and water quality. Implementation of mitigation
measures would reduce this impact to a less than significant level. The revised project
would not result in new significant environmental impacts to hydrology, nor is there a
substantial increase in the severity of impacts to hydrology from that described in
certified Final EIR No. 97 -2.
• Biological Resources: Final EIR No. 97 -2 also concludes that the project would result
in potential significant impacts during the nesting season to native raptor birds and
cumulative impacts to nesting raptor birds. Implementation of mitigation measures would
reduce this impact to a less than significant level. The revised project would not result in
new significant environmental impacts to biological resources, nor is there a substantial
increase in the severity of impacts to biological resources from that described in certified
Final EIR No. 97 -2.
• Transportation and Circulation: The Final EIR concludes that the project may result in
significant short-term, construction - related impacts due to the addition of truck and
construction traffic vehicles. In addition, the Final EIR determined that the project, in
conjunction with other past, present, and reasonably foreseeable future projects, will
result in level of service deficiencies at the intersections of Bolsa Chica Street and
Warner Avenue, and Graham Street and Warner Avenue under the 2020 condition, and
would therefore have a significant impact related to level of service before mitigation.
Implementation of mitigation would reduce these impacts to a less than significant level.
The revised project would not result in new significant environmental impacts to
transportation and circulation, nor is there a substantial increase in the severity of
impacts to transportation /circulation from that described in certified Final EIR No. 97 -2.
RAProje s\New oMJ0150raft EIRV ppmdix M- 082311.do M -63 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Air Quality: Final EIR No. 97 -2 concludes that the project would result in potentially
significant air quality impacts associated with construction activities. Implementation of
mitigation measures would reduce this impact to a less than significant level. The
revised project would not result in new significant environmental impacts to air quality,
nor is there a substantial increase in the severity of impacts to air quality from that
described in certified Final EIR No. 97 -2.
• Noise: Final EIR No. 97 -2 concludes that the project would result in potentially
significant, short-term, construction - related noise and long -term operational noise
impacts. Implementation of mitigation measures would reduce this impact to a less than
significant level. The revised project would not result in new significant environmental
impacts to noise, nor is there a substantial increase in the severity of impacts to noise
from that described in certified Final EIR No. 97 -2.
• Cultural Resources: The Final EIR concludes that the project would result in a
significant impact to archaeological sites CA -ORA -1308 and CA -ORA -1309. A portion of
CA -ORA -83/86 is also located on the project site but would not be impacted. Final EIR
No. 97 -2 includes mitigation that requires a subsurface test investigation for both
CA -ORA -1308 and CA -ORA -1309 sites, a cultural resources management plan based
on the test results, and archaeological monitoring. Implementation of mitigation
measures would reduce the potential impact to the two sites to a less than significant
level. The revised project would also avoid direct impacts to CA -ORA 83/86. The revised
project would not result in new significant environmental impacts to cultural resources,
nor is there a substantial increase in the severity of impacts to cultural resources from
that described in certified Final EIR No. 97 -2.
• Public Services and Utilities: The Final EIR concludes that the project would create
increased demand for public services and utilities on a local and regional basis.
Implementation of mitigation measures would reduce this impact to a less than
significant level. The revised project would not result in new significant environmental
impacts to biological resources, nor is there a substantial increase in the severity of
impacts to biological resources from that described in certified Final EIR No. 97 -2.
Conclusions: The project is located approximately eight miles to the northwest of the Newport
Banning Ranch site. Because of the distance between the two sites, any construction - related
impacts (air quality, noise) would not be cumulatively considerable. Aesthetic impacts
associated with the project would not be cumulative because the two sites are not within the
same viewshed. Impacts associated with policies or implementing requirements specific to the
City of Huntington Beach (e.g., provision of affordable housing in Huntington Beach) would not
be assumed in the cumulative analysis for Newport Banning Ranch. With respect to traffic, the
Newport Banning Ranch traffic study area does not include the project site or intersections
significantly impacted by the Parkside Estates project. Identified earth resources impacts would
generally be confined to the site and would be mitigated to less than significant; therefore, they
would not be considered cumulatively significant. While mitigation measures have been
identified to reduce potential cultural impacts to less than significant, this project would be
considered in the cumulative impact analysis. The project is not in the same watershed as the
proposed Project and is not in the same hydrologic cumulative study area; therefore, hydrology
impacts impact would not be cumulatively significant. Identified biological resources impacts to
habitat and wetlands would be considered in the cumulative analysis. The project is anticipated
to result in a cumulatively significant net increase of criteria pollutants for which the project
region is in nonattainment; therefore, this approved project would be in SCAOMD background
R: \Projects \Newportllg15\ raft EIRWppe dix M- 082311.do M -64 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
assumptions for regional air quality emissions within the air basin. The project is also assumed
in the cumulative background assumptions for GHG and fire protection.
Poseidon Desalination Plant
The project proposes the construction and operation of a 50- million - gallon per day seawater
desalination facility within the City of Huntington Beach. The facility would consist of seawater
intake pretreatment facilities, a seawater desalination plant using reverse osmosis technology,
product water storage, two pump stations, materials storage tanks, and 42- to 48 -inch diameter
product water transmission pipeline(s) possibly up to 10 miles in length in Huntington Beach and
Costa Mesa. The facility would use the existing Huntington Beach Generating Station seawater
intake and outfall pipelines for its operations. The proposed desalination facility would be
located on an 11 -acre portion of the 22 -acre Huntington Beach Generating Station facility
located at 21730 Newland Street, off Pacific Coast Highway. Discretionary actions include a
conditional use permit, coastal development permit, franchise agreement, owner participation,
development agreement, coastal development permit, domestic water supply permit, NPDES,
SCAQMD permit to operate, various encroachment permits, various institutional permits, lease
agreement, and Orange County Sanitation District industrial source control permit. The Final
EIR was certified and the project was approved on September 6, 2005. Currently, the project
applicant is securing permits from other regulatory agencies and has indicated that construction
could begin in 2001 and the facility could be operational in 2013. In May 2010, a Supplemental
EIR was released. A Subsequent EIR was also released in June 2010, which recirculated
Section 4.10 (Ocean Water Quality and Marine Biological Resources) of the EIR. The
Supplemental EIR was certified in September 2010. The EIR evaluated and determined that the
following impacts were less than significant: agricultural resources, biological resources, cultural
resources, hazards and hazardous materials, land use and planning, mineral resources,
population and housing, recreation, and transportation and traffic. The EIR identifies the
following potentially significant impacts:
• Aesthetics and Glare: The project would result in aesthetic and light/glare impacts.
Implementation of the recommended mitigation measures would reduce these impacts
to a less than significant level.
• Air Quality: The project would result in significant and unavoidable impacts to
construction - related emissions of ROG, NOx, and CO. Recommended mitigation
measures would reduce this impact but not to a level considered less than significant.
Impacts would remain significant and unavoidable.
• Geology, Soils and Seismicity: The project would result in potentially significant
geotechnical impacts including wind and water erosion during grading activities, unstable
soils and shallow groundwater, seismicity and faulting, and liquefaction. Implementation
of the Uniform Building Code and recommended mitigation measures would reduce
these impacts to a less than significant level.
• Hydrology and Water Quality: The project would result in potentially significant
long -term water quality impacts related to flooding and storm water runoff.
Implementation of the recommended mitigation measures would reduce these impacts
to a less than significant level.
• Noise: The project would result in significant impacts to sensitive receptors adjacent to
the desalination plant site from long -term stationary noise sources associated with
RAProje sV4ewportllg15�raft EIRWppe dix M- 082311.do M -65 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
project operation. Implementation of the recommended mitigation measures would
reduce these impacts to a less than significant level.
Public Services and Utilities: The project would result in potentially significant impacts
to schools, roadway maintenance, wastewater, storm water drainage, water, and solid
waste. Implementation of the recommended mitigation measures would reduce these
impacts to a less than significant level.
Construction - related Impacts: The project would result in potentially significant,
short -term, construction - related impacts to hydrology and water quality, noise, public
services and utilities, aesthetics /light and glare, hazards and hazardous materials, traffic,
biological resources, and cultural resources. Implementation of the recommended
mitigation measures would reduce these impacts to a less than significant level.
Conclusions: The project is located approximately two miles to west of the Newport Banning
Ranch Project site and is proposed to be operational prior to commencement of development of
the Newport Banning Ranch Project. The existing Huntington Beach Generating Station is
visible from the Newport Banning Ranch Project site; no structures associated with the
Poseidon project would be more than 35 feet. The project would be considered in the analysis
of aesthetic impacts associated with the Newport Banning Ranch Project. With respect to water
supply, while the desalination facility could provide 50 million gallons of potable water per day
which has been estimated to meet approximately 7 percent of Orange County's water needs,
the Newport Banning Ranch Project does not rely on this project to supply water to the Project.
Identified geology, soils and seismicity impacts would generally be confined to the site and
would be mitigated to less than significant; therefore, they would not be considered cumulatively
significant. Both project sites are located in the Talbert Watershed; the Poseidon project would
be included in the cumulative assumptions for water quality. The identified construction - related
impacts are generally site - specific, would be mitigated to less than significant, and are proposed
to occur prior to initiation of the Newport Banning Ranch Project. Therefore, construction - related
impacts are not considered cumulatively significant. The project is anticipated to result in a
cumulatively significant net increase of criteria pollutants for which the project region is in
nonattainment; therefore, this approved project would be in SCAQMD background assumptions
for regional air quality emissions within the air basin. The project is also assumed in the
cumulative background assumptions for GHG and fire protection.
The Ridge
The site is located southeast of the intersection of Bolsa Chica Street and Los Patos Avenue
approximately 8 miles northwest of the Newport Banning Ranch Project site. The project
proposes a 22 -unit single - family planned unit development (PLID) with a 5,775 sf common open
space area. The 22 residential lots range from 5,114 to 12,250 sf. The proposed 4 and
5 bedroom dwellings range in size from 2,700 to 4,200 sf. Discretionary actions include a
general plan amendment, zoning map amendment, local coastal program amendment, zoning
text amendment, tentative tract map, coastal development permit, and conditional use permit.
An IS /MND was prepared as part of Environmental Assessment No. 2008 -016 for the project.
The IS /MND was circulated for public review in September 2009; however, due to changes with
the project, the IS /MND would need to be recirculated. The City Council approved the project on
July 6, 2010. The IS /MND identifies that the project would not exceed significance thresholds
with respect to the following environmental topics: land use and planning, population and
housing, geology and soils, hydrology and water quality, air quality, agricultural resources,
transportation and traffic, biological resources, mineral resources, hazards and hazardous
materials, noise, public services, utilities and service systems, aesthetics, and recreation. Based
RtlProje s\New oftMlViDraft EIRV ppmdix M- 082311.do M -66 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
on the IS /MND, the significant impacts listed below are identified; measures are identified to
mitigate impacts to a less than significant level:
• Cultural Resources: The project site was previously investigated for presence of
archeological site CA- ORA -86 and it is not anticipated that significant deposits would be
discovered during construction of the project. However, mitigation measures would be
implemented in the event that unanticipated resources are encountered during grading
and construction. Implementation of mitigation measures would reduce potential impacts
to cultural resources to a level considered less than significant.
Conclusions: While mitigation measures have been identified to reduce potential impacts to
less than significant, this project would be considered in the cumulative analysis for cultural
resources, fire protection, regional air quality, and GHG emissions.
CITY OF HUNTINGTON BEACH PROJECTS WITHOUT APPROVED CEQA
DOCUMENTATION
Citv of Huntinaton Beach General Plan Circulation Element Update
The project consists of the adoption and implementation of the Huntington Beach General Plan
Circulation Element Update. Two significant technical components are being completed as part
of the update. First, an updated local area transportation model is being developed, which
includes completion of a local land use inventory. Second, the new model will be used as the
basis for the analysis and development of recommendations for updating several sections of the
Circulation Element. An IS (Environmental Assessment No. 2009 -004) was prepared and
circulated for public review in July 2009. Based on the Initial Study, the following impacts were
found to be less than significant: aesthetics, agricultural resources, cultural resources, geology
and soils, hazards and hazardous materials, hydrology and water quality, land use and
planning, mineral resources, recreation, and utilities /services systems. Based on the Initial
Study, the following potential environmental impacts will be addressed in the EIR:
• Biological Resources: Potential impacts to plants and wildlife species would potentially
occur if future expansion of roadways reduces or damages viable wetlands or riparian
habitat. Such potential impacts have been reduced somewhat through the proposed
removal of planned extensions of Hamilton and Edinger Avenues, which would have
potentially affected existing wetlands and /or riparian resources. Future intersection
capacity improvements are recommended to address long -range traffic increases at the
intersections of Pacific Coast Highway and Goldenwest Street, Warner Avenue, and
Brookhurst Street. There are some water -based plant resources near each of these
intersections. Specific intersection improvements have not been designed and need not
be designed for a number of years; therefore, the specific impact on such resources, if
any, cannot be determined at this time. However, the EIR will provide a preliminary
assessment of impact potential and ways to avoid impacts to protected wetlands or
riparian resources.
• Population and Housing: The proposed Circulation Element includes reclassification of
some roadway segments to add lanes to handle future traffic projections. Additional
right -of -way needs cannot be determined until the actual project design phase, during
which time a variety of geometries would be examined for costs /benefits. Therefore, the
environmental effects that might be associated with potential future roadway widening
would be determined through subsequent project -level assessments. Recommended
improvements to one or more intersections might require acquisition of additional right-
RtlProje MNew oMJ0150raft EIRV ppmdix M- 082311.dm M -67 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
of -way, which would potentially affect one or more residential properties that abut the
needed right -of -way. Further analysis will be required in the EIR to determine potential
impact levels and to identify measures to avoid or offset potential impacts that would
have the potential to result in displacement of any housing units.
• Transportation and Circulation: The Orange County Transportation Authority's Master
Plan of Arterial Highways (MPAH) is the countywide plan guiding development of major
arterial roadways and highways throughout the County. Several modifications to MPAH
classifications are included in the proposed Circulation Element. These changes will be
assessed in the EIR to ensure that significant impacts along affected MPAH links do not
occur. Components of the Orange County Congestion Management Plan (CMP)
roadway network occur within Huntington Beach, and further analysis would be required
to assess whether the proposed Circulation Element has the potential to create
conditions that would exceed CMP level of service standards. Proposed changes to the
MPAH include deleting the previously planned extension of Hamilton Avenue and the
previously planned connection between Graham Street and Talbert Avenue. These will
be analyzed to determine if emergency response times would have the potential to be
negatively affected as a result of roadways not being built.
• Air Quality: The proposed Circulation Element is designed to accommodate long range
traffic volumes to minimize congestion problems, and would not, in and of itself,
generate any stationary or mobile sources of air emissions. However, further analysis in
an EIR is required to determine if potential future changes to the circulation system
would affect long -term traffic volumes or distribution in such a way that achievement of
target limits for criteria pollutants and air quality standards could be impeded.
Construction of roadway and intersection improvements may produce short-term odors,
that some may find objectionable (e.g., the odor of tar in asphalt surface applications).
These temporary impacts are common in any urban environment and considered to be
less than significant effects. Long term operation of street improvements would not result
in the production of objectionable odors.
• Noise: The proposed Circulation Plan is designed to accommodate increasing traffic
volumes generated by population and economic growth over the next 20 to 30 years.
Increased traffic volumes and future street widening to provide additional traffic capacity
could increase permanent noise levels along roadways. This would potentially result in
significant impacts along segments where noise levels currently exceed the City's land
use /noise compatibility policy, and possibly other segments that are at or near the
current threshold. Increased truck traffic along designated truck routes would contribute
to increased roadway noise levels and would potentially increase the level of ground
vibration along those routes. Periodic increases in local noise levels would occur during
construction of future street improvements; however, this would occur during a normal
construction work day and all activities would be subject to all routine construction
control measures to minimize noise intrusion on nearby properties.
• Public Services: Proposed revisions to the MPAH include deletion of a previously
planned extension of Hamilton Avenue and a previously planned connection between
Graham Street and Talbert Avenue. These changes might negatively affect fire
department response times that could potentially require construction of new facilities to
maintain desired fire protection levels of service. This will be evaluated in the EIR.
Future roadway and intersection improvements would require regular maintenance
services provided by the City's Public Works Maintenance Division. Since the future
improvements would occur along existing streets and intersections, the amount of
RtlProje MNew oMJDlViDraft EIRV ppmdix M- 082311.do M -68 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
increased maintenance would be minor and would not require expansion of any
municipal maintenance facilities.
Conclusions: The environmental documentation for the City's Circulation Element has not
been completed and the City of Huntington Beach is currently using the existing General Plan
Circulation Element. The traffic study area for the Newport Banning Ranch Project was
identified by the City of Newport Beach in collaboration with the Cities of Huntington Beach and
Costa Mesa and the Orange County Transportation Authority.
Harmony Cove Residential Condominium and Marina Development
The project is located at the former Percy Park site at 3901 Warner Avenue (northern side of
Warner Avenue, west of Weatherly Lane). The project involves a residential development
consisting of 15 condominium units and a 25 -boat slip marina (15 private slips and
10 commercial slips). The project includes the following entitlements: (1) a General Plan
Amendment to change the designation from Open Space -Park to Medium Density Residential;
(2) a Zoning Map Amendment to change the zoning from Low Density Residential to Medium
Density Residential; (3) a Local Coastal Program Amendment to change the land use
designation to reflect the proposed land use; (4) an "approval in concept" for the boat
slips /marina; and (5) a subdivision for 15 residential condominium units, 15 boat slips, and
10 commercial boat slip /marina. The project application was originally submitted on March 26,
2008, and deemed complete on February 17, 2009. The MND was released on April 15, 2010.
Based on the Initial Study, the following impacts were found to be less than significant:
population and housing, air quality, greenhouse gas emissions, transportation and circulation,
mineral resources, public services and utilities, aesthetics, agricultural resources, cultural
resources, hazards and hazardous materials, recreation, and utilities /services systems. The
following environmental impacts can be mitigated to a less than significant level:
• Land Use: The project site is located in State Tidelands for the purpose of access to
navigable waters and the rights of the public to fish. The proposed residential use for the
project site would be incompatible with the State of California Public Trust Easement.
The applicant is pursuing a title settlement agreement with the California State Lands
Commission to remove the Public Trust Easement over the project site and allow the
residential project to be developed. The impact would be less than significant with
mitigation that indicates that the entitlements on the project are not effective until this
issue is resolved with the State.
• Geology and Soils: The project site is subject to liquefaction and landslides during
seismic - related events. Additionally, a portion of the project site has expansive soils.
These impacts would be less than significant with mitigation.
• Hydrology and Water Quality: With implementation of code requirements, existing
regulations, and mitigation measures identified in the EIR, impacts related to hydrology
and water quality, including storm water runoff, would be considered less than
significant.
• Biological Resources: The project would result in a short-term loss of benthic
invertebrate populations and fish species during construction activities in the bay bottom
during dredging activities. This impact would be mitigation through the creation of soft
bottom habitat. Although no eelgrass is currently present, eelgrass surveys are required
and any loss of eelgrass habitat would require mitigation. Mitigation is also required for
the potential impact to foraging opportunities for protected sea mammals.
RtlProje s\New oMJ0150raft EIRV ppmdix M- 082311.dm M -69 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Noise: Noise levels during construction would be significant but would cease upon the
completion of pile driving. Proposed residences would be impacted by vehicular noise
along roadways. Mitigation is provided to mitigate the impact to a less than significant
level.
Conclusions: The project has not been constructed but the site is located approximately nine
miles northwest of the Newport Banning Ranch Project site. Project construction is expected to
take approximately three years. Although it is unknown when construction would commence on
the Harmony Cove project, the distance between the two sites indicates that any construction -
related /short-term impacts would not be cumulatively considerable. The identified site - specific
impacts are generally confined to the site because of the geographical setting for the site (tidal
waters) and are not applicable to the Newport Banning Ranch Project; therefore, they not
considered cumulatively significant. This project is included in the cumulative impact
assumptions for Newport Banning Ranch for fire protection, regional air quality, and GHG
emissions.
Beach and Warner Mixed -Use Project
The proposed project is located at the southwest corner of the Beach Boulevard and Warner
Avenue intersection in the City of Huntington Beach. The project includes the construction of
two new retail buildings at the corner of Warner Avenue and Beach Boulevard, new mixed -use
buildings along both Warner and Beach Boulevard, and two new parking structures. Under the
proposed project, the existing 15 -story, 196,000 square- foot (sf) office tower; and the eix -story,
863 -stall parking structures located on the northeast corner of Sycamore Avenue and Ash
Street would remain. All other existing buildings on the project site would be replaced with new
development. The project proposes three components: the construction of a mixed -use building
on Beach Boulevard; a mixed -use building on Warner Avenue, and two retail buildings on the
corner of Beach Boulevard and Warner Avenue. The Draft EIR was circulated for public review
in January 2011. The Draft EIR evaluated and determined that the following would result in less
than significant impacts: agricultural resources, land use, mineral resources, population and
housing, public services, recreation, utilities and service systems, and climate change. The Final
EIR identified the following significant impacts:
• Aesthetics: Mitigation has been provided in the EIR to reduce glare caused by reflective
building surfaces.
Air Quality: Construction activities associated with the proposed project have the
potential to violate air quality standards or contribute substantially to an existing or
projected air quality violation in addition to exposure of sensitive receptors. This would
be a potentially significant impact. Because no feasible mitigation is available to reduce
this impact to a less than significant level, this would be a significant and unavoidable
impact.
• Biological Resources: Biological resources on the project site are limited to trees and
landscaping. However, the City of Huntington Beach Tree Ordinance requires the
applicant to submit an application for a permit from the Public Works Department for any
activity that may disturb trees of any kind.
Cultural Resources: Mitigation has been provided in the EIR to reduce impacts to
cultural resources. No impacts are anticipated.
RAProje s\Newportll0150raft EIRWppe dix M- 082311.do M -70 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Geology and Soils: Mitigation has been provided in the EIR to reduce geologic impacts
to a less than significant level.
• Hazards and Hazardous Materials: Mitigation has been provided in the EIR to reduce
impacts from hazardous materials.
• Hydrology and Water Quality: Mitigation has been modified to reflect that the proposed
project which includes rental residential units will not have a homeowners association
(HOA). As such, the mitigation measure was changed, as appropriate, to ensure that
either the Applicant or the future property manager would be responsible for the same
actions.
• Noise: Mitigation has been provided in the EIR to reduce noise impacts to a less than
significant level.
• Traffic: Mitigation has been provided in the EIR to reduce traffic- related impacts to a
less than significant level.
Conclusions: The project is located approximately six miles to the northwest of the Newport
Banning Ranch site. Because of the distance between the two sites, any construction - related
impacts (air quality, noise) would not be cumulatively considerable. Aesthetic impacts
associated with the project would not be cumulative because the two sites are not within the
same viewshed. Impacts associated with policies or implementing requirements specific to the
City of Huntington Beach (e.g., provision of affordable housing in Huntington Beach) would not
be assumed in the cumulative analysis for Newport Banning Ranch. With respect to traffic, the
Newport Banning Ranch traffic study area does not include the project site or intersections
significantly impacted by this proposed project. Identified earth resources impacts would
generally be confined to the site and would be mitigated to less than significant; therefore, they
would not be considered cumulatively significant. While mitigation measures have been
identified to reduce potential cultural impacts to less than significant, this project would be
considered in the cumulative impact analysis. The project is not in the same watershed as the
proposed Project and is not in the same hydrologic cumulative study area; therefore, hydrology
impacts impact would not be cumulatively significant. The project is anticipated to result in a
cumulatively significant net increase of criteria pollutants for which the project region is in
nonattainment; therefore, this approved project would be in SCAOMD background assumptions
for regional air quality emissions within the air basin. The project is also assumed in the
cumulative background assumptions for GHG and fire protection.
CITY OF IRVINE
The following projects were identified by the City of Irvine for consideration in the cumulative
analysis for the Newport Banning Ranch Project. The projects are depicted in Exhibit 5 -5 of
Section 5.0, Cumulative Impact Analysis, and are summarized below.
CITY OF IRVINE PROJECTS WHERE CONSTRUCTION HAS BEEN INITIATED OR
COMPLETED
Booth Circle Medical Office
The site is located at 4968 Booth Circle in the City of Irvine approximately 10 miles northeast of
the Newport Banning Ranch Project site. The project proposes to construct a 17,845 -sf, single -
story medical office building on a 2.14 -acre site located in El Camino Real Planning Area 11.
RtlProje MNew oMJ0150raft EIRV ppmdix M- 082311.dm M -71 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
The project would require the following approvals: a General Plan Amendment (modifies the
land use designation and assigns intensity to the subject Planning Area 11); zone change
(modifies the zoning designation and assigns intensity to the subject Planning Area 11); a
master plan to allow the development of a medical office; and a parcel map to eventually
subdivide the building into non - residential ownership condominiums. Project development would
be consistent with adjacent land uses and surrounding development. The Final IS /MND and
project were approved on July 17, 2007; the project is completed. The IS /MND evaluated and
determined that the following impacts were found to be less than significant: agricultural
resources, air quality, biological resources, geology and soils, hazards and hazardous materials,
mineral resources, population and housing, public services, and recreation. Based on the
IS /MND, the following significant impacts are identified; measures are proposed to mitigate the
impacts to a less than significant level:
• Aesthetics: Implementation of the project would introduce additional lighting including
nighttime lighting to the project area. Impacts related to lighting would be reduced to a
less than significant level with the incorporation of mitigation measures identified in the
IS /MND.
• Hydrology and Water Quality. Due to construction activities, the project would have
the potential to contribute additional sources of pollution to the existing drainage
facilities. Impacts related to storm water runoff from the project would be reduced to a
less than significant level with incorporation of mitigation measures identified in the
IS /MND.
• Transportation and Circulation: Project implementation would cause the intersection
of Yale Avenue /Booth Circle to operate at unacceptable levels under existing conditions
and year 2010 with - project conditions. However, implementation of mitigation measures
identified in the IS /MND would reduce traffic - related impacts at this intersection to a less
than significant level.
• Noise: The project has the potential to generate significant interior noise impacts during
project operation. However, mitigation measures provided in the IS /MND would reduce
potential noise impacts to a less than significant level.
• Cultural Resources: There is the potential for archeological and /or paleontological
resources to exist at the project site. Incorporation of mitigation measures identified in
the IS /MND would reduce any adverse impacts related to buried archeological and /or
paleontological resources to a less than significant level.
• Utilities and Service Systems: With the exception of construction debris, the project
would not result in the generation of significant amounts of solid waste. The amount of
debris generated is not anticipated to significantly impact landfill capacities. Additionally,
mitigation measures provided in the IS /MND would reduce impacts related to solid waste
disposal to a less than significant level.
Conclusions: The project was completed in 2009 and is located over 10 miles from the
Newport Banning Ranch Project site. Therefore, any construction - related /short-term impacts
would no longer be applicable for consideration in the proposed Project's cumulative analysis.
The identified site - specific impacts are generally confined to the site and are mitigated to less
than significant and are therefore not considered cumulatively significant. Therefore, this project
is not included in the cumulative impact assumptions for Newport Banning Ranch with the
exception of background regional air quality emissions and GHG emissions.
RtlProje s\New oMJ0150raft EIRV ppmdix M- 082311.do M -72 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
Irvine Business Complex Vision Plan (Planning Area 36)
The 2,800 -acre Irvine Business Complex (IBC) is located within the western portion of the City
of Irvine and is generally bound by the former Tustin Marine Corps Air Station (MCAS) to the
north, the San Diego Creek channel to the east, John Wayne Airport and Campus Drive to the
south, and State Route (SR) 55 to the west. A 40 -acre parcel of the IBC is detached and located
to the south of the main IBC boundary area, which is bound by Jamboree Road, Fairchild Road,
MacArthur Boulevard, and the San Joaquin Marsh and is adjacent to the City of Newport Beach.
The project was subject to litigation by the Cities of Newport Beach and Tustin regarding
environmental documentation prepared by the City of Irvine on the IBC Vision Plan. The Cities
of Newport Beach and Irvine have reached a settlement agreement that resolves four separate
lawsuits filed by the City of Newport Beach. Both Cities have agreed not to file any further
challenges to projects consistent with either City's General Plan. The City of Newport Beach
also agreed not to file any further legal challenges to the IBC Vision Plan provided that the City
of Irvine caps the number of residential units allowed under the plan and abides by the
stipulations of the Allergan Settlement Agreement, which limits development south of 1-405. The
City of Tustin, which, jointly with Newport Beach, filed all four lawsuits against Irvine, is not a
party to this settlement agreement.
The project would allow for an increase in total units in the IBC (Planning Area 36) from
9,401 units to 15,000 units. In addition, 1,191 density bonus units would be allowed in
accordance with State Law for a total 16,191 units. The current General Plan allows for
53,461,052 sf of office equivalency in Planning Area 36. The 5,599 additional new units (either
potential or in process) remaining under the 15,000 unit cap would be offset by a reduction of
2,715,062 sf of non - residential office equivalency square footage, reducing the number to
50,899,418 sf. If approved, the proposed project would allow for the development of 6,380,955
non - residential sf and 458 -room hotel based on the existing trip caps for the area.
Key discretionary actions associated with the project include a General Plan Amendment; a
Zoning Ordinance Amendment; a Municipal Code Amendment; and a Circulation Element
Amendment. Approved IBC residential development projects identified and evaluated include
(1) The Lofts on Von Karman, 116 units; (2) 2801 Kelvin, 248 units; (3) The Carlyle, 156 units;
and (4) Avalon Jamboree I, 280 units. Pending IBC development projects identified and
evaluated include the following: (1) Irvine Crossings Master Plan and Modification and TPM,
17871 Von Karman, increase of 173,774 sf of office tenant improvements in an existing building;
and (2) Master Plan for GIFREHC Center, 18691 Jamboree Road, master plan for 250,000 sf
office, 39,000 sf retail, and a 350 room hotel. Pending IBC residential development projects
identified and evaluated include the following: (1) Martin Street Condos, 82 units; (2) 2851 Alton,
170 units; (3) Avalon /Jamboree II, 179 units; (4) Irvine Technology Center, 1,000 units;
(5) Kilroy, 469 units; (6) Alton /Millikan Apartments, 156 units; and (7) 2852 Kelvin, 192 units.
The Draft EIR was distributed for public review in March 2009 but due to changes in the project,
was recirculated on December 23, 2009; the public review period ended on February 5, 2010.
The Final EIR was certified and the project approved; the Notice of Determination was filed on
July 15, 2010.
The DREIR evaluated and determined that the following impacts would be less than significant:
aesthetics, biological resources, cultural resources, geology and soils, hydrology and water
quality, land use and planning, population and housing, public services, recreation, utilities and
service systems, and global climate change. However, project design features (PDFs) and
plans, programs, and policies (PPPs) are identified that would further lessen the less than
RAProje sv4ewportW015�raft EIRWppe dix M- 082311.do M -73 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
significant impacts in the aforementioned environmental topics. The DREIR identifies the
following significant impacts:
• Air Quality: Regional population, housing, and employment growth projections in the
Irvine Business Complex were not accounted for in the air quality management plan.
Construction emissions associated with buildout of the IBC would generate short-term
and long -term stationary- and mobile- source emissions that exceed the SCAQMD
regional significance thresholds for VOC, NOx, CO, PM10, and PM2.5, and would
significantly contribute to the nonattainment designations of the South Coast Air Basin
for 03 and particulate matter (PM10 and PM2.5). Project - related construction activities
have the potential to expose sensitive receptors to substantial pollutant concentrations of
NOx, PM1o, and PM2.5. As a result, air quality impacts would be considered significant
and unavoidable.
• Noise: Construction activities have the potential to result in temporary noise increases in
the vicinity of the project. In addition, construction of the project may generate
perceptible levels of vibration at adjacent vibration - sensitive land uses. Furthermore,
project - related vehicle trips would substantially increase ambient noise at noise - sensitive
receptors in the vicinity of the Project site on McGaw Avenue between Jamboree Road
and Murphy Avenue and cumulatively on Valencia Avenue between Newport Avenue
and Red Hill Avenue, Warner Avenue between SR -55 and Red Hill Avenue, McGaw
Avenue between Jamboree Road and Murphy Avenue, and Birch Street between Mesa
Drive and Bristol Street. Sensitive land uses also have the potential to be exposed to
noise levels that exceed 65 dBA CNEL from transportation or stationary sources. As a
result, noise impacts would be considered significant and unavoidable.
• Transportation/Traffic: Buildout of the IBC under the project would generate additional
traffic volumes and impact levels of service for the existing area roadway system. This
impact is considered significant and unavoidable.
Conclusions: Because of the distance between the two project sites (over 7 miles), traffic and
noise impacts associated with the phased development of IBC would not result in cumulatively
considerable impacts associated with the Newport Banning Ranch Project site. The project is
anticipated to result in a cumulatively significant net increase of criteria pollutants for which the
project region is in nonattainment; therefore, this project would be in SCAQMD background
assumptions for regional air quality emissions within the air basin and is assumed in the
Newport Banning Ranch's cumulative GHG assumptions.
Planning Area 40 /Planning Area 12 General Plan Amendment and Zone Change
The project sites are located in northern Irvine on the southwest corner of Planning Area (PA)
33 and are generally bordered by Alton Parkway to the north, Pacifica and a portion of the San
Diego Creek to the east, 1 -405 to the south, and State Route 133 to the west approximately
11 miles northeast of the Newport Banning Ranch Project site. The project required a General
Plan Amendment and zone change of portions of PA 40 and PA 12, and the transfer of
entitlements for 1,533 dwelling units permitted in the General Plan. The General Plan
Amendment includes changes to the Land Use Element by increasing the allowable Regional
Commercial Dwelling Units in PA 33 to 3,700 units. The Zoning Amendment also would rezone
the project site from 4.8, Irvine Center Commercial, to 47C, Urban Commercial. The Final EIR
was certified and approved in September 2008. The EIR evaluated and determined that the
following impacts were found to be less than significant: agricultural resources, cultural
resources, geology and soils, hydrology and water quality, mineral resources, population and
RtlProje MNew oMJD150raft EIRV ppmdix M- 082311.do M -74 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
housing, public services, recreation, and utilities /services systems. Based on the EIR, the
following significant impacts are identified:
Aesthetics: The project would increase nighttime illumination within the project vicinity.
However, all new lighting would be required to comply with the City's existing lighting
codes and standards. Therefore, impacts related to light and glare would be reduced to
a less than significant level.
Biological Resources: Project implementation would potentially result in a significant
impact if trees being used for nesting by migratory birds are removed during the
breeding season (February 15 to August 15). However, mitigation measures provided in
the EIR would reduce any potential impact on biological resources to less than
significant.
Hazards and Hazardous Materials: Project implementation would potentially result in
significant impacts if (1) demolition of structures within PA 12 (Traveland) encounter and
release ACMs and /or (2) the potential development of recreational or residential uses
within PA 40 results in cancer risk exposure higher than the target levels identified in the
Human Health Risk Assessment completed for the site. In addition, the PA 12 project
site is known to have limited soil and groundwater contamination. Based on the Phase I
Environmental Site Assessment (ESA) completed for the PA 12 project site, there are a
number of potential or suspect recognized environmental conditions (RECs) that would
represent a potentially significant hazard risk impact. Compliance with existing plans,
programs, policies, and mitigation measures would reduce potential impacts associated
with hazards and hazardous materials to a less than significant level.
Transportation and Circulation: Transportation improvements have been
recommended to mitigate the intersection and freeway ramp locations being impacted by
the project for year 2012 conditions. In addition, mitigation measures and fair share fees
are included in the EIR in conjunction with the North Irvine Transportation Mitigation
(NITM) program to address traffic impacts. Mitigation measures are designed to address
the project's impacts by improving the levels of service at each impacted location.
Air Quality: Construction emissions associated with the project would exceed SCAQMD
thresholds for ROG, NOx, CO, PM10, and PM2.5. Therefore, short-term construction air
quality impacts would be significant and unavoidable. In addition, it is anticipated that the
long -term ROG, CO, NOx, PM10, and PM2.5 emissions associated with operation of the
project would continue to exceed SCAQMD thresholds and would be considered
significant and unavoidable.
• Global Climate Change: The incorporation of project design features such as
participation in a Green Building Program would serve to reduce the overall GHG
emissions associated with the project. Therefore, implementation of the project would
not interfere with the State of California's ability to achieve the current GHG reduction
goals and strategies. Impacts related to climate change would be less than significant.
Noise: Implementation of Mitigation Measure NOS -5 is subject to the project applicant
(Irvine Company) and the Irvine Community Church reaching an agreement regarding
the possibility of required soundproofing measures. However, in the event that mitigation
is not fully implemented and the recommended soundproofing measures are not
implemented, significant noise impacts to the church would occur.
RAProje sWewportW0150raft EIRWppedix M- 082311.do M -75 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
• Utilities and Service Systems: The construction of public service infrastructure would
potentially result in significant impacts such as construction - related dust, traffic, and
noise. Mitigation measures provided in the EIR would reduce any potential construction
impacts to a less than significant level.
Conclusions: The project is located approximately 11 miles to the northeast and is not located
within the viewshed of the proposed Project; therefore, the identified site - specific aesthetic
impacts would not be considered cumulatively significant. The identified hazards /hazardous
materials impacts are generally confined to the site and are mitigated to less than significant;
therefore, they are not considered cumulatively significant. Because of the distance between the
two project sites, the identified noise impacts would not be cumulatively significant. Because the
project impacts air quality would remain significant and unavoidable they are assumed in
regional air quality basin assumptions. Public services would not be considered cumulatively
significant world because the two projects would be served by different agencies. The project is
included in the cumulative impact assumptions for Newport Banning Ranch with respect to
regional air quality and GHG emissions.
CITY OF IRVINE PROJECTS WITH APPROVED CEQA DOCUMENTATION
HCG Irvine Proiect
The project site is located at 2722 Michelson Drive and 18582 Teller Avenue in the City of Irvine
approximately six miles northeast of the Newport Banning Ranch Project site. The project
consists of a Master Plan to develop 785,000 sf of office space and 15,500 sf of retail /restaurant
space within the IBC. Discretionary actions include a master plan, zone change, tentative parcel
map, conditional use permit, and development agreement. The Final EIR was certified and the
project approved in December 2008. The EIR evaluated and determined that the following
impacts were found to be less than significant: aesthetics, agricultural resources, biological
resources, cultural resources, land use and planning, mineral resources, population and
housing, recreation, and utilities /services systems. Based on the EIR, the following significant
impacts were identified:
• Geology and Soils: Proper engineering design and conformance with
recommendations presented in the Comprehensive Geotechnical Report, compliance
with current building codes, and implementation of mitigation measures identified in the
EIR would reduce all potential geologic impacts to a less than significant level.
• Hydrology and Water Quality: Proper engineering design and conformance with the
requirements of the State NPDES Construction Permit and the County /Municipal Permit
and implementation of mitigation measures identified in the EIR would reduce all
potential water quality (short-term and long -term) impacts to a is less than significant
level.
• Transportation and Circulation: A proposed street improvement at the intersection of
Jamboree Road /MacArthur Boulevard is included as mitigation. However, mitigation
related to the proposed intersection would result in an alteration, which is within the
responsibility and jurisdiction of another agency (City of Newport Beach). Therefore, the
City of Irvine cannot guarantee that the improvement can be implemented.
• Air Quality. Operation of the project would have significant and unavoidable adverse
impacts on regional air quality related to NOx emissions from vehicle exhaust in the year
2011, but by 2010 all emissions would be under SCAOMD operational thresholds.
RtlProje s\New oMJ0150raft EIRV ppmdix M- 082311.dm M -76 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Protects
• Noise: The project would result in long -term traffic noise impacts. With implementation
of recommended mitigation measures, these impacts would be reduced to a less than
significant level.
• Public Services: Implementation of the project would not result in significant adverse
impacts related to public services, and no mitigation measures would be required.
However, project design features included in the EIR would enhance public safety and
security.
Conclusions: For the environmental topics listed where a potentially significant impact would
occur (hydrology and water quality, transportation and circulation, noise, public service
systems), the two project site are approximately six miles apart. The sites are in different
watersheds and are services (e.g., water, fire, and police) are provided by different agencies.
This project is included in the cumulative impact analysis for the Newport Banning Ranch
Project with respect to background regional air quality emissions and GHG emissions.
RAProje s\NewportU0150raft EIRWppe dix M- 082311.do M -77 Newport Banning Ranch
Draft EIR
Appendix M
Cumulative Proiects
This page intentionally left blank
RAProje s\NewportU0150raft EIRWppe dix M- 082311.do M -78 Newport Banning Ranch
Draft EIR