HomeMy WebLinkAbout01 - 4.4 - Hydrology and Water QualitySection 4.4
and Water Quality
4.4 HYDROLOGY AND WATER QUALITY
4.4.1 INTRODUCTION
This section identifies, discusses, and analyzes the effects of the proposed Project on local and
regional hydrology, flooding, and water quality. The purpose of this section is to provide (1) a
discussion of existing hydrology, flooding, and water quality conditions on the Project site and
(2) an analysis of how the proposed Project would affect those existing conditions. This analysis
considers the effects of the proposed Project on hydrology, water quality, storm water runoff,
and potential on- and off -site erosion and sedimentation. Cumulative impacts are addressed in
Section 5.0 of this EIR.
This analysis was based on the proposed land use plan for the Project (FORMA 2010). Primary
sources for this analysis are Fuscoe Engineering's Watershed Assessment Report, Newport
Banning Ranch (2010), the Santa Ana Regional Water Quality Control Board's Basin Plan
(Santa Ana RWQCB 1995), GMU's Report of Geotechnical Studies, the City of Newport
Beach's General Plan and General Plan EIR (Newport Beach 2006a, 2006b) and the Newport
Banning Ranch Green and Sustainable Program (Newport Banning Ranch LLC 2010). These
reports were also the source documents for presenting site design concepts and for identifying
and selecting Best Management Practices. The Watershed Assessment Report, Newport
Banning Ranch ( Fuscoe 2010b) is provided in Appendix C to this EIR. Groundwater quality
impact assessments and characterization were derived from the Technical Memorandum from
Geosyntec to the Applicant dated September 18, 2009, and the Memorandum to the City of
Newport Beach from Fuscoe Engineering dated September 16, 2009, which are also included in
Appendix C.
4.4.2 REGULATORY SETTING
Federal
Clean Water Act
In 1972, the Federal Water Pollution Control Act (Clean Water Act) was amended to require
National Pollutant Discharge Elimination System ( NPDES) permits for the discharge of
pollutants to "Waters of the U.S. "' from any point source .2 In 1987, the Clean Water Act was
further amended to require that the U.S. Environmental Protection Agency (USEPA) establish
regulations for permitting municipal and industrial storm water discharges under the NPDES
permit program. Final regulations regarding storm water discharges were issued on November
16, 1990, and require that municipal separate storm sewer system (MS4) discharges and
industrial (including construction) storm water discharges to surface waters be regulated by an
NPDES permit. NPDES permit requirements relevant to the proposed Project are discussed
later in this section.
The Clean Water Act also requires states to adopt water quality standards for receiving water
bodies and to have those standards approved by the USEPA. Water quality standards consist of
designated beneficial uses for a particular receiving water body (e.g., wildlife habitat, agricultural
supply, fishing), along with the water quality criteria necessary to support those uses. Water
quality criteria are prescribed concentrations or levels of constituents (such as lead, suspended
1 "Waters of the U.S." include all waters that have, are, or may be used in interstate or foreign commerce
(including sightseeing or hunting), including all waters subject to the ebb and Flow of the tide and all interstate
waters including interstate wetlands (33 CFR 328.3).
2 Point sources are discrete water conveyances such as pipes or man -made ditches.
R: \Projects \Newpart \J015Rnrafi EIR\4.4 Hydm- 090211.dm 4.4 -1 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
sediment, and fecal coliform bacteria) or narrative statements that represent the quality of water
that support a particular use. Because the State of California was unable to develop these
standards for priority toxic pollutants, the USEPA promulgated the California Toxics Rule in
1992 (40 Code of Federal Regulations [CFR] 131.38), which fills this gap. As a separate Rule,
the California Toxics Rule is discussed further below under State regulations.
When water quality issues compromise the designated beneficial uses of a particular receiving
water body, Section 303(d) of the Clean Water Act requires the identification and listing of that
water body as "impaired ". Once a water body has been deemed impaired, a Total Maximum
Daily Load (TMDL) must be developed for the impairing pollutant(s). A TMDL is an estimate of
the total load of pollutants from point, non - point, and natural sources that a water body may
receive without exceeding applicable water quality standards (plus a "margin of safety'). Once
established, the TMDL allocates the loads among the water body's current and future pollutant
sources.
Section 404 of the Clean Water Act is a program administered by the U.S. Army Corps of
Engineers (USAGE) that regulates the discharge of dredged and fill material into "Waters of the
U.S. ", including wetlands. Activities that affect "Waters of the U.S." that are regulated under this
program include fills for development (including physical alterations to drainages to
accommodate storm drainage, stabilization, and flood - control improvements); water resource
projects (such as dams and levees); infrastructure development (such as highways and
airports); and conversion of wetlands to uplands for farming and forestry. The USEPA and the
USACE have issued Section 404(b)(1) Guidelines (40 CFR 230) that regulate dredge and fill
activities, including water quality aspects of such activities.
Section 401 of the Clean Water Act requires that any person applying for a federal permit or
license that may result in a discharge of pollutants into "Waters of the U.S." must obtain a State
water quality certification ensuring that the activity complies with all applicable water quality
standards, limitations, and restrictions. Section 404 permits and authorizations are subject to a
Section 401 certification by the local Regional Water Quality Control Board (RWQCB).
Federal Antidegradation Policy
The federal Antidegradation Policy was released in 1968 and was included in the USEPA's first
Water Quality Standards Regulation. The Antidegradation Policy represents a three - tiered
approach to maintaining and protecting water quality. First, all existing beneficial uses and
levels of water quality necessary to protect those uses must be preserved and protected from
degradation. Second, water quality must be protected in areas where the quality cannot support
the propagation of fish, shellfish, and wildlife and recreation ( "fishable /swimmable "). Third, the
policy provides special protection of waters for which the ordinary water quality criteria are not
sufficient. These waters are called "Outstanding National Resources Waters" and have been
designated as unique or ecologically sensitive.
If an activity is going to be allowed to degrade or lower water quality (in situations where existing
water quality is higher than that needed to maintain established beneficial uses), the
Antidegradation Policy requires that proposed projects meet the criteria below:
The activity is necessary to accommodate important economic or social development in
the area.
• Water quality is adequate to protect and fully maintain existing beneficial uses.
R:Trojeats\Newpart \J015Nnrafi EIRWA Hydm- 090211.dm 4.4 -2 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
• The highest statutory and regulatory requirements and Best Management Practices
(BMPs) for pollution control are achieved.
National Flood Insurance Act
The National Flood Insurance Act of 1968 established the National Flood Insurance Program,
which is based on the minimal requirements for floodplain management and is designed to
minimize flood damage within Special Flood Hazard Areas. The Federal Emergency
Management Agency (FEMA) is the agency that administers the National Flood Insurance
Program. Special Flood Hazard Areas (SFHA) are defined as areas that have a 1 percent
chance of flooding within a given year, also referred to as the 100 -year flood. Flood Insurance
Rate Maps were developed to identify areas of flood hazards within a community.
State
California Porter- Cologne Act
California's Porter - Cologne Water Quality Control Act of 1970 (Porter - Cologne Act) grants the
State Water Resource Control Board ( SWRCB) and the RWQCBs power to protect surface
water and groundwater quality and is the primary vehicle for implementing California's
responsibilities under the federal Clean Water Act. The Porter - Cologne Act grants the SWRCB
and the RWQCBs authority and responsibility to adopt plans and policies, to regulate
discharges of waste to surface and groundwater, to regulate waste disposal sites, and to require
cleanup of discharges of hazardous materials and other pollutants. The Porter - Cologne Act also
establishes reporting requirements for unintended discharges of any hazardous substance,
sewage, or oil or petroleum product.
Each RWQCB must formulate and adopt a Water Quality Control Plan (Basin Plan) for its
region. The Basin Plan must conform to the policies set forth in the Porter - Cologne Act and
established by the SWRCB in its State Water Policy. The Basin Plan establishes beneficial uses
for surface and groundwater in the region, and sets forth narrative and numeric water quality
standards to protect those beneficial uses. The Porter - Cologne Act also states that an RWQCB
may include water discharge prohibitions applicable to particular conditions, areas, or types of
waste within its regional plan.
California Toxics Rule
The California Toxics Rule (40 CFR 131.38) is a USEPA- issued federal regulation that provides
water quality criteria for potentially toxic constituents in California surface waters with
designated uses related to human health or aquatic life. The rule fills a gap in California water
quality standards that was created in 1994 when a State court overturned the State's water
quality control plans containing water quality criteria for priority toxic pollutants. These federal
criteria are legally applicable in the State of California for inland surface waters, enclosed bays,
and estuaries for all purposes and programs under the Clean Water Act.
The California Toxics Rule establishes two types of aquatic life criteria: (1) acute criteria
represent the highest concentration of a pollutant to which aquatic life can be exposed for a
short period of time without harmful effects and (2) chronic criteria equal the highest
concentration to which aquatic life can be exposed for an extended period of time (four days)
without deleterious effects. Due to the intermittent nature of storm water runoff (especially in
3 The rule does not specify timeframe for "acute ". Standard practice would likely imply that any condition that is
permanent or semi - permanent is chronic—all else would be short-term.
R: \Projects \Newpart \J015Rnrafi EIR\4.4 Hydm- 090211.doc 4.4 -3 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Southern California), the acute criteria are considered to be more applicable to storm water
conditions than chronic criteria.
State Antidegradation Policy
Under the State's Antidegradation Policy (as set forth in SWRCB Resolution No. 68 -16),
whenever the existing quality of waters is better than what is needed to protect present and
future beneficial uses, such existing quality must be maintained. This State policy has been
adopted as a water quality objective in all the State's Basin Plans. The State policy establishes
a two -step process to determine if discharges with the potential to degrade the water quality of
surface or groundwater will be allowed.
The first step requires that, where a discharge would degrade high - quality water, the discharge
may be allowed only if any change in water quality would:
• Be consistent with the maximum benefit to the people of the State;
• Not reasonably affect present and anticipated beneficial uses of such water;
Result in water quality that is not less than that which is prescribed in State policies (i.e.,
Basin Plans).
The second step (as set forth in SWRCB Resolution No. 68 -16) states that any activity resulting
in discharge to high - quality waters is required to use the best practicable treatment or control of
the discharge necessary in order to avoid the occurrence of pollution or nuisance and to
maintain the "highest water quality consistent with the maximum benefit to the people of the
state ". The State policy applies to both surface and groundwater, as well as to both existing and
potential beneficial uses of the applicable waters.
Recycled Water Policy
On February 3, 2009, by Resolution No. 2009 -0011, the SWRCB adopted a Recycled Water
Policy. In this Recycled Water Policy, the SWRCB states "we declare our independence from
relying on the vagaries of annual precipitation and move towards sustainable management of
surface waters and groundwater, together with enhanced water conservation, water reuse and
the use of storm water' ( SWRCB 2009b). The following goals are included in the Policy:
• Increase use of recycled water over 2002 levels by at least one million acre -feet per year
(afy) by 2020 and at least two million afy by 2030.
• Increase the use of storm water over use in 2007 by at least 500,000 afy by 2020 and at
least one million afy by 2030.
• Increase the amount of water conserved in urban and industrial areas by comparison to
2007 by at least 20 percent by 2020.
• Substitute as much recycled water for potable water as possible by 2030.
The SWRCB also states in this Recycle Water Policy that they expect to develop additional
policies to encourage the use of storm water, encourage water conservation, encourage the
conjunctive use of surface and groundwater, and improve the use of local water supplies.
The Recycled Water Policy provides direction to the RWQCBs regarding appropriate criteria in
issuing permits for recycled water projects that are intended to streamline permitting of the vast
majority of recycled water projects, while also reserving sufficient authority and flexibility to
R:Trojeats \Newpart \J015Rnrafi EIRWA Hydm- 090211.dm 4.4 -4 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
address site - specific conditions. The Policy also addresses the benefits of recycled water and
encourages other public agencies to presume there is a benefit from the use of recycled water
in evaluating the impacts of recycled water projects on the environment as required by CEQA.
The Policy addresses a mandate for use of recycled water and indicates that the SWRCB will
exercise their authority to the fullest extent possible to encourage the use of recycled water,
consistent with State and federal water quality laws.
The Recycled Water Policy indicates that some groundwater basins contain salts and nutrients
that exceed or threaten to exceed water quality objectives established in Basin Plans and states
that the Policy's intent is to manage salts and nutrients on a basin -wide or watershed -wide basis
through development of regional or sub - regional management plans. The Policy describes the
components of these salt and nutrient management plans.
Finally, the Policy addresses the control of incidental runoff from landscape irrigation projects,
recycled water groundwater recharge projects, antidegradation (i.e., not applying less restrictive
standards to high quality water bodies such as Lake Tahoe), control of emerging constituents
and chemicals of emerging concern, and incentives for use of recycled water.
National Pollutant Discharge Elimination Program ( NPDES)
The NPDES permit program is administered in the State of California by the RWQCBs, and was
first established under the authority of the Clean Water Act to control water pollution by
regulating point sources that discharge pollutants into "Waters of the U.S. ". If discharges from
industrial, municipal, and other facilities go directly to surface waters, those project applicants
must obtain permits. An individual NPDES permit is specifically tailored to a facility. A general
NPDES permit covers multiple facilities within a specific activity category such as construction
activities. A general permit applies the same or similar conditions to all dischargers covered
under the general permit.
There are nine RWQCBs in the State of California. These boards have the mandate to develop
and enforce water quality objectives and implementation plans within their regions The Project
site is located within the jurisdiction of the Santa Ana RWQCB.
General Construction Permit
The SWRCB has issued a statewide general NPDES Permit and Waste Discharge
Requirements for storm water discharges from construction sites. Under this General
Construction Permit, discharges of storm water from construction sites with a disturbed area of
one or more acres are required to either obtain individual NPDES permits for storm water
discharges or be covered by the General Construction Permit. Each applicant under the
General Construction Permit must file a Notice of Intent (NOI) with the RWQCB and ensure that
a Storm Water Pollution Prevention Plan ( SWPPP) is prepared prior to grading. Terms of the
SWPPP must be implemented during construction. The primary objective of the SWPPP is to
identify BMPs to reduce or eliminate pollutants in storm water discharges and authorized non -
storm water discharges from the site during construction.
In 1999, the SWRCB issued and subsequently amended the General Construction Storm Water
Permit (Water Quality Order 99- 08 -DWQ), which governs discharges from construction sites
that disturb one acre or more of surface area. Again, on September 2, 2009, the SWRCB
adopted a new General Construction Permit that substantially alters the approach taken to
regulate construction discharges through (1) requiring the determination of risk levels posed by
a project's construction discharges to water quality and (2) establishing numerical water quality
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -5 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
thresholds that trigger permit violations. These new permit regulations took effect on July 1,
2010.
Municipal Storm Water Permitting (MS4 Permit)
The State's Municipal Storm Water Permitting Program regulates storm water discharges from
MS4s. MS4 Permits were issued in two phases. Phase I was initiated in 1990, under which the
RWQCBs adopted NPDES storm water permits for medium (serving between 100,000 and
250,000 people) and large (serving more than 250,000 people) municipalities. As part of
Phase 11, the SWRCB adopted a General Permit for small MS4s (serving less than
100,000 people) and non - traditional small MS4s including governmental facilities such as
military bases, public campuses, and prison and hospital complexes (WQ Order
No. 2003- 0005 -DWQ).
California Coastal Commission
The California Coastal Commission (Coastal Commission) is responsible for protecting water
quality in coastal environments as defined under Sections 30230 and 30231 of the California
Coastal Act. These water quality provisions provide a broad basis for protecting coastal waters,
habitats and biodiversity associated with new development and redevelopment projects. To
meet the objectives of Sections 30230 and 30231, the Coastal Commission supports a
multi - pronged approach to water quality management, which includes implementing site - design,
source - control, and treatment - control BMPs and low impact development (LID) features. New
development and redevelopment projects that are within the Coastal Zone are required to apply
for a Coastal Development Permit through the Coastal Commission prior to construction. As
part of the Coastal Development Permit process, projects must demonstrate water quality
protection with the implementation of site- design, source - control, and treatment - control BMPs.
The Project's consistency with applicable California Coastal Act policies is provided later in this
section.
California Ocean Plan
The Water Quality Control Plan for Ocean Waters of California (Ocean Plan), amended through
2001, establishes beneficial uses and water quality objectives for waters of the Pacific Ocean
along the California coast outside enclosed bays, estuaries, and coastal lagoons. The Ocean
Plan establishes water quality objectives, discharge prohibitions, and management guidelines
for safeguarding the Pacific Ocean's water quality.
Regional
Basin Plan
As indicated above, the Project site is located within the Santa Ana RWQCB's jurisdiction. The
Water Quality Control Plan for the Santa Ana River Basin (Santa Ana River Basin Plan)
designates beneficial uses and water quality objectives for water bodies in the region. Narrative
water quality criteria contained in the Basin Plan cover a range of both organic and inorganic
constituents for both surface and groundwater; the Santa Ana River Basin Plan prohibits the
degradation of water quality in a manner that would adversely impact a water body's designated
beneficial uses. The Basin Plan incorporates applicable portions of a number of national and
statewide water quality plans and policies, including the California Water Code and the Clean
Water Act. For certain designated surface water bodies and groundwater management zones,
specific numeric water quality objectives have been established for a range of constituents.
R:Trojeats\Newpart \J015Nnrafi EIRWA Hydm- 090211.dm 4.4 -6 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
These water quality criteria apply within receiving waters and do not apply directly to runoff.
Within the Project area, there are no water bodies (or groundwater management zones) for
which numeric objectives have been established.
General Waste Discharge Requirements for Discharges to Surface Waters Which Pose an
Insignificant (de minimus) Threat to Water Quality (Dewatering Permit)
The Santa Ana RWQCB issued Order No. R8- 2003 -0061 and Amendments to NPDES Permit
No. CAG998001 (Dewatering Permit) to regulate the discharge of dewatering wastes from
construction, subterranean seepage, and other similar types of discharges considered to have
"de minimus" impacts on water quality within the jurisdictions covered by the County permit.
This permit was updated in March 2009 (by Order No. R8- 2009 -0003, NPDES
NP. CAG998001) and applies to projects located within the City of Newport Beach (City). To
obtain coverage under this permit, an applicant must submit an NOI and data establishing the
chemical characteristics of the dewatering discharge. A standard monitoring and reporting
program is included as part of the permit. For dewatering activities that are not covered by the
General Permit, Waste Discharge Requirements, and an individual NPDES permit must be
obtained from the applicable RWQCB.
Orange County Storm Water Program 2003 Drainage Area Management Plan (DAMP)
Section 402(p) of the Clean Water Act, as amended by the Water Quality Act of 1987, requires
that municipal NPDES Permits include requirements (1) to essentially prohibit non -storm water
discharges into municipal storm sewers and (2) to control the discharge of pollutants from
municipal storm drains to the maximum extent practicable. In response to this requirement, the
Orange County Drainage Area Management Plan (DAMP) was developed in 1993, which has
been updated several times in response to requirements associated with NPDES permit
renewals (County of Orange et al. 2003). The City is a permittee covered by the requirements of
this permit.
The main objectives of the Orange County DAMP are to fulfill the Permittees' commitment to
present a plan that satisfies NPDES permit requirements and to evaluate the impacts of urban
storm water discharges on receiving waters. Orange County DAMP elements include (1) the
establishment of public outreach and educational programs, management strategies, and
inter - agency coordination; (2) continuing participation in the Regional Research /Monitoring
program that is being conducted with the neighboring counties, the Southern California Coastal
Waters Research Project, and three Southern California Regional Boards; (3) the establishment
of BMPs aimed at managing project- induced hydrologic effects; and (4) the improvement of
water quality throughout the region (County of Orange et al. 2003).
Areas of Special Biological Significance
Areas of Special Biological Significance are areas designated by the SWRCB for the protection
of sensitive marine species or biological communities from undesirable alterations in natural
water quality. Pursuant to recent revisions to the California Public Resources Code (PRC),
Areas of Special Biological Significance are now included within the areas classified as "State
Water Quality Protection Areas" where marine species and biological communities are protected
from "undesirable alteration[s] in natural water quality' (PRC §36700[f]). The two closest Areas
of Special Biological Significance to the Project site include the Irvine Coast Marine Life Refuge
Areas of Special Biological Significance, located offshore and about seven miles south, and the
Newport Beach Marine Life Refuge, also offshore and about five miles to the south.
R:Trojeats \Newpart \J015Nnrafi EIRWA Hydm- 090211.dm 4.4 -7 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
City of Newport Beach
City of Newport Beach Council Policy Manual
The City of Newport Beach Council Policy Manual stipulates Policies L -18 and L -22 for the
protection of water quality within the City, both of which are intended to minimize dry- weather
runoff and runoff from small rain events to improve water quality - limited receiving waters, the
near -shore ocean environment, and Newport Bay's water quality (Newport Beach 2002). Policy
L -18 is entitled "Protection of Water Quality: Drainage — Public Rights -of- Way ". Policy L -22 is
entitled "Protection of Water Quality: Water Quality Management Plans for New Development
and Redevelopment ".
Policy L -18 states that "Whenever possible, runoff should be retained on private property to
prevent the transport of these pollutants... Reduction, detention or diversion of runoff can
benefit property owners through water conservation and reuse of water that would otherwise
drain to the City's street drainage system and our harbors, bays, and ocean" (City of Newport
Beach 2002a). Policy L -22 states:
New development or redevelopment presents the City and the public with the
opportunity to reduce the impacts of runoff that would otherwise drain to the
City's street drainage system and our harbors, bays, and ocean. At the time of
submittal of an application for a new development or redevelopment project, an
applicant shall submit [a] Water Quality Management Plan (WQMP) to the City.
The WQMP's purpose is to minimize to the maximum extent practicable dry
weather runoff and runoff from small storms (less than 3 /4' of rain falling over a
24 -hour period) during construction and post- construction from the property"
(Newport Beach 2002b).
City of Newport Beach Municipal Code
The City of Newport Beach Municipal Code contains policies relevant to water quality
management, specifically to control storm water runoff from development sites.
Section 14.36.040, Control of Urban Runoff, requires new development and redevelopment
projects to comply with the DAMP as well as conditions and requirements established by the
Community Development Department or Building Department to reduce or eliminate pollutants
in storm water runoff from a project site.
Local Implementation Plan (LIP)
The City's Local Implementation Plan (LIP) was prepared as part of a compliance program
pursuant to the Third Term NPDES Permit. The LIP presents the actions, activities and
programs undertaken by the City, as well as current activities and programs, to meet the
requirements of the NPDES Permit and to improve urban water quality. Although the LIP is
intended to serve as the basis for City compliance during the five -year period of the Third Term
NPDES Permit, the LIP is subject to modifications and updates as the City determines
necessary, or as directed by the Santa Ana RWQCB.
The LIP, in conjunction with the County DAMP, is the principal policy and guidance document
for the City's NPDES Storm Water Program. Sections A.7.0 and A.8.0 of the LIP address new
development and significant redevelopment controls for incorporating BMPs into environmental
compliance requirements. The LIP also addresses construction requirements for sedimentation
and erosion control, as well as on -site hazardous materials and waste management.
R:Trojeats \Newpart \J015Nnrafi EIRWA Hydm- 090211.dm 4.4 -8 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
On May 22, 2009, the Santa Ana RWQCB re- issued the MS4 Permit for the Santa Ana Region
of Orange County (Order R8 -2009- 0030). Re- issuance of the fourth term of this permit resulted
in changes to the 2003 DAMP and City of Newport Beach LIP and storm water program. This
updated Fourth Term permit includes new requirements pertaining to hydromodifi cation 4 and
low impact development (LID) features associated with new developments and redevelopment
projects. Within 12 months after the permit adoption, the County of Orange, as the Principal
Permittee, must finalize a new Model WQMP that incorporates feasibility criteria for LID and
hydromodification requirements. Following the Santa Ana RWQCB's approval of the Model
WQMP, the City will be required to update their LIP and storm water programs and incorporate
the new Model WQMP into their discretionary approval processes for new development and
redevelopment projects.
One component of the New Development/Significant Redevelopment Section of the City's LIP is
the provision to prepare a WQMP for specified categories of development aimed at reducing
pollutants in post - development runoff. Specifically, a project - specific WQMP includes Santa Ana
RWQCB- approved BMPs, where applicable, that address post- construction management of
storm water runoff water quality. This includes operation and maintenance requirements for all
structural or treatment - control BMPs required for specific categories of developments to reduce
pollutants in post - development runoff to the Maximum Extent Practicable (MEP). The categories
of development that require preparation of a project - specific WQMP include:
• All significant redevelopment projects, where redevelopment is defined as the addition of
5,000 square feet (sf) or more of impervious surface on an already developed site;
• New development projects that create 10,000 sf or more of impervious surface
(collectively over the entire site) including commercial, industrial, residential housing
subdivisions, mixed use, and public projects;
• Automotive repair shops;
• Restaurants where the land area of development (including parking areas) is 5,000 sf or
more;
• Hillside developments on 5,000 sf or more, which are located on areas with known
erosive soil conditions or where the natural slope is 25 percent or more;
• Developments of 2,500 sf or more located within, directly adjacent to (within 200 feet), or
discharging directly into receiving waters within Environmentally Sensitive Areas such as
areas designated in the Ocean Plan as Areas of Special Biological Significance or water
bodies listed on the Clean Water Act Section 303(d) list of impaired water bodies;
• Parking lots with 5,000 sf or more of impervious surface, or with 15 parking spaces or
more exposed to urban storm water runoff;
• Streets, roads, highways and freeways of 5,000 sf or more of paved surface, which shall
also incorporate USEPA guidance contained within "Managing Wet Weather with Green
Infrastructure: Green Streets" in a manner consistent with the MEP standard;
• Retail gasoline outlets of 5,000 sf or more with a projected average daily traffic of
100 vehicles or more per day.
As required by the City's municipal ordinances on storm water quality management, a project's
WQMP must be submitted to the City for approval prior to the City issuing any building or
grading permits. Since the proposed Project includes the development in multiple categories
Hydromodifcation is generally defined as the alteration of natural flow characteristics.
R: \Projects \Newpart \J015Rnrafi EIR\4.4 Hydm- 090211.doc 4.4 -9 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
listed above (e.g., residential and commercial uses, parking), the Project is subject to the
requirements of the City's WQMP. This includes meeting any new requirements of the updated
MS4 Permit and associated revised LIP. These updated requirements may include LID features
and erosion /sediment controls.
General Plan Natural Resources Element and Harbors and Bay Element
The Natural Resources Element and the Harbors and Bay Element of the City of Newport
Beach General Plan includes goals and policies related to water quality and water resources
that are applicable to the proposed Project. The Project's consistency with applicable General
Plan goals and policies is provided at the end of this EIR section.
4.4.3 METHODOLOGY
A hydrologic analysis was performed to assess the potential impacts on water and groundwater
resources as a result of the proposed development. In general, the proposed change in land
uses and flow patterns would increase impervious surfaces and runoff potential within the
Project site which, in turn, affects the downstream hydrology in the watershed, which is
described below in Existing Conditions.
Hydrologic modeling was performed by Fuscoe Engineering according to procedures specified
in the Orange County Hydrology Manual (1986) and Addendum No. 1 of the Hydrology Manual
(1996). Two types of design events (as defined by Orange County) were analyzed for the
Project watershed: (1) high- confidence (HC) events and (2) expected -value (EV) events. As
described in the Hydrology Manual, HC events are used for flood - control facility design and
loading assessment, and EV events are used to mitigate for increased runoff due to
development. The following hydrologic conditions with a range of storm return frequencies were
analyzed for each of the subwatershed areas, discussed further below, within the Project
watershed:
• Existing Condition: 10 -year, 25 -year, 100 -year HC events;
• Existing Condition: 2 -year and 100 -year EV events;
• Proposed Condition: 10 -year, 25 -year, 100 -year HC events; and
• Proposed Condition: 2 -year and 100 -year EV events.
These analyses were performed for all Project subwatershed
summarization of these results focuses on the changes in
within the subwatersheds impacted by the proposed Project.
4.4.4 EXISTING CONDITIONS
Hydrologic Setting
drainage areas. Presentation and
peak flow rate and runoff volume
Orange County encompasses an area of approximately 798 square miles, beginning on the
coastal plain and rising to an elevation of over 5,000 feet above mean sea level (msl) in the
Puente Hills and Santa Ana Mountains to the north and east (County of Orange et al. 2003).
The climate of the Santa Ana Region is classified as Mediterranean, which is generally dry in
the summer with mild, wet winters. The average annual rainfall in the region is about 15 inches
and under 11 inches in Newport Beach; most of it occurring between November and March
( Fuscoe 2010b).
R:Trojeats\Newpart \J015Nnrafi EIRWA Hydm- 090211.dm 4.4 -10 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Newport Beach is located within four distinct watersheds, all of which are related to the
hydrologic areas delineated by the Santa Ana RWQCB in the Basin Plan. As depicted on
Exhibit 4.4 -1, Regional Watersheds, the four regional watersheds are the Newport Bay, Newport
Coast, Talbert, and San Diego Creek Watersheds. Although most of the City is located within
the Newport Bay and Newport Coast Watersheds, the Project site is located within the Talbert
Watershed, which covers approximately 21.4 square miles and drains into the Pacific Ocean on
either side of the mouth of the Santa Ana River. Two main tributaries drain the Talbert
Watershed: the Greenville — Banning Channel in the portion of the watershed to the east of the
Santa Ana River mouth, and the Talbert and Huntington Beach Channels on the western side of
the river mouth. As shown on the County of Orange's Environmentally Sensitive Area
Watershed Maps (County of Orange 2010, the Project site is located within Watershed D
(Talbert- Greenville Banning Channel). The Project site is located within the Lower Santa Ana
River Hydrologic Area and the East Coast Plain Hydrologic Sub -Area (HSA) 801.11 discharging
to the Santa Ana River Tidal Prism and Newport Slough (Fuscoe 2010b).
Site Drainage Patterns and Characteristics
Drainage patterns on the Project site generally flow from the higher elevations in the east
toward lower elevations to the west. Off -site drainage from the existing urban areas of the Cities
of Costa Mesa and Newport Beach enter the Project site through storm drain culverts at the
upstream ends of the larger Arroyos. As depicted on Exhibit 4.4 -2, Existing Site Features, there
are five geomorphic features on the Project site that apply to site hydrology, drainage patterns,
and sediment transport (see Exhibit 3 -4, Existing Topographic Site Conditions, Section 3.0,
Project Description). These features are:
Lowland: This area is located in the northern and northwestern portions of the Project
site. The Lowland area contains several narrow channels and shallow depressions, and
often ponds water under conditions where the Santa Ana River tidal gates are closed
and /or during significant precipitation events. This area is fairly degraded and heavily
impacted by infrastructure that supports oil operations. The USACE has restored salt
marsh (USACE- restored salt marsh basin) habitat near the mouth of the Santa Ana
River. This area is separated from the Lowland by a low berm; however, water exchange
between the USACE- restored salt marsh basin and the Lowland does occur through two
culverts.
Newport Mesa (Upland): The Upland area is located in the eastern portion of the
Project site. This area is actually a part of the larger (Upland) geological region that
extends off the Project site. The portion of the Upland located on the Project site has
also been heavily impacted by the construction and use of oil infrastructure including
pipelines, roads, buildings, and other equipment.
• Bluffs: The bluffs are located adjacent to the Lowland area in the transition zone
between the Lowland and the Upland. These bluffs form the western edge of the Upland
and are characterized by west- and southwest - facing slopes of varying steepness. The
bluffs have historically contributed sediment to the Semeniuk Slough through localized
erosion of bluff faces and shallow slumping of colluvial material.
Arroyos: There are three existing arroyos on the Project site that are formed by
precipitation and local site runoff /drainage. One of these drainages, located at the
Project site's northeastern boundary, is fairly small and does not convey large quantities
of flow. The two other arroyos, referred to as the "Northern Arroyo" located in the
northern portion of the Project site and the "Southern Arroyo" the southernmost arroyo,
both convey on- and off -site flows as well as significant volumes of sediment across the
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -11 Newport Banning Ranch
Draft Environmental Impact Report
�I
w
N
3
z
v
Q
a
0
Santa Are Regional water Ouali Control Board
to Mora
COYOTE
CREEK
ea
PWNIWn ppya a liW 11
...wb
Region4 -� ^... - -/ Mapped Area
La Palma �-
p auaN Park W • • y'� ,
-t`U '�
, r
ARSON CREEK°
Oran gpyBa�' SgNTAANq RIVFF _.
orarpa
Loa Nam �rb0 p
'
ldr
WES INSTHI ✓ a Man Gme
seal aexn <. �we.aalrmtar 3'�i -
0 ntaAN o Y wan
sky n
_ SAN DIEGO
CREEK
'
TALBERT
coma Neu 't d
PacAic Ocean _ f
7 Nb � Region 9
. Laplm0HA,
Beach
Project
Location
1. "PORT
^'AAST
LEGEND
Q Newport Beach City Boundary i;..r.,.
Watershed Boundaries
Source: Santa Ana Regional Water Quality
Control Board 2009
Regional Watersheds Exhibit 4.4 -1
Newport Banning Ranch EIR
a5p-nJ ; /
wAa
VY C O N S V L T I N G
s (Rev 072511 JFG) Projects/ NewportJJ015/ GraphicslEIR /Ex4.41_Walershed.pdf
�1�L��ik�� v r� , -� 'y���,i.�' -'Kt4,•r (•iyy"� �,r �'r
♦a a
1 gffit `• ,- Q
,whim a ry
1
r`.,41
_ 18th Stream
N'
e r Lwland Area '
PCt °y° �A�f w • �i/�i1�iiife.�•g
1 !
17th Street
jyal efi;,
wow lit
Marsh Basin
ir
or
er�y ��` ���;�I• }ref. �f ♦ PAC ♦'� �♦ w fi ��
el
to
Pacific Ocean
- 1 1
m I I
-titpoiniu: 1 11 01 in
/e 1
1 1
Section 4.4
and Water Quality
Project site from the eastern edge of the Project site to the Semeniuk Slough and
Lowland in the west.
Semeniuk Slough: also known as the Oxbow Loop Channel, the Semeniuk Slough
consists of a meandering drainage course that flows along the southern and
southwestern edge of the Project site. A reinforced concrete box (RCB) channel under
West Coast Highway discharges off -site flows into Semeniuk Slough a short distance
from the West Coast Highway roadway, and on -site flows enter the slough from the
Southern Arroyo and bluff faces. The Semeniuk Slough drains to the west and north into
the USACE- restored salt marsh basin.
Existing Drainage Conditions and Infrastructure
Exhibit 4.4 -3, Existing Watershed, depicts the Project site's existing drainage patterns and
associated infrastructure. There are no major storm drain facilities within the Project site
boundary. A reinforced concrete box (RCB) storm drain under West Coast Highway discharges
off -site runoff from hydrologically contiguous areas north and east of the Project site into the
Semeniuk Slough located at the southern boundary of the Project site. This existing storm drain
at West Coast Highway is owned and maintained by the California Department of
Transportation (Caltrans). Flows within the Semeniuk Slough discharge into the
USACE- restored salt marsh basin and are hydrologically connected to the Santa Ana River by
means of a tidal gate in the Santa Ana River channel levees. Flows in the Lowland area
ultimately drain into the Santa Ana River through a second tidal gate located in the river levee
approximately a half -mile north of the first tidal gate. These tidal gates are designed to stay
open to allow tidal flows to circulate through the Lowland; the Santa Ana River's water surface
elevation controls the gates and determines when these gates close. At times when the tidal
gates are closed, flows within the Lowland area and the USACE- restored salt marsh basin
cannot discharge and therefore, water ponds within both basins.
Lowland Area and USACE- restored Salt Marsh Basin. As noted on Table 4.4 -1, the drainage
area of the on -site Lowland area is composed primarily of Subwatersheds A through K
(Exhibit 4.4 -3), which encompass approximately 368 acres. The design elevations of the tidal
gates in the Santa Ana River Levee indicate that they will begin to close when the water level
inside the USACE- restored salt marsh basin reaches an elevation of 3.0 feet above msl, and will
be completely closed when interior water elevations reach 3.5 feet above msl. As the maximum
design water level elevation within the USACE- restored salt marsh basin is 6.0 feet above msl,
the basin storage volume encompassed between elevations 3.5 and 6.0 feet above msl can be
viewed as available storage capacity for local runoff once the tidal gates are closed. The
USACE- restored salt marsh basin has a footprint of approximately 90 acres, and the adjacent
Lowland area has a footprint of approximately 126 acres. The combined flood storage capacity
of both basins is approximately 345 acre -feet.
Northern Arroyo. The Northern Arroyo is located near the northern portion of the Project site,
receiving both on- and off -site runoff from a 42 -inch storm drain pipe and a V -ditch along the
Project site boundary. The Northern Arroyo starts at the discharge location of the 42 -inch pipe,
which is located within a retaining wall at the eastern Project site boundary, and runs
approximately 930 feet to the east to its discharge point in the Lowland area. There are no
existing engineering improvements to the Northern Arroyo. There is evidence of localized
erosion associated with from site runoff and local culvert drainage.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -12 Newport Banning Ranch
Draft Environmental Impact Report
fie. rL 1.-1.
I
t
I 0 f
AMA
_
•\ •\ � UUW rlllll -if
:
\~'••� ;
K O v'�•�
IF
Doe
G
j
J
1 WOO
j
( Subwatershed Designation 1 '
1�
- - Existing Open Channel /Ditch ��•y. '
— Existing Storm Drain Pipe •�••�•• j'
r
_
- - Arroyo "••'.ice
—••• Project Boundary
Existing Basin Boundary •.
Lowland /Marsh Boundary
Source: Fuscoe 2010
Existing Watershed Exhibit 4.4 -3
Newport Banning Ranch EIR
N
eTING
wAa
ry C O N 5 U L T I N G
s (0]2511 JPG) R: Pmjecte\ Newport\ J0151Graplh .TIMEx4.4 -3_ ExistWatershed.pdf
Section 4.4
and Water Quality
TABLE 4.4 -1
LOWLAND AREA AND USACE- RESTORED SALT MARSH BASIN EXISTING
CONDITIONS RUNOFF VOLUME SUMMARY (HC EVENTS)
Subwatershed
Drainage Area
(ac)
10 -Year
Volume
(ac -ft)
25 -Year
Volume
(ac -ft)
100 -Year
Volume
(ac -ft)
A
349.6
67.3
86.1
131.7
B
135.1
30.9
38.9
54.0
C
63.6
11.5
15.0
24.0
D
14.3
2.8
3.6
5.6
E
97.2
22.4
28.1
39.4
F
5.8
1.3
1.6
2.1
G
1.8
0.4
0.5
0.7
H
7.0
1.5
1.9
2.6
1
1.1
0.2
0.3
0.4
J
11.0
2.4
3.0
4.0
K
6.3
1.4
1.7
2.3
Lowland Area'
126.0
38.6
47.1
59.1
USACE- Restored
Salt Marsh Basin
90.0
27.6
33.7
42.2
Total
908.8
1 208.6
261.5
368.1
For the Lowland and USACE- restored salt marsh areas, the runoff volume is estimated by the following:
Precipitation (in) x Area (ac)112
Source: Fuscoe 2010b.
Southern Arroyo. The Southern Arroyo, located near the site's southern boundary, begins at
an existing 48 -inch storm drain pipe discharge point on top of the Upland. The Southern Arroyo
runs approximately 2,340 feet through the Project site from east to west, and terminates at a dirt
road approximately 500 feet upstream of the Semeniuk Slough. The Southern Arroyo is
surrounded by approximately 30 acres of natural habitat with heavy vegetation cover. Field
observations indicate severe erosion and sloughing of sediment into the Southern Arroyo from
the adjacent on -site tributary areas that enter this Arroyo as a result of sheet flow. During large
storm events, sediment from the tributaries enters the Southern Arroyo and is conveyed
downstream to the Semeniuk Slough, resulting in large sediment fans within the channel
following these rain events. Historical photos of the site indicate that erosion and undercutting
within the tributaries has been occurring since the 1930s.
Caltrans Storm Drain at West Coast Highway. As previously noted, there is an existing RCB
storm drain located under a portion of West Coast Highway along the southern Project
boundary, which is owned and operated by Caltrans. The existing storm drain varies in size,
from 8 feet in width by 5 feet in height at the upstream end and increases to 14 feet in width by
5 feet in height at the downstream portion, where it outlets to a trapezoidal channel upstream of
the Semeniuk Slough. This Caltrans storm drain receives street flow on West Coast Highway. It
also receives flows from areas north and south of West Coast Highway.
Semeniuk Slough. The Semeniuk Slough begins at the southerly tidal gate and migrates south
around an existing Newport Shores residential neighborhood, ending at West Coast Highway.
During high tides, the Slough's tidal prism migrates up the channel and leaves limited capacity
for storm water conveyance. The channel floods when a high tide and a large storm occur
R:Troieats\Newpart \J015Nnraft EIRWA Hydm- 090211.dm 4.4 -13 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
simultaneously. Storm flows passing through the Semeniuk Slough are primarily stored in the
southerly portion of the USACE - restored salt marsh basin.
As addressed in Table 4.4 -2, the Semeniuk Slough's drainage area is composed of
Subwatersheds A, F, G, H, I, J, and K, and encompasses a total of approximately 436.6 acres.
Subwatersheds B, C, D, and E are tributary to the lowlands and are not part of the Semeniuk
Slough drainage area. The elevation of the channel bank adjacent to the residential
development is approximately 5 feet above msl, resulting in about 1.5 feet of available flood
storage capacity in the Slough when water surface elevations in the USACE- restored salt marsh
basin reach 3.5 feet and the tidal gates close. This flood storage capacity in the Slough is
further reduced by the presence of several habitat islands constructed in the USACE- restored
salt marsh basin. As a result, the available flood storage capacity within the Semeniuk Slough is
estimated to be approximately 28 acre -feet, about equal to the 2 -year event (EV) runoff volume
delivered to the Slough. This indicates the Semeniuk Slough's hydrologic system under existing
conditions provides about a 2 -year level of flood protection to surrounding development.
TABLE 4.4 -2
SEMENIUK SLOUGH EXISTING CONDITION RUNOFF VOLUME (EV EVENT)
Subwatershed
Drainage Area
(ac)
2 -Year Volume
(ac -ft)
100 -Year Volume
(af)
A
349.6
17.3
85.2
F
5.8
0.5
1.6
G
1.8
0.2
0.5
H.
7.0
0.6
1.9
1
1.1
0.1
0.3
J
11.0
0.9
3.0
K
6.3
0.5
1.7
Salt Marsh Basin
54.0
6.5
20.2
Total
436.6
26.6
114.4
Source: Fuscoe 2010b.
The 2 -year volume analysis was also performed to analyze potential hydrologic conditions of
concern (HCOC) to the Southern Arroyo consistent with the Fourth Term Storm Water Permit.
Changes in volume greater than five percent to the Southern Arroyo and Semeniuk Slough
drainage area under the proposed condition could lead to HCOC's within the Southern Arroyo
and also potential long -term channel instability issues that require hydromodification controls.
The 2 -year volume analysis for HCOC's is not required for the Lowland /USAGE- restored salt
marsh basin area because this area represents a more uniform, low -lying flood storage area
that is not susceptible to channel instability and long -term channel degradation. Therefore, the
HCOC 2 -year volume analysis for existing and post - project conditions has been limited to the
Semeniuk Slough /Southern Arroyo and is not included in the Lowland /USACE- restored salt
marsh basin flood storage evaluations.
Site Subwatersheds
The subwatersheds have been delineated to characterize Project site drainages as they
discharge into the Semeniuk Slough and the Lowland area (Exhibit 4.4 -3). Of these
11 subwatersheds, Subwatersheds A through E drain portions of the Project site. Of these five
subwatersheds, the Project would modify only Subwatersheds A, B, C, and D. Drainage
patterns within Subwatershed E would not be altered or impacted by the Project.
R:Trojeats\Newpart \J015Nerafi EIRWA Hydm- 090211.dm 4.4 -14 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
These subwatershed designations confirm the Project site's overall east -to -west drainage
pattern and provide additional detail relative to topographic variation in flow. The Northern
Arroyo, located within Subwatershed B, receives flows from surrounding neighborhoods to the
east as well as localized site runoff, and discharges into the Lowland area. The Southern
Arroyo, located within Subwatershed A, discharges into Semeniuk Slough and receives runoff
from the Project site and off -site runoff from areas east of the Project site.
Soils
Three soil units are present on the Project site, interspersed with colluvial material in areas near
the bluffs and arroyos. The site is underlain by the San Pedro Formation, which is the oldest
geologic unit at the Project site and which constitutes a "bedrock" layer comprised of siltstone
and clayey - siltstone mixed with lenses of fine -to- coarse sandstone. In the Upland area, San
Pedro Formation materials are overlain by marine terrace deposits. Recent alluvial materials
consisting of sediments deposited by earlier Santa Ana River flows and tributary drainages
comprise the Lowland and USACE- restored salt marsh basin. Pockets of artificial fill are also
found throughout the site and are generally associated with oil support facilities.
Flood Hazards
As depicted on Exhibit 4.4 -4, Flood Hazards, the FEMA Flood Insurance Rate Map (FIRM)
applicable to the Project site (FIRM Number 060590026H) show that the the Lowland and the
southwestern corner are located outside the 100 -year floodplain, but within the 500 -year
floodplain. The City of Newport Beach General Plan is consistent with these designations and
indicates that Semeniuk Slough is also located outside the 100 -year floodplain but within the
500 -year floodplain. Due to its elevation, the Upland area is outside the 500 -year floodplain.
Localized flooding does occur along the Semeniuk Slough during periods of high precipitation
and storm conditions.
Surface Water Quality and Designated Beneficial Uses of Receiving Waters
Beneficial Uses of Receiving Waters
The Santa Ana RWQCB defines a beneficial use for surface waters in the region as "one of the
various ways that water can be used for the benefit of people and /or wildlife" (Santa Ana
RWQCB 1995). Beneficial uses, along with specific water quality criteria, comprise water quality
standards for surface (navigable) waters as defined by Section 303 of the federal Clean Water
Act (33 United States Code [USC] §1313). Under the Porter - Cologne Water Quality Control Act
(California Water Code § §13050 et seq.), these concepts are separately considered as
beneficial uses and water quality objectives. Beneficial uses and water quality objectives are to
be established for all "Waters of the State ", both surface and subsurface groundwater.
There are 23 beneficial uses defined statewide; of these, 19 are recognized within the Santa
Ana Region. One additional beneficial use — Limited Warm Freshwater Habitat —is unique to the
Santa Ana Region, bringing the total number of beneficial uses recognized in the Santa Ana
Region to 20 (Santa Ana RWQCB 1995).
Surface waterbodies with designated beneficial uses within the vicinity of the Project site include
the Santa Ana River Tidal Prism (which is defined by the extent of tidal influence within the river
channel) and estuary and the USACE- restored salt marsh basin. The beneficial uses of the
USACE- restored salt marsh basin and the Santa Ana River Tidal Prism, into which flows from
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -15 Newport Banning Ranch
Draft Environmental Impact Report
=fir
1
COSTA MESA
Legend
'Special Flood Hazard Areas
IKVIME Inundated by 100 -yecr flood
C A Areas of 500 -year flood: areas of
> 100 - yearflood with average
depths of less than 1 foot or with
drainage areas less than 1 square
mile; and areas protected by
+ _ levees from 100 -year flood
i Zane VIE, Coastal flood zone with
_ velocity hazard (wave action);
base flood elevations determined,
Approximate . Approximate
Project Location
Project Locati n` <°
PAC /Fyn.
OCEAN
1 � �
,� Ne
_ CRYSTAL COVERATE PARK
1
(7
S
Z /
b
e
a
o Source: City of Newport Beach 2006
Flood Hazards Exhibit 4.4 -4
Newport Banning Ranch EIR
AN
W— pE
���YYY• /// C O N 511 L T I N G
0725 J G) R: Projects \NewportU015l13raphics \E R\ExA 4- 4_FlOOtlhaz.ptlf
Section 4.4
and Water Quality
the Project site ultimately discharge after passing through the Semeniuk Slough, are listed in
Table 4.4 -3.
TABLE 4.4 -3
BENEFICIAL USES OF RECEIVING WATERS IN PROJECT VICINITY
Surface Water Beneficial Uses
tY
cJ
K
�
LU
(-
�
C�7
K
3:
Q
0
w
w
0
Q
-J
0
0
4
2
Receiving Water
¢
z
a
0
z
IL
tY
U
3
0
m
N
W
w
Tidal Prism of Santa
+
X
X
X
X
X
X
Ana River
USACE- Restored
+
X
X
X
X
X
X
X
Salt Marsh Basin
X Present or Potential Beneficial Use
+ Excepted from MUN: Municipal and Domestic Supply
MUN: municipal and domestic supply; AGR: agricultural supply]; IND: industrial service supply]; PROC: industrial process supply;
GWR: Groundwater Recharge]; NAV: navigation; POW: hydropower generation]; REC1: water contact recreation; REC2: non -
contact water recreation; COMM: commercial and sport fishing; WARM: warm freshwater habitat]; LWARM: limited warm freshwater
habitat; COLD: cold freshwater habitat; BIOL: biological significance; WILD: wildlife habitat; RARE: rare, threatened, or endangered
species; SPWN: spawning, reproduction, and development; MAR: marine habitat; SHEL: shellfish harvesting; EST: estuarine
habitat.
Source: Santa Ana RWQCB 1995.
Surface Water Quality Objectives
The Project drainage in the Semeniuk Slough and Lowland area connects to the Santa Ana
River via the existing tidal gates within the Santa Ana River's tidal prism. Therefore, the
applicable water quality objectives for these receiving waters can be found in the Santa Ana
RWQCB criteria for "Enclosed Bays and Estuaries ". The Santa Ana RWQCB defines "enclosed
bays" as "indentations along the coast which enclose an area of oceanic water within distinct
headlands or harbor works'; "estuaries" are defined as "including coastal lagoons, located at the
mouths of steams which serve as areas of mixing for fresh and ocean waters' (Fuscoe 2010b).
Although the Santa Ana RWQCB has not set specific water quality objectives for the Tidal Prism
of the Santa Ana River, the Basin Plan does contain general water quality objectives for all bays
and estuaries within the Santa Ana RWQCB boundaries.
Existing Surface Water Quality Conditions
The Santa Ana River has been divided into six reaches representing hydrologic and water
quality units. Reach 1 extends almost '/z mile from 17th Street in Newport Beach to the river's
outlet at the Pacific Ocean. As receiving waters for the Project, the Tidal Prism and Reach 1 of
the Santa Ana River are not listed as impaired according to the year 2006 USEPA- approved
303(d) list (USEPA 2007) and do not have any TMDLs in place. The Semeniuk Slough is not
proposed to be listed by the RWQCB on the 303(d) list. However, according to the 2008
California 303(d)/305(b) Integrated Report, the Newport Slough is recommended to be listed as
impaired for enterococcus, fecal coliform, and total coliform. If approved by the SWRCB and
USEPA, the 303(d) list would be revised to include the new impairments. The closest 303(d)
Listed Water Body is the Pacific Ocean — Huntington Beach State Park, is approximately
1.5 miles from the Project site.
R:Trojects\Newpan \J015NDmft EIRWA Hydm- 090211.dm 4.4 -16 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Groundwater Resources
Groundwater Characterization and Elevations
Geographically, the Project site is located within the Orange County Groundwater Management
Zone as defined in the Basin Plan. The Orange County Groundwater Management Zone
consists primarily of three intra- connected confined aquifers: the Lower, Middle, and Upper
Aquifers.
The Lower Aquifer system is a series of hydraulically interconnected aquifers overlying the
non - water - bearing formations of consolidated sedimentary and basement rock. The Middle
Aquifer system is composed of a series of aquifers predominantly of the water - bearing San
Pedro Formation. The Main Aquifer, the predominant aquifer within the Middle Aquifer system,
is comprised of coarse sand and gravel that contain layers of finer deposits and is Orange
County's primary source of groundwater (Fuscoe 2010b). The Upper Aquifer system is made up
of discontinuous lenses of coarse sand and gravel confined by lenses of clay sediments. The
Talbert Aquifer is the uppermost confined aquifer in the Upper Aquifer system. Local
fine - grained sediments give rise to perched or quasi - perched water above the Talbert Aquifer.
Groundwater within the Orange County Groundwater Management Zone is affected by salt
water intrusion near the coast and colored water from natural organic materials in the Lower
Aquifer system. The most typical source of groundwater contamination in the area is the erosion
of natural deposits, which could deliver chemicals such as arsenic, barium, fluoride, nickel, and
selenium along with radiologicals such as radium and uranium in the groundwater (Newport
Beach 2006b). Nitrates are also problematic owing to the extensive use of fertilizers within
Orange County (Newport Beach 2006b). The Santa Ana RWQCB has identified water quality
objectives for the Orange County Groundwater Management Zone for total dissolved solids
(TDS) and nitrates.
Groundwater levels below the Lowland area of the Project site generally occur within a few feet
of mean sea level (Geosyntec 2009). Groundwater elevations below the Upland have been
identified at around sea level, although sampling data indicate that local variations in
groundwater elevation in the area could occur in relation to a perched water condition (Fuscoe
2010b). Seepage in the existing on -site bluff faces has not been observed.
Beneath the Project site, the Upper Aquifer is subject to sea water intrusion, which began in the
1940s as lower rainfall amounts and increased groundwater drawdown for domestic use
reduced groundwater table elevations to levels below sea level. Due to this condition (i.e.,
where sea water actually moves in and mixes with fresh water within the aquifer), groundwater
at the Project site is brackish. Measured TDS and chloride levels in groundwater samples
collected from the Lowland area indicate that concentrations are above the State of California
drinking water standards (Geosyntec 2009).
As addressed in Section 4.3, Geology and Soils, global climate change and sea level rise have
become considerations in project design throughout California, potentially influencing future
project performance as well as project effects. The range of global climate change and sea level
rise scenarios constitute predictions based on current understanding of the underlying causal
processes at work; therefore, there is a degree of uncertainty in how the future scenarios would
unfold. In May 2009, the California Climate Change Center, with funding from three California
State agencies, published a paper entitled "The Impacts of Sea -level Rise on the California
Coast ". This study proposes a worst -case prediction of sea level rise along the California coast
of 55 inches, or 4.6 feet, by 2100 (CCCC 2009b). This potential scenario is similar to other
R:Trojects\Newpart \J015NDrafi EIRWA Hydm- 090211.doc 4.4 -17 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
studies regarding sea level rise along the California coast (Fuscoe 2010b). Global climate
change and accompanying sea level rise could move this sea water intrusion farther inland,
under the Project site and also raise groundwater levels within the Lowland area.
In the Upland area, the groundwater flow direction appears to be toward the bluffs (to the west
in the northern portion of the Project site and to the south along West Coast Highway) while in
the Lowland area, the direction of groundwater flow in the Upper Aquifer appears to be mainly
toward the south parallel to the Santa Ana River (GMU 2010).
Because groundwater at the Project site is not used for drinking water or irrigation due to its
poor quality and is not anticipated for these uses in the future, no significant change in
groundwater quality associated with this future condition is anticipated. Increases in
groundwater levels within the Lowland area associated with sea level rise would likely result in
evolving changes to native habitat communities within the Lowland, but would not impact the
development proposed on the Upland area. The worst -case prediction of sea level rise would
result in the inundation of the proposed water quality basin within the Lowland area under
extreme flooding scenarios. Under the current Project design, the water quality basin floor is
above the existing 100 -year flood plain limit and would be protected from flood flows.
Groundwater Quality
Groundwater sampling has been conducted at the Project site since 1986 to evaluate the
potential impact of existing oil operations on groundwater quality. In 2000, a Site Environmental
Assessment work plan was developed and subsequently implemented in 2001. The
Environmental Assessment's objective was to characterize the nature and extent of potential
impacts to soil and groundwater at areas determined to be a potential environmental concern
(PEC), and to evaluate location and potential volumes of impacted materials that may require
remediation (Geosyntec 2009). Ten groundwater monitoring wells were established as a
component of this Environmental Assessment; Table 4.4-4 presents the range of groundwater
sampling results from the Project site associated with implementing the EA.
Exhibit 4.4 -5, Groundwater Monitoring Locations, identifies the location of groundwater
monitoring and residual petroleum product recovery wells at the Project site. Groundwater
samples from sampling wells placed near operations areas were shown to contain
concentrations of volatile organic compounds (VOCs). Samples taken around the maintenance
shop, where chemicals were stored and vehicle parts - washing occurred, also showed elevated
levels of aromatic compounds (ethylbenzene, toluene, and xylenes). Samples in the vicinity of
the Tank Farm Site in the central portion of the Lowland area confirmed the presence of crude
oil and VOCs in the soil layer above groundwater, and subsequent remedial action was taken
with RWQCB approval. Semi - annual monitoring is now conducted to confirm that the crude oil
contamination is not migrating beyond its current location.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4 -18 Newport Banning Ranch
Draft Environmental Impact Report
' .—Mrt "
J
.r u
,•
a s ti
LS
w r
I II I i�
� •
�r i � -,. ��i
—
r.
i
wow 4-4 a
-�'. �. !i v l ,
f
i
,k Y '�
t''-
� Fl .6M1
� - •r• •Y�9Nq�
f Biif
1
� �� A71LM1►>,
II
• J'
It" I
'VA
ry
aw
It
1
iij� Ili, 111111111111 111111111111111 IN 11111 �111111111111111111111�1
Section 4.4
and Water Quality
TABLE 4.4 -4
GROUNDWATER SAMPLING RESULTS
Area (PEC No.)
Contaminant
Range
Comment
Tank Farm Site
TPH
N/A — Free
Wells within former sump area
(PECO2)
product
Main Site Tank Farm
TPH
ND — 26 ppm
Perimeter Wells
(PECO2)
Methylene
ND — 91 ppb
Methylene Chloride detected
Chloride
above MCL
Maintenance
Benzene
ND —1.1 ppb
Benzene, Methylene Chloride,
Shop/Warehouse
Methylene
ND —100 ppb
and Vinyl Chloride detected
(PEC01)
Chloride
above MCLs
Vinyl Chloride
ND —15 ppb
Former Sump /Clarifier
Methylene
ND — 25 ppb
Methylene Chloride detected
(PEC08)
Chloride
above MCL
TPH: total petroleum hydrocarbons; N/A: not applicable; ppm: parts per million; ppb: parts per billion; MCL:
maximum contaminant level
No indicates below detectable limits or common standard; oftentimes the GC can detect a substance but it is
below reportable limit probably more accurate to use ND vs. 0.
Source: Geosyntec 2009.
Site groundwater sampling has confirmed that groundwater below the site has been intruded by
sea water, and has undergone limited impact by oil production activities and related facilities
(Geosyntec 2009). The zone of partial saturation above the groundwater table has been
impacted (in the vicinity of wells, tanks, and mud pits, among other areas) with crude oil, and
some of the oil production tank bottom materials (crude oil and sand - forming asphalt -like
materials) have been used for dust- and erosion - control at the site. Therefore, groundwater
sampling over an extended period of time at the Project site indicates that (1) there is an ocean
influence on groundwater quality beneath the Lowland; (2) localized impacts from crude oil
contamination and chemical compounds associated with oil support operations were evident in
areas of existing and former oil operations; (3) a limited area of extended impact extends out
from the former sump boundaries in the Lowland out to a radius of approximately 100 to
150 feet; and (4) groundwater quality below the development area is brackish and not suitable
for drinking water purposes. Please refer to Section 4.5, Hazards and Hazardous Materials, for
additional discussion of this issue.
Selenium has not been included in routine metals testing of soils, groundwater, or surface
waters because it is not anticipated to be present at the Project site in forms that represent a
toxic threat to human health or the environment. Selenium is sometimes found in soils from the
Monterey Formation; Monterey Formation is not present within the Project site and therefore is
considered a low probability in terms of occurrence. Selenium is part of a watershed -wide study
(Newport Bay Watershed) referred to as the Nitrogen and Selenium Management Program.
While selenium has been detected in several areas of the watershed draining into Upper
Newport Bay, and may be accumulated in certain wetland environments, it has not been a
pollutant of concern because it is not naturally occurring in the geologic formations of the Project
site.
R:Trolects\Newpan \J015NDmft EIRWA Hydm- 090211.doa 4.4 -19 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
4.4.5 PROJECT DESIGN FEATURES AND STANDARD CONDITIONS
Project Design Features
PDF 4.4 -1 The Master Development Plan requires that two water quality basins (one in the
Community Park and one in the Open Space Preserve) be constructed to treat
off -site urban runoff from Costa Mesa and Newport Beach and Project runoff that
drains into the Lowland area.
PDF 4.4 -2 The Master Development Plan includes a water quality basin and a diffuser basin
located within the Open Space Preserve to provide for storm water control,
energy dissipation, and natural water quality treatment.
PDF 4.4 -3 The Master Development Plan requires that public arterials and some selected
collector roadways within the Project site be designed with "Green Street" and
other Low Impact Development (LID) features, such as bioswales and bio- cells.
Green Streets are designed to incorporate sustainable design elements such as
narrower pavement widths, canopy street trees, traffic- calming features, and
minimal use of street lighting. Landscaping along the street edges will be
selectively used to treat storm water runoff from the streets and adjacent
development areas.
PDF 4.4-4 The Master Development Plan requires that arroyos be planted with native
riparian vegetation as part of the restoration effort to minimize potential erosion
and to enhance the water - cleansing function.
PDF 4.4 -5 The Master Development Plan requires development of a drainage plan to
ensure that runoff systems from the Project site to West Coast Highway and the
Semeniuk Slough will be stabilized and maintained through the Project's
drainage system.
PDF 4.4 -6 The Master Development Plan requires the use of best management practices
(BMPs) for erosion control, sediment control, wind erosion control, storm water
and non -storm water management, and waste management/pollution control.
These BMPs will be implemented to ensure that potential effects on local site
hydrology, runoff, and water quality remain in compliance with all required
permits, City policies, and the Project's Water Quality Management Plan
(WQMP), and Storm Water Pollution Prevention Plan (SWPPP).
Standard Conditions
SC 4.4 -1 All landscape materials and irrigation systems shall be maintained in accordance
with the approved Landscape Plan. All landscaped areas shall be kept in a
healthy and growing condition and shall receive regular maintenance. All
landscaped areas shall be kept free of weeds and debris. All irrigation systems
shall be kept operable, including adjustments, replacements, repairs, and
cleaning as part of regular maintenance.
SC 4.4 -2 The development shall be kept free of litter and graffiti. The owner or operator shall
provide for removal of trash, litter debris, and graffiti from the premises and on all
abutting sidewalks.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -20 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
SC 4.4 -3 Prior to the issuance of grading permits, an SWPPP and Notice of Intent (NOI) to
comply with the General Permit for Construction Activities shall be prepared,
submitted to the State Water Resources Control Board (SWRCB), and made part
of the construction program. This SWPPP shall detail measures and practices
that would be in effect during construction to minimize the Project's impact on
water quality and storm water runoff volumes.
SC 4.4 -4 Prior to issuance of grading permits, the Project Applicant shall prepare and
submit a Water Quality Management Plan (WQMP) for the project, subject to the
approval of the Community Development Department, Building Division and
Code and Water Quality Enforcement Division. The WQMP shall include
appropriate BMPs to ensure project runoff is adequately treated.
SC 4.4 -5 A list of "good housekeeping" practices shall be incorporated into the long -term
post- construction operation of the site to minimize the likelihood that pollutants
would be used, stored, or spilled on the site that could impair water quality.
These may include frequent parking area vacuum truck sweeping, removal of
wastes or spills, limited use of harmful fertilizers or pesticides, and the diversion
of storm water away from potential sources of pollution (e.g., trash receptacles
and parking structures). The WQMP shall list and describe all structural and
non - structural BMPs. In addition, the WQMP must also identify the entity
responsible for the long -term inspection, maintenance, and funding for all
structural (and if applicable treatment - control) BMPs.
4.4.6 THRESHOLDS OF SIGNIFICANCE
Threshold criteria for evaluating hydrologic impacts have been developed based on a review of
applicable provisions of the City of Newport Beach Environmental Checklist, the Regional
MS4 Permit, and the DAMP. Significant adverse impacts to natural drainage systems created by
altered hydrologic conditions of concern would occur if the proposed Project would:
Threshold 4.4 -1 Violate any water quality standards or waste discharge requirements.
Threshold 4.4 -2 Substantially deplete groundwater supplies or interfere substantially with
groundwater recharge such that there would be a net deficit in aquifer
volume or a lowering of the local groundwater table level (e.g. the
production rate of pre- existing nearby wells would drop to a level which
would not support existing land uses or planned uses for which permits
have been granted).
Threshold 4.4 -3 Substantially alter the existing drainage pattern of the site or area,
including through the alteration of the course of a stream or river, in a
manner which would result in substantial erosion or siltation on- or off-
site.
Threshold 4.4 -4 Substantially alter the existing drainage pattern of the site or area,
including through the alteration of the course of a stream or river, or
substantially increase the rate or amount of surface runoff in a manner in
which would result in flooding on- or off -site.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -21 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Qualitv
Threshold 4.4 -5 Create or contribute runoff water which would exceed the capacity of
existing or planned storm water drainage systems or provide substantial
additional sources of polluted runoff.
Threshold 4.4 -6 Otherwise substantially degrade water quality.
Threshold 4.4 -7 Place housing within a 100 -year flood hazard area as mapped on a
federal Flood Hazard Boundary or Flood Insurance Rate Map or other
flood hazard delineation map.
Threshold 4.4 -8 Place within a 100 -year flood hazard area structures which would impede
or redirect flood flows.
Threshold 4.4 -9 Expose people or structures to a significant risk of loss, injury or death
involving flooding, including flooding as a result of the failure of a levee or
dam.
Threshold 4.4 -10 Cause inundation by seiche, tsunami, or mudflow.
Threshold 4.4 -11 Result in significant alteration of receiving water quality during or following
construction.
Threshold 4.4 -12 Result in a potential for discharge of storm water pollutants from areas of
material storage, vehicle or equipment fueling, vehicle or equipment
maintenance (including washing), waste handling, or storage, delivery
areas, loading docks or other outdoor work areas.
Threshold 4.4 -13 Result in the potential for discharge of storm water to affect the beneficial
uses of the receiving waters.
Threshold 4.4 -14 Create the potential for significant changes in the flow velocity or volume
of storm water runoff to cause environmental harm.
Threshold 4.4 -15 Create significant increases in erosion of the project site or surrounding
areas.
Threshold 4.4 -16 Conflict with any applicable plan, policy, or regulation of an agency with
jurisdiction over the project (including, but not limited to the general plan,
specific plan, local coastal program, or zoning ordinance) adopted for the
purpose of avoiding or mitigating an environmental effect.
4.4.7 ENVIRONMENTAL IMPACTS
The proposed Project would allow for the development of approximately 149 acres of the
401 -acre Project site for residential, commercial, resort inn, mixed -use, and recreational land
uses. Approximately 252 acres (63 percent) of the Project site would be retained as open
space, with restored wetland and habitat areas located throughout the Lowland and Upland
areas. The amount of impervious surfaces on the site would increase by approximately
45 percent overall as a result of the Project (Fuscoe 2010b). The proposed Runoff Management
Plan and drainage design accounts for increases in runoff to specific natural site features.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -22 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Proposed Proiect Drainage and Water Qualitv Management Elements
The Project would incorporate a Runoff Management Plan that includes water quality and
drainage features designed to treat site runoff for water quality purposes and to reduce runoff
volumes or rates where feasible. Water quality features would consist of LID features where
feasible (e.g., bioswales, landscaping biocells, permeable pavement, and other improvements
designed to promote soil -based infiltration processes) as well as source - control and
treatment - control BMPs. Drainage improvements would minimize runoff to arroyos, redirect
runoff away from bluffs, and reduce flow rates and volumes in the Semeniuk Slough. These
drainage features would result in an improvement over existing site runoff conditions with
respect to water quality, velocities, and volumes.
The Project incorporates Project Design Features (PDFs) (see Section 4.4.4) to minimize
adverse Project effects to water quality, storm water runoff, and groundwater impacts. Site
drainage patterns would remain generally consistent with the existing condition, with minor
alterations proposed in site subwatershed boundaries in order to manage flows from the Project
into Lowland area. The integration of LID features into the Project design would provide
sustainable water quality and storm water management capabilities for the site.
Proposed Proiect Drainage Features
Storm Drains
On -site local drains would be provided to drain each of the on -site subwatersheds under
developed conditions. As depicted on Exhibit 4.4 -6, Master Drainage Plan, these systems are
designated as Storm Drains A through G.
Storm Drain A (Subwatershed A): These drains discharge flows to the existing
Caltrans RCB storm drain under West Coast Highway. Storm Drain A (SD -A) is
designed to reduce the tributary drainage area of this storm drain system over existing
conditions to offset the increase in Project runoff in the proposed condition.
Storm Drains B and C (Subwatershed A): These drains collect flows from the
development areas adjacent to the Southern Arroyo and deliver these flows to a diffuser
basin located downstream of the Arroyo adjacent to the Semeniuk Slough. The design of
Storm Drains B and C (SD -B, SD -C) serves three primary functions: (1) to minimize the
discharge of storm water flows directly to the Southern Arroyo in order to protect long-
term channel stability; (2) to dissipate erosive energy before flows enter the Semeniuk
Slough; and (3) to control sediment contributions to the Semeniuk Slough.
Storm Drains D and E (Subwatershed C): These drains collect flows from the Project's
larger development areas and deliver storm flows to the Lowland. Under the existing
conditions, a portion of the drainage from Storm Drain D (SD -D) is tributary to both the
Southern Arroyo and Semeniuk Slough. The proposed drainage would specifically be
designed to maximize the amount of flow that would be redirected towards the Lowland
area in order to reduce the flood loading of the Semeniuk Slough. A second diffuser
basin would be installed downstream of SD -D and Storm Drain E (SD -E) to reduce the
rate of flows from the pipes and to distribute runoff to the Lowland in a manner that
would enable habitat restoration efforts.
• Storm Drain F (Subwatershed B): This storm drain collects flows from the
northernmost development area. The tributary drainage area has been designed to
match existing runoff conditions to the Northern Arroyo. An energy dissipater would be
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -23 Newport Banning Ranch
Draft Environmental Impact Report
a
D
w
b
re
z_
E
0
0
1
�N
3° "RQP 2] "RCP
1-- atreel
L4B"
i
I
9ney I
r--------------
iC
9n t
t
1
2
/
• _ t
r 1
c
C
t \_
1
r
tem street
C
_ i
I z _
. - --
x9
t
Off Site Flows to
Northern Arroyo i
v
i
io
2
_ —
'
`.
•
; ♦ \
'sn.. .� .
nm Steel t
____ _.._.. _. _. ___
\
z+
____
\.
ACOE
f
t
Wetlands
Resteetion \ -\ i
\� Newhall street
Area •1
�-lns
' az --
t -_J
` --' I
�;:
_
3 °`DJ
Off -Site Flows to
—\
I Southern Arroyo E
�\ - ao'
NMUSP' Low Tiow I I
`\ ♦ ax lath Street i
\
\` i
`\
LEGEND
P`\ ��
i •
City
♦, le utilities i
'Yard I
L Protect site Boundary
/
o\ ".x `C-� J
.•
aa^ �• I
- - -;
0 Natural Channel
\ za °'
`
��\
50' 6B'RCP • 1
6" l
1
e,
' as" A-
\,
�e
- � � -�
Existing Surtace Drainage Facility
m
�
Existing underground Drainage Facility
d
� xz
0 P roposetl Drainage Area Boundary
ne^
1 s street
Proposed Storm Drain'
OProposed
Storm Drain System Designation
Proposed Drainage Away from Bluffs /Slopes"
Az
to reduce Erosion /Sedimentation
OProposed Water Duality /Detention Basin
n4
_
we
zi4
; A
Proposed Diffuser Basin /Habitat Area
�zT acP
Proposed Water Quality Basin
r+VOCI
f
O Roars to
WCH B Culvert
+LV
10'- iNxS'1i RC8�-
coaxt
o
W 6 "PCP
J
' Storm drain sizes are approximate and based on
w¢irw3y%y sH ; ,
Fuses.z
the hydrology calculations to date.
+c 7 Sunset Ridge
�
ea Park
csc
6
IN
9
•___i_..
C
eAO y
OCCIAN
Source: FORMA
2011
Master Drainage Plan
Exhibit 4.4 -6
Newport Banning Ranch EIR
N
e
wAa
ry
C O N 5 U L T T I N N G G
s
(0]2511 JCD) R: Projects \Newp nrt J0151Gmphics \EIR \Ex4.4G_MDminPlan.Sol
Section 4.4
and Water Quality
installed at the outlet to Storm Drain F (SD -F) to transition flows from erosive velocities
to mild velocities, and to deliver non - erosive flows to the natural channel.
• Storm Drain G (Subwatershed D): This storm drain collects flows from the
northernmost portion of the development area. Flow in Storm Drain G (SD -G) would be
delivered to the Lowland via a culvert and a storm drain located in North Bluff Road.
Water Quality /Detention Basins
One water quality basin and one diffuser basin /habitat area are proposed in the Lowland within
the Open Space Preserve. The diffuser basin /habitat area is proposed adjacent to the north Oil
Consolidation area to provide treatment of storm water and detention of runoff flowing from on-
site areas and off -site urban areas located to the east prior to discharging into the Lowland. The
other basin is proposed in the Lowland near the North Family Village to provide energy
dissipation of flows prior to entering the Semeniuk Slough. Both of these basins would be
planted with native emergent marsh and riparian species to promote water quality cleaning and
natural energy dissipation.
A second water quality /detention basin is proposed to intercept approximately 48 acres of off -
site flows from the 16th Street Costa Mesa drainage area. These off -site flows enter the Project
site via a 48 -inch reinforced concrete pipe and discharge into the Southern Arroyo. In general,
these flows contain urban runoff pollutants and also convey sediment from the eroding
tributaries of the Southern Arroyo to the downstream end, ultimately discharging into the
Semeniuk Slough during severe storms. The water quality /detention basin is proposed on the
Project site at the southeast corner of 16th Street at the Project site boundary. The required
basin capacity is estimated to be approximately 2.3 acre -feet, which can treat all dry weather
and a portion of first -flush runoff from the off -site tributary as well as reduce a portion of peak
flow discharge. The basin is also intended to reduce peak flow rates discharging into the
Southern Arroyo to reduce erosion and scour potential. The reduction in peak discharges
combined with the stabilization of the eroding tributaries of the Southern Arroyo would control
the current sediment loads into the Semeniuk Slough.
Treatment - control BMPs are engineered systems similar to LID features as they are sized to
capture, filter, and /or treat the required runoff volume or flow before it is discharged into a
project's receiving waters. Treatment - control BMPs treat fairly large flow volumes from large
drainage areas. These features are located both internal to development areas and on the
periphery of development and are identified in the Water Quality Management Plan as
Community Water Quality Basins. Selection of treatment - control BMPS is based on the
pollutants of concern from the Project site and the BMP's ability to effectively mitigate those
pollutants, in consideration of site conditions and constraints. The Project's treatment - control
BMPs would be designed to infiltrate, filter, and /or treat runoff volumes generated from the
Project through the use of water quality basins. As depicted on Exhibit 4.4 -7, Proposed Sub -
Watershed Basins, three basins would be incorporated into the Project for water quality
treatment, detention, and diffusion purposes. More detailed information about these basins is
provided further later in this section as part of the discussion of Treatment Control BMPs.
Threshold 4.4 -1 Would the project violate any water quality standards or waste
discharge requirements?
Threshold 4.4 -6 Would the project otherwise substantially degrade water quality?
Threshold 4.4 -11 Would the project result in significant alteration of receiving water
quality during or following construction?
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -24 Newport Banning Ranch
Draft Environmental Impact Report
/
♦ ♦ -�`
RodgeAL-iE
i
•`♦
ULLJI�
K
`
o � i
�,OO��ca
'♦
!
Legend
— — - Exishrg open ChanneMnch
i 1
!1
1
— Exlslirg Storm Drain Pipe
r,
�••� Project BourMery
— Proposed SWm Drain
Proposed Basin
b�•-U° 't�t%%L'ID
Ca= LOwlandfMarsh Boul ary
Source: Fuscoe
2011
Proposed Sub - Watershed Basins
Exhibit 4.4 -7
Newport Banning Ranch EIR
N
wAa
e �
ry
N G
C O N 5 U L T T I G
s
(072511 JCD)
R: Pmjecis \Newpor 015 \Gmphims EIRlEx4.4- 7_PmpSubWatershed.pdf
Section 4.4
and Water Quality
Threshold 4.4 -12 Would the project result in a potential for discharge of storm water
pollutants from areas of material storage, vehicle or equipment
fueling, vehicle or equipment maintenance (including washing),
waste handling, or storage, delivery areas, loading docks or other
outdoor work areas?
Threshold 4.4 -13 Would the project result in the potential for discharge of storm water
to affect the beneficial uses of the receiving waters?
The proposed Project would create new types of pollutant sources associated with residential
development and consequently alter the types of constituents or levels of pollutants contained in
post - development site runoff. In order to reduce the amount of pollutants in storm water runoff
from the Project and to minimize associated hydrologic and water quality impacts, BMPs are
required to be implemented in accordance with city, State, and RWQCB standards and
consistent with California Coastal Act policies.
Construction Impacts
Project construction impacts to water quality could occur from (1) grading and oil remediation;
(2) utility and road construction; (3) building construction (e.g., residential units); (4) final
stabilization and landscaping; and (5) equipment staging, operation and fueling. Clearing,
grading, excavation, and construction activities associated with the proposed Project may
impact water quality by induced sheet erosion of exposed soils and the subsequent deposition
of particulates in local drainages. Grading activities and sediment stockpiles can lead to
exposed areas of loose soil that are susceptible to uncontrolled sheet flow and wind erosion.
Impacts can also occur from sediment laden runoff and mobilization of pollutants associated
with vehicle staging and operation. Petroleum hydrocarbons may also contaminate local
sediments and surface water in areas where the oil pipeline is removed. Remediation and
grading is estimated to total approximately 2,500,000 cubic yards (cy) including approximately
900,000 cy of cut and fill and approximately 1,455,000 cy of corrective grading. (see
Table 4.3 -2, in Section 4.3, Geology and Soils, for more detailed breakdown of the grading
quantities).
Construction Site Risk Assessment
The General Construction Permit uses a risk -based approach for controlling erosion and
sediment discharges from construction sites because the rates of erosion and sedimentation
can vary by site depending on factors such as duration of construction activities, climate,
topography, soil condition, and proximity to receiving water bodies. Three levels of risk are
identified within the General Construction Permit with corresponding monitoring and reporting
requirements as well as differing and compulsory minimum BMP implementation requirements.
These risk levels are designated within the General Construction Permit as Risk Levels 1, 2,
and 3. Risk Level 1 is assigned to projects considered to have the lowest risk of water quality
impact and therefore has the fewest permit requirements and Risk Level 3 is assigned to
projects considered to have a fairly high risk or impact to water quality and has the most
stringent permit requirements.
The Risk Assessment, prepared at the time of grading permit application, relies on the
determination of two component risk factors for a project site: sediment risk (which is the
general amount of sediment that could be discharged from a site) and receiving water risk (the
risk that sediment discharges can pose to receiving waters). Although a detailed site - specific
Risk Assessment would not be prepared until the exact details of Project implementation (e.g.,
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -25 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
finalized phasing by timeframe), a preliminary Risk Assessment has been prepared for this EIR
analysis (Fuscoe 2010b).
Sediment risk from a project site is determined using the Revised Universal Soil Loss Equation,
which is a model developed by the U.S. Department of Agriculture and used by the USEPA for
estimating rates of soil loss at construction sites during rain events. Sediment risk (the rate of
sheet and rill erosion) considers: rainfall, soil erodibility characteristics, slopes, erosion controls,
and management operations and support practices (sediment controls). The preliminary
sediment risk assessment found that the proposed Project is considered a High Sediment Risk
because its rate of sheet and rill erosion under bare ground conditions is anticipated to be
greater than 75 tons per acre over the lifetime of the Project. This risk number is not based on
the site - specific conditions nor does it account for the use of any erosion control, sediment
control and scheduling controls when assigning the theoretical sediment risk value. A detailed
discussion of this analysis may be found in Appendix C of this EIR.
The second risk factor, receiving water risk, is determined by the type of discharge and the
Project's proximity to any 303(d) listed impaired water bodies. Should the Newport Slough be
listed in the future for bacteria, the listing would not affect the risk level designation for the
Project site because the General Construction Permit only calculates receiving water risk based
on listings of water bodies impaired for sediment. Receiving waters for the proposed Project —
the Tidal Prism of the Santa Ana River and Newport Slough — are not listed on USEPA's 303(d)
list of impaired water bodies for sediment, and therefore are not subject to a TMDL requirement.
In addition, the receiving water body does not contain the beneficial uses of SPAWN, COLD,
and MIGRATORY (habitat - related water body uses). The Project can therefore be considered to
have a Low Receiving Water Risk.
The proposed Project is preliminarily identified as a Risk Level 2, because the site would have a
low receiving water risk and a high sediment risk, which intersects as a Risk Level 2. While this
determination would not bind the Project for the purposes of permitting and it may be that further
refinements in the Project design and analysis demonstrates a lesser risk, this determination is
constitutes the more conservative conclusion for the purposes of environmental review at this
time.
The General Construction Permit identifies requirements for Risk Level 2 dischargers. These
requirements are summarized below and described in greater detail in Appendix C of this EIR.
• Implement minimum BMPs.
• Develop Rain Event Action Plans designed to protect exposed portions of the site for all
phases of construction during predicted precipitation events.
• Implement Visual Monitoring (Inspection) requirements for qualifying rain events at
minimum frequencies.
• Conduct storm water effluent sampling for pH and turbidity for qualifying rain events to
determine whether any exceedances of numeric action levels have occurred.
• Conduct non -storm water discharge sampling where any non -storm water discharges
occur. In the event that turbidity exceedances are observed during the required storm
event monitoring, the site's erosion and sediment controls would be evaluated to
improve effectiveness. If necessary, Active Treatment Systems may be used to reduce
sediment in storm water effluent. Active Treatment Systems are systems that are
engineered to quantifiably control specific water quality parameters.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -26 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
In the event numeric action levels are not met on site, the Project may use Active Treatment
Systems as a BMP to reduce sediment and /or turbidity from the site (regardless of Risk Level).
However, it is not anticipated that the proposed Project would require the use of Active
Treatment Systems; BMP efficiencies have been determined effective in meeting the
requirements established by regulatory performance objectives. Requirements associated with
the use of Active Treatment Systems include those listed below.
• Preparation and submittal of an Active Treatment Systems Plan to the SWRCB 14 days
prior to operation that includes the preparation of the following:
— An Active Treatment Systems Operation and Maintenance Manual for all equipment;
— An Active Treatment Systems Monitoring, Sampling and Reporting Plan, including
Quality Assurance (QA) /Quality Control (QC) information;
— An Active Treatment Systems Health and Safety Plan;
— An Active Treatment Systems Spill Prevention Plan;
— Project design where the Active Treatment Systems capture and treat a volume
equivalent to the runoff from 10 -year and 24 -hour storm events;
— Site - specific treatment tests conducted with the required chemical residual and
toxicity tests;
— Project design that ensures the Active Treatment Systems meets the turbidity
Numeric Effluent Limits;
— Monitoring of Active Treatment Systems.
Prior to commencement of construction activities, the SWPPP would be prepared in accordance
with site - specific sediment risk analyses based on the final grading plans and erosion and
sediment controls proposed for construction. Grading and /or tract maps would identify the
location and size of sediment basins; the maximum amount of soil disturbed at any one time as
construction proceeds; and other control measures to accommodate all active soil disturbance
areas and the monitoring and sampling plans.
Grading and Oil Remediation Activities
During grading, soil loss potential would be at its highest risk level to exceed numeric action
level specified for Risk Level 2 sites. A combination of erosion and sediment controls would be
implemented during this phase of construction to ensure sediment production from the
construction site remain controlled and within accepted regulatory limits. Table 4.4 -5 presents
established guidelines for erosion and sediment control applications for this region.
R:Trojeats\Newpart \J01&1Dmft EIRWA Hydm- 090211.doa 4.4 -27 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -5
GUIDELINES FOR EROSION AND SEDIMENT CONTROL PRACTICES
Erosion /Sediment Control Application Guidelines
Disturbed
Soil Areas
Season
Construction BMP
Slope (V:H)
<_ 1:20
> 1:20
51:4
> 1:4
51:2
> 1:2
Inactive
Rainy
Erosion Control
X
X
X
X
Sediment Control
X
X
X
Desilting Basin
Non -Rainy
Erosion Control
Sediment Control
X
Desilting Basin
Rainy
Erosion Control
Sediment Control
X
X
X
Desilting Basin
X
Active
Non -Rainy
Erosion Control
Sediment Control
Desilting Basin
Caltrans Stormwater Quality Handbooks, Construction Site Best Management Practices Manual (March 1, 2003).
Source: Fuscoe 2010b.
This region requires the use of sediment basins to control the amount of sediment discharged
off site during the rainy season (i.e., October 1 through April 30 each year). Sediment/desilting
basins play a primary role in erosion and sediment control designs at downstream locations
where they provide final polishing of runoff prior to discharging off site. According to the
California Stormwater Quality Association's (CASQA) sediment basin design guidelines,
approximately 3,600 cubic feet of basin storage volume must be provided per acre of drainage
area during this phase of construction. Application of CASQA's design criteria indicate that a
minimum of three sediment desilting basins would be required on the Project site in order to
control sediment production and transport. This would be accommodated through the water
quality basins and the diffuser basin discussed above.
Based upon the preliminary Site Risk Analysis discussed above, it is unlikely that the Project
would be considered a Risk Level 3 site. Accordingly, use of an Active Treatment System is not
likely to be required. However, should the application of traditional erosion and sediment control
BMPs unexpectedly fail to achieve compliance with the turbidity Numeric Action Level of
250 nephelometric turbidity units (NTU) for the Project, an analysis was performed to confirm
that the Project site would be able to accommodate an Active Treatment System without
requiring a redesign of the proposed Project. Please refer to Appendix C for the details of this
analysis.
Utility and Road Installation
In addition to the erosion- and sediment - control BMP requirements for grading, the installation
of utilities and roads would introduce materials to the Project site that affect the risk rating of the
site. Materials include, but are not limited to hydrated lime, concrete, mortar, Portland cement
treated base, and fly ash. Therefore, pH levels would be controlled through non -storm water
management and waste and materials management BMPs. Stockpile management would also
be applied associated with the trenching activities involved in utility installation. The minimum
R:Trojeats\Newpan \J015NDmft EIRWA Hydm- 090211.dm 4.4 -28 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
BMPs are summarized later in Table 4.4 -6. Should Numeric Action Levels be exceeded at any
point in time, additional site management or "good housekeeping" BMPs would be implemented
and the source of pollution controlled.
Vertical Construction
Upon completion of road construction and utility installation, sediment controls designed for
these earlier stages of construction may no longer be applicable or functional due to the
installment of curbs and gutters, catch basins, and /or storm drain infrastructure to convey runoff
off site from the post- construction condition. BMPs at this stage of construction would therefore
be more focused on construction -lot sediment - control BMPs and at discharge points (i.e., catch
basin inlet protection). Erosion - control BMPs for manufactured slopes would be in place and
would require periodic maintenance to retain their integrity. During vertical construction (e.g.,
construction of residences, etc.), construction materials would be delivered to the site, and
wastes generated from the site would have the potential to negatively impact pH levels.
Therefore, non -storm water management and waste and materials management BMPs would
be required (Table 4.4 -6).
Final Stabilization and Landscaping
During final stabilization and landscaping, minimal construction would take place and the
majority of the Project site would be stabilized. The majority of activities would involve planting
and landscaping lots and common areas. Finished slopes that have not been landscaped would
also be planted. Sediment control at discharge locations and stockpile management would be of
primary concern. Good housekeeping practices would continue.
Equipment Staging, Operation, and Fueling
During construction, materials would be delivered to the Project site, and wastes generated from
the site have the potential to negatively impact pH levels; non -storm water management and
waste and materials management BMPs would be used. BMPs at this stage would also be more
focused on on -lot sediment control and discharge points.
Construction Dewatering
Based on the depths to groundwater within the proposed development areas within the Upland,
construction dewatering is not anticipated to be required. Should groundwater be unexpectedly
encountered that would require dewatering, the Project would apply for coverage and adhere to
the monitoring and reporting program under Order No. R8- 2009 -0003. Dewatering may also be
performed as part of localized remediation efforts within the Lowland area of the Project site, as
guided by the regulatory agencies with appropriate jurisdiction. Any dewatering associated with
the removal of oil facilities and associated remediation would be managed and properly
disposed of in accordance with Order No. R8- 2009 -003 and the proposed Remedial Action
Plan, as described later in this section. If techniques to remediate impacted soils would involve
soil removal, dewatering may be required as a remediation element in order to enhance the
geotechnical stability of the excavation for safety purposes. If this activity is required, it would be
performed in accordance with the appropriate NPDES requirements under the Clean Water Act
and the Dewatering Permit. Additional detail on the applicable BMPs for remediation activities is
provided later in this section under the heading, Removal of Oil Facilities in the Lowland:
Groundwater Quality Impacts.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -29 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Compliance with the General Construction Permit
Potential construction impacts associated with construction grading /excavation; material
stockpiling and /or dewatering; construction and use of access and haul roads; and equipment
staging, operation, and fueling would be minimized through compliance with the General
Construction Permit and, if necessary, the Orange County Dewatering Permit. The Project
would be required to comply with the most current General Construction Permit and associated
local NPDES regulations to ensure that the potential for construction - related erosion and
adverse sedimentation is minimized. In accordance with the General Construction Permit (Order
No. 2009- 0009 -DWQ), the following Permit Registration Documents would be completed and
submitted to the SWRCB prior to issuance of a grading permit and commencement of
construction activities:
• Notice of Intent (NOI),
• Risk Assessment (Standard or Site - Specific),
• Particle Size Analysis (if site - specific risk assessment is performed),
• Site Map,
• SWPPP,
• Active Treatment System Design Documentation (if an Active Treatment System is
determined necessary)
• Annual Fee, and
• Certification.
These permits (i.e., the General Construction Permit and the Orange County Dewatering
Permit, the later if determined necessary) also require development and implementation of a
SWPPP, which would be prepared and implemented at the Project site and revised as
necessary as administrative or physical conditions change. The SWPPP would (1) be made
available for review on the State's Storm Water Multiple Application and Report Tracking
System; (2) would describe construction BMPs that address pollutant source reduction; and
(3) provide measures /controls necessary to mitigate potential pollutant sources. These
measures would include erosion controls, sediment controls, tracking controls, non -storm water
management practices, materials and waste management, and good housekeeping practices.
Minimum Construction BMPs
The following BMPs would also be implemented at the construction site as appropriate to
facilitate compliance with these updated permit requirements. An effective combination of
erosion and sediment controls would be selected based on the specific site conditions in the
area of construction grading disturbance. Good housekeeping practices, such as waste and
materials management, non -storm water management, and tracking controls would be
implemented at all times. Additional guidelines and minimum BMPs for active construction areas
are outlined in the Watershed Assessment Report (Fuscoe 2010b).
Table 4.4 -6 contains general guidelines for the minimum BMPs required at all active areas of
construction within the Project site. A combination of erosion and sediment controls would be
selected based on the specific site conditions, in particular during major soil- disturbing activities.
The table identifies the minimum BMPs that are applicable to the proposed Project. The BMPs
that are unmarked may be added later as necessary to enhance sediment/erosion and non-
R:Trojeats\Newpart \J015Nnrafi EIRWA Hydm- 090211.dm 4.4 -30 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
visible pollutant discharge controls or are not applicable because the activity is not being
conducted (e.g., temporary stream crossing).
TABLE 4.4 -6
CONSTRUCTION BMP IMPLEMENTATION
CASQA
BMP ID
BMP Name
Minimum
Requirement
Erosion Control
EC -1
Scheduling
X
EC -2
Preservation of Existing Vegetation
X
EC -3
Hydraulic Mulch
X°
EC-4
Hydroseeding
X°
EC -5
Soil Binders
Xa
EC -6
Straw Mulch
X°
EC -7
Geotextiles and Erosion - Control Mats
X°
EC -8
Wood Mulching
EC -9
Earth Dikes and Drainage Swales
EC -10
Outlet Protection and Velocity Dissipation Devices
EC -11
Slope Drains
EC -12
Streambank Stabilization
Sediment Control
SE -1
Silt Fence
X°
SE -2
Sediment /Desilting Basin
SE -3
Sediment Trap
SE -4
Check Dam
SE -5
Fiber Rolls
Xa
SE -6
Gravel Bag Berm
X`
SE -7
Street Sweeping and Vacuuming
Xa
SE -8
Sandbag Barrier
SE -9
Straw Bale Barrier
SE -10
Storm Drain Inlet Protection
X
Wind Erosion Control
WE -1
Wind Erosion Control
X
Tracking Control
TRA
Stabilized Construction Entrance /Exit
X
TR -2
Stabilized Construction Roadway
TR -3
Entrance /Outlet Tire Wash
Non Storm Water
Management
NS -1
Water- Conservation Practices
NS -2
Dewatering Operations
NS -3
Paving and Grinding Operations
NS-4
Temporary Stream Crossing
NS -5
Clear Water Diversion
NS -6
Illicit Connection /Illegal Discharge Detection and Reporting
X
NS -7
Potable Water /Irrigation
NS -8
Vehicle and Equipment Cleaning
X
NS -9
Vehicle and Equipment Fueling
X
R:Troje ts\Newpan \J015NDmft EIRWA Hydm- 090211.dm 4.4 -31 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -6 (Continued)
CONSTRUCTION BMP IMPLEMENTATIONa
CASGA
BMP ID
BMP Name
Minimum
Requirement
NS -10
Vehicle and Equipment Maintenance
X
NS -11
Pile Driving Operations
NS -12
Concrete Curing
NS -13
Concrete Finishing
NS -14
Material and Equipment Use Over Water
NS -15
Demolition Adjacent to Water
NS -16
I Temporary Batch Plants
Waste Management
And Materials Pollution Control
WM -1
Material Delivery and Storage
X
WM -2
Material Use
X
WM -3
Stockpile Management
X
WM -4
Spill Prevention and Control
X
WM -5
Solid Waste Management
x
WM -6
Hazardous Waste Management
WM -7
Contaminated Soil Management
WM -B
Concrete Waste Management
WM -9
Sanitary/Septic Waste Management
X
WM -10
I Liquid Waste Management
CASQA — California Stormwater Quality Association
a BMPs marked with an'X' are those that are applicable to the Project
Contractor shall select one of the five measures listed or a combination thereof to achieve and maintain
the contract's rainy season disturbed soil area (DSA) requirements.
Contractor shall select one of the three measures listed or a combination thereof to achieve and
maintain the contract's rainy season disturbed soil area (DSA) requirements.
Source: Fuscoe 2010b.
Removal of Oil Facilities in the Lowland: Groundwater Quality Impacts
Exhibit 3 -5, Oil Operations, in Section 3.0, Project Description, depicts the oil production
facilities on the Project site. With the exception of existing oil wells and equipment located in the
proposed consolidation areas, all oil wells and oil facilities would be abandoned and /or
reabandoned as a part of the Project. The potential exists for soils to be contaminated with
petroleum hydrocarbons in the vicinity of these facilities, impacting surface flows and runoff
through the Lowland. Temporary significant adverse impacts to water quality could potentially
occur during removal of oil facilities if proper BMPs are not used.
Groundwater sampling at the Project site indicates that groundwater under the Lowland area is
impacted by VOCs. Low level impacts detected in oil wells located within the Lowland and their
potential sources of contamination would be remediated as a part of the Project (Geosyntec
2009). These areas include the operations areas, facility sites, and well sites in addition to
associated and localized groundwater impacts. There were no significant contamination levels
detected in the groundwater samples, and those areas described in the following paragraph with
low -level impacts are isolated, contained, and do not extend under the Upland area (Geosyntec
2009). Groundwater contamination in the Lowland was identified in the following areas of the
Project site: the mechanics shop, the Tank Farm, and a former sump location to the south of the
Main Drill Site. No development other than public trails and water quality features is proposed in
the Lowland area as a part of the proposed Project.
R:Troieats \Newpart \J015NDmft EIR\4.4 Hydm- 090211.dm 4.4 -32 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
The on -site oil operations are currently subject to regulatory oversight by both the Santa Ana
RWQCB and the Orange County Health Care Agency (OCHCA). Since about 1992, both
agencies have been involved in overseeing certain aspects of cleanup activities and operations.
Currently, the lead regulatory agency (Santa Ana RWQCB) for the Project site has approved a
Remedial Action Plan (RAP) and is overseeing remediation efforts for an existing drill site in the
northern portion of the proposed oil consolidation area (Geosyntec 2009). The draft Remedial
Action Plan (dRAP) associated with the proposed Project is described and discussed in Section
4.5, Hazards and Hazardous Materials. The existing regulatory oversight structure, described
further in Section 4.5 is expected to continue through the anticipated oilfield abandonment and
remediation activities that would be necessary to implement the proposed Project.
Mitigation Measure (MM) 4.5 -1 requires that a comprehensive final RAP be prepared and
implemented on -site to address the removal and remediation of existing oil facilities on the
Lowland, as discussed in Section 3.0, Project Description. The final RAP would be based upon
the draft RAP (dRAP) and the existing clean -up and remediation activities on the Project site;
would identify the remediation methods to be used that have been previously described in the
dRAP; specify the cleanup levels for specific areas of the Project site depending upon the land
uses proposed for those areas; and provide additional details regarding cleanup and
remediation activities. The final RAP would be submitted to and approved by the Santa Ana
RWQCB, OCHCA, and the Orange County Fire Authority prior to implementation.
In accordance with General Construction Permit criteria, additional BMPs would be
implemented prior to, during, and after implementation of the final RAP until native vegetation is
established and /or permanent BMPs are in place. In general, the process of plugging and
abandoning wells would also include demolition and removing of the pipelines, utility poles and
other related production equipment, buildings, and road surface materials, with the remediation
process following shortly after the well demolition and abandonment process. During demolition,
the site perimeter would be bermed with silt fencing (Construction BMP SE -1 on Table 4.4 -6) or
gravel bag berms (SE -6) to contain the area and limit erosion and runoff.5 Upstream runoff
would be directed around the limits of work with the use of sediment and erosion control
measures including berming and gravel bags (SE -6). Removed materials would be stockpiled in
specified areas of the site and bermed and /or covered in accordance with stockpile
management procedures (WM -3) until properly disposed of off -site or treated on -site in
accordance with the final RAP. Additional construction BMPs would also be implemented in
accordance with the Project SWPPP, including but not limited to: good housekeeping practices
to contain potential construction materials (WM -1), leaks and maintenance activities for large
equipment used on site (WM -4, NS -10), stabilized construction entrances, exits and roadways
(TR -1, TR -2), and additional measures for management of contaminated soils (WM -7).
Implementation of these BMPs would provide for the protection of surface water quality by
avoiding and /or minimizing pollutant runoff into surface waters and provide for protection of
groundwater quality by minimizing the introduction of pollutants into the groundwater table.
Therefore, proposed Project's impacts to groundwater and surface water associated with
removal of oil facilities would be less than significant.
With the completion of permit documentation as described above and with the incorporation of
specific BMPs required by the General Construction Permit associated with the Project Risk
Level analysis, impacts to water quality from construction would be less than significant.
5 BMPs are provided in Table 4.4 -6.
R: \Projects \Newpart \J015Rnrafi EIR\4.4 Hydm- 090211.dm 4.4 -33 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Project Operation
The proposed Project would increase the total acreage of impervious surfaces on the Project
site by approximately 45 percent, resulting in higher runoff volumes and peak flow rates when
compared to existing conditions. Road construction and development of the Project site with
residential, commercial, visitor - serving, and recreational land uses would alter the composition
and amounts of pollutants leaving the site. Potential pollutants of concern that could be
generated from the Project are discussed below.
Pollutants of Concern
Water quality Pollutants of Concern are pollutants that are anticipated or that potentially could
be generated by the Project, based on past and projected land uses, along with those pollutants
that have been identified by the Santa Ana RWQCB and USEPA as potentially impairing
beneficial uses in receiving water bodies. Based upon the proposed land uses at the Project
site, the Orange County DAMP anticipated the potential pollutants of concern are identified in
Table 4.4 -7 and described after the table.
TABLE 4.4 -7
POLLUTANTS OF CONCERN
Pollutants of Concern
�^
y
N
9
V C
W
'o
tm N
N
N i
C
N
a
C 7
d
'�
01 C N
10 R
Priority Project Categories
'>
_ E
a
o f
0
2 v
E
O 5,
and /or
m
z
a
$
to
4) y
Project Features
Detached Residential Development
X
X
X
X
X
X
X
Attached Residential Development
P
X
X
X
X
Pa
Pb
Commercial /Industrial Development
Pa
P
Pa
Pa
Pe
Pa
X
Pa
X
Restaurants
X
X
X
X
Hillside Development >1 0,000 sf
X
X
X
X
X
X
X
Parking Lots
P1
X
Pa
Pa
X°
Pa
X
Pa
X
Streets, Highways, and Freeways
P`
X
Pa
Pa
Xtl
X
X
Pa
X
X: Anticipated; P: Potential; sf: square feet
a A potential pollutant if landscaping or open area exist on -site.
A potential pollutant if the Project includes uncovered parking areas.
A potential pollutant if land use involves food or animal waste products.
Including petroleum hydrocarbons.
a Including solvents.
r Analyses of pavement runoff routinely exhibit bacterial indicators.
Source: County of Orange at al. 2003 (Table 7 -1.3).
BacteriaNlrus
Urban runoff can pick up and transport pathogens, including bacteria and viruses, by the
transport of human or animal fecal wastes from the watershed. Naturally occurring sources of
bacteria /pathogens can include wildlife, vegetation, and soils; increased human presence
associated with development can also provide additional sources of bacteria /pathogens such as
pet waste and leaky sanitary sewer pipes. Total and fecal coliform, enterococcus bacteria, and
E. coli bacteria are commonly used as indicators to measure bacterial levels.
R:Trolects\Newpan \J015RDmft EIRWA Hydm- 090211.dm 4.4 -34 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Heavv Metals
Metals are commonly found in paints, fuels, adhesives and coatings, and in structures and
transportation facilities. Copper, lead, and zinc are the most common metals typically found in
urban runoff, although other trace metals (such as cadmium, chromium, and mercury) may be
also occur at low levels. Trace metals have the potential to cause toxic effects on aquatic life
and are a potential source of groundwater contamination.
Nutrients
Nutrients are inorganic forms of phosphorous and nitrogen. The main sources of nutrients in
urban areas include fertilizers in lawns, pet waste, failing septic systems, and atmospheric
deposition from automobiles and industrial operations. The most common impact of excessive
nutrient input is the eutrophications of the receiving water body, resulting in excessive algal
production, adverse dissolved oxygen variations, fish kills, and potential releases of toxins from
sediment due to changes in water chemistry.
Pesticides
Pesticides (including herbicides) are chemical compounds commonly used to control insects,
rodents, plant diseases, and weeds. Excessive or inappropriate application of a pesticide may
result in runoff containing toxic levels of these chemicals and other microorganisms flowing to
receiving water bodies. The proposed Project would comply with the City's standards and
guidelines for Integrated Pest Management (IPM) in accordance with the Orange County DAMP
and the MS4 Permit.
Oraanic Comoounds
Organic compounds are typically found in pesticides, solvents, and hydrocarbons. Dirt, grease,
and other particulates can also attract organic compounds in rinse water from cleaning objects,
and can be harmful or hazardous to aquatic life either indirectly or directly.
Sediments
Increases in runoff velocities and volumes can cause excessive stream channel erosion and
deposition, which upsets the balance of a natural channel system. Excessive suspension of fine
sediment in water can impair aquatic life through reduced light transmission and temperature
changes among other features.
Trash and Debris
Paper, plastics, and debris — including biodegradable organic matter such as leaves, grass
cuttings, and food waste —can accumulate on the ground if not properly handled, and then
become trapped in urban runoff. Transport of trash and debris can impair storm drain facilities,
impact recreational enjoyment, and degrade downstream habitats.
Oxygen Demanding Substances
Oxygen- demanding substances include biodegradable organic material and chemicals that
react with dissolved oxygen in water to form other compounds (e.g., proteins, carbohydrates,
fats, ammonia, and hydrogen sulfide). The oxygen demand of a substance can lead to depletion
6 Eutrophication is a process where water bodies receive excess nutrients that stimulate excessive plant growth.
R:Trojects\Newpart \J015Nnrafi EIR\4.4 Hydm- 090211.doc 4.4 -35 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
of dissolved oxygen in a water body and possibly the development of conditions resulting in the
growth of undesirable organisms, odor issues, and toxic releases.
Petroleum Hydrocarbons /Oil and Grease
The most common sources of oil and grease in urban runoff are from spilled fuels and
lubricants, domestic and industrial wastes, atmospheric deposition, and runoff. Runoff can
contain leachate from roads, break down of tires /rubber, and deposition of automobile exhaust.
Hydrocarbons can bioaccumulate in organisms, and can persist in sediment for long periods of
time in the environment reducing benthic' biodiversity and abundance.
Site Design and Low Impact Development (LID) Best Management Practices
In order to minimize impacts and potential environmental harm from discharges containing
these Pollutants of Concern (Table 4.4 -7), the proposed Project has incorporated site
design /LID strategies and source - control measures. LID features have been incorporated into
the Project for storm water treatment and for reduction of runoff volumes. Throughout the
Project site, the use of LID features would be implemented to meet water quality treatment
requirements in concert with treatment - control BMPs. The Project approach relies on optimal
use of LID features, supplemented with the treatment - control BMPs as secondary measures
where LID measures are not feasible.
LID features would be sized for water quality treatment requirements according to the Santa
Ana RWQCB's sizing criteria, which are defined in the MS4 Permit for either flow -based or
volume -based BMPs. The Project would integrate LID techniques throughout the development
area to provide treatment of low -flow runoff directly at the source along with runoff reduction
from small, frequent storm events. Final LID design features and sizing information would occur
during development of construction -level documentation in the final WQMPs prior to issuance of
grading permits by the City.
LID features would be implemented on the Project site and in transitional areas that lead into or
out of the Project site. LID Project features to be installed on site would pre -treat storm water
runoff and would remove large sediment, trash, and debris. These features could include
cisterns and rain barrels, storm water planters, common area porous pavement, tree box fillers,
and pocket rain gardens. Table 4.4 -8 identifies the on -site design and LID features that would
be incorporated into the Project design where feasible based upon proposed land uses.
The term benthic refers to organisms that reside within bottom sediments.
R: \Projects \Newpart \J015Rnrafi EIR\4.4 Hydm- 090211.doc 4.4 -36 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -8
ON -SITE DESIGN AND LID BMPS
Project Category
Application
Single - Family Residential
SF-1:
Incorporate landscaped areas on individual lots into overall site
drainage design.
SF -2:
Drain roof and driveway runoff into landscaped areas or pocket rain
gardens.
SF -3:
Use rain barrels to capture and store roof runoff for reuse as irrigation
water.
SF -4:
Use porous pavement in driveways and patios.
Multi - Family Residential /Mixed -Use
MF -1:
Drain impervious areas into landscaped areas.
MF -2:
Drain roof runoff into landscaping or cisterns for reuse as irrigation.
MF -3:
Direct runoff from sidewalks, common areas, and courtyards to pocket
rain gardens or landscaped areas.
MF-4:
Use porous pavement for sidewalks, courtyards, parking lots and low -
traffic drive aisles.
Resort Inn and Commercial Use
RC -1:
Divert runoff from rooftops, sidewalks, courtyards and other
impervious areas to landscaping, storm water planters, and pocket
rain gardens.
RC -2:
Use cisterns to capture runoff from rooftops for reuse as irrigation.
RC-3:
Use porous pavement for parking stalls and drive aisles.
Source: Fuscoe 2010b.
Transitional Area LID Features
"Transitional areas" refer to primary streets and travel ways that lead into and out of the
development areas. LID features within the transitional areas provide primary treatment of runoff
filtering and removing pollutant -laden sediments. The primary water quality mechanism would
be the use of integrated runoff treatment within "Green Streets" or sustainable travelways.
Green Streets would include curbless edge conditions, parkway bioswales (biocells), trails,
and /or biofiltration zones within the landscape setback areas for a variety of different sized
streets within the Project site. This allows for the treatment of water quality at the source and for
the reduction of peak storm water runoff volumes and rates. These streets would provide water
quality treatment of flows generated from the streets; would provide treatment of adjacent
development areas depending upon the volumes available within the LID landscaping features;
and would deliver low flow runoff to these features. Several types of these features are listed in
Table 4.4 -9.
As previously noted, the identification and evaluation of the most effective Project BMPS would
be completed during final development design, and would be provided in the Project's WQMP.
All LID site design features sized to handle the treatment requirements would be identified
during final design and would be incorporated into water quality permit applications. These
BMPS would ensure that Basin Plan standards are met through implementation.
R:Troje ts\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4 -37 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -9
TRANSITIONAL AREA LID FEATURES
LID
Feature
Description
Porous Pavement. Porous pavements allow precipitation and storm water runoff to infiltrate through
TA -1
void spaces within the pavement medium. Examples of porous pavement designs would include the
use of pavers within common areas
Tree Box Filters. Tree box filters are bioretention areas installed beneath trees. Runoff is directed to
TA -2
the tree box, where it is cleaned by vegetation and soil before entering a catch basin. The runoff
collected in the tree -boxes also irrigates the trees.
Vegetated Swales. Vegetated swales are treatment BMPs that provide filtration through a grass or
TA -3
vegetated bottom. The vegetation provides a mechanism for retarding surface runoff and filtering
flows to drop sediments, fines, debris, and organics.
Biocells. Biocells, also known as bioretention zones, are small, vegetated depressions to promote
TA4
infiltration and soil -based filtering of storm water runoff. They combine shrubs, grasses, and flowering
perennials in depressions that allow water to pool and infiltrate or evaporate within 24 to 48 hours.
Bioswales can be incorporated into portions of the linear bioswales for additional treatment.
Source: Fuscoe 2010b.
Transitional Area LID Features: Landscaping Biocells
The use of the landscaping biocells in combination with other LID and Green Street features
would provide substantial treatment and reduction of runoff at the source of the development
areas (for detailed analysis, please see the Project's Watershed Assessment Report). Each LID
feature would be designed to accommodate the required treatment volume, and flow beyond
this requirement would be designed to bypass the features for conveyance into the traditional
storm drain system. In those instances where the proposed biocell features are not sufficient to
handle treatment requirements independently, water quality calculations would quantify how
much the additional treatment is required by the downstream water quality basins.
In order to determine the maximum treatment potential of the proposed subsurface biocells, the
landscaping biocell areas within the parkway bioswale were evaluated to determine the
appropriate volume they could treat based on the upstream tributary drainage areas. Results of
the sizing analyses for the biocell sizing options are summarized in Table 4.4 -10 and identify
that the use of the landscaping biocells within the parkway bioswales in combination with other
interior LID features would treat and reduce runoff from the development areas. Each biocell
would be designed to accommodate the required treatment volume, and flow beyond this
requirement would be designed to bypass the features for conveyance into the traditional storm
drain system. In those instances where the LID features are not sufficient to handle treatment
requirements independently, the next LID feature downstream would provide treatment. These
analyses support the conclusion that the Project as proposed would sufficiently treat site
requirements for storm water runoff water quality through landscaping biocell development. As
needed, each LID feature designed into the Project in the downstream direction would be sized
to accommodate flows from the upstream LID feature.
R:Troje ts\Newpart \J01&1Cmft EIRWA Hydm- 090211.doa 4.4 -38 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -10
SUMMARY OF BMP SIZING FOR GREEN STREET FEATURES
Green Street Treatment Potential
Green Street
with
Minimum Design
Minimum
Primary
Landscaping
Capture
Treatment
Treatment
Biocells
Area
Volume
Capacity`
BMP Type
Mechanism
Arterial Streets
19.42 acres
0.94 of
—0.94 of
Green Street
Bio- treatment°
Biocells /Bioswales
Collector Streets
4.14 acres
0.20 of
—0.2 of
Green Street
Bio- treatment
Biocells /Bioswales
af: acre feet
e Refer to Exhibit 4.4 -7 for locations of the drainage boundaries used for BMP calculations.
Minimum design capture volume is the required SQDV for the contributing street drainage areas. Detailed
calculations are provided in Appendix E to the Watershed Assessment Report (see Appendix C of this EIR).
Minimum treatment capacity assumes approximately 25% of the proposed parkway bioswales include the biocell
sub - surface component at the downstream end of the Swale, sufficient to treat the design capture volume for
associated street runoff.. In some areas, the biocell sub - surface enhancements may be expanded to bio -treat
additional areas beyond the street drainage where feasible.
"Bio- treatment" is generally defined as sail and plant -based filtration BMPs, such as bioretention where the runoff
volume is filtered through vegetation and soil filtration layers. Bio- treatment BMPs that release treated flows off -site
are subject to feasibility criteria per OC DAMP and Countywide Model WQMP. Where feasible, infiltration of treated
runoff would be used.
Source: Fuscoe 2010b.
Site Design BMPs
The Site Design BMPs presented in Table 4.4 -11 (excerpted from the DAMP) intend to minimize
storm water runoff, the Project's impervious footprint, and any directly connected impervious
areas; they also help to conserve natural areas. Priority projects as defined in the DAMP (of
which the proposed Project is included) would also incorporate the design elements listed
below, as appropriate (and as further refined within the Project's WQMP and NPDES permit
compliance documentation), and would incorporate site - design BMPs included in any regional
or watershed program that the Project relies upon for treatment - control BMPs.
R:TrolectslNewpanu01&1Dmft EIRWA Hydm- 090211.doa 4.4 -39 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -11
SITE DESIGN BMPS
Number
BMP _
SD -1
Maximize permeable areas.
SD -2
Conserve natural areas.
SD -3
Construct walkways, trails, patios, overflow parking lots, alleys, driveways, low- traffic streets and other
low- traffic areas with open - jointed paving materials or permeable surfaces, such as pervious concrete,
porous asphalt, unit pavers, and granular materials.
SD-4
Construct streets, sidewalks and parking lot aisles to the minimum widths necessary, provided that public
safety and a walkable environment for pedestrians are not compromised.
SD -5
Incorporate landscaped buffer areas between sidewalks and streets.
SD -6
Reduce street widths where off - street parking is available.
SD -7
Maximize canopy interception (the interception of precipitation by tree canopies and vegetation) and
water conservation by preserving existing native trees and shrubs and by planting additional native or
drought - tolerant trees and large shrubs.
SD -8
Minimize the use of impervious surfaces in landscape design.
SD -9
Use natural drainage systems.
SD -10
Where soils conditions are suitable, use perforated pipe or gravel filtration pits for low -flow infiltration.
SD -11
Construct on -site ponding areas or retention facilities to increase infiltration opportunities.
SD -12
Drain rooftops into adjacent landscaping prior to discharging into the storm drain.
SD -13
Drain impervious sidewalks, walkways, trails, and patios into adjacent landscaping.
SD -14
A�County
Increase the use of vegetated drainage swales in lieu of underground piping or imperviously lined swales.
Source: of Orange et al. 2003.
In addition to these Site Design BMPs, Table 4.4 -12 describes street drainage and parking area
BMP concepts that would be incorporated into the Project, if feasible. These BMPs would
enhance the effectiveness of runoff management and Project water quality commitments.
TABLE 4.4 -12
STREET DRAINAGE AND PARKING AREA BMPS
BMP
Description
DP -1
Rural Swale System. Street runoff flows to a vegetated swale or gravel shoulder to curbs at street
corners and to culverts under driveways and street crossings.
DP -2
Urban Curb /Swale System. Streets slope to the curb; periodic swale inlets drain to vegetated
swale /biofilter.
Dual Drainage System. First flush is captured in street catch basins and then discharged to an
13133
adjacent vegetated swale or gravel shoulder. High flows connect directly to municipal storm drain
systems.
Smart Driveway Design. Driveways with shared access, flared (single lane at street), or wheel strips
DP-4
(paving only under tires) or design driveways drain into landscaping prior to discharging to the
municipal storm drain system.
Permeable Residential Parking Areas and Smart Drainage. Uncovered temporary or guest
DP -5
parking on private residential lots would be paved with a permeable surface or would be designed to
drain into landscaping prior to discharging to the municipal storm drain system.
DP -6
Landscaped Areas as Drainage Features. Would be an integral part of drainage design.
DP -7
Porous Pavement Overflow Parking Areas. Overflow parking would be constructed with permeable
paving.
Source: Fuscoe 2010b.
R:Troje ts\Newpan \J015NDmfl EIRWA Hydm- 090211.doa 4.4-40 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Overall, primary site design includes integrating LID features and emphasizing landscaped
features to provide runoff treatment and to control the rate and volume of runoff from impervious
surfaces.
Source - Control BMPs
Source - control BMPs are operational practices that reduce potential pollutants at the source,
and include both structural and routine non - structural practices. Typical non - structural and
structural source - control measures contained within the DAMP for residential and commercial
developments are discussed in Tables 4.4 -13 and 4.4 -14, respectively. Final selection and
design of Project - specific BMPs would be completed as part of the WQMP. These measures
are determined during final site plan development and WQMP preparation. All BMPs are
applicable to the proposed Project unless deemed unnecessary based on site - specific
development (e.g., if no loading docks are proposed or no hazardous waste would be stored,
then those specific BMPs would not be required).
TABLE 4.4 -13
SOURCE - CONTROL (NON- STRUCTURAL) BMPS
BMP
Description
N1
Education for Property Owners, Tenants and Occupants
For developments with no Property Owners Association (POA) or with POAs of less than 50 dwelling
units, practical information materials will be provided to the first residents /occupants /tenants on general
housekeeping practices that contribute to the protection of storm water quality. These materials will be
initially developed and provided to first residents /occupants /tenants by the developer. Thereafter, such
materials will be available through the City's education program. Different materials for residential, office
commercial, retail commercial, vehicle - related commercial, and other land uses will be involved.
For developments with POA and residential projects of more than 50 dwelling units, project conditions of
approval will require that the POA provide environmental awareness education materials, made available
by the municipalities, to all members periodically. Among other things, these materials will describe the
use of chemicals (including household type) that should be limited to the property, with no discharge of
wastes via hosing or other direct discharge to gutters, catch basins, and storm drains.
N2
Activity Restrictions
If a POA is formed, conditions, covenants and restrictions (CCBRs) shall be prepared by the developer
for the purpose of surface water quality protection. An example would be not allowing car washing
outside established community car wash areas in multi -unit complexes. Alternatively, use restrictions
may be developed by a building operator through lease terms, etc. These restrictions must be included in
the project's WQMP.
N3
Common Area Landscape Management
Ongoing maintenance shall be consistent with County Water Conservation Resolution or city equivalent,
plus fertilizer and /or pesticide usage consistent with Management Guidelines for Use of Fertilizers
(DAMP, Section 5.5). Statements regarding the specific applicable guidelines must be included in the
project WQMP.
N4
BMP Maintenance
The responsibility for implementing each non - structural BMP and scheduling cleaning and /or
maintenance of all structural BMP facilities shall be identified.
N5
Title 22 CCR Compliance
Compliance with Title 22 of the California Code of Regulations (CCR) and relevant sections of the
California Health and Safety Code regarding hazardous waste management shall be enforced by County
Environmental Health on behalf of the State. The project's WQMP must describe how the development
will comply with the applicable hazardous waste management section(s) of Title 22.
R:Trolects\Newpart \J015NDmfl EIRWA Hydm- 090211.dm 4.4-41 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -13 (Continued)
SOURCE CONTROL (NON-STRUCTURAL) BMPS
BMP
Description
N6
Local Water Quality Permit Compliance
The City, under the Water Quality Ordinance, may issue permits to ensure clean storm water discharges
from fuel dispensing areas and other areas of concern to public properties.
N7
Spill Contingency Plan
A Spill Contingency Plan shall be prepared by the building operator for use by specified types of building
or suite occupancies; it shall mandate stockpiling of cleanup materials, notification of responsible
agencies, disposal of cleanup materials, documentation, etc.
N8
Underground Storage Tank Compliance
The project shall comply with State regulations dealing with underground storage tanks and shall be
enforced by County Environmental Health on behalf of State.
N9
Hazardous Materials Disclosure Compliance
Compliance with City ordinances typically enforced by respective fire protection agency for the
management of hazardous materials shall be ensured. The Orange County, health care agencies, and/or
other appropriate agencies (i.e., Department of Toxics Substances Control) are typically responsible for
enforcing hazardous materials and hazardous waste handling and disposal regulations.
N10
Uniform Fire Code Implementation
The fire protection agency shall ensure compliance with Article 80 of the Uniform Fire Code.
N11
Common Area Litter Control
For industrial /commercial developments and for developments with POAs, the owner /POA shall be
required to implement trash management and litter control procedures in the common areas aimed at
reducing pollution of drainage water. The owner /POA may contract with their landscape maintenance
firms to provide this service during regularly scheduled maintenance, which should consist of litter patrol,
emptying of trash receptacles in common areas, and noting trash disposal violations by
tenants /homeowners or businesses and reporting the violations to the owner /POA for investigation.
N12
Employee Training
The Developer shall include an education program (see N1), as it would apply to future employees of
individual businesses. The Developer shall either prepares manual(s) for the initial purchasers or, for the
development that is constructed for an unspecified use, makes commitment on behalf of PDA or future
business owner to prepare.
N13
Housekeeping of Loading Docks
Loading docks typically found at large retail and warehouse -type commercial and industrial facilities shall
be kept in a clean and orderly condition through a regular program of sweeping and litter control and
immediate cleanup of spills and broken containers. Cleanup procedures shall minimize or eliminate the
use of water. If washdown water is used, it must be disposed of in an approved manner and not
discharged to the storm drain system. If there are no other alternatives, discharge of non -storm water
flow to the sanitary sewer may be considered only if allowed by the local sewering agency through a
permitted connection.
N14
Common Area Catch Basin Inspection
For industrial /commercial developments and for developments with privately maintained drainage
systems, the owner shall have at least 80% of drainage facilities inspected, cleaned, and maintained on
an annual basis with 100% of the facilities included in a 2 -year period. Cleaning shall take place in the
late summer /early fall prior to the start of the rainy season. Drainage facilities include catch basins (storm
drain inlets) detention basins, retention basins, sediment basins, open drainage channels, and lift
stations.
N15
Street Sweeping Private Streets and Parking Lots
Streets and parking lots are required to be swept prior to the storm season, in late summer or early fall,
prior to the start of the rainy season.
Source: Fuscoe 2010b.
R:Troje is \Newpart \J015Nnraft EIRWA Hydm- 090211.dm 4.4-42 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -14
SOURCE - CONTROL STRUCTURAL BMPS
BMP
Description
S1
Provide Storm Drain System Stenciling and Signage
Storm drain stencils are highly visible source - control messages that are typically placed directly adjacent
to storm drain inlets. The stencils contain a brief statement that prohibits the dumping of improper
materials into the municipal storm drain system. Graphic icons, either illustrating anti - dumping symbols or
images of receiving water fauna, are effective supplements to the anti - dumping message. Stencils and
signs alert the public to the destination of pollutants discharged into storm water.
The following requirements shall be included in project design and shown on the project plans:
1. Provide stenciling or labeling of all storm drain inlets and catch basins that are constructed or
modified in the project area with prohibitive language (such as: "NO DUMPING - DRAINS TO
OCEAN ") and /or graphic icons to discourage illegal dumping.
2. Post signs and prohibitive language and/or graphic icons that prohibit illegal dumping at public
access points along channels and creeks within the Project area.
3. Maintain legibility of stencils ad signs.
S2
Design Outdoor Hazardous Material Storage Areas to Reduce Pollutant Introduction
Improper storage of materials outdoors may increase the potential for toxic compounds, oil and grease,
fuels, solvents, coolants, wastes, heavy metals, nutrients, suspended solids, and other pollutants to enter
the municipal storm drain system. Where the plan of development includes outdoor areas for storage of
hazardous materials that may contribute pollutants to the municipal storm drain system, the following
storm water BMPs are required:
1. Hazardous materials with the potential to contaminate urban runoff shall either be: (a) placed in an
enclosure such as, but not limited to, a cabinet, shed, or similar structure that prevents contact with
runoff or spillage to the municipal storm drain system or (b) protected by secondary containment
structures (not double wall containers) such as berms, dikes, or curbs.
2. The storage area shall be paved and sufficiently impervious to contain leaks and spills.
3. The storage area shall have a roof or awning to minimize direct precipitation and collection of storm
water within the secondary containment area.
4. Any storm water retained within the containment structure must not be discharged to the street or
storm drain system. Location(s) of installations of where these preventative measures will be
employed must be included on the map or plans identifying BMPs.
S3
Design Trash Storage Areas to Reduce Pollutant Introduction
All trash container areas shall meet the following requirements (limited exclusion: detached residential
homes):
1. Paved with an impervious surface, designed not to allow run -on from adjoining areas, designed to
divert drainage from adjoining roofs and pavements diverted around the area, screened or walled
to prevent off -site transport of trash.
2. Provide attached lids on all trash containers that exclude rain, or a roof or awning to minimize direct
precipitation.
3. Prohibit connection of trash area drains to the municipal storm drain system.
S4
Use Efficient Irrigation Systems and Landscape Design
Projects shall design the timing and application methods of irrigation water to minimize the runoff of
excess irrigation water into the municipal storm drain system. (Limited exclusion: detached residential
homes.) The following methods to reduce excessive irrigation runoff shall be considered and
incorporated in common development areas and other areas where determined applicable and feasible
by the City:
1. Employing rain shutoff devices to prevent irrigation after precipitation.
2. Designing irrigation systems to each landscape area's specific water requirements.
3. Using flow reducers or shutoff valves triggered by a pressure drop to control water loss in the event
R:TrojecWNewpart \J015VDmft EIRWA Hydm- 090211.doa 4.4-43 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -14 (Continued)
SOURCE - CONTROL STRUCTURAL BMPS
BMP
Description
of broken sprinkler heads or lines.
4. Implementing a landscape plan consistent with County Water Conservation Resolution or city
equivalent, which may include provision of water sensors, programmable irrigation times (for short
cycles), etc.
5. The timing and application methods of irrigation water shall be designed to minimize the runoff of
excess irrigation water into the municipal storm drain system.
6. Employing other comparable, equally effective methods to reduce irrigation water runoff.
7. Grouping plants with similar water requirements in order to reduce excess irrigation runoff and to
promote surface filtration. Choose plants with low irrigation requirements (for example, native or
drought - tolerant species). Consider other design features, such as:
• Using mulches (such as wood chips or shredded wood products) in planter areas without
ground cover to minimize sediment in runoff.
• Installing appropriate plant materials for the location, in accordance with amount of sunlight
and climate, and use native plant material where possible and /or as recommended by the
landscape architect.
• Leaving a vegetative barrier along the property boundary and interior watercourses to act as
a pollutant filter, where appropriate and feasible.
• Choosing plants that minimize or eliminate the use of fertilizers or pesticides to sustain
growth.
S5
Protect S lopes and Channels
Project plans shall include source - control BMPs to decrease the potential for erosion of slopes and /or
channels, consistent with local codes and ordinances and with the approval of all agencies with
jurisdiction (e.g., the USACE, the RWQCB, and the CDFG). The following design principles shall be
incorporated and implemented where determined applicable and feasible by the City:
1. Convey runoff safely from the tops of slopes.
2. Avoid disturbing steep or unstable slopes.
3. Avoid disturbing natural channels.
4. Install permanent stabilization BMPs on disturbed slopes as quickly as possible.
5. Vegetate slopes with native or drought - tolerant vegetation.
6. Control and treat flows in landscaping and /or other controls prior to reaching existing natural
drainage systems.
7. Install permanent stabilization BMPs in channel crossings as quickly as possible and ensure that
increases in runoff velocity and frequency caused by the project do not erode the channel.
8. Install energy dissipaters, such as riprap, at the outlets of new storm drains, culverts, conduits, or
channels that enter unlined channels in accordance with applicable specifications to minimize
erosion. Energy dissipaters shall be installed in such a way as to minimize impacts to receiving
waters.
9. Where appropriate, line on -site conveyance channels to reduce erosion caused by increased flow
velocity due to increases in tributary impervious area. The first choice for linings shall be grass or
some other vegetative surface, since these materials not only reduce runoff velocities, but also
provide water quality benefits from filtration and infiltration. If velocities in the channel are large
enough to erode grass or other vegetative linings, riprap, concrete soil cement, or geo -grid
stabilization may be substituted or used in combination with grass or other vegetation stabilization.
10. Use other design principles that are comparable and equally effective.
R:Troje ts\Newpan \J015NDmft EIRWA Hydm- 090211.dm 4.4-44 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -14 (Continued)
SOURCE - CONTROL STRUCTURAL BMPS
BMP
Description
S6
Loading Dock Areas
Loading /unloading dock areas shall:
1. Be covered loading dock areas, or drainages shall be designed to preclude urban run -on and
runoff.
2. Directly connect to the municipal storm drain system from below grade loading docks (truck wells)
or similar structures are prohibited. Storm water can be discharged through a permitted connection
to the storm drain system with a treatment - control BMP applicable to the use.
3. Include other comparable and equally effective features that prevent unpermitted discharges to the
municipal storm drain system.
4. Include Housekeeping measures consistent with N13.
S7
Maintenance Bays
Maintenance bays shall:
1. Be indoors or shall be designed to preclude urban run -on and runoff.
2. Be designed to include a drainage system to capture all wash water, leaks, and spills. Impermeable
berms, drop inlets, trench catch basins, or overflow containment structures around repair bays shall
also be provided to prevent spilled materials and wash -down water from entering the storm drain
system. Drains shall be connected to a sump for collection and disposal. Any discharge from the
repair /maintenance bays to the municipal storm drain system is prohibited. If there are no other
alternatives, discharge of non -storm water flow to the sanitary sewer may be considered, but only
when allowed by the local sewering agency through permitted connection.
3. Include other comparable and equally effective features that prevent discharges to the municipal
storm drain system.
S8
Vehicle Wash Areas
Projects that include areas for washing /steam cleaning vehicles shall:
1. Be self- contained or covered with a roof or overhang.
2. Be equipped with wash racks constructed in accordance with the guidelines in Attachment C of the
DAMP and with prior approval of the sewering agency (Note: Discharge monitoring may be
required by the sewering agency).
3. Be equipped with a clarifier or other pretreatment facility.
4. Include other comparable and equally effective features that prevent unpermitted discharges, to the
municipal storm drain system.
S9
Outdoor Processing Areas
Outdoor process equipment operations (such as rock grinding or crushing, painting or coating, grinding
or sanding, degreasing or parts cleaning, landfills, waste piles, and wastewater and solid waste handling,
treatment, and disposal, and other operations determined to be a potential threat to water quality by the
City) shall adhere to the requirements listed below.
1. Cover or enclose areas that would be the sources of pollutants or slope the area toward a sump to
provide infiltration or evaporation with no discharge. If there are no other alternatives, discharging
non -storm water flow to the sanitary sewer may be considered only when allowed by the local
sewering agency through a permitted connection.
2. Grade or install berms in the area to prevent run -on from surrounding areas.
3. Ensure that equipment repair areas do not include storm drains.
4. Include other comparable or equally effective features that prevent unpermitted discharges to the
municipal storm drain system.
5. Where wet material processing occurs (e.g., electroplating), provide secondary containment
R:Troje ts\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4-45 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -14 (Continued)
SOURCE - CONTROL STRUCTURALBMPS
BMP
Description
structures (not double wall containers) to hold spills resulting from accidents, leaking tanks or
equipment, or any other unplanned releases. (Note: If these are plumbed to the sanitary sewer, the
structures and plumbing shall be in accordance with Section 7.11- Attachment C of the DAMP, and
with the prior approval of the sewering agency.) See also Section 7.11- 3.4.2, N10. Design of
secondary containment structures shall be consistent with Design of Outdoor Material Storage
Areas to Reduce Pollutant Introduction.
Some of these land uses (e.g., landfills, waste piles, wastewater and solid waste handling, treatment and
disposal) may be subject to other permits including Phase I Industrial Permits that may require additional
BMPs.
S10
Equipment Wash Areas
Outdoor equipment/accessory washing and steam cleaning activities shall:
1. Be self- contained or covered with a roof or overhang.
2. Have an equipment wash area drainage system that captures all wash water. Impermeable berms,
drop inlets, trench catch basins, or overflow containment structures shall be provided around
equipment wash areas to prevent wash -down water from entering the storm drain system. Drains
shall be connected to a sump for collection and disposal. Equipment wash areas shall be prohibited
from discharging to the municipal storm drain. If there are no other alternatives, discharge of non -
storm water flow to the sanitary sewer may be considered, but only when allowed by the local
sewering agency through a permitted connection.
3. Include other comparable or equally effective features that prevent unpermitted discharges to the
municipal storm drain system.
S11
Hillside Landscaping
Hillside areas that are disturbed by project development shall be landscaped with deep- rooted,
drought - tolerant plant species selected for erosion control, satisfactory to the City.
S12
Wash Water Controls for Food Preparation Areas
Food establishments (per California Health and Safety Code §27520) shall have either contained areas
or sinks, each with sanitary sewer connections for disposal of wash waters containing kitchen and food
wastes. If located outside, the contained areas or sinks shall also be structurally covered to prevent entry
storm water. Adequate signs shall be provided and appropriately placed stating the prohibition of
discharging wash water to the storm drain system.
S13
Community Car Wash Racks
In complexes larger than 100 dwelling units where car washing is allowed, a designated car wash area
that does not drain to a storm drain system shall be provided for common usage. Wash waters from this
area may be directed to the sanitary sewer (in accordance with Attachment C of the DAMP, and with the
prior approval of the sewering agency); to an engineered infiltration system; or to an equally effective
alternative. Pre - treatment may also be required. Signage shall be provided prohibiting discharges of
wash water outside of the designated area.
Source: Fuscoe 2010b.
Treatment - Control BMPs
Infiltration and Sub -Drain Systems
All LID features would include sub - drains to ensure flows are collected, treated, and discharged
from to the backbone storm drain system or to provide hydrologic nourishment to newly created
habitat areas. Field percolation tests would also be performed throughout the Project site to
determine areas of high infiltration rates where sub - drains may not be necessary. To the
maximum extent, sub - drains would be perforated to promote infiltration into deeper strata per
the geotechnical engineer specifications.
R:Troiects\Newpart \J015Nnrafi EIRWA Hydm- 090211.dm 4.4-46 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Community Water Quality Basins. Water quality treatment and polishing basins (i.e., finishing
basins) would be incorporated into the Project to provide the final treatment of runoff for certain
portions of the site. For those subwatershed areas not served by a water quality basin,
upstream LID features would be sized in accordance with the water quality treatment
requirements associated with runoff from the Project site. Biotreated flows would be either
discharged off site or collected and reused on site in accordance with the new Countywide
Model WQMP feasibility criteria.
The Project proposes "community" water quality basins along the perimeter of the development
areas adjacent to the bluff tops as depicted in Exhibit 4.4 -8, Water Quality Management Plan.
For these community water quality basins, infiltration is not recommended due to adjacency to
the bluff and the potential for subsurface seepage through the canyon walls. Therefore, these
basins would be lined, and treated flows would be discharged in a controlled manner to the
arroyo canyon bottom for evapotranspiration and habitat benefits.
Water quality basins are typically designed with a small debris /entrapment area, a spreading
ground, and a deeper pool prior to discharging out the riser tower. Water quality basins typically
include planted emergent wetland bottoms with vegetated side slopes and impound surface
runoff so it gradually filters through the subsoil. The detained runoff is filtered through the
vegetation and soil beneath the basin, removing both fine and soluble pollutants. Water quality
basins may also include subdrain pipes to provide additional treatment where applicable.
Off -site Runoff Water Quality Basin. One water quality basin is proposed near the Project
entrance at 16th Street to accommodate the off -site treatment of urban runoff from areas
tributary to the Southern Arroyo. The off -site drainage area located within the City of Costa
Mesa and the City of Newport Beach encompasses approximately 48 acres and is completely
developed. This "regional' water quality basin would provide treatment for approximately
2.3 acre -feet of water quality treatment, which represents all urban runoff (dry weather) and
almost the entire first -flush storm water event. In addition, the basin would also provide
detention capabilities to reduce peak flow velocities that discharge into the Southern Arroyo.
Dual Purpose Water Quality Basin. An on -site water quality treatment basin is proposed
within the Lowland of the Project site (Exhibit 4.4 -8). This basin would be located above the
100 -year floodplain and would also serve as a diffuser basin to control the rate at which water
drains from the Upland down to the Lowland. The basin would serve as the downstream water
quality basin for Storm Drain Systems D and E for flows bypassing the upstream LID features.
Although this basin would have sufficient treatment capacity to treat all flows from the upstream
drainage area (6 acre -feet of treatment volume) in combination with the established treatment
efficiency of the upstream LID features, only 2.3 acre -feet of treatment capacity would actually
be required. Treated flows from this basin would remain on site and would be discharged into
the Lowland for infiltration, evapotranspiration, and habitat nourishment benefits. This
constructed basin would use native wetland habitat for treatment function within the basin limits.
This basin would also require long -term Safe Harbor maintenance agreements with the
Resource Agencies within the physical limits of the basin to ensure maintenance activities are
performed on a routine basis to maximize water quality treatment and energy dissipation
functions.
Preliminary technical analyses summarized in Table 4.4 -15 indicate that the Project would be
able to provide sufficient on -site treatment capacity to maintain water quality standards and to
comply with updated regulatory requirements for 100 percent of the runoff expected from the
site.
R:Trojeats\Newpart \J01&1Dmft EIRWA Hydm- 090211.doa 4.4-47 Newport Banning Ranch
Draft Environmental Impact Report
j' `
1991 Street
`IL
w y_.: i•
r�.r
w _____I
9 r oyo � r______i 1
l
2 i
i
18M Street..
I i aa�
11
r•\
/ � it �°
6'
a S
.AT. I'ERIMETER 20NE _ '
WA ER pUPLIT'e ii N, I
Tual
,Evapo- upreloon iron
_ Retain h-
t ♦ `` �__ 17th Stal r`
\ __ J ` Green Slreeb wlaotreelmeelt r 1
'•\ ✓ I - �._
} PrkwaYS arp Priem ��
j- -- SUb suRacaBOCel Ennancemenb r 1
EI
ACOE INTERIOR DEVELOPMENT ZONE
Wetlands HYtl Illyaas Sn— ClutIll,
Restoration Am,OV n•' i Newhall Street 1
.-I Reuse PA. a'-
Area - .41
PERIMETER ZONE- j 1
WATER OUALITYIEETENTION BASIN r
>i NMUSp'° Oa Stu annan
,
.f t
16th Street
PERIMETER ZONE. ; •
Qua ry Treamrenl By'im
-
B Orelamlon rune \ City
L'nkege to Pnaym antl LwaleMa DIIII(le5
\, Yard i
\
Gd
OIRUSERystay.ryAerrPTggEA -
EIre19Yht
ouransI a
sedlmernOenpollEnwPme,n I -
•Na44lEnnan
159r Ramat
rla^
r li
INTERIOR REVELOPMENT20NE
• XYWOlo91c III Cantles `
nioua A•m Ohpereluo /� -'....
.BI ase l n¢.nae Oppuwnitiee
I
LEGEND /
PTjaa,slle2ouneary 1
-roe bunnem ZLna i
r l
Tm,s4ona12ane- ParkwaylPaseo Sb Atment - e
..� ♦:yk
Peimebr2are auR Park
Perlmabr2om Rag'wna Way, ManegamenlAnas •� \� a5' ,
I'
II ' Sunset Ridge
0 e'mwalm h sh ay�, Park
KCommunity Water Quality Basins
IAPPrealmate Lcca4one) f' - _- s �
1h' ImusntllAnoyo Nspm m son sy4e '/ �__- ,
Preemad OralmeeAme Boundary PA C I P C
OCEA
Source: FORMA
2011
Water Quality Management Plan Exhibit 4.4 -8
Newport Banning Ranch EIR
N
WAE�
ry C 0 N 5 U L T I N G
s (0]2511 JCD) R: Projects\ Newport\ 1015 \Graphirs ]R \a4.4- 8_WalerQuali yMP.pdf
Section 4.4
and Water Quality
TABLE 4.4 -15
WATER QUALITY BASINS TREATMENT SUMMARY
Water Quality Basins Treatment Summary
Minimum
% of Site
Design
Design
Drainage
Runoff
Capture
BMP
Treatment
Capture
Development Area
Area'
Coefficient
Volume
Capacity`
BMP Type
Mechanism(s)
Volume
Lowland Drainage Area
Medium /Medium-
Evapotranspiration,
Low /Low Density
60.54
0.66
2.32 of
-6.2 of
Multi -Use Basin
Retention
Residential (SD -D)
44%
Mixed -Use
4.57
0.75
0.20 of
-0 20 of
WQ Basin(s) or
Evapotranspiration,
Residential (SD -F)
.
equivalent BMP
Retention
Southern Arroyo /Semeniuk Slough Drainage Areas
Medium /Medium-
WQ Basin(s) or
Evapotranspiration,
Low /Low Density
21.54
0.63
0.79 of
-0.79 of
equivalent BMP
Reuse, o
Residential (SD -C)
Bio- treatment
Low Density
WQ Basin(s) or
Evapotranspiration,
Residential/ Resort
31.48
0.65
1.2 of
-1.2 of
equivalent BMP
Reuse,
40%
Inn (SD -B)
Bio- treatment
Community Parks
WQ Basin(s) or
Evapotranspiration,
(SD -A)
22.41
0.26
0.30 of
-0.3 of
equivalent BMP
Reuse,
Bio- treatment
Other
Community Park
with Water Quality
2.39
0.71
0.10 of
+0.1 of
WQ Basin
Evapotranspiration,
1%
Basin for Off -site
Retention
Flows
Green Streets'
17.52
0.83
0.84
-0.84 of
Biocells and
Evapotranspiration,
o
15 /o
Bioswales
Bio- treatment
Total Design Capture Volume
5.79 of
9.63 of
-
-
100%
of acre feet
SD storm drain
WQ water quality
Refer to Exhibit 4.4 -7 for locations of the drainage boundaries used for BMP calculations.
° Sizing is approximate based on minimum SQDV for contributing drainage areas of proposed for development. Detailed calculations are
provided in Appendix E to the Watershed Assessment Report (see Appendix C of this EIR).
Minimum treatment capacity assumes approximately 25% of the proposed parkway bioswales include the biocell sub - surface component
at the downstream end of the swale, sufficient to treat the design capture volume for associated street runoff.. In some areas, the biocell
sub - surface enhancements may be expanded to bio -treat additional areas beyond the street drainage where feasible. 'Bio - treatment' is
generally defined as soil and plant -based filtration BMPs, such as bioretention where the runoff volume is filtered through vegetation and
soil filtration layers. Biotreatment BMPs that release treated flows off -site are subject to feasibility criteria per OC DAMP and Countywide
Model WQMP. Where feasible, infiltration of treated runoff would be utilized.
Acreage and sizing refers to on -site park area only. Water quality basin would be sized for additional upstream, off -site flows, of which
are not included in this table. Refer to Appendix E of the Watershed Assessment Report (Appendix C of this EIR) for additional
calculations for off -site tributary area.
Green streets that are located outside of the above listed drainage areas. For total green street acreages, refer to Table 5.8 in Appendix
E to the Watershed Assessment Report (see Appendix C of this EIR).
Source: Fuscoe 20106.
R:Troiects\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4-48 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
BMP Maintenance Considerations
As the Project would rely on the effectiveness of LID features and water quality basins for water
quality treatment, regular maintenance of these facilities and associated sediment - control
measures would be required. LID features and water quality basin maintenance activities would
include:
• Conducting site inspections two times per year by qualified personnel to observe the
integrity of the facility over time;
• Weekly trash and debris removal;
• Monthly weeding, trimming, thinning, and landscape maintenance within the basin limits
to ensure the vegetative height and density does not prohibit runoff from entering
landscaping biocells;
• Quarterly visual inspection for health of vegetation, excess ponded water, and excess
trapped sediment and debris;
• Implementation of maintenance measures stipulated in the Project operation and
maintenance plan to ensure functional stability of all BMP features;
• Inspect inlet/outlet facilities for signs of damage and clean out as necessary;
• Integrated pest/plan management to reduce reliance on pesticides in accordance with
City standards and guidelines.
PDFs 4.4 -1, 4.4 -2, 4.4 -3 and SCs 4.4 -1, 4.4 -2, 4.4 -3, 4.4 -4, and 4.4 -5 incorporate measures to
protect water quality and beneficial uses of receiving waters at the Project site from both
construction and operational impacts. These LID and BMP features would ensure that runoff
from the Project site complies with updated NPDES site discharge requirements for the
protection of receiving water quality and beneficial uses. Water quality entering the Lowland and
Semeniuk Slough would not be adversely impacted once these controls are in place, and
impacts from Project construction and operation would be less than significant.
Impact Summary. Less Than Significant Impact. Construction and operation of the
proposed Project would have the potential to adversely impact water
quality in downstream receiving waters through discharge of runoff that
contains various pollutants of concern. However, the Project incorporates
detailed LID features into internal site design and transitional areas for
sediment, source, and treatment control. Additional site - design, structural,
source - control, and treatment - control BMPs would be incorporated into
the Project to supplement LID features, ensuring compliance with the
Project Water Quality Management Plan and NPDES permit. The Project
has demonstrated on -site ability to treat all runoff treatment volumes that
would be generated from the Project site in addition to runoff entering the
site from upstream developed areas within Costa Mesa in compliance
with regulatory standards. With the incorporation of the LID and BMP
features identified in the PDFs 4.4 -1 through 4.4 -3 and SCs 4.4 -1 through
4.4 -5, proposed Project impacts to water quality and the affects to
beneficial uses of the receiving waters would be less than significant.
Additionally, the implementation of BMPs would provide for the protection
of surface water quality by avoiding and /or minimizing pollutant runoff into
surface waters and provide for protection of groundwater quality by
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.449 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
minimizing the introduction of pollutants into the groundwater table.
Therefore, proposed Project impacts to groundwater and surface water
associated with removal of oil facilities, including in the Lowland, would be
less than significant.
Threshold 4.4 -2 Would the project substantially deplete groundwater supplies or
interfere substantially with groundwater recharge such that there
would be a net deficit in aquifer volume or a lowering of the local
groundwater table level (e.g., the production rate of pre- existing
nearby wells would drop to a level which would not support existing
land uses or planned uses for which permits have been granted)?
Although the Project would increase the amount of impervious surfaces by approximately
45 percent compared to the existing oilfield conditions and would thus reduce the potential for
groundwater percolation, treatment - control BMPs and LID features are proposed that would
encourage infiltration of storm water runoff where feasible. In addition, the design of the
structural BMPs and LID features would conform to the restrictions outlined in the MS4 Permit
for North Orange County (Order R8- 2009 - 0030). These measures would include having a
vertical distance from the bottom of the infiltration system to the seasonal high groundwater (i.e.,
at least ten feet) and would provide impermeable liners with subdrain systems for areas with
high groundwater levels, thereby eliminating the potential for groundwater contamination. Most
pollutants in infiltrated water are effectively treated in the uppermost soil layers of infiltration type
BMPs (Geosyntec 2009).
Groundwater recharge does occur at the Project site and would decrease under Project
conditions due to a reduction in pervious surface area. However, infiltration BMPs would be
incorporated into site design to ensure that site runoff continues to infiltrate to the maximum
extent practicable. The Project site is not a designated recharge site for the City.
Local groundwater is not suitable for use as drinking water because of mixing with tidal waters.
Consequently, the Project's potable water needs would not impact local groundwater levels.
Therefore, there would be no Project impact to groundwater table drawdown.
The Santa Ana RWQCB's Basin Plan designates beneficial uses and water quality objectives to
provide the foundation for various State - implemented regulatory programs. According to the
Basin Plan, the Project site is located within the Orange County Groundwater Management
Zone, which has specific water quality objectives set for total dissolved solids (TDS) and nitrates
(N) for the protection of its beneficial uses.
Although specific objectives have been set by the Santa Ana RWQCB, the proposed Project is
not anticipated to contribute excess concentrations of storm water pollutants into groundwater
resources. BMPs that protect receiving waters and groundwater in the vicinity would be in place
prior to, during, and, to a lesser degree, after implementation of the final RAP until native
vegetation returns to the area. BMPs may include, but are not limited to, good housekeeping
practices to contain potential construction materials, leaks and maintenance activities for large
equipment used on site, containment measures for soil stockpiles and, potentially, treatment -
control BMPs including lined and /or vegetated swales and retention basins to filter /manage
runoff water from active work areas. Based on the incorporation of BMPs and LID features and
preparation of the final RAP (see Section 4.5, Hazards and Hazardous Materials), no pollutants
from the Project are expected to reach groundwater, and groundwater quality impacts are
expected to be less than significant. The construction erosion and sediment control BMPs are
also applicable for the oilfield site remediation procedures; no additional BMPs are currently
R:Trojeats\Newpart \J01&1Dmft EIRWA Hydm- 090211.dm 4.4 -50 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
proposed (see Table 4.4 -6, BMP WM -7 for soil contamination management). It is acknowledge
that the applicable regulatory agencies can impose additional conditions including BMPs related
to remediation, construction, and operational activities at the Project site.
Impact Summary. Less Than Significant. Local groundwater is not suitable for use as
drinking water; therefore, there would be no Project impact to
groundwater table due to drawdown. Groundwater recharge does occur
at the Project site and would decrease under Project conditions due to a
reduction in pervious surface area. Infiltration BMPs would be
incorporated into site design to ensure that site runoff continues to
infiltrate to the maximum extent practicable. Proper design of structural
BMPs and LID features would ensure separation of the volumes of water
to be treated and the underlying groundwater table, which would ensure
no adverse impact to groundwater quality from treatment - control BMPS
and LID features. Infiltration BMPs would treat most pollutants within the
uppermost soil layers of the BMP facility, reducing pollutant transfer to the
groundwater table. Temporary construction impacts associated with
removal of oil pipelines in the Lowland would be reduced to a less than
significant level with the incorporation of BMPs set forth in this EIR. PDFs
4.4 -3, the use of LID standards, and PDF 4.4 -6, incorporation of BMPs,
would ensure that Project impacts would be less than significant.
Threshold 4.4 -3 Would the project substantially alter the existing drainage pattern of
the site or area, including through the alteration of the course of a
stream or river, in a manner which would result in substantial
erosion or siltation on- or off- site?
Threshold 4.4 -15 Would the project create significant increases in erosion of the
project site or surrounding areas?
Construction
As discussed above in the impact discussion for Thresholds 4.4 -1, 4.4 -6, 4.4 -11, 4.4 -12, and
4.4 -13, sediment - control BMPs would be installed to intercept and filter out soil particles that
may have been mobilized by flows during construction activities before these flows discharge
into receiving waters. These controls may include installing check dams, desilting basins, fiber
rolls, and silt fencing, as well as revegetating landscaped areas. Per CASQA guidelines, a
minimum of three desilting basins would be in operation during Project construction to control
sediment moving off site. All storm drain inlets on the Project site and along streets immediately
adjacent to the Project boundary would be protected with an impoundment (i.e., gravel bags)
around the inlet and would be equipped with a sediment filter (i.e., fiber roll) to slow the velocity
of moving water and to trap sediment particles prior to discharge into the inlet. These measures
would also be placed around areas of soil- disturbing activities, such as grading or clearing, to
retain sediments on site.
Erosion - control BMPs would be used during construction to protect the soil surface by covering
and /or binding the soil particles together or to divert runoff away from exposed areas and into
more suitable locations. These BMPs measures may include application of hydraulic mulch, soil
binders, and the use of geotextiles and mats. Temporary earth dikes or drainage swales may
also be used.
R:Trojeats\Newpart \J01&1Dmft EIRWA Hydm- 090211.dm 4.4 -51 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
The proposed Project is considered a Risk Level 2 site. Risk Level 2 dischargers that pose a
medium risk to water quality are subject to technology -based Numeric Action Level for pH and
turbidity. Should the Project exceed a pH range of 6.5 -8.5 or turbidity of 250 nephelometric
turbidity units (NTU), the discharger is required to immediately determine the source associated
with the exceedance and to implement corrective actions if necessary to mitigate the exceedance.
It is not anticipated that Active Treatment Systems would be needed for the Project.
Compliance with the General Construction Permit and the Orange County Dewatering Permit,
the later if required, would minimize construction impacts from grading /excavation; material
stockpiling and dewatering; construction and utilization of access and haul roads; and
equipment staging, operation, and fueling. The Project would comply with the most current
General Construction Permit and associated local NPDES regulations to ensure that the
potential for construction - related erosion and adverse sedimentation effects are minimized
through the identification and application of efficient sediment - control BMPs and construction
site monitoring. These permits require development and implementation of an SWPPP, which
would describe construction BMPs that address the measures and controls necessary to ensure
that construction site effects on sedimentation and erosion are appropriately minimized and
remain less than significant.
Project Operation
Oil operations in the Lowland have resulted in modifications to on -site subwatersheds proposed
by the Project. Under existing conditions, Semeniuk Slough has an available capacity to store the
2 -year storm event, and periodically floods as a result of a coincidence of high tides and larger
storms. In order to preserve the 2 -year flood protection limit of Semeniuk Slough, a portion of the
on -site development tributary would be directed to Subwatershed C as identified in Table 4.4 -16.
Overall site drainage patterns would largely remain the same upon Project completion; drainage
would continue to flow from east to west across the site, through the existing arroyos and into
either the Semeniuk Slough or the Lowland area. Minor variations in surface drainage patterns
and discharge volumes would occur through the reduction in size of Subwatershed A by
approximately 27 acres ( -7.8 percent). Subwatershed B would decrease in size by
approximately 14.5 acres ( -10.73 percent). Subwatershed C would increase in size by
approximately 34 acres ( +53.45 percent) as a result of diversion of some of the Subwatershed A
discharge away from the Semeniuk Slough into the Lowland.
The Lowland area currently receives runoff from approximately 63.6 acres, which would
increase by approximately 34 acres under the proposed condition. Runoff rates would remain
unchanged under the proposed condition to the Northern Arroyo since existing flow rates and
volume would be maintained, resulting in no additional impact. The increased discharge to the
Lowland would be delivered via the primary storm drains for this area (SD -D and SD -E), which
would eliminate the potential for increased sediment transport within the existing natural
channels. Flows carried by SD -D and SD -E (Drainage Area C) would be delivered to a water
quality basin with energy dissipation measures to minimize local erosion within the basin
footprint. The discharge of flows from the basin into the adjacent Lowland would also be
diffused to minimize sediment transport impacts within the Lowland.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4 -52 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -16
SUBWATERSHED DRAINAGE AREAS
Subwatershed
Drainage Area:
Existing Conditions (ac)
Drainage Area:
Post Project (ac)
Percent Change
A
349.6
322.0
-7.89%
B
135.1
120.6
-10.73%
C
63.6
97.6
+53.45%
D
14.3
22.4
+56.64%
E
97.2
97.2
0%
F
5.8
5.8
0%
G
1.8
1.8
0%
H
7.0
7.0
0%
I
1.1
1.1
0%
J
11.0
11.0
0%
K
6.3
6.3
0%
Lowland Area
126.0
126.0
0%
USACE- restored Salt
Marsh Basin
90.0
90.0
0%
Total
908.8
908.8
ac: acres
Source: Fuscoe 2010b.
The Northern and Southern Arroyos are the Project watershed's main watercourses and are
located immediately adjacent to proposed development. The Southern Arroyo would experience
modifications in its drainage area (Subwatershed A) in association with the proposed
development, while the drainage area for the Northern Arroyo would be slightly reduced
(Subwatershed B). Only a small portion of the open space within Subwatershed B would be
converted to residential development. In addition, proposed North Bluff Road would cross the
Northern Arroyo. The flow path of the Northern Arroyo would cross under North Bluff Road
within a new culvert. As shown in Table 4.4 -17, the Northern Arroyo would have similar off -site
and on -site drainage acreages as in the existing condition.
Modeling was performed (Fuscoe 2010b) to determine if the Northern and Southern Arroyos are
hydrologically stable under existing conditions and to identify the effects of the proposed
Project. Under existing conditions, the Northern Arroyo is approximately six acres and contains
no engineering improvements. These modeling results indicate that the Northern Arroyo
channel is stable under existing conditions.
Table 4.4 -17 presents the modeling results for the Northern Arroyo in the proposed Project
condition. Most of the flows have a high water surface and slow velocity condition, which
indicates that flows would not cause significant channel erosion under post- Project conditions.
Even the extreme 100 -year condition does not exceed a conservative channel erosion threshold
of 6 feet per second (fps). The Northern Arroyo is highly vegetated and, under post- Project
conditions, would remain relatively stable with respect to channel erosion.
R:Trojeats\Newpart \J01&1Cmft EIRWA Hydm- 090211.doa 4.4 -53 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -17
NORTHERN ARROYO MODELING RESULTS FOR CHANNEL STABILITY:
PROPOSED PROJECT CONDITIONS
The Southern Arroyo begins at an existing 48 -inch storm drain pipe discharge point and runs in
an east -west direction for approximately 2,340 feet through the Project site. The Southern
Arroyo is surrounded by approximately 30 acres of heavily vegetated open space under existing
conditions. During large storm events under existing conditions, sediment from the surrounding
arroyo walls and tributary drainages enters the Southern Arroyo and is conveyed downstream to
the Semeniuk Slough. Field observations confirm continuing erosion and sloughing of sediment
into the Southern Arroyo from the on -site tributary drainages. Evidence of undercutting and
erosion of the side tributaries of the Southern Arroyo exist on site; these areas would be
stabilized under post- Project conditions. These measures include use of improved grading, soil
compaction, drainage improvements to reduce sheet flow runoff, as well as increased
vegetation to further stabilize slopes.
As summarized in Table 4.4 -18, the modeling of the Southern Arroyo indicates that the channel
is expected to remain stable with the Project. In general, the majority of flows in the arroyo
channel remain below erosive velocities in the post- Project condition, and the channel is
expected to remain in a stable condition after Project completion. Measures would be taken to
stabilize the eroding tributaries that enter the Southern Arroyo (including the use of improved
grading, soil compaction, and drainage improvements), thereby reducing the amount of
sediment available for transport to the Semeniuk Slough. This would result in an improvement
(or beneficial impact) over the existing condition with respect to sediment deposition in the
Semeniuk Slough. The diffuser basin at the lower end of the Southern Arroyo would also
provide increased sediment - control capabilities for channel flows and a reduction in
sedimentation within the downstream Lowland area.
The proposed Project is not expected to create or exacerbate erosion or sedimentation along
the existing coastal bluffs surrounding the proposed development area. Please refer to Section
4.3, Geology and Soils, for additional discussion and analysis of Project effects on the on -site
bluff areas.
R:Trojects\Newpan \J01&1Dmft EIRWA Hydm- 090211.doa 4.4 -54 Newport Banning Ranch
Draft Environmental Impact Report
Water Depth (ft)
Velocity (ftls)
Froude No.
Station No.
2 -Year
100 -Year
2 -Year
100 -Year
2 -Year
100 -Year
8 +55
2.0
3.3
1.8
2.7
0.28
0.34
6 +95
0.9
1.9
5.2
5.6
1.02
1.01
5 +00
1.1
2.9
4.8
3.4
1.01
0.45
4 +00
2.4
4.8
1.1
1.5
0.15
0.14
1 +00
0.9
1.5
1.8
3.0
0.44
0.55
0 +00
0.2
0.5
2.4
3.6
0.33
0.44
ft: feet; ft/s: feet per second.
Source. Fuscoe 2010b.
The Southern Arroyo begins at an existing 48 -inch storm drain pipe discharge point and runs in
an east -west direction for approximately 2,340 feet through the Project site. The Southern
Arroyo is surrounded by approximately 30 acres of heavily vegetated open space under existing
conditions. During large storm events under existing conditions, sediment from the surrounding
arroyo walls and tributary drainages enters the Southern Arroyo and is conveyed downstream to
the Semeniuk Slough. Field observations confirm continuing erosion and sloughing of sediment
into the Southern Arroyo from the on -site tributary drainages. Evidence of undercutting and
erosion of the side tributaries of the Southern Arroyo exist on site; these areas would be
stabilized under post- Project conditions. These measures include use of improved grading, soil
compaction, drainage improvements to reduce sheet flow runoff, as well as increased
vegetation to further stabilize slopes.
As summarized in Table 4.4 -18, the modeling of the Southern Arroyo indicates that the channel
is expected to remain stable with the Project. In general, the majority of flows in the arroyo
channel remain below erosive velocities in the post- Project condition, and the channel is
expected to remain in a stable condition after Project completion. Measures would be taken to
stabilize the eroding tributaries that enter the Southern Arroyo (including the use of improved
grading, soil compaction, and drainage improvements), thereby reducing the amount of
sediment available for transport to the Semeniuk Slough. This would result in an improvement
(or beneficial impact) over the existing condition with respect to sediment deposition in the
Semeniuk Slough. The diffuser basin at the lower end of the Southern Arroyo would also
provide increased sediment - control capabilities for channel flows and a reduction in
sedimentation within the downstream Lowland area.
The proposed Project is not expected to create or exacerbate erosion or sedimentation along
the existing coastal bluffs surrounding the proposed development area. Please refer to Section
4.3, Geology and Soils, for additional discussion and analysis of Project effects on the on -site
bluff areas.
R:Trojects\Newpan \J01&1Dmft EIRWA Hydm- 090211.doa 4.4 -54 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -18
SOUTHERN ARROYO MODELING RESULTS FOR CHANNEL STABILITY:
PROPOSED PROJECV
Therefore, the Project would not result in adverse erosion or sedimentation impacts on the
Project site, in arroyo drainage channels, or to downstream receiving waters. The incorporation
of PDFs 4.4 -1, 4.4 -2, and 4.4 -5 as well as SCs 4.4 -3, 4.4 -4, and 4.4 -5 would also ensure that
Project construction and operation would maintain flow velocities below erosion thresholds and
reduce overall sediment delivery to downstream systems. PDF 4.4 -1 requires water quality
basins on the Project site to treat urban runoff originating from off -site properties. PDF 4.4 -2
identifies that a portion of the Lowland would provide for water quality treatment and storm
water detention. PDF 4.4 -5 requires the Project's drainage plan to stabilize runoff to West Coast
Highway and the Semeniuk Slough. SC 4.4 -3 requires a SWPPP in compliance with the
General Permit for Construction Activities and SC 4.4-4 requires a WQMP including required
BMPs. Post - construction operations must include "good housekeeping" as required in the
WQMP (SC 4.4 -5).
Impact Summary. Less than Significant. Hydrologic modeling of the Northern and
Southern Arroyos confirms that both channels would remain stable under
proposed Project conditions. The incorporation of PDFs 4.4 -1, 4.4 -2, and
4.4 -5 as well as SCs 4.4 -3, 4.4 -4, and 4.4 -5 would provide additional
measures to ensure that Project construction and operation would not
result in adverse erosion or sedimentation effects. Project impacts are
therefore less than significant.
Threshold 4.4 -4 Would the project substantially alter the existing drainage pattern of
the site or area, including through the alteration of the course of a
stream or river, or substantially increase the rate or amount of
surface runoff in a manner in which would result in flooding on- or
off -site?
Threshold 4.4 -14 Would the project create the potential for significant changes in the
flow velocity or volume of storm water runoff to cause
environmental harm?
R:�ProjectswewponUO15 \!Draft E!R�4.4 nydm- 090211.doo 4.4 -55 Newport Banning Ranch
Draft Environmental Impact Report
Water Depth (ft)
Velocity (ftls)
Froude No.
Station No.
Existing
Proposed
Existing
Proposed
Existing
Proposed
20 +62
0.8
0.9
3.6
3.6
0.84
0.84
19 +02
0.7
0.7
1.7
1.8
0.39
0.39
16 +57
0.5
0.5
3.7
3.8
1.01
1.01
14 +63
1.5
1.6
1.3
1.3
020
0.20
12 +92
0.3
0.4
3.2
3.2
1.00
1.00
11 +12
1.0
1.0
1.2
1.1
0.24
0.23
8 +96
0.4
0.4
3.2
3.0
1.01
1.00
6 +56
0.6
0.6
1.3
1.2
0.30
0.30
4 +81
0.8
0.6
1.2
1.1
0.30
0.31
3 +31
1.4
1.2
2.3
2.0
0.45
0.42
1 +25
0.3
0.3
3.0
2.6
1.00
1.00
ft: feet; We: feet per second.
HEC -RAS 2 -Year Summary
Source: Fuscoe 2010b.
Therefore, the Project would not result in adverse erosion or sedimentation impacts on the
Project site, in arroyo drainage channels, or to downstream receiving waters. The incorporation
of PDFs 4.4 -1, 4.4 -2, and 4.4 -5 as well as SCs 4.4 -3, 4.4 -4, and 4.4 -5 would also ensure that
Project construction and operation would maintain flow velocities below erosion thresholds and
reduce overall sediment delivery to downstream systems. PDF 4.4 -1 requires water quality
basins on the Project site to treat urban runoff originating from off -site properties. PDF 4.4 -2
identifies that a portion of the Lowland would provide for water quality treatment and storm
water detention. PDF 4.4 -5 requires the Project's drainage plan to stabilize runoff to West Coast
Highway and the Semeniuk Slough. SC 4.4 -3 requires a SWPPP in compliance with the
General Permit for Construction Activities and SC 4.4-4 requires a WQMP including required
BMPs. Post - construction operations must include "good housekeeping" as required in the
WQMP (SC 4.4 -5).
Impact Summary. Less than Significant. Hydrologic modeling of the Northern and
Southern Arroyos confirms that both channels would remain stable under
proposed Project conditions. The incorporation of PDFs 4.4 -1, 4.4 -2, and
4.4 -5 as well as SCs 4.4 -3, 4.4 -4, and 4.4 -5 would provide additional
measures to ensure that Project construction and operation would not
result in adverse erosion or sedimentation effects. Project impacts are
therefore less than significant.
Threshold 4.4 -4 Would the project substantially alter the existing drainage pattern of
the site or area, including through the alteration of the course of a
stream or river, or substantially increase the rate or amount of
surface runoff in a manner in which would result in flooding on- or
off -site?
Threshold 4.4 -14 Would the project create the potential for significant changes in the
flow velocity or volume of storm water runoff to cause
environmental harm?
R:�ProjectswewponUO15 \!Draft E!R�4.4 nydm- 090211.doo 4.4 -55 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Construction
Application of the BMPs, as discussed above in the impact analysis regarding erosion and
sedimentation, would control flows on site and would ensure that impacts associated with
construction would be properly managed. PDFs 4.4 -1, 4.4 -2, 4.4 -3 and SCs 4.4 -2, 4.4 -3, 4.4 -4,
and 4.4 -5 incorporate measures to protect water quality and beneficial uses of receiving waters
at the Project site from both construction and operational impacts. These LID and BMP features
would ensure that runoff from the Project site complies with NPDES site discharge requirements
for the protection of receiving water quality and beneficial uses. Water quality entering the
Lowland area and Semeniuk Slough would not be adversely impacted once these controls are
in place. Construction BMPs also contain measures to be implemented to control construction
site runoff and storm water.
Project Operation
Semeniuk Slough
Storm flows within the Semeniuk Slough are generally stored in the southerly portion of the
USACE- restored salt marsh basin. The Semeniuk Slough's drainage area is composed of
primarily Subwatershed A, which encompasses about 350 acres, and the Newport Shores
residential neighborhood along the Semeniuk Slough represented by Subwatersheds F through
K, which encompass an additional 33 acres in total. The elevation of the channel bank on the
southern side of the Slough channel (near the residences) is approximately five feet above msl.
When the tidal gate in the Santa Ana River levee is completely closed (at 3.5 feet above msl),
there is approximately 1.5 feet of remaining runoff storage capacity within the Semeniuk Slough
and the USACE- restored salt marsh basin. Several habitat islands constructed within the
USACE- restored salt marsh basin reduce this storage capacity to approximately 28 acre -feet,
which is approximately equal to the 2 -year rainfall event delivered to the Semeniuk Slough
under existing conditions.
Recognizing the existing constraints posed by this storage deficit, the Project drainage plan was
developed with the objective of avoiding any increase in storm water runoff conveyed to the
Semeniuk Slough while preserving its 2 -year storage capacity limit. Consequently, a portion of
Subwatershed A has been diverted away from the Semeniuk Slough under the proposed
Project's drainage plan and would be discharged instead to the Lowland via proposed storm
drain systems.
Tables 4.4 -19 and 4.4 -20 summarize the modeling results for the existing and proposed
conditions under the 2 -year and 100 -year storm EV events. As the Semeniuk Slough functions
both as a flood- conveyance and storage facility, both the runoff volumes and the peak flow rates
are summarized in the following tables. The time of concentration (Tc) value has also been
provided for the 2 -year evaluation per the requirements of Section XII.D of the MS4 Permit.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4 -56 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -19
SEMENIUK SLOUGH EXISTING CONDITION
EXPECTED VALUE (EV) RUNOFF VOLUME
Subwatershed
Drainage Area (acres)
2 -Year Volume (af)
100 -Year Volume (af)
A
349.6
17.3
85.2
F
5.8
0.5
1.6
G
1.8
0.2
0.5
H
7.0
0.6
1.9
1
1.1
0.1
0.3
1
11.0
0.9
3.0
K
6.3
0.5
1.7
USACE- restored Salt
Marsh Basine
54.0
6.5
20.2
Total
436.6
26.6
114.4
Total n
Existing Condition Peak
Flow Rate (EV Events)
Location
Drainage Area (acres)
2 -Year Peak Flow (cfs)/Tc'
100 -Year Peak Flow (cfs)
Node 19 (upstream)
155.1
80.8/19.24
323.4
Node 23 (downstream)
349.6
121.3137.4
501.2
af: acre -feet; cis cubic feet per second
For the USACE- restored salt marsh basin, the runoff volume is estimated by the following: Precipitation (in) x Area (ac) + 12
cis
Tc + Time of Concentration in minutes noted for the 2 -year event per Section XII.D of fourth term MS4 Storm Water Permit
Source: Fuscoe 20101b.
TABLE 4.4 -20
SEMENIUK SLOUGH PROPOSED CONDITION
EXPECTED VALUE (EV) RUNOFF VOLUME
Subwatershed
Drainage Area (acres)
2 -Year Volume (af)
25 -Year Volume (af)
A
322.0
18.3
81.2
F
5.8
0.5
1.6
G
1.8
0.2
0.5
H
7.0
0.6
1.9
1
1.1
0.1
0.3
1
11.0
0.9
3.0
K
6.3
.5
1.7
USACE- restored Salt
54.0
6.5
20.2
Marsh Basin
Total n
409.0
27.6
110.4
( -27.6)
( +1.0)
( -4.0)
Proposed Condition Peak Flow Rate (EV Events)
Location
Drainage Area (acres)
2 -Year Peak Flow (cfs)/Tea
100 -Year Peak Flow (cfs)
Node 19 (upstream)'
145.8
72.7/54
302.2
( -9.3)
( -8.1) / ( +34)
( -21.2)
Node 23
322.0
128.1/37.51
513.9
(downstream)'
( -27.6)
(-6.8)1(+.11)
( +12.7)
af: acre -feet; cfs cubic feet per second
For the USACE- restored salt marsh basin, the runoff volume is estimated by the following: Precipitation (in) x Area (ac) +
12.
Numbers in parentheses represent change as compared to existing condition (as shown in Table 4.4 -19)
` Tc + Time of Concentration in minutes noted for the 2 -year event per Section XII.D of fourth term MS4 Storm Water Permit
d See Watershed Assessment Report for additional details on factors influencing runoff volumes for small and large storm
events (Appendix C).
Source: Fuscoe 20106.
R: \Projects \Newpart \J015RDmft EIR\4.4 Hydm- 090211.dm 4.4 -57 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
The Fourth Term MS4 Permit requires that the 2 -year storm event be analyzed both with and
without a project to determine the "hydrologic conditions of concern" (Order R8- 2009 - 0030).
Hydrologic conditions of concern occur when the volume and the time of concentration of storm
water runoff for the post - development condition significantly exceeds those of the existing
condition for a 2 -year frequency storm event (a difference of 5 percent or less is considered less
than significant). Results of the analysis indicate that, in compliance with permit requirements,
the peak flow and time of concentration of storm water runoff for the post- Project 2 -year storm
would not exceed the existing condition and the 2 -year volume increase is less than 5 percent,
resulting in a less than significant impact. Therefore, the implementation of the Project does not
pose hydrologic conditions of concern (HCOCs) (Fuscoe 2010b) and additional
hydromodification controls for discharges into the Southern Arroyo and Semeniuk Slough are
not required.
Lowland Area
As previously discussed, the proposed Project drainage area for Subwatershed A would be
reduced by approximately 27 acres ( -7.8 percent) from the existing condition. While the
proposed Project runoff potential is anticipated to be slightly higher in the Project watershed, the
overall results show that this reduction in drainage area maintains flow volumes similar to the
existing condition. This is achieved largely through the preservation of open space on the
Project site.
Modeling results of existing and proposed runoff volumes into the Lowland and USACE- restored
salt marsh basin are presented in Tables 4.4 -21 and 4.4 -22, respectively. These modeling
results indicate that the combined basin capacity (Lowland and USACE- restored salt marsh
basin) can store existing flood volumes up to the 25 -year frequency in its current capacity. As
shown in Table 4.4 -21, the existing condition 25 -year runoff volume is 261.5 acre feet. Because
this value is less than the combined flood storage capacity of the USACE— restored salt marsh
basin and Lowland area (345 acre - feet), a 25 -year level of protection is provided in the existing
condition. The proposed condition 25 -year runoff volume increases slightly to 264.9 acre -feet
(Table 4.4 -22). However, the proposed condition 25 -year runoff volume would be less than the
345 acre -feet storage capacity of the combined USACE- restored salt marsh basin and Lowland
area. This comparison demonstrates that a 25 -year level of protection is provided after
development in the proposed condition, and that mitigation is not needed to maintain the
predevelopment level of protection.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4 -58 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -21
LOWLAND AND USACE- RESTORED SALT MARSH AREAS
EXISTING CONDITION RUNOFF VOLUME SUMMARY (HC EVENTS)
Subwatershed
Drainage Area (ac)
10- Year(af)
25 -Year (af)
100 -Year (af)
A
349.6
67.3
86.1
131.7
B
135.1
30.9
38.9
54.0
C
63.6
11.5
15.0
24.0
D
14.3
2.8
3.6
5.6
E
97.2
22.4
28.1
39.4
F
5.8
1.3
1.6
2.1
G
1.8
0.4
0.5
0.7
H
7.0
1.5
1.9
2.6
1
1.1
0.2
0.3
0.4
J
11.0
2.4
3.0
4.0
K
6.3
1.4
1.7
2.3
Lowland'
126.0
38.6
47.1
59.1
USACE- restored
Salt Marsh Basina
90.0
27.6
33.7
42.2
Total
908.8
208.6
261.5
368.1
at acre -feet
For the Lowland and USACE- restored salt marsh basin, the runoff volume is estimated by the following: Precipitation
(in) x Area (ac) + 12.
Source: Fuscoe 20010.
TABLE 4.4 -22
LOWLAND AND USACE- RESTORED SALT MARSH AREAS
PROPOSED CONDITION RUNOFF VOLUME SUMMARY (HC EVENTS)
Subwatershed
Drainage Area (ac)
10- year(af)
25- Year(af)
100- Year(at)
A
322.0
64.2
81.2
118.3
B
120.6
27.5
34.7
48.7
C
97.6
19.9
25.5
38.6
D
22.4
4.4
5.6
8.8
E
97.2
22.4
28.1
39.4
F
5.8
1.3
1.6
2.1
G
1.8
0.4
0.5
0.7
H
7.0
1.5
1.9
2.6
1
1.1
0.2
0.3
0.4
1
11.0
2.4
3.0
4.0
K
6.3
1.4
1.7
2.3
Lowland'
126.0
38.6
47.1
59.1
USACE- restored
Salt Marsh Basin'
90.0
27.6
33.7
42.2
Total'
908.8
( +0.0)
211.8
( +3.2)
264.9( +3.4)
367.2
( -0.9)
For the Lowland and USACE- restored salt marsh basin, the runoff volume is estimated by the following: Precipitation
(in) x Area (ac) + 12
Numbers in parentheses represent change as compared to existing condition (shown in Table 4.4 -21).
Source: Fuscoe 2010'.
R:Troje ts\Newpan \J01&1Dmft EIRWA Hydm- 090211.dm 4.4 -59 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Upland Area
All on -site curbs, gutters, and storm drains would be designed in accordance with City
standards, thereby minimizing potential impacts of on -site development area flooding.
Therefore, the proposed Project would slightly alter the existing drainage patterns from the
requirement to reduce existing flow volumes into the Semeniuk Slough through minor
modification in on -site subwatersheds as described above. These minor alterations are
consistent with an overall Project storm water management strategy that directs flows to areas
that have additional capacity (the Lowland) and decreases flows to areas with minimal or
constrained capacity (Semeniuk Slough). Increase in storm water runoff volume delivered to the
Lowland area would be accommodated by the storage capacity of the existing Lowland and
USACE- restored salt marsh basin. Sheet flow runoff under the existing condition on the Project
site would be replaced with storm drain systems to convey flows to the Lowland area, Semeniuk
Slough, and the Caltrans storm drain. The incorporation of PDFS 4.4 -1, 4.4 -2, 4.4 -4, 4.4 -5, and
4.4 -6 as well as SC 4.4 -4 would provide additional measures to ensure that Project construction
and operation would not result in adverse flooding as compared to existing conditions.
PDF 4.4 -1 requires water quality basins on the Project site to treat urban runoff originating from
off -site properties. PDF 4.4 -2 identifies that a portion of the Lowland would provide for water
quality treatment and storm water detention. PDF 4.4 -4 requires that arroyos be planted with
native riparian vegetation to limit potential erosion and to enhance the water cleansing function.
PDF 4.4 -5 requires the Project's drainage plan to stabilize runoff to West Coast Highway and
the Semeniuk Slough. PDF 4.4 -6 requires the Project to incorporate BMPs for erosion control,
sediment control, wind erosion control, storm water and non -storm water management, and
waste management/pollution control. SC 4.4-4 requires a WQMP including required BMPs.
Therefore, impacts relating to on -site or downstream flooding would be considered less than
significant.
Global climate change and sea level rise was considered in Project design and impact analyses.
It was determined that sea level rise would not negatively impact the Project's ability to drain
into the Lowland or the Semeniuk Slough based on the hydraulic grade lines of the proposed
storm drain system. In severe instances, flood flows could back up further into the Lowland or in
the Southern and Northern Arroyos, resulting in some limited localized impact to the
performance of low -lying storm drain outlets should they become temporarily submerged. If this
does occur, it would not impact the Project during this temporary condition.
Impact Summary: Less Than Significant. The Project- induced increase in impervious
surfaces would result in an increase in peak flow runoff and runoff
volumes from the site. Project drainage area modifications would be
incorporated into a Runoff Management Plan to ensure that peak flow
rates and volumes would not result in adverse flooding impacts to
downstream systems. The incorporation of PDFs 4.4 -1, 4.4 -2, 4.4-4,
4.4 -5, and 4.4 -6 as well as SC 4.4 -4 would provide additional measures
to ensure that Project construction and operation would not result in
adverse flooding as compared to existing conditions. Therefore, impacts
relating to on -site or downstream flooding would be considered less than
significant.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4 -60 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Threshold 4.4 -5 Would the project create or contribute runoff water which would
exceed the capacity of existing or planned storm water drainage
systems or provide substantial additional sources of polluted
runoff?
Project site drainage from Subwatershed A would discharge into the existing Caltrans' RCB
storm drain in West Coast Highway. As previously identified, the existing storm drain varies in
size, from 8 feet in width by 5 feet in height at the upstream end and increases to 14 feet in
width by 5 feet in height at the downstream portion, where it outlets to a trapezoidal channel
upstream of the Semeniuk Slough. This Caltrans storm drain receives (1) street flow on West
Coast Highway; (2) flows from areas north and south of West Coast Highway; and (3) flows
from areas as far as north as 15th Street (Fuscoe 2010b).
The Project's proposed drainage plan would modify Caltrans' existing storm drain to
accommodate a new storm drain system from the Upland. Flow rates were modeled in order to
determine the Project's effect on flow rates moving through the storm drain. An increase in flow
rate could potentially result in an exceedance of storm drain capacity and subsequent flooding of
the area upstream of the storm drain, including West Coast Highway. Tables 4.4 -23 and 4.4 -24
summarize the peak flow modeling results for existing and proposed conditions, respectively.
TABLE 4.4 -23
EXISTING CONDITIONS PEAK FLOW RATES: CALTRANS STORM DRAIN
Caltrans Reinforced Concrete Box Storm Drain at West Coast Highway:
Existing Condition Peak Flow Rate (HC Events)
RCB Capacity
Drainage Area
10 -Year Peak
25 -Year Peak
100 -Year Peak
Location
(cfs)
(ac)
Flow (cfs)
Flow (cfs)
Flow (cfs)
Node 16
213
63.3
129.2
156.9
203.4
(upstream)
( +0.4)
( +0.9)
( +1.1)
( +1.5)
Node 17
327
118.6
213.3
261.6
341.5
(middle)
( -8.8)
( -14.6)
( -18.3)
( -23.5)
Node 18
447
142.7
262.4
310.3
405.5
(downstream)
( -9.3)
( -24.5)
( -18.7)
( -24.1)
RCB: reinforced concrete box; HC Event: High Confidence Event; cfs cubic feet per second.
Source: Fuscoe 2010b.
TABLE 4.4 -24
PROJECT CONDITIONS PEAK FLOW RATES: CALTRANS STORM DRAIN
Caltrans Reinforced Concrete Box Storm Drain at West Coast Highway:
Proposed Condition Peak Flow Rate (HC Events)
RCB Capacity
Drainage Area
10 -Year Peak
25 -Year Peak
100 -Year Peak
Location
(cfs)
(acres)
Flow (cfs)
Flow (cfs)
Flow (cfs)
Node 16
213
63.7
130.1
158.0
204.9
(upstream)'
( +0.4)
( +0.9)
( +1.1)
( +1.5)
Node 17
327
109.8
198.7
243.3
318.0
(middle)'
( -8.8)
( -14.6)
( -18.3)
( -23.5)
Node 18
447
133.4
237.9
291.6
381.4
(downstream)'
( -9.3)
( -24.5)
( -18.7)
( -24.1)
cfs: cubic feet per second
Numbers in parentheses represent change as compared to existing condition (as shown in Table 4.4 -23).
Source: Fuscoe 2010b.
R:TroiectslNewpartU015Nnrafi EIRWA Hydm- 090211.dm 4.4 -61 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
These modeling results indicate that, absent any changes to the storm drain, the proposed
Project's drainage plan would result in a slight increase in peak flow rates at the upstream
section of the existing RCB storm drain, caused by the addition of new manufactured slope
drainage from the Project site. However, the proposed connection of the new storm drain
system from the Project site, modifying the RCB storm drain, would be located downstream of
this existing section. This storm drain would convey flows from a smaller drainage area than
what occurs under existing conditions. Therefore, in the middle and downstream sections of the
storm drain, the Project's peak flow rates would be less than those in the existing condition.
Overall, the storm drain would experience reduced flood loading compared with the existing
condition. Therefore, impacts from the Project on the capacity of the Caltrans' RCB storm drain
are less than significant. Please refer to the above discussion for Thresholds 4.4 -1, 4.4 -6,
4.4 -11, 4.4 -12, and 4.4 -13 for the impact analysis associated with water quality and additional
pollutant sources. As discussed above, for these thresholds, PDFs 4.4 -1 through PDF 4.4 -3 and
SC 4.4 -2 through SC 4.4 -5 were identified as applicable. These same measures would be
applicable to Threshold 4.4 -5.
Impact Summary: Less Than Significant. Proposed Project modifications in Project
drainage patterns and Project drainage features would reduce flow rates
through the middle and lower sections of the Caltrans RCB from existing
conditions. These modifications (see PDFs 4.4 -1 through PDF 4.4 -3 and
SC 4.4 -2 through SC 4.4 -5) would result in Project impacts to the RCB
that are less than significant.
Threshold 4.4 -7 Would the project place housing within a 100 -year flood hazard area
as mapped on a federal Flood Hazard Boundary or Flood Insurance
Rate Map or other flood hazard delineation map?
Threshold 4.4 -8 Would the project place within a 100 -year flood hazard area
structures which would impede or redirect flood flows?
Flood- control improvements along the Santa Ana River protect adjacent areas from the
100 -year storm event. Areas proposed for housing on the Project site are included in Zone X,
which is defined as property located outside the 500 -year floodplain. The local Flood Insurance
Rate Map (FIRM) indicates that the 100 -year flood elevation is 10 feet above msl. Proposed
development is planned for the Upland (at elevations between approximately 50 feet and
105 feet above msl). There are no habitable structures that would be placed between sea level
and 10 feet above msl on the Project site.
In order to evaluate the long -term cumulative impacts of sea level rise on local area flooding on
the Project site over the next 90 years (i.e., through 2100), the proposed grading plan for the
Project was overlaid onto the worst -case sea level rise water elevation data provided by the
Pacific Institute. This sea level rise analysis indicates there would be increased potential for
flood water depths to increase near the base of the existing slopes that border the Upland
development areas in the future. However, this analysis also concludes that the Project's entire
development footprint remains outside the 100 -year floodplain after a 4.6 -foot sea level rise has
been added to existing coastal base flood elevations. Therefore, sea level rise is not anticipated
to result in an enhanced flooding risk within the development area at the Project site. Therefore,
there is no impact regarding flood hazards created by or affecting the Project.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4 -62 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Impact Summary: No Impact. Proposed Project housing would be located on the Upland at
elevations well outside the 100 -year floodplain. No structures would be
built within the Lowland between sea level and 10 feet above msl. There
would no impacts to or from the 100 -year flood zone.
Threshold 4.4 -9 Would the project expose people or structures to a significant risk
of loss, injury or death involving flooding, including flooding as a
result of the failure of a levee or dam?
Improvements to the Santa Ana River implemented over recent years by the USACE in
partnership with the Counties of Orange, Riverside, and San Bernardino include levee
upgrades, improvements to Prado Dam, and construction of Seven Oaks Dam. These
improvements protect surrounding residences and communities from the 100 -year flood event.
Because of its location at the lower end of the watershed, the Project site is not located within
any dam inundation areas. Project development is proposed for the Upland area, which is
located above the Santa Ana River's 100 -year floodplain. In the unlikely event that the Seven
Oaks Dam in San Bernardino County or Prado Dam in Riverside County failed, the Project site
would remain protected due to distance from the dams and elevation of the Upland. While
flooding could affect the Lowland, no habitable structures are proposed in this area as a part of
the Project. In addition, the City has an Emergency Management Plan, which includes
procedures and evacuation plans to be implemented in the unlikely event of dam or levee
failures. Therefore, impacts at the Project site due to flooding associated with failure of a dam or
levee on the Santa Ana River are considered less than significant.
Impact Summary: Less than Significant. The Project is not located in a dam inundation
area. The proposed development would be located on the Upland above
the 100 -year flood elevation. Project impacts would, therefore, be less
than significant.
Threshold 4.4 -10 Would the project be subject to inundation by seiche, tsunami, or
mudflow?
There are no permanent standing water bodies in the Upland area and inundation by seiche or
mudflow is not anticipated in the Upland area. Due to the Project's proximity to the coast,
inundation by tsunami is possible, and the Lowland is located within the tsunami warning area
designated in the City's General Plan. West Coast Highway and existing development lie
between the Project site and the Pacific Ocean and. The proposed Project was also evaluated
against a tsunami inundation map used for emergency preparedness (Newport Beach
Quadrangle, CA Department of Conservation; March 15, 2009). The proposed development
footprint remains out of the tsunami inundation area and the impacts from potential tsunami
effects under a condition of future sea level rise are considered less than significant. It is also
noted that the City has an Emergency Management Plan, which includes procedures and
evacuation plans in the event of tsunamis. Therefore, risks to development areas on the Project
site are considered less than significant.
Impact Summary: Less than Significant Impact. Inundation of the Project site by seiche or
mudflow is not anticipated as there are no standing water bodies or high
slopes in the Upland. Inundation by tsunami is not likely because Project
development is not proposed in the Lowland. Therefore, impacts are less
than significant.
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.dm 4.4 -63 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
Threshold 4.4 -16 Would the project conflict with any applicable plan, policy, or
regulation of an agency with jurisdiction over the project (including,
but not limited to the general plan, specific plan, local coastal
program, or zoning ordinance) adopted for the purpose of avoiding
or mitigating an environmental effect?
Tables 4.4 -25 and 4.4 -2611 evaluate the Project's consistency with the applicable goals and
policies of the City's General Plan and the Coastal Act, respectively.
Impact Summary: No Impact. As identified in Tables 4.4 -25 and 4.4 -26, the proposed
Project would be consistent with the intent of the hydrology- and water
quality - related goals and policies of the City of Newport Beach General
Plan.
4.4.8 MITIGATION PROGRAM
Project Design Features
The Project would be required to implement PDFs 4.4 -1 through 4.4 -6 with respect to hydrology
and water quality.
Standard Conditions and Requirements
The following standard conditions are applicable to the Project with respect to hydrology and
water quality: SC 4.4 -1 through 4.4 -5.
Mitigation Measures
No mitigation is required.
4.4.9 LEVEL OF SIGNIFICANCE AFTER MITIGATION
With the incorporation of the Project Design Features and Standard Conditions discussed
above, Project impacts related to surface water runoff and water quality would be less than
significant.
11 For ease of reading, the policy tables are located at the end of this section.
R: �Rrojects\Newport\d015\loren EIR\4A Hydro- 09021 1.doc 4.4 -64 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -25
CITY OF NEWPORT BEACH GENERAL PLAN CONSISTENCY ANALYSIS
City of Newport Beach General Plan
Relevant Goals, Policies, and Programs
Consistency Analysis
Harbor and Bay Element
Harbor and Bay Element Plan Goal HB 8
Enhancement and protection of water quality of all
The Project is consistent with this goal. The Project would
natural water bodies, including coastal waters, creeks,
comply with all water quality objectives set by the
bays, harbors, and wetlands. (Goal NR3)
Regional Water Quality Control Board (RWQCB) in the
Basin Plan and the City Council policies through the use
of appropriate best management practices (BMPs) for
Project construction and long -term operation. These
BMPs would ensure compliance with the current National
Pollutant Discharge Elimination System ( NPDES)
General Construction Permit; the County of Orange
NPDES MS4 Permit; and the County of Orange Drainage
Area Management Plan (DAMP). A Water Quality
Management Plan (WQMP), which provides additional
detail on water quality management features, shall be
prepared as final design proceeds. Project storm drain
features ensure that flows are treated by on -site biocells
and treatment basins, such that flows entering Semeniuk
Slough and the Lowland area maintain and /or enhance
existing beneficial uses. Project Design Features (PDFs)
4.4 -1, 4.4 -2, 4.4 -3 and SCs 4.4 -3 and 4.4 -4 provide for
BMPs protecting water quality of receiving waters in the
Lowland and Santa Ana River.
Policies
HB Policy 8.1: Chemical Uses Impacting Water
The Project is consistent with this policy. PDF 4.4 -8 and
Quality
SCs 4.4 -4 and 4.4 -5 provide for development of a Water
Support regulations limiting or banning the use of
Quality Management Plan and Good Housekeeping
insecticides, fertilizers, and other chemicals which are
BMPs limiting the use of insecticides and fertilizers on the
shown to be detrimental to water quality.
Project site, have been incorporated into the Project. In
addition, specific restrictions are included when applying
these chemicals regarding the occurrence of rainfall
events, application techniques, and qualifications of the
individual performing the application. A Pesticide and
Fertilizer Management Plan would be prepared to further
document the appropriate applications and uses of
fertilizers and pesticides to protect existing water quality
for Project receiving waters.
HB Policy 8.2: Water Pollution Prevention
The Project is consistent with this policy. Construction
Promote pollution prevention and elimination methods
management BMPs would be developed that ensure the
that minimize the introduction of pollutants into natural
risks from discharge and transport of pollutants from the
water bodies. (Policy NR 3.2)
construction site are minimized. Post - construction BMPs
include source controls and a well- designed water quality
program that reduce the likelihood of initial pollutant
discharge and treats all runoff from the Project site prior
to discharge into the Semeniuk Slough and /or the
Lowland. Site design and LID BMPs further address
storm water pollution prevention through site planning
features and landscaping elements.
The Project's Green Building Program encourages use of
natural treatment, bioswales, and arroyos for water
quality treatment to improve water quality discharged into
natural water bodies.
The Project would provide wetlands restoration, creation,
and enhancement. Please refer to Section 3.0, Project
R:Trojeats\Newpan \J015NDmft EIRWA Hydm- 090211.doa 4.4 -65 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -25 (Continued)
CITY OF NEWPORT BEACH GENERAL PLAN CONSISTENCY ANALYSIS
City of Newport Beach General Plan
Relevant Goals, Policies, and Programs
Consistency Analysis
Description, and Section 4.6, Biological Resources.
The Project would comply with all requirements set forth
in the current NPDES General Construction Permit and
the MS4 Permit, which includes preparation of a Storm
Water Pollution Prevention Plan (SWPPP). The Project
would also comply with the updated General Construction
Permit and revised Water Quality Management Plan
guidelines. PDFs have been incorporated into the Project
design including Site Design and LID features and good
housekeeping procedures consistent with the overall goal
of preventing pollution occurrences and /or pollutant
transport off the Project site.
HB Policy 8.3: Ground Water Contamination
The Project is consistent with this policy. Groundwater
Suspend activities and implement appropriate health
levels beneath the Project site are at approximately mean
and safety procedures in the event that previously
sea level, close to ground surface elevation within the
unknown groundwater contamination is encountered
Lowland. Project construction is not anticipated to
during construction. Where site contamination is
encounter or impact groundwater levels, supply, or quality
identified, implement an appropriate remediation
in the Upland. Removal of oil facilities within the Lowland
strategy that is approved by the City and state agency
would incorporate specific BMPs that would ensure the
with appropriate jurisdictions. (Policy NR 3.3)
risk of groundwater contamination during these
construction activities is minimized. In addition,
construction BMPs have been incorporated into the
Project including waste management and materials
pollution control BMPs. Implementation of these
measures would further reduce any risk of encountering
or negatively impacting groundwater levels or quality.
HB Policy 8.4: Storm Drain Sewer System Permit
The Project is consistent with this policy. As addressed in
Require all development to comply with the regulations
Section 4.3, Geology and Soils, and this section of the
under the City's municipal separate storm sewer
EIR, the Project requires an NPDES permit. All
system permit under the National Pollutant Discharge
requirements of the Orange County Drainage Area
Elimination System. (Policy NR 3.4)
Management Plan shall be complied with through the
development of a Project Water Quality Management
Plan. Please also refer to Section 4.3, Geology and Soils.
HB Policy 8.5: Natural Water Bodies
The Project is consistent with this policy. The Project
Require that development not result in the degradation
would comply with all water quality objectives set by the
of natural water bodies. (Policy NR 3.5)
RWQCB in the Basin Plan and the City Council policies
through the use of appropriate BMPs for Project
construction and long -term operation. These BMPs would
ensure compliance with the current NPDES General
Construction Permit; the MS4 Permit; and the County of
Orange DAMP. A WQMP, which provides additional detail
on water quality management features, shall be prepared
as final design proceeds. Project storm drain features
ensure that flows are treated by on -site biocells and
treatment basins, such that flows entering Semeniuk
Slough and the Lowland maintain and /or enhance
existing beneficial uses. PDFs 4.4 -1, 4.4 -2, 4.4 -3 and
SCs 4.4 -3 and 4.4-4 provide for BMPs protecting water
quality of receiving waters in the Lowland and Santa Ana
River.
HB Policy 8.9: Water Quality Management Plan
The Project is consistent with this policy. A WQMP shall
Require new development applications to include a
be prepared during final design consistent with revised
Water Quality Management Plan (WQMP) to minimize
guidelines contained in the Orange County DAMP. The
runoff from rainfall events during construction and post-
Project proposes to ensure all site runoff is treated to a
construction. (Policy NR 3.9)
level protecting existing beneficial uses of downstream
receiving waters of the Semeniuk Slough and Lowland.
R:\Projeats\Newpan \J015NDmft EIRWA Hydm- 090211.dm 4.4 -66 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -25 (Continued)
CITY OF NEWPORT BEACH GENERAL PLAN CONSISTENCY ANALYSIS
City of Newport Beach General Plan
Relevant Goals, Policies, and Programs
Consistency Analysis
Implementation Program 7.1 is not applicable to the
The Project's green building program encourages use of
Project which requires the City to review building and
natural treatment techniques, LID features, Site Design
construction codes for consistency with the General
BMPs and Source Control BMPs, to improve water quality
Plan.
discharged into natural water bodies. Please refer to
Section 3.0, Project Description, and Section 4.6,
Biological Resources.
The Applicant would be responsible for ensuring that the
Project is designed and constructed in accordance with
all applicable codes. The application of appropriate BMPs
for Project construction and long -term operation would
ensure compliance.
HB Policy 8.10: Best Management Practices
The Project is consistent with this policy. The Project
Implement and improve upon Best Management
proposes to implement a water quality program to protect
Practices (BMPs) for residences, businesses,
existing water quality and beneficial uses of receiving
development projects, and City operations.
waters by treating site runoff and incorporating LID
features into Project design.
The Project's green building program encourages use of
natural treatment, bioswales, and arroyos for water
quality treatment to improve water quality discharged into
natural water bodies. The Project would provide wetlands
restoration, creation, and enhancement. This EIR
identifies the proposed BMPs that would be implemented
as a part of the Project.
HB Policy 8.11: Site Design and Source Control
The Project is consistent with this policy. Site Design and
Include site design and source control BMPs in all
Source Control BMPs have been incorporated into
developments. When the combination of site design
Project conceptual development and site design. This EIR
and source control BMPs are not sufficient to protect
identifies the proposed BMPs, including structural and
water quality as required by the National Pollutant
non - structural BMPs, which would be implemented as a
Elimination System, structural treatment BMPs will be
part of the Project.
implemented along with site design and source control
measures. (NR 3.11)
HB Policy 8.13: Natural Wetlands
The Project is consistent with this Policy. The water
Promote the use of natural wetlands to improve water
quality treatment basins would use native wetland habitat
quality. (Policy NR 3.13)
for treatment function within the basin limits. This basin
would also require long -term Safe Harbor maintenance
agreements with the Resource Agencies within the
physical limits of the basin to ensure maintenance
activities are performed on a routine basis to maximize
water quality treatment and energy dissipation functions..
Landscaping biocells through the Project site would also
be used to improve water quality prior to discharge from
the site into the Project storm drain system.
HB Policy 8.14: Runoff Reduction on Private
The Project is consistent with this policy. The Project
Property
incorporates structural and non - structural BMPs to reduce
Retain runoff on private property to prevent the
or and treat runoff from the Project site. Downstream
transport of pollutants into recreational waters, to the
biological systems and arroyo vegetation would be
maximum extent practicable. (Policy NR 3.14)
maintained by the Project through ensuring the provision
of continued adequate runoff discharge volumes. Where
feasible, infiltration on the Project site would be
accomplished through LID and Site Design features.
R:Troieats\Newpan \J015NDmft EIRWA Hydm- 090211.doa 4.4 -67 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -25 (Continued)
CITY OF NEWPORT BEACH GENERAL PLAN CONSISTENCY ANALYSIS
City of Newport Beach General Plan
Relevant Goals, Policies, and Programs
HB Policy 8.15: Street Drainage Systems
Require all street drainage systems and other physical
improvements created by the City, or developers of
new subdivisions, to be designed, constructed, and
maintained to minimize adverse impacts on water
quality. Investigate the possibility of treating or diverting
street drainage to minimize impacts to water bodies.
(NR 3.15)
HB Policy 8.16: Siting of New Development
Require that development be located on the most
suitable portion of the site and designed to ensure the
protection and preservation of natural and sensitive site
resources that provide important water quality benefits.
(Policy NR 3.16)
HB Policy 8.17: Parking Lots and Rights -of -Ways
Require that packing lots and public and private rights -
of -way be maintained and cleaned frequently to remove
debris and contaminated residue, (Policy NR 3.17)
HB Policy 8.19: Natural Drainage Systems
Require incorporation of natural drainage systems and
stormwater detention facilities into new developments,
where appropriate and feasible, to retain stormwater in
order to increase groundwater recharge. (Policy NR
3.19)
HB Policy 8.20: Impervious Surfaces
Require new development and public improvements to
minimize the creation of and increases in impervious
surfaces, especially directly connected impervious
areas, to the maximum extent practicable. Require
redevelopment to increase area of pervious surfaces,
where feasible. (Policy NR 3.20)
Consistency Analysis
The Project is consistent with this policy. The Project
provides for the incorporation of Site Design and LID
features that treat, infiltrate, and provide source controls
for both construction and post- construction site runoff.
Curb designs would direct flows into bioswales and
subdrain features that connect to water quality treatment
basins, treating flows prior to discharge into receiving
waters.
The Project is consistent with this Policy. Development is
sited away or buffered from the arroyos and bluffs on the
Project site. Bluff setbacks and a linear bluff edge park
have been incorporated into the site design to ensure
bluff and arroyo vegetation are protected. Development
would also be set away and buffered from wetlands.
The Project is consistent with this policy. The City would
be responsible for the maintenance of public roads and
parking lots; the Applicant would be responsible for the
maintenance of private rights -of -way, roads, parking lots,
etc. Typical maintenance activities include, but are not
limited to, street sweeping, parking lot vacuuming, and
removing trash. This EIR identifies the proposed BMPs
that would be imolemented as a can of the Proiect.
The Project is consistent with this policy. The Project
maintains existing drainage patterns and incorporates
natural drainage features into site design where feasible.
These features include the Northern and Southern
Arroyos, vegetated swales throughout the Project site,
and maintenance of wetland vegetation in downstream
wetland systems. However, the Project site does not
currently function as a significant groundwater recharge
site, although groundwater infiltration would be
incorporated into the Project where feasible, on the
Upland away from the bluff faces.
The Project is consistent with this policy. The proposed
Project incorporates Site Design BMPs to reduce the
effect of an increase in Project impervious surface area.
These BMPs include maximizing the use of permeable
pavers and surfaces, incorporation of natural or open
space areas, minimizing street widths and directly
connected impervious areas and other applicable
concepts to minimize the effect of impervious surface
development. Linear park development, bluff setbacks
and landscaping buffers and bioswales have also been
used to reduce the Project's effect from impervious
surface development by increasing infiltration where
feasible and reducing runoff volume and velocities.
Please also see Section 4.3, Geoloqv and Soils.
II Natural Resources Element II
II Natural Resources General Plan Goal NR 3 II
Enhancement and protection of water quality of all The Project is consistent with this goal. Please refer to
natural water bodies, including coastal waters, creeks, the response to Goal HB 8.
bays, harbors, and wetlands. (Goal HB 8)
R:Trolects\Newpan \J015VDmft EIRWA Hydm- 090211.doa 4.4 -68 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -25 (Continued)
CITY OF NEWPORT BEACH GENERAL PLAN CONSISTENCY ANALYSIS
City of Newport Beach General Plan
Relevant Goals, Policies, and Programs
Consistency Analysis
Policies
NR Policy 3.2: Water Pollution Prevention
The Project is consistent with this policy. Please refer to
Promote pollution prevention and elimination methods
the response to HB Policy 8.2.
that minimize the introduction of pollutants into natural
water bodies. (Policy HB 8.2)
NR Policy 3.3: Ground Water Contamination
The Project is consistent with this policy. Please refer to
Suspend activities and implement appropriate health
the response to HB Policy 8.3.
and safety procedures in the event that previously
unknown groundwater contamination is encountered
during construction. Where site contamination is
identified, implement an appropriate remediation
strategy that is approved by the City and the state
agency with appropriate jurisdiction. (Policy HB 8.3)
NR Policy 3.4: Storm Drain Sewer System Permit
The Project is consistent with this policy. Please refer to
Require all development to comply with the regulations
the response to HB Policy 8.4.
under the City's municipal separate storm drain system
permit under the National Pollutant Discharge
Elimination System. (Policy HB 8.4)
NR Policy 3.5: Natural Water Bodies
The Project is consistent with this policy. Please refer to
Require that development does not degrade natural
response to the HB Policy 8.5.
water bodies. (Policy HB 8.5)
NR Policy 3.9: Water Quality Management Plan
The Project is consistent with this policy. Please refer to
Require new development applications to include a
the response to HB Policy 8.9.
Water Quality Management Plan (WQMP) to minimize
runoff from rainfall events during construction and post -
construction. (Policy HB 8.9)
NR Policy 3.10: Best Management Practices
The Project is consistent with this policy. Please refer to
Implement and improve upon Best Management
response to the HB Policy 8.10.
Practices (BMPs) for residences, businesses,
development projects, and City operations.
(Policy HB 8.10)
NR Policy 3.11: Site Design and Source Control
The Project is consistent with this policy. Please refer to
Include site design and source control BMPs in all
the response to HB Policy 8.11.
developments. When the combination of site design
and source control BMPs are not sufficient to protect
water quality as required by the National Pollutant
Discharge Elimination System (NPDES), structural
treatment BMPs will be implemented along with site
design and source control measures. (Policy HB 8.11)
NR Policy 3.12: Reduction of Infiltration
The Project is consistent with this policy. The Project
Include equivalent BMPs that do not require infiltration,
contains a storm drain system that ensures infiltrated
where infiltration of runoff would exacerbate geologic
water is directed away from the bluff faces on the Project
hazards. (Policy HB 8.12)
site. This storm drain system, which includes bioswale
subdrains, would ensure that the risk of bluff instability is
minimized and that a geologic hazard does not develop.
NR Policy 3.13: Natural Wetlands
The Project is consistent with this policy. Please refer to
Promote the use of natural wetlands to improve water
the response to HB Policy 8.13.
quality. (Policy HB 8.13)
R:TroieatslNewpanu015NDmft EIRWA Hydm- 090211.doa 4.4 -69 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -25 (Continued)
CITY OF NEWPORT BEACH GENERAL PLAN CONSISTENCY ANALYSIS
City of Newport Beach General Plan
Relevant Goals, Policies, and Programs
Consistency Analysis
NR Policy 3.14: Runoff Reduction on Private
The Project is consistent with this policy. Please refer to
Property
the response to HB Policy 8.14.
Retain runoff on private property to prevent the
transport of pollutants into natural water bodies, to the
maximum extent practicable. (Policy HB 8.14)
NR Policy 3.15: Street Drainage Systems
The Project is consistent with this policy. Please refer to
Require all street drainage systems and other physical
the response to HB Policy 8.15.
improvements created by the City, or developers of
new subdivisions, to be designed, constructed, and
maintained to minimize adverse impacts on water
quality. Investigate the possibility of treating or diverting
street drainage to minimize impacts to water bodies.
(Policy HB 8.15)
NR Policy 3.16: Siting of New Development
The Project is consistent with this policy. Please refer to
Require that development be located on the most
the response to Policy HB 8.16.
suitable portion of the site and designed to ensure the
protection and preservation of natural and sensitive site
resources that provide important water quality benefits.
(Policy HB 8.16)
NR Policy 3.17: Parking Lots and Rights -of -Way
The Project is consistent with this policy. Please refer to
Require that parking lots and public and private rights-
response to HB Policy 8.17.
of -way be maintained and cleaned frequently to remove
debris and contaminated residue. (Policy HB 8.17)
NR Policy 3.19: Natural Drainage Systems
The Project is consistent with this policy. Please refer to
Require incorporation of natural drainage systems and
response to HB Policy 8.19.
stormwater detention facilities into new developments,
where appropriate and feasible, to retain stormwater in
order to increase groundwater recharge.
(Policy HB 8.19)
NR Policy 3.20: Impervious Surfaces
The Project is consistent with this policy. Please refer to
Require new development and public improvements to
response to HB Policy 8.20.
minimize the creation of and increases in impervious
surfaces, especially directly connected impervious
areas, to the maximum extent practicable. Require
redevelopment to increase area of pervious surfaces,
where feasible. (Policy HB 8.20)
Natural Resources Element Goal NR 4
Maintenance of water quality standards through
The Project is consistent with this goal. The Project does
compliance with the total maximum daily loads
not discharge into a 303(d)- listed water body, and there
(TMDLs) standards.
are no total maximum daily loads (TMDLs) established for
the Project site's receiving waters.
Policies
NR Policy 4.3: Restore Natural Hydrologic
The Project is consistent with this policy. Site- design
Conditions
concepts for the Project would maintain site drainage
Preserve, or where feasible, restore natural hydrologic
patterns and incorporate existing natural drainage
conditions such that downstream erosion, natural
features into site design. Natural swales and treatment -
sedimentation rates, surface flow, and groundwater
control BMPs including water quality improvement basins
recharge function near natural equilibrium states.
ensure that flow rates and runoff volumes leaving the site
in the post- Project condition are treated and do not result
in exacerbation of either erosion or sedimentation within
the arroyos on the site, or within the Semeniuk Slough
and Lowland. The Project site does not currently function
as a groundwater recharge site although infiltration of
R:Troje ts\Newpan \J015NDmft EIRWA Hydm- 090211.dm 4.4 -70 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -25 (Continued)
CITY OF NEWPORT BEACH GENERAL PLAN CONSISTENCY ANALYSIS
City of Newport Beach General Plan
Relevant Goals, Policies, and Programs
Consistency Analysis
runoff has been incorporated into the Project where
feasible, in areas away from the bluff faces.
NR Policy 4.4: Erosion Minimization
The Project is consistent with this policy. The Project
Require grading /erosion control plans with structural
would comply with the requirements of the new General
BMPs that prevent or minimize erosion during and after
Construction Permit. Construction BMPs have been
construction for development on steep slopes, graded,
incorporated into the Project through PDF 4.4 -8, SC 4.4-
or disturbed areas.
5, and SC 4.4 -6. These BMPs include scheduling,
preserving existing vegetation, utilization of hydroseeding,
hydraulic and straw much, and the application of soil
binding materials, as well as use of geotextiles. Other
BMPs (see Table 4.4 -6 of the EIR) would assist in
minimizing runoff, and consequent site erosion. They
ensure that landscape and irrigation plans minimize
irrigation near natural areas and slopes.
Natural Resources Element Goal NR 5: Sanitary Sewer Outlets
Minimal adverse effects to water quality from sanitary
The Project is consistent with this goal. The City has
sewer outflows.
adequate sewer system capacity to serve the
requirements of the proposed Project. The Project would
be able to tie into the existing sewer system without
adversely affecting the system or causing any water
quality affects. (Please also see Section 4.15, Utilities.)
Policies
NR Policy 5.2: Waste Discharge Permits
The Project would be consistent with this policy. The City
Require waste discharge permits for all food
would require a waste discharge permit for any Project
preparation facilities that produce grease.
restaurants and other food preparation facilities that may
be proposed on the Project site.
Safety Element
Safety Element Goal S 5
Protection of human life and public and private property
The Project is consistent with this goal. As identified in
from the risks of flooding.
this EIR section, the northwestern portion (the Lowland)
and the southwestern corner of the Project site are
located outside the 100 -year floodplain, but within the
500 -year floodplain. No habitable development is
proposed in the floodplain.
Policies
S Policy 5.1: New Development Design within 100-
The Project is consistent with this policy. Please refer to
year Floodplains
the response to Safety Element Goal S 5.
Require that all new development within 100 -year
floodplains incorporate sufficient measures to mitigate
flood hazards including the design of onsite drainage
systems that are connected with the City's storm
drainage system, gradation of the site such that runoff
does not impact adjacent properties, and buildings are
elevated.
S Policy 5.3: Minimization of Flood Hazard Risk
The Project is consistent with this policy. Extensive
Require stormwater detention basins, where
analysis has demonstrated that Project implementation
appropriate, to reduce the potential risk of flood
would not create any new flood hazard or exacerbate
hazards.
existing conditions. Project development is proposed for
the Upland portion of the Project site, which is above the
100 year floodplain of the Santa Ana River and is not
prone to existing flood hazard.
R:Troiects\Newpan \J015NDmft EIRWA Hydm- 090211.doa 4.4 -71 Newport Banning Ranch
Draft Environmental Impact Report
TABLE 4.4 -26
CALIFORNIA COASTAL ACT CONSISTENCY ANALYSIS
Relevant California Coastal Act Policies
Marine Environment
Section 30230 Marine resources; maintenance
Marine resources shall be maintained, enhanced, and
where feasible, restored. Special protection shall be
given to areas and species of special biological or
economic significance. Uses of the marine environment
shall be carried out in a manner that will sustain the
biological productivity of coastal waters and that will
maintain healthy populations of all species of marine
organisms adequate for long-term commercial,
recreational, scientific, and educational purposes.
Section 30231 Biological productivity; water quality
The biological productivity and the quality of coastal
waters, streams, wetlands, estuaries, and lakes
appropriate to maintain optimum populations of marine
organisms and for the protection of human health shall
be maintained and, where feasible, restored through,
among other means, minimizing adverse effects of
waste water discharges and entrainment, controlling
runoff, preventing depletion of ground water supplies
and substantial interference with surface waterflow,
encouraging waste water reclamation, maintaining
natural vegetation buffer areas that protect riparian
habitats, and minimizing alteration of natural streams.
Section 4.4
and Water Quality
Consistency Analysis
The Project is consistent with this policy. There are no
marine resources within the boundaries of the Project site.
The Project site includes Lowland areas that are adjacent
to coastal waters (the Semeniuk Slough) and Lowland
areas that include wetlands. The Project includes the
restoration of degraded wetlands as well as the creation of
a third -party reserve area for future habitat restoration.
With respect to water quality, this section of the EIR as
well as Section 3.0, Project Description, address the
proposed water quality treatment program for the Project
site which would include water quality features and best
management practices to be implemented at development
sites, in public street rights of way, as well as in parks and
the Open Space Reserve.
The Project is consistent with this policy. There are no
marine resources within the boundaries of the Project site.
As addressed in this EIR section, the there are three
existing arroyos on the Project site that are formed by
precipitation and local site runoff /drainage. One of these
drainages, located at the Project site's northeastern
boundary, is fairly small and does not convey large
quantities of flow. The Northern Arroyo and the Southern
Arroyo both convey on- and off -site flows as well as
significant volumes of sediment across the Project site
from the eastern edge of the Project site to the Semeniuk
Slough and the Lowland area to the west.
In order to minimize impacts and potential environmental
harm from discharges, the Project has incorporated site
design /LID strategies and source - control measures
throughout Project development. LID features have been
incorporated into the Project for storm water treatment and
for reduction of runoff volumes. Throughout the Project
site, the use of LID features would be implemented to
meet water quality treatment requirements in concert with
treatment - control BMPs. The Project would integrate LID
techniques throughout the development area to provide
treatment of low -flow runoff directly at the source along
with runoff reduction from small, frequent storm events.
LID features would be implemented on the Project site and
in transitional areas that lead into or out of the Project site.
LID Project features to be installed on site would pre -treat
storm water runoff and would remove large sediment,
trash, and debris.
R:Troje ts\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4 -72 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
TABLE 4.4 -26 (Continued)
CALIFORNIA COASTAL ACT CONSISTENCY ANALYSIS
Relevant California Coastal Act Policies
Consistency Analysis
Development
Section 30253 Minimization of adverse impacts
The applicable provision of the Coastal Act is Section
New development shall do all of the following:
30253(a) with respect to minimizing risks to life and
(a) Minimize risks to life and property in areas of high
property from flood hazards. The Project is consistent
geologic, flood, and fire hazard.
with this policy. With respect to flooding, as identified in
this EIR section, the northwestern portion (the Lowland)
(b) Assure stability and structural integrity, and neither
and the southwestern corner of the Project site are
create nor contribute significantly to erosion,
located outside the 100 -year floodplain, but within the
geologic instability, or destruction of the site or
500 -year floodplain. No habitable development is
surrounding area or in any way require the
proposed in the floodplain. Project development is
construction of protective devices that would
proposed for the Upland, and is not prone to existing
substantially alter natural landforms along bluffs and
flood hazard.
Cliffs.
(c) Be consistent with requirements imposed by an air
pollution control district or the State Air Resources
Board as to each particular development.
(d) Minimize energy consumption and vehicle miles
traveled.
(e) Where appropriate, protect special communities and
neighborhoods that, because of their unique
characteristics, are popular visitor destination points
for recreational uses.
R:Troieats\Newpan \J015NDmft EIRWA Hydm- 090211.doa 4.4 -73 Newport Banning Ranch
Draft Environmental Impact Report
Section 4.4
and Water Quality
This page intentionally left blank
R:Trojeats\Newpart \J015NDmft EIRWA Hydm- 090211.doa 4.4 -74 Newport Banning Ranch
Draft Environmental Impact Report