HomeMy WebLinkAbout01 - Chapter 7_Landform Restoration and GradingLANDFORM RESTORATION AND GRADING PLAN
7.1 Purpose and Intent
The purpose of this chapter is to describe the Landform Restoration and Grading Plan for the
Project. This chapter includes exhibits and text describing and illustrating the proposed master
grading concept for the Project, including bluff /slope restoration, preliminary earthwork quantities
for cut and fill, and contours and grades, at generally one -foot contour intervals, for all graded
areas of the Project Site, including remedial grading for geotechnical purposes.
7.2 Existing Conditions
The existing topography of the Project Site is composed of the Lowland and Upland. The
Lowland is generally 0 feet to 10 feet above Mean Sea Level (MSL) and includes degraded
wetlands, oil facilities, and access roads. The Upland ranges in elevation from 10 to 110 feet
above MSL, and includes the transitional slopes, bluffs, and arroyos that rise to the Upland, which
begins at approximately 50 feet above MSL. The Upland is bounded by existing development in
the cities of Costa Mesa and Newport Beach to the east. The Southern Arroyo divides the Upland
into two areas. The existing slopes and bluff edges have historically been adversely impacted by
oil operations and water erosion.
Newport Banning Ranch 7 -1
mdp chapter 7 , landrem, restoration and grading 08.19.11 final.docx•August 19 . 2011
MASTER DEVELOPMENT PLAN
7.3 Master Grading Plan
Master grading for the Project will occur within the primary development envelope and includes
grading for the public roadways and infrastructure, and private development within the Villages
and Colonies and Parklands. The master grading plan includes both landform grading and
corrective/remedial grading requiring the over - excavation and recompaction of soils as
recommended in geotechnical /soils reports prepared for the Project.
Master grading for development of the Project Site is illustrated in Exhibit 7 -1, "Master Grading
Plan." Areas of cut and fill within the Project Site are illustrated in Exhibit 7 -2, "Cut and Fill
Map." Approximately 1,100,000 cubic yards of landform grading will be required for the Project.
Cuts may vary from one foot to 10 feet across the Project Site, but may be up to 25 feet in
localized areas. Fills may vary from one foot to 30 feet, but may be up to 60 feet in limited areas
that require erosion repair and removal of alluvium.
Approximately 1,500,000 cubic yards of additional corrective/remedial grading is necessary to
implement geotechnical /soils recommendations and structurally stabilize the Project Site. This
corrective /remedial grading shall not change the landform of the Project Site. Corrective/remedial
grading may occur from three feet to 30 feet below the proposed landform elevations. Corrective/
remedial grading recommendations are described in detail in the geotechnical reports prepared
for the Project.
Subsequent to remediation activities, all grading shall balance on -site and may be phased using
borrow and spoils procedures as needed. An agronomist approved by the City Engineer shall
evaluate soil chemistry for selective placement of the fill to ensure that the best soils are placed
for habitat restoration and community landscape planting.
7 -2 mdp chapter 7,landiono restoration and grading 08.19.11 final.docx- AOSnst19,2o„
LANDFORM RESTORATION AND GRADING PLAN
7.4 Bluff /Slope Restoration
Bluff /slope restoration shall occur along the south and west - facing slopes and bluffs to restore
areas historically impacted by erosion and soil degradation. Restored bluffs and slopes shall
match the existing bluff /slope edge elevations to preserve the bluff /slope massing and create a
natural appearance.
In several areas, the bluff /slope edge has been eroded due to years of oil operations and
uncontrolled drainage through the Project Site. These areas shall be graded to restore and
revegetate the bluff/ slope edge and limit further degradation. As part of the restoration of bluffs
and slopes, existing uncontrolled stormwater flows across the bluff /slope edge shall be intercepted
and redirected to bioswales, community water quality basins, and other features described in
Chapter 9, "Water Management Plans."
The bluff /slope restoration areas are illustrated in Exhibit 7 -3, "Bluff and Slope Restoration Plan."
For ease of discussion, bluff /slope restoration can be characterized as falling into the following
four categories.
7.4.1 Natural Bluff— No Erosion Features
In instances where there is no evident erosion damage to the existing bluff /slope, invasive plants
and the asphalt -like material shall be carefully removed and the area replanted. Storm flows shall
be directed away from the slope/bluff.
7.4.2 Case 1 Restoration — Significant Erosion
Case 1 Restoration is required where significant areas of the bluff /slope have been impacted by
uncontrolled erosion and /or oil operations. In cases where the impacted area is greater than 30
linear feet (LF) of bluff /slope edge, conventional grading techniques and equipment shall be
utilized to restore the impacted area. Finished slope gradients shall be a maximum of 1.5:1
without terrace drains in order to match the existing character of the bluff. Fabric or equivalent
methods may be used, based upon a soils engineer's recommendations and as approved by the
City, for additional slope stability. Smaller equipment and /or hand labor shall be used, as
necessary, at locations where the bluff /slope restoration adjoins stable natural bluff/ slope areas.
7.4.3 Case 2 Restoration — Moderate Erosion
In Case 2 Restoration Areas, the bluff /slope edge projection is apparent and the erosion damage
has moved 20 -50 feet towards the Lowland area. In these locations, sloughed areas shall be
cleaned out, and the bluff /slope fully restored to match the existing neighboring condition. Repair
techniques shall include small equipment operating from the bluff /slope top, use of fabric and soil
Newport Banning Ranch 7 -3
MASTER DEVELOPMENT PLAN
cement to allow for the steeper than 2:1 slopes, and redirection of storm runoff into the
appropriate water quality feature.
7.4.4 Case 3 Restoration — Minor Erosion
Case 3 Restoration Areas are areas where minor erosion features have appeared. In these areas,
runoff shall be redirected way from the area and hand labor shall be utilized, as necessary, to
stabilize the top of bluff /slope prior to habitat restoration.
7.5 Structural Setbacks from Faults and Bluffs
To avoid future problems related to geotechnical conditions on the Project Site, habitable
buildings shall be set back a minimum of 60 feet from the tops of bluff edges, as required in the
NBR -PC. Habitable buildings shall not be constructed within identified fault setback zones. Fault
setback distances meeting the mandates of the Alquist Priolo Earthquake Fault Zoning Act shall be
confirmed, as appropriate, upon the completion of additional trenching investigations. There are
no Alquist Priolo faults on the Project site and thus it does not fall under the Alquist Priolo
Earthquake Fault Zoning Act.
7.6 Disposition of Remediated Soils
Soils impacted by oil production and similar related activities shall be remediated to comply with
State and local laws. Hydrocarbon -laden soils shall be treated, tested, and placed or removed in
accordance with the Project's Remedial Action Plan (RAP).
As part of oil facility consolidation activities, existing oil wells and facilities within development
and habitat restoration areas shall be abandoned and remediated. Most remediated soil will be
properly treated and placed in deep fills or outside the limits of residential, commercial, and
resort building areas. Deep fills are defined as fills 10 feet or greater from the proposed finished
surface. The primary location for placement of the treated soil will be in the deeper over -
excavation areas located within the North Family Village and Urban Colony.
Some percentage of the soil /material from the oil remediation and oil well closure process may
not be recyclable or suitable for use within the Project Site. Approximately 25,000 cubic yards of
this material may be exported off -site to an appropriate landfill.
7 -4 mdp chapter 7,landiono restoration and grading 08.19.11 final.docx•Awsust ls,2o„
LANDFORM RESTORATION AND GRADING PLAN
7.7 Limited /Selective Grading within Open Space Preserve
Limited /selective grading is allowed in the Open Space Preserve to create interpretive trails for
public access, to prepare habitat restoration and mitigation areas, to implement bluff restoration,
to provide for open space maintenance access, and to create water management areas. Earthwork
volumes associated with this grading shall be minimal in order to minimize impacts to open space
resources.
Exhibit 7 -4, "Soil Disturbance Map," identifies the areas of soil disturbance within the Project Site.
Limited /selective grading is allowed in the Open Space Preserve to allow for the following five
types of improvements:
7.7.1 Public Interpretive Trails
Minor grading is allowed to ensure a safe public trail network within the Open Space Preserve.
To the extent possible, trails shall be located on top of existing oil roads to minimize grading.
Minor grading may be required in these areas to create a pedestrian -safe trail surface and provide
localized drainage conveyances to minimize the need for trail maintenance.
7.7.2 Habitat Mitigation and Restoration Areas
In areas where habitat mitigation or restoration will occur, minor grading to repair localized
erosion features or compact loose soil is allowed as part of the restoration effort. This work effort
may be conducted utilizing hand tools and /or with small equipment.
7.7.3 Water Management Areas
Grading will be required to create the two water management areas within the
Water Quality Basin in SPA 4a; and the Diffuser Basin /Habitat Area in SPA 4b.
areas may include cuts of up to 8 feet and fills of up to 6 feet.
Lowland: the
Grading for these
Newport Banning Ranch 7 -5
MASTER DEVELOPMENT PLAN
7.7.4 Infrastructure and Utilities
Exhibit 7 -4 identifies the limited grading areas where infrastructure and utilities will be placed
underground within the proposed Open Space Preserve. To the extent feasible this grading shall
be coterminous with grading for public roadways and trails.
7.7.5 Oil Site Buffers
Limited and selective soil disturbance will be allowed to plant native landscape and /or install
screen fencing as a visual buffer adjacent to the two Oil Operation Sites (SPA 5a and SPA 5b)
where existing surface oil operations will be consolidated prior to the Project's land use
development.
7 -6 mdp chapter 7,landfono restoration and grading 08.19.11 final.docx•Aw9ust 19,zo„
UJ
Q
2
Q
Q
ti
2 /o
i
i'
i
i•
i
ACOE
Wetlands'
Restoration
Area
0 Project Site Boundary
Approximate Grading Limit
Approximate 1 -foot Contour
Approximate 5 -foot Contour
0 Top of Edge of Bluff
60 Foot Setback from Top of Edge
of Bluff for Habitable Structures
C'
PACIFIC y
OCEAN
18th Street
Sunset Ridge
Park
0
`c
0
Street
rrcv� Exhibit 7 -1
NEWPORT BANNING RANCH Master Grading Plan
MASTER DEVELOPMENT PLAN eENnwKOSn ocinrES® rl!I�FUSCOE FORM
City of Newport Beach - California 0 600 4200 . .. . " 06- 44-2011
S\d—n w oks_s taa<_i729M2soanoeyisbmduan�mmtg steldaMmxda llkgrzding_IU17 110B%mx
ACOE
Wetlands
Restoration
Area
LEGEND
Project Site Boundary
Fill
_ Cut
Note: Cut/ Fill Limits Reflect Surface
Features and Do Not Include Excavation
for Subterranean Parking
r .� I
a'
>
i jl> a
l _ � o
17th street !
- – – - -- -- - - - -_ — –
I!
1
�- - Newhall Street I I
NMUSD i
16th Street I
City —
Utilities �. !
Yard
OrrLo
/ I I
v D• �� 15th Street
Al
\ Ii
t?
F~
7q� _
'F west !C'� �i-. ,•''� I ,. +q /
Sunset Ridge
\ ay Park
6 \
F
9
C'
PACIFIC y
OCEAN
rrcv� Exhibit 7 -2
NEWPORT BANNING RANCH Cut and Fill Map
MASTER PLAN I I I I I I GtNNWKOSA5OaATES10 �'j FU CO FORMA
City e P - I sl0 4Id0 , ... .
06. 44.2011
same tsV,rooks_rreel VM172W01M _,WprodWs4masfersife_0ommxns1cm1m ffl1 1107 fsnoala.mxd
'j
0 1, N
If
i
i r
li
i
�i
LEGEND
Project Site Boundary
Case 3 Restoration - Minor Erosion
Case 2 Restoration - Moderate Erosion
_ Case l Restoration- Significant Erosion
® Slope Repair Access
v V \ aU'
NMUSD
,t
�. city
v",
`Utilities
�'�� Yard
� Ir - v !9�'
es c i
O \
r
Exhibit 7 -3
NEWPORT BANNING RANCH Bluff and Slope Restoration Plan
MASTER DEVELOPMENT PLAN ���
City f Newport Beach - California I I I I I I o�ruN wxos nssoanres r1�9s�FUfCOE ia21�'1
y P 0 300 600• —• 06.16.2011
s:mi�Wm.o � rreO _ace_gemmAMchmewn mgcmi llxl7 immeta.m.a
ti
2
o
LEGEND
Project Site Boundary
_ Temporary Soil Disturbance
(Includes Oil Remediation, Pipeline Removal,
Sump Remediation, Existing Oil Operation
Roads, Vernal Pool Interpretive Area,
Consolidated Oil Site Buffer, and Bluff Repair)
Permanent Soil Disturbance
(Includes Master Grading, Development, Utility
Infrastructure, Water Quality Basins, Wetlands,
Open Space Trails, Consolidated Oil Site /Access
Road, Fuel Management Zones A, B, and C and
Oil Remediation within Fuel Management Zone C)
d)'\
0
LI
1
I
1
PAC
Utc.viv
19th Street
___..._..._...._---- -- - -- --- r
I
i
i
z
n
I
I
I
I
IQ
d
IE
13
NMUSD7 /�
city
Utilities
\. Yard
17th Street
Newhall Street
Q'
0
C
0
it
I�
\
\
istn Staet
Exhibit 7 -4
NEWPORT BANNING RANCH Soil Disturbance Map
MASTER DEVELOPMENT PLAN ML GI NNl11KOSA OCIATES® ':FUSCOr 1c11
City of Newport Beach - California 0 w0 1,200 11Y�" - = 111A .. I'll 0s- 13-2m1
S'.bllen %mew str t 1729172900906�Mpmducb"M ter_siWe anM dskhT ofl distur n� 11x17_110613.mxd