HomeMy WebLinkAboutSS3 - Reuse of Existing City Hall PropertyaEWPORT = CITY OF NEWPORT BEACH Item No. C9�M00.N`P City Council Staff Report Agenda March 27,2 0 2 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Community Development Department Kimberly Brandt, Director 949 - 644 -3226, kbrandto)newportbeachca.gov Public Works Department Dave Webb, Acting Public Works Director 949 - 644 -3328, dawebb(a-)newportbeachca.aov PREPARED BY: Kimberly Brandt, Director APPROVED: TITLE: Reuse of Existing City Hall Property at 3300 Newport Boulevard and Lido Village Conceptual Plan 5B (PA2012 -031) ABSTRACT: With the upcoming relocation of City personnel to the new Civic Center at the end of 2012, the existing City Hall property provides an excellent opportunity for redevelopment in a manner that benefits West Newport Beach. Concept Plan 5B for the Lido Village area was approved by City Council in January 2011, and it includes the 4.26 -acre City Hall site. A further refinement of the Concept Plan has been developed, and staff seeks Council direction on the alternative concept and potential interim use for the City Hall site. RECOMMENDATION: Review information and provide feedback regarding both the interim and long -term uses of the City Hall property and alternative Lido Village concept plan, and direct staff to return to a City Council meeting for appropriate action. DISCUSSION: Interim Use of City Hall Site Given the near -term relocation of City Hall personnel, staff desires the City Council's consideration of what to do with the existing facility once staff has moved to the new Civic Center. One option would be to demolish the existing buildings and develop an interim public parking lot. Staff believes that the elimination of the buildings is necessary to prevent the site from becoming an attractive public nuisance, as well as to eliminate 1 2 Reuse of Existing City Hall Property at 3300 Newport Boulevard March 27, 2012 Page 2 necessary on -going maintenance and site security costs. Fire Station #2 would remain. The interim parking lot would be metered and accommodate approximately 300 spaces. The plan would also seek to utilize as much of the current parking and landscaping as possible to reduce construction costs. The estimated cost of the demolition and parking lot/landscaping improvement is $500,000, and the interim plan will require appropriate environmental documentation and may require Coastal Commission review. Long -Term Use of City Hall Site Conceptual Plan 5B In January 2011, City Council approved Conceptual Plan 5B for the Lido Village area as depicted in Exhibit A. Key components of the plan include: • Complete redevelopment of the City Hall site with community services; market rate apartments, and /or live -work units • Major redevelopment of the Via Lido Plaza with a new anchor tenant mix and support retail • High Density residential for "Cal- Beach" and Olen parcels • Proposed 32nd Street parking structure • Re- alignment of Via Lido and 32nd Street intersection • Pedestrian linkage to the Bay /Harbor • Pedestrian bridge to Mariner's Mile Alternative Site Plan Subsequent to the review of Conceptual Plan 5B, the City learned that the scope of the near -term improvements envisioned for the adjacent Via Lido Plaza may be scaled back to the upgrade of the existing buildings. Additionally, City Council has been considering a West Newport Facilities Conceptual Plan (City Council Study Session September 13, 2011) for the 8 -acre parcel on Superior Avenue, where the City's Corporation Yard is currently located. Preliminary plans include: • Consolidating the City's two corporation yards to the current 16th Street yard, thus, freeing up all or some of the 15th Street/Superior yard for different uses; • Establishing a new, larger community center in West Newport at the 15th Street/Superior yard that might mirror the Newport Coast Community Center; • Relocating the Police Department Facility to the 15th Street/Superior yard; and • Retaining some type of transfer station to allow for the efficient transfer of residential trash. In consideration of these possibilities, an alternative site plan for Lido Village was developed as shown in Exhibit B. A key assumption of the plan was to create a pedestrian promenade (linkage) from the City's property across Via Lido Plaza to the 3 Reuse of Existing City Hall Property at 3300 Newport Boulevard March 27, 2012 Page 3 Bay /Harbor area that recognizes the existing building locations and allows for additional retail buildings to be constructed at Via Lido Plaza if parking is made available on the City Hall site. The alternative plan includes the following development assumptions: On the City Hall property: 1. 92 market -rate rental flats and townhomes 2. 6,000 square feet of retail 3. 512 -space parking structure On the Via Lido Plaza site: 1. The addition of two new retail buildings (18,400 square feet) and a public pedestrian promenade. 2. The loss of onsite parking spaces (approximately 108 spaces) plus the demand of additional parking spaces (92 spaces, for a total of 200 spaces) may be met in the new City parking structure. In terms of street circulation, the alternative plan includes: 1. Via Lido - Reconfiguration to a one -way, two -lane access to Lido Isle with angled on- street parking (20 spaces); 2. 32nd Street - Reconfiguration to a two -way access from Lafayette Road to Newport Boulevard (two lanes westbound and one lane eastbound) with a Round -a -bout west of the Lido Isle Bridge. 3. Via Oporto and Via Malaga- Reconfigured as Pedestrian Promenades. It should be noted that staff has not conducted any traffic circulation studies regarding the proposed circulation design. Additionally, there are other onsite circulation /parking concerns to be addressed including the existing truck access across the City Hall property between Via Lido Plaza and 32nd Street; the preservation of the 12 parking spaces reserved for 503 32nd Street; the anticipated lot line adjustment between Via Lido Plaza and the City Hall property, and the fee ownership of the Finley Avenue access at Newport Boulevard. Fiscal Analysis of the Alternative Site Plan At staffs direction, Keyser Marston Associates, Inc. prepared a pro -forma analysis for the conceptual Alternative Site Plan. The purpose of the analysis was to determine an order -of- magnitude estimate of the land value that can be supported by private development. The land value was then adjusted to reflect the financial impacts created by the proposed public uses both on the City Hall site and adjacent properties. The net land value was converted into annual lease payments for the City Hall site ranging from approximately $470,000 to $589,000. 21 Reuse of Existing City Hall Property at 3300 Newport Boulevard March 27, 2012 Page 4 Next Steps Should City Council wish to further pursue the Alternative Site Plan concept, staff recommends that community outreach be conducted with the area's business owners and residents. Upon completion of that effort, staff believes it would then be appropriate to conduct a traffic circulation study to analyze the impacts of the conceptual proposal (both vehicular and pedestrian). The traffic circulation analysis may have some bearing on the final configuration of the land use plan and possibly the lot line adjustment; therefore, staff recommends that the traffic circulation study occur early in the sequence of future steps. The study would cost approximately $35,000 to complete. FUNDING REQUIREMENTS: The $500,000 in funding for demolition of the existing City Hall facility and construction of an interim parking facility will be requested in the 2012/2013 Capital Improvement Budget. The $35,000 to perform the necessary traffic study to evaluate the Alternative Site Plan will need to be identified and funds appropriated prior to hiring a consultant to conduct the study. ENVIRONMENTAL REVIEW: The City Council's review of the conceptual plan is exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15262 (Feasibility and Planning Studies) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. The City Council is considering the feasibility of and planning for possible future actions. No final action on the conceptual Alternative Site Plan or interim uses at the City Hall site will be taken and direction given does not have any legally binding effect upon later activities. Environmental review will be conducted prior to approval of any development project or legally binding land use plan. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). Submitted by: Kimberly Brandt, AI P Dave Webb Community Develo ment Director Acting Public Works Director Exhibit A — Conceptual Site Plan 5B Attachments: Exhibit B — Alternative Site Plan 0 NO Exhibit No. A Conceptual Site Plan 5B 7 2 I, 1 1 I C7 tive Alter native 5 8 -- - -- �- 1 ILLAGE MARSHALL DEV. MIXD -UUSE, OFF/ RES fl opp9 M WCI 9 10 Exhibit No. B Alternative Site Plan 11 12 SUMMARY EXISTING RETAIL 189,302 (INCLUDES LIDO THEATER) \ • NEWP. BLVD SURFACE LOT =145 SPACES • VIA LIDO 45° ANG. PKG. 20 SPACES • TOTAL PROPOSED SPACES 165 (298 TARGET) \�\ S PROPOSED NEW STRUCTURE = 279 SPACES L /7L Z LOSS OF SPACES WITH NEW PADS 108 IIEB SPACES PROPOSED WITH NEW LET CONFIGURATfON1 O "G� � • JAKOWSKI PARKING REQUIREMENT =12 J • PROPOSED NET PARKING GAIN = 159 O PROPOSED RETAIL SCENARIOS BASED ON PARKING 159 @3.9/1000 - 40,700 ST OF Ip POTENTIAL RETAIL j IP • 159 @4.0/1000 = 39,750 ST OF POTENTIAL RETAIL ACCESS N VA AYT • 159 ri C 5.0/1000 = 31;800 SY OF TWO LANE VIA W LIDO TO LIDO ISLAND � �' POTENTIAL RETAIL CONFIGURED PUDIUMETRUCTURE — 97 D -U. S PARKING L 282 SURFACE SPACES III I FREERIGHTTURN 'IV o OUMY OF ORANGE m Fiuiif'TYT r l n STANDARD FOR 35 WIT n ti:�I.IIf:o3�i3N - i , I . r '. ' - 1 I i �II I o -NEW PEDCSTR4W PLAZA TWO WANES WEST OULD) � v r STREET FROM LAFAYETTE R➢. T➢NfiWPORT ELV➢- AN O NELANEEEARTHLI , AND ONE LANE EARTHLING) L� �F W PD DRAFT SITE FEASIBILITY STUDY -OPT CITY OF NEWPORT BEACH THtrFnx�A LIDO VILLAGE 50 E 50 1W SEE III hull, III III ,1111, 11111 III December 16, 2011 13 SCALE; 1 -50' PROPOSED DS ALONG NI �� PROMENADE AND LIMITED SERVICF VEHICLEACICESS. OUTDOOR DINING OPPORTUNITIES. EXISTING DO LDMGSa 89302 S.f. "'� [uninc[wi Ps SvaoR 4 ONE WAY VEHICULAR ACCESS. FRIENDLY STREET WITH LIMITED LIMITED ACCESR HOURS. �' '•'.14�i I /Y \ \\ PRIVATEACCESSTO RESIDENTIAL DECK 17' n,M w � �\' DECKH4'CLEAR) RETAIL SPACE AT GRADE. WITH @ISIDENTIALi I LTD G,VI E NTIAL - _ a.rwaw.0 PUDIUMETRUCTURE — 97 D -U. S PARKING L 282 SURFACE SPACES III I FREERIGHTTURN 'IV o OUMY OF ORANGE m Fiuiif'TYT r l n STANDARD FOR 35 WIT n ti:�I.IIf:o3�i3N - i , I . r '. ' - 1 I i �II I o -NEW PEDCSTR4W PLAZA TWO WANES WEST OULD) � v r STREET FROM LAFAYETTE R➢. T➢NfiWPORT ELV➢- AN O NELANEEEARTHLI , AND ONE LANE EARTHLING) L� �F W PD DRAFT SITE FEASIBILITY STUDY -OPT CITY OF NEWPORT BEACH THtrFnx�A LIDO VILLAGE 50 E 50 1W SEE III hull, III III ,1111, 11111 III December 16, 2011 13 SCALE; 1 -50' 14 "RECEI ED AFTER AU lA PRINTED" 3 � SUBJECT: Revitalization of Lido Village area and proposed reuse of existing City Hall property located at 3300 Newport Blvd. REFERENCE: City Council Study Session of March 27,2012, Agenda Item No. SS3 TO: Honorable Mayor and City Council City of Newport Beach Q ^, PLEASE ENTER INTO THE PUBLIC RECORD. Cry s (7I Honorable Mayor and Members of the City Council: r v —$+A st We have had the opportunity to review the Staff Report proposing reuse of t misting rn \ City Hall property. We commend the Council for recognizing the need ,both revitalize � the Lido Village area, and to effectively utilize the current City Hall site once the City relocates its functions to the new site. We have a number of comments and concerns ,summarized below. 1. The Concept Plan 513, and as subsequently modified, very clearly stated Use direction for this site: Market -rate flats,townhomes(est. 92); retail(est. 6,000 sq ft); and parking structure(512 spaces). Staff acknowledges this, yet recites under "Long tern Use of City Hall Site" some items which were identified in initial meetings, but ultimately not approved: "live -work units "; pedestrian bridge to Mariners Mile being most significant. We agree that,if the site is left vacant, nuisance problems could develop.The Staff Report proposes an "interim" measure of installing a parking lot on the site. It also states that Coastal Commission approval "may be required ". This approach is, quite frankly, a waste of money. The direction on appropriate reuse was established in the "Concept Plan" resulting from the revitalization discussion. The direction was for some parking, in combination with a higher end housing plus retail mixed use, with some open area. We object to the City's expenditure of $500,000(likely more) for an unsightly temporary structure. If Council remains undecided on uses, we propose that the City issue an RFP for a Private Public Partnership,and solicit proposals. Let qualified developers with comparable resort area experience lead the way.This would be a reasonable and customary approach. 2. Staff proposal to reconfigure Street Circulation with stated scope to one way is premature. The proposed direction could conflict with uses key to successful commercial revitalization. The proposed plan also impairs access to and from both the village and Lido Isle —with potential for congestion and flow impairment on and off the Isle.This represents both a circulation problem for the residents of Lido Isle, and public safety risk. 3. We understand that an Economic Study has been completed(or completion pending). Multiple requests have been made to learn of the scope and methodology of this study, without response. Without a hypothetical Use parameter ,along with demographic and user /consumer market —based information, such a study is of limited value.( We appreciate that staff has proposed to maybe later gather this input). SUMMARY: It was requested by the public, recommended by consultants, that the City work towards development of a Specific Plan for the area. Such a plan could have been completed and largely through required coastal commission approvals by now, at comparable or lower expense than that being proposed for the "interim parking structure" and new street /traffic circulation plan implementation. We request that the Council move forward decisively with development and completion of a Specific Plan for the area. Benefits of this approach include: - An Integrated Use strategy and plan, most likely to provide a robust, sustainable economic revitalization platform, and be responsive to the desires of the public and coastal stakeholders - Within a tried and true framework, provide a Brown Act compliant, defensible process for specific stakeholder and broad community input. - Provide the appropriate framework required for both City leaders and staff to snake the myriad of infrastructure, traffic and access management and capital decisions required for positive results - Support a more timely implementation of actions required to acheive revitalization momentum; economic retum(to the City and private stakeholders); and realization of community and environment /aesthetic benefits. We request that the City take immediate action to initiate the process outlined above. This is a Win/Win for the City, its residents and merchants, and the visitors we want to attract, and have repeatedly visit, our community. Thank you for your consideration. Denys OBERMAN Resident and coastal community stakeholder Planning for City Hall and LidoVillage City Council Study Session March 27, 2012 Planning for City Hall and Lido Village July 2010 —City Council Ad -Hoc Committee established to guide Lido Village Planning and City Hall Re -use January 2011 — Concept Alternative 5B Approved U t e r n a. t I V e 5 rI J *w it r - � J J y �- . r • ' J J S° J r J r J 1 J �:.f Conceptual illu1. LIDO VILLAGE r J L.I Key Elements of Alternative 5B • Complete redevelopment of the City Hall site with community services, market rate apartments, and /or live -work units • Major redevelopment of the Via Lido Plaza with a new anchor tenant mix and support retail Major redevelopment of Lido Marina Village to include new retail, open public waterfront, hotel, and reconfigured docks High Density residential for "Cal- Beach" and Olen parcels • Potential 32nd Street parking structure • Re- alignment of Via Lido and 32nd Street intersection • Pedestrian linkages to the Bay Pedestrian bridge to Mariner's Mile Planning for City Hall and Lido Village Continues September 2011 -West Newport Facilities Planning Study Session January 2012 — Lido Village Design Guidelines Adopted Interim Use of City Hall Staff relocating in approximately 9 months Demolition of buildings proposed to avoid attractive nuisance Fire Station #2 remains Retain existing parking lots & some landscaping (some is being moved to the new Civic Center) to the extent possible to reduce costs Construction of additional parking to create metered public parking (approximately 300 - spaces) Interim Use of City Hall • Significantly reduces security and maintenance costs $500,000 estimated cost • Timeline • Concept layout —approximately I month • Project review and Council approval - approximately 3 months Coastal Commission review - approximately 3 -6 months Finalize plans and bid /award project — approximately 3 months o Demolition and construction — approximately 13 months ® Discussion Lido Village Planning Permanent use of City Hall Site New Alternative Concept Plan for Lido Village prepared Discussions with commercial property representatives Alternative Concept Plan focus: City Hall Via Lido Plaza Public rights -of -way J _ J Yi -E �.� .. _ I•A �\ uU J ._. 0 m _Tk Q DRAFT SITE FEASIBILITY STUDY -OPT CITY OF NEWPORT BEACH LIDO VILLAGE m Dtt'aoW Ib, 1011 SCALE; I'-50 Alternative Concept Plan City Hall Property o 92 market -rate rental units 6,000 square feet of retail space 0 512 -space public parking structure 0 Public pedestrian promenade o Lot Line Adjustment Annual lease payments range between $470,000 to $589,000 SUMMARY FASTINGRRAIL389,103 • LOFl=145SAAI� PACES • YULIW SPACES VIAL 4P AN U, PACES OP SED 1 • TOTAL PROPOSED SPACES IrtS ME TARGET ST PROWS' OF SP ElTH NM FADS 10 • LOoSNO�F SPnA�CCS wm�ww��xoSwn0m1 • 1AKOMFU PARKING REQUIREMENT -11 • PROPOSED NET PARKING GAIN =159 PROPoSPD RETAIL SMNAWOS RASED ON PARKING a •159® l 91 IOW- 00.7W SF OF \ POTENTIAL MAIL • 15911 AN FEES - 19,805.F OF POTENTIAL REI'AR. • 159 0 5,01 VXXD = 31,M SY OF POTENTIAL REPAa �\ uU J ._. 0 m _Tk Q DRAFT SITE FEASIBILITY STUDY -OPT CITY OF NEWPORT BEACH LIDO VILLAGE m Dtt'aoW Ib, 1011 SCALE; I'-50 Alternative Concept Plan City Hall Property o 92 market -rate rental units 6,000 square feet of retail space 0 512 -space public parking structure 0 Public pedestrian promenade o Lot Line Adjustment Annual lease payments range between $470,000 to $589,000 J _ wo�R.uw � 1� I•A 111_ roav�o� 200 spaces J - , �Jr� SUMMARY FASTING. 6LVD lJRfA2 LCff=145S AAI� VLAL RLVO ANN, CELOT- PASPACES • YULIW OP SED PKG. ACES 1 SPACES • TOTAL PROPOSED SPACES 165 ME TARGET) PROF05EON STRUT E- 2795PACE5 • '"(ENSKI PARKING REQLTREMENT -12 • PROPOSED NET PARKING GALY =159 PROPoSEO RETAIL SCtNWOS RASED ON PARKING • 159 ®l9 /IWD-4%7(OSTOF Po [A TENL MAIL • 1590 aw TWO- 19,805.F OF POTENTIAL REFAR. • 15905 V I=J 31,MSY OF POTENTIAL REPAE. A Q Qom' DRAFT SITE FEASIBILITY STUDY -OPT CITY OF NEWPORT BEACH LIDO VILLAGE Oaw6a161 2011 SCALE; I'-S0 Alternative Concept Plan Via Lido Plaza Renovate some or all existing commercial buildings Two new retail buildings (18,400 square feet) Public pedestrian plaza & promenade Parking in adjacent public parking structure F-;:::'r 0 DRAFT SITE FEASIBILITY STUDY -OPT SUMMARY FASTINGRETAIL389,103mv.,mo, —, NEW, BLVD SUfFFACE LOT =145 SPACES • VU LRIG<S ANG, PKG. -A SPACES • TOTAL PROPOSED SPACES 10 ME TARGET LOSS' OFF SPPAAM wm H NEW PoSw 1009 )"OWSKI PARKING REQLTREMENT - lE PROPOSED NET PARKING GA N -159 159@ RE TAIL SCEJARIOSBASED ON PARKING 159 ®l 9 1 IOW =Og1C05 FOF POTENTL 1000-3 R. MTENIO LRETA,SO S.FOF I"95TIALRETAR. POTS W I RZI1 W S.FOF PnreNTrAL RETAIL r Circulation & Pedestrian Improvements (public right -of -way) Via Lido- Reconfiguration one -way, two -lane access to Lido Isle with angled on- street parking Cj 32nd St.- Reconfiguration two -way access from Lafayette Road to Newport Boulevard (two lanes westbound and one lane eastbound) with a Round -a -bout west of the Lido Isle Bridge. CITY OF NEWPORT BEACH Dwauo 16.1300 LIDO VILLAGE Via Oporto and Via Malaga- Reconfigured as Pedestrian Promenades. '0�� J Q P. SUMMARY 5ASfMG.BMS ACµrvarr -145 SPAIW • NEV/P.BLVO SURFACE -WSPA3PACE3 • YL1L PRD ANG.PKG.=Z100SS • TOTAL PROPOSED SPACF3165 (293 TARGFO PROPOS ®NEW SfROCN3C•2195PAC9S •LOSS OFSP^�CE4� NEW P� MS= =108 • IAROW310PA31P REQUBEI.1 I" =12 • PSOPG59D NEI PARILINGGAVI =159 PROPOSEDREPRO.SCENARIOSBASWONPA G :; • 1%@39 11000 -Q. pS.FOF POT2NMLSEPA6 .. . 159 ®{.a 1000- 39.]503FOF POTeNT1AL REFAG • MTE 10 PJET .00 S.FOF . . POTeN2UL R61'AIL i .>o,o �o Clp DRAFT SITE FEASIBILITY STUDY -OPT � CITY OF NEWPORT BEACH " "°° LIDO VILLAGE Oxmbv 142011 SCA ; r-m Enhanced Pedestrian Experience Public and Private Via Lido,Via Oporto and Via Malaga, and 32nd Street Via Lido Plaza (existing and proposed) City Hall property y • DRAFT SITE FEASIBILITY STUDY -OPT � CITY OF NEWPORT BEACH " "°° LIDO VILLAGE Oxmbv 142011 SCA ; r-m Enhanced Pedestrian Experience Public and Private Via Lido,Via Oporto and Via Malaga, and 32nd Street Via Lido Plaza (existing and proposed) City Hall property Lido Village Planning Permanent use of City Hall Site Next Steps Community Outreach • Residents - Lido Isle & Peninsula • Property owners Businesses Further refinement & study Questions?