Loading...
HomeMy WebLinkAbout06 - Wayfinding Signsp �gW PpR � CITY OF NEWPORT BEACH City Council Staff Report Agenda Item No. 6 September 27, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Peter Tauscher, Junior Engineer APPROVED: A WXYFINDING SI N PROJECT - COMPLETION AND TITLE: ACCEPTANCE OF CONTRACT NO. 4040 ABSTRACT: On March 8, 2011, City Council awarded Contract No. 4040 to Censource, Inc.,.for an amount of $97,551.16, and established a 15 percent contingency allowance. Work is now complete and staff requests City Council to accept and close out of the contract. 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials Bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description General Fund Contributions DISCUSSION: Account Number 7014- C3002012 7251- C3002012 Overall Contract Cost/Time Summary Amount $35,814.83 60,300.00 Total: $96,114.83 Construction Actual Contract Time Contract Award Final Cost at Contingency gency Contract Time+ Under or Amount Completion Target Change Exttean sion Over $97,551.16 $96,114.83 15% or less -1.5% 75 +13 The project consisted of removing existing wayfinding directional signs; fabricating and installing 64 new wayfinding signs; and incidental work items as required by the contract Wayfinding Sign Project — Completion and Acceptance of Contract No. 4040 September 27, 2011 Page 2 documents. Pursuant to the contract specifications, Censource had 75 consecutive working days to complete the project, but due to adjustments to the shop drawings, identifying and substituting specific color preferences, and material limitations, additional time was needed. Early identification of some of the possible problems contributed to assuring a successful project. Consequently, Censource required an additional 13 days to install and adjust the signs. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: Actual cost of bid items constructed: Total change orders: Final contract cost: A summary of the added project schedule is as follows: Estimated completion date per March 2011 Schedule: Project Awarded for Construction: Contract Completion Date Plus Approved Extensions: Actual Substantial Completion Date: ENVIRONMENTAL REVIEW: $97,551.16 96,114.83 0.00 $96,114.83 August 12, 2011 March 8, 2011 August 5, 2011 August 24, 2011 City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301 (Minor alterations of existing facilities with negligible expansion of the facilities) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: This agenda item has been noticed according to the Brown Act. In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. Submitted by: -p*rrStephen GCBadum Public Works Director Attachment: Location Map 2 Wayfinding Sign Project — Location Map C -4040 Reference Grid City of Newport Beach IWAM �Ip ' f'r`o °moo � �. pia /.jl F., n'. ■ // ® � ,� , ��. :ill �� y� °�'••�• �. � �.. •, �' t �� ire' '���� .Y. �� �. � If9t•szii � �I�L�� In'll mom ON 0 IF �W\ll■ 1 L 0 `m ON N m VIII -2110, ` �4 ICS /llil� mm