Loading...
HomeMy WebLinkAbout14 - Free Right-Turn Templates to Enhance Bicycle Facilitiesou Agenda Item No. 14 September 27, 2011 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Brad Sommers, Senior Civil Engineer APPROVED:�z TITLE: Approval of "Free" Right -Turn Striping and Signage Design Templates to Enhance Bicycle Facilities ABSTRACT: After evaluating bicycle facilities throughout the City, staff designed striping and sign templates for bicycle lanes to be applied at 'free" right -turn locations. These are locations at which vehicle crossings and merges may present challenges to motorists and cyclists. The templates were created to guide cyclists and motorists in an efficient manner while providing a defined passage through intersections for cyclists. RECOMMENDATION: Approve 'free" right -turn design templates to be deployed at intersections within the City, as determined by Public Works staff. FUNDING REQUIREMENTS: There is no fiscal impact related to this item. DISCUSSION: The Bicycle Safety Committee identified intersections and roadways throughout the City and requested staff to analyze these intersections as to the location of vehicles, location of cyclists, visibility of drivers and cyclists and the merge area created by 'free" right turns. "Free" right turn pockets are those that allow a vehicle to turn from one street to another without stopping, except to yield to others (pedestrians, bicycles, or vehicles) already within the intersection. Typical 'free" right -turn layouts are shown in the attached exhibits. Approval of "Free" Right -Turn Striping and Signage Design Templates to Enhance Bicycle Facilities September 27, 2011 Page 2 Staff designed new bike lane striping to better facilitate the flow of vehicle and bicycle traffic as each enters, passes through, and leaves intersections. The designs incorporate changes in striping and installation of signs within existing City right -of -way. The designs can be applied to new striping layouts or modified to fit into existing layouts. As there is not currently an adopted bicycle lane treatment for "free" right turns, the Public Works Director believes in his professional opinion these templates are reasonable to address the presented concerns. Upon approval of these design templates, staff will deploy them in a pilot project along East Coast Highway from MacArthur Boulevard to Irvine Terrace. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this action is not subject to the California Environmental Quality Act ( "CEQA") pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly or indirectly. Additionally, Staff recommends the City Council find future deployment of these striping and signing templates be exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301 (for repair, maintenance and minor alteration of existing public facilities with negligible expansion) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). Submitted by: ;� Stephen GZBadurit Public Works Director Attachments: A. Exhibit A - Bicycle Lane shoulder bike lane) B. Exhibit B - Bicycle Lane trap lane) Design Standard for Free Right Turn (with Design Standard for Free Right Turn (with a SIGN DETAILS BIKE IANE I .t 4!,^ Vw 1 0 INSTALL R81 IKE ".-j :KINGS l I PROPOSED BIKE LANE TEMPLATE AT A FREE ^ RIGHT TURN WITH SHOULDER BIKE LANE 4 nL INSTALL DET 376 CURB FACE INSTALL DET 37A `INSTALL DET 39A INSTALL DET 39 INSTALL BIKE LANE MARKINGS INSTALL BIKE LANE MARKINGS t'D O @11 SIGN DETAILS BIK R81 (12x8) W11 -1 (2424 .. a � •_ �/ IN DET 39 INSTALL R81 INSTALL W11 -i INSTALL DET 37B CURB FACE NST LL BIKE ` INSTALL DET 39A ILANEAMARKINGS INSTALL DET 37A INSTALL BIKE LANE MARKINGS -� INSTALL DET 39 PROPOSED BIKE LANE TEMPLATE AT A FREE B RIGHT TURN WITH A TRAP LANE 4