Loading...
HomeMy WebLinkAbout06 - FY 2010-11 Streetlight Improvement Project-Completion�EWPO�r == CITY �JOF BEACH C'9CiF00.N`P Uty CouncH Sffeffff Deport Agenda Item No. 6 April 10, 2012 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FRONT: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Peter Tauscher, Junior Civil Engineer APPROVED:, 0. � 1 FY2010 -2011 Streetlight Improvement Project — Completion and TITLE: Acceptance of Contract No. 4605 ABSTRACT: On June 14, 2011, City Council awarded Contract No. 4605 to Steiny and Company, Inc. ( Steiny), for an amount of $585,510.75, and established a 10 percent contingency allowance. Work is now complete and staff requests City Council to accept and close out the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Increase the contingency amount by $7,201.84, approximately 1.4 percent. 3. Authorize the City Clerk to release the Labor and Materials Bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond one year after Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following account: Account Description Account Number Amount General Fund 7013- C2202002 $ 652.201.84 $ 652,201.84 DISCUSSION: FY 2010 -2011 Streetlight Improvement Project - Completion and Acceptance of Contract No. 4605 April 10, 2012 Page 2 Overall Contract Cost/Time Summary Construction Contract Award Amount Description Cost 1 Ba side Drive Change of Conditions - Installing conduit $ 5,563.42 Final Cost at Completion Contingency Target Actual Contract Change Contract Time+ Extension (days) Time (Under) or Over $585,510.75 $652,201.84 10% 11.39% 117 ( -3) $112.09 The contract consisted of replacing 155 higher energy use streetlight fixtures with new energy efficient LED units as part of the rehabilitation and upgrade of four existing deteriorated streetlight circuits identified in the City's 15 -year Streetlight Replacement Master Plan. The work areas included portions Bayside Drive, Harbor Island Drive, and the Westcliff Community. In addition to rehabilitating the four circuits, the new fixtures will yield yearly energy savings of approximately $3,500, plus reduce maintenance costs as the new LED lamps are expected to last approximately 5 times longer then the HPS lamp bulbs they replaced. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: Actual cost of bid items constructed: Total change orders: Final contract cost: $585,510.75 652,089.75 112.09 $652,201.84 The final overall construction cost including change orders was 11.4 percent over the original bid amount. Essentially all of these additional costs resulted from design changes during construction to account for unanticipated field conditions. Additionally, four change orders were issued for this project and itemized below: CO # Description Cost 1 Ba side Drive Change of Conditions - Installing conduit $ 5,563.42 2 Additional Circuit Breakers and Contactors $ 2,146.75 3 Revise Pay Item #8 Procedure -clean and paint mast arms $ - 8,710.00 4 Additional Underground Utility Verification $ 1,111.92 TOTAL $112.09 A summary of the added project schedule is as follows: Estimated completion date per July 2011 Schedule: Project Awarded for Construction: Contract Completion Date Plus Approved Extensions: Actual Substantial Completion Date: June 11, 2012 June 14, 2011 January 25, 2012 January 23, 2012 FY 2010 -2011 Streetlight Improvement Project - Completion and Acceptance of Contract No. 4605 April 10, 2012 Page 3 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15302 (replacement of existing facilities involving negligible expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: This agenda item has been noticed according to the Brown Act. In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. Submitted by- 1z' T Stephen G. Badum �QfPublic Works Director Attachment: A. Location Map FY 2010 -2011 STREETLIGHT IMPROVEMENT PROJECT CONTRACT No. 4605 ATTACHMENT A ,(,Q' BAKER py PAUURIN O /AV n /'J AV QOph 4/ CITY OF MERRIM40 -Av ARLINGTON DR. 2 OR s COSTA FNfl DR J" Q CITY MESA OF a IRN E WILSON ST c NCTORIA ST J P �t 2jH0 NIVERSRY 94 � OR IM Ay P J �yd G�P> �4i BlS °ry O` 'ski V 00 CANTO Rp?�e CITY O, NE ° BEACH 2P tt' Op'L h0 V �9 dT u0 Q9�Si0E � h O R 4 S RD h °ADUIN 0 \\. GCVO PACIF /c Po y PROJECT LOCATIONS OC O— INDICATES AREA d SHOi'fN ON SHEET INDEX MAP VICINITY MAP N.T.S. ATTACHMENT A