Loading...
HomeMy WebLinkAboutSS2 - Early CIP Look for FY2012-2013111fly lssk ;'nav 8 (CIpIl�1Il Rf(bgnm City Council Study Session April 10, 2012 CsnsnI 7unZ �CT Csil • $1,000,000 - FY 2010 -11 • $2,000,000 - FY 2011 -12 • $3,600,000 - FY 2012 -13 • Consider an increase in FY 2013 -14 * Eventually to $5M /year. Critical General Fund CIP Focus: * Necessary Maintenance, Repair or Replacement * Identified Master Plan Projects Streets, sidewalks, ADA, street lights, alleys, storm drains, bulkheads, critical facilities, more ry TA fil = Anterim Use Plan for Current City Hall Site yRepainting of Balboa Yacht Basin Buildings yCentral Library HVAC Refurbishment (Replacement of VAVB Boxes, Control System) yDesign of Auxiliary Maintenance Yard at Big Canyon Reservoir rLifeguard Headquarters Building Rehabilitation (Construction) TOTAL FACILITIES $300,000 $35,000 $340,000 $140,000 $1,500,000 $2,315,000 y Annual Citywide Sidewalk, Curb & Gutter Replacement Program :Annual Citywide Street Slurry Seal Program yHarbor Island Drive, Harbor Island Road, Bayside Drive and Avocado Avenue Pavement Rehabilitation rBalboa Blvd & Channel Road Pavement Reconstruction on Peninsula Point yCentral Balboa Alley Reconstruction (follow -up to UUD 100) and Bayfront South Alley Reconstruction $500,000 $635,000 $1,680,000 $1,975,500 $1,900,000 y Old Newport Road & West Coast Highway Modifications (design) Drainage System Repair and CMP Slip- lining Jamboree Road Pavement Rehabilitation yAsphalt Alley Replacement in Newport Heights TOTAL STREET & DRAINAGE $360,000 $700,000 $500,000 $360,000 $9,925,500 East Coast Highway Signal Rehabilitation (design only) $300,000 Phase 6 and 7 of Citywide Traffic Signal Modernization (OCTA Grant Projects) $916,900 Annual Traffic Signal Rehabilitation Program $300,000 Citywide Street Signage, Striping & Marking Modifications $75,000 TOTAL TRAFFIC $1,591,900 �Tidegate Value Retrofit and Upgrades Seawall and Bulkhead Modifications yPlayground Equipment Replacement Shallow Water Eelgrass Habitat Survey Bay Beach Sand Management vVessel Waste Pumpout Station Replacement Balboa Marina Public Dock .Mooring Field Realignment TOTAL PARKS, HARBORS & BEACHES $200,000 $500,000 $65,000 $50,000 $300,000 $80,000 $125,000 $25,000 $1,345,000 Measure M - Tier II Water Quality Grant Match $800,000 ,ASBS Education & Signage (Part of Prop 84 Grant) $112,000 TOTAL WATER QUALITY & ENVIRONMENTAL $912,000 Big Canyon Reservoir Floating Cover Replacement $3,965,000 YWater Main Master Plan Program $1,500,000 yTransmission Main Cathodic Program $150,000 �, 16th St. Pump Station and Well Site VFD Improvements $450,000 TOTAL WATER $6,065,000 yWastewater Master Plan Rate Study Sewer Pipeline Point Repairs and Lining TOTAL WASTEWATER $125,000 $75,000 $200,000 7 TR(D ' Ts 2-FY(CTJD = a fm (No NnA ng=ni - i't ("D15i Solo N?OAM Project GF Cost Cumulative Base CIP General Fund Budget $3.600.000 $3.600.000 1) Streetlight Replacement Program z) SCE Rule 20A Credits Purchase 3) Finish LCP 4) Newport Coast Drive Monument Signs 5) Balboa Boulevard Landscaping Design 6) Bristol Street South Median Landscaping 7) Corona Del Mar Entry Improvements 8) West Coast Highway Concept Plan 9) Bayside Cover Public Walkway TOTAL UNPROGRAMMED PROJECTS LIST $150,000 $3,750,000 $29,000 $3,779,000 $150,000 $3,929,000 $70,000 $3,999,000 $265,000 $4,264,000 $125,000 $4,389,000 $100,000 $4,4891000 $300,000 $4,7891000 $50,000 $4,839,000 $1,239,000 Eastbluff Bike Lane Addition @ Jamboree Rd. * Will submit for grant funding (est. $100,000) Other Bike Safety Improvements * OCTA's call for projects due April 30, 2012