Loading...
HomeMy WebLinkAbout06 - Various Storm Drain ImprovementsAgenda Item No. 6 March 13. 2012 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Tom Sandefur, P.E. APPROVED: TITLE: Various Storm Drain Improvements -- Award of Contract No. 4966 ABSTRACT: Staff received construction bids for the "Various Storm Drain Improvements" Project and is requesting City Council's approval to award the work to RY Engineering Works, Inc. RECOMMENDATIONS: 1. Approve the project drawings and specifications; 2. Declare RY Engineering Works, Inc., (RYE) as the lowest responsible bidder. 3. Award Contract No. 4966 to RYE., for the total bid price of $186,012.50 and authorize the Mayor and City Clerk to execute the contract; and 4. Establish a contingency of $27,900.00 (approximately 15 percent) to cover the cost of unforeseen work. FUNDING REQUIREMENTS: The current adopted budget includes sufficient funding for this project. It will be expensed to the General Fund account, 7012- C2502011. Proposed uses are as follows: Vendor Purpose Amount RY Engineering Works, Inc. Construction Contract $ 186,012.50 RY Engineering Works, Inc. Construction Contingency 27,900.00 Total $ 213,912.50 1 Various Storm Drain Improvements -- Award of Contract No. 4966 March 13, 2012 Page 2 DISCUSSION: At 9:00 a.m. on February 14, 2012, the City Clerk opened and read the following bids for the Various Storm Drain Improvements Project: BIDDER Low RY Engineering Works, Inc. 2 La Strada Contracting 3 Palp, Inc., dba Excel Paving 4 Pointer Enterprises, Inc. 5 Topline Construction, Inc. 6 SLS Construction, Inc. 7 The RJ Noble Company 8 TED Enterprises 9 Paulus Engineering, Inc. 10 Altas Underground, Inc. 11 GCI, Inc. 12 Peterson -Chase General Engineering 13 RSB Group, Inc. 14 Garcia Juarez, Inc. 15 Altas- Allied, Inc. 16 T.E. Roberts, Inc. 17 Cali -Agua, Inc. TOTAL BID AMOUNT $186,012.50 ** $188,888.00 $194,492.00 $207,157.00 $214,222.00 $214,242.00 $214,941.00 $217,545.00 $224,129.00 $238,178.00 $239,575.00' $240,329.00* $247,825.00 $249,955.00 $264,896.00 $283,245.00 $295,420.00 * Corrected Bid Amount * *Due to a mistake on their bid documents, RY Engineering Works had an As -Read bid price of $190,520.50. The corrected value is $186,0125.50 based on the word written values. Once it was determined that a mistake had been made in their bid, RY Engineering Works was given the opportunity to withdraw their bid. RY Engineering Works decided to stand by their corrected bid and is therefore the lowest responsible bidder. The total low bid amount is 17% percent below the Engineer's Estimate of $225,000.00. The lower price is probably the result of an extremely competitive bid environment as evidenced by the large number of bidders on this project. Staff recommends establishing a 15% contingency as this project involves extensive underground excavations which typically have a higher degree of unknown issues associated with them including utility conflicts and unknown soil conditions differing from the as -built plans. The work necessary for the completion of this contract consists of: • Installing perforated subdrain and related structures and connecting to existing storm drain system on Newport Hills Drive. • Repaving the street area affected by the subdrain construction. Various Storm Drain Improvements -- Award of Contract No. 4966 March 13, 2012 Page 3 • Installing a new grate catch basin in the vicinity of 227 Bayside Drive and connecting to an existing storm drain. • Installing a Stormtech detention basin at 32nd Street and Seashore Drive. The low bidder, RYE possesses California State Contractors License Classification of "A" as required by the project specifications. A check of RY Engineering Works' references indicated satisfactory completion of similar projects in the past. Pursuant to the contract specifications, RY Engineering Works will have 45 consecutive working days to complete the Work. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c) (maintenance activities with negligible expansion) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). Submitted by: Director A. Location Maps 2 r[ tf/ �A: %TT L LOCATION MAP VARIOUS STORM DRAIN IMPROVEMENT PROJECTS CONTRACT NO.4966 PROJECT LOCATION Z m \ v o y CD CITY HALL 0 32ND STREET O T 2T IbLJ�U LJ_LLW 32ND STREET AND SEASHORE DRIVE 5 LOCATION MAP VARIOUS STORM DRAIN IMPROVEMENT PROJECTS CONTRACT NO.4966 \\� ON- PROJECT LOCATION BAYSIDE DRIVE 0 LOCATION MAP VARIOUS STORM DRAIN IMPROVEMENT PROJECTS CONTRACT NO.4966 N1( c 4ORD ROR RDq ' PORT P RT ', CNq P RT WET PROJECT LOCATION P RT a Mou BEY C / IRIiN y R v O J� GP NEWPORT HILLS DRIVE WEST