Loading...
HomeMy WebLinkAbout07 - Bulkhead and Seawall RepairsC 50k Agenda Item No. 7 March 13, 2012 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Stephen G. Badum, Public Works Director 949 - 644 -3311, sbadum @newportbeachca.gov PREPARED BY: Tom Sandefur, P.E. APPROVED: a C TITLE: Bulkhead and Seawall Repairs -- Award of Contract No. 4897 ABSTRACT: Staff received favorable construction bids for the "Bulkhead and Seawall Repair' Project and is requesting City Councils approval to award the work to Surfside Restoration and Waterproofing, Inc. RECOMMENDATIONS: 1. Approve the project drawings and specifications; 2. Award Contract No. 4897 to Surfside Restoration and Waterproofing, Inc., (Surfside) for the total bid price of $141,300.00 and authorize the Mayor and City Clerk to execute the contract; and 3. Establish a contingency of $35,200.00 (approximately 25 percent) to cover the cost of unforeseen work and pay for additional crack repair. FUNDING REQUIREMENTS: The current adopted budget includes sufficient funding for this project. It will be expensed to the Tide and Submerged Lands account, 7231- C4402007. Vendor Purpose Amount Surfside Restoration Construction Contract $ 141,300.00 Surfside Restoration Construction Contingency 35,200.00 Total $ 176,500.00 Bulkhead and Seawall Repairs -- Award of Contract No. 4897 March 13, 2012 Page 2 DISCUSSION: At 9:00 a.m. on February 16, 2012, the City Clerk received sealed bids for the Bulkhead and Seawall Repairs project. Bids packets were then opened and read aloud with a final tabulation as follows: No. BIDDER TOTAL BID AMOUNT Low Surfside Restoration $141,300.00 2 Howard Ridley Co., Inc. $211,450.00 The total low bid amount is 54% percent below the Engineers Estimate of $305,000.00. The lower price is the result of a continued favorable construction environment. As a result of these favorable bid prices received, staff recommends establishing the contingency at 25% of the bid price so as to provide additional funds for staff and the contractor to address a backlog of bulkhead and seawall repairs while staying within the 25% cap for change orders established by the APWA Standard Specifications. The work necessary for the completion of this contract consists of: • Repairing existing expansion joints, cracks, & spalls in the Newport Island area. • Replacing deteriorated joint material with new joint material in the Balboa Yacht Basin and other City Bulkhead /Seawall structures. • Repairing a concrete cap on an existing sand groin along the Little Balboa Island South Bay Front. • Other incidental items to be completed within the work areas as required by the Plans and Specifications. The low bidder, Surfside Restoration, possesses a California State Contractors License Classification of "G27' as required by the project specifications. A check of Surfsidds references indicated satisfactory completion of similar projects in the past for the City and other agencies. Pursuant to the contract specifications, Surfside will have 40 working days to complete the work. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act (`CEQA) pursuant to Section 15301(d) (maintenance activities activities with negligible expansion) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. a Bulkhead and Seawall Repairs -- Award of Contract No. 4897 March 13, 2012 Page 3 NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). Submitted by: Attachments: A. Location Maps 3 Iq LOCATION MAP BULKHEAD AND SEAWALL REPAIRS CONTRACT NO -4897 NEWPORT ISLAND �sq 9�T �y`ev �i` 0 9 C /pO�V 3 �L •y, O CITY HALL REPAIR LOCATION O RIUO ALTO BULKHEAD CRACK REPAIR I LOCATION MAP BULKHEAD AND SEAWALL REPAIRS CONTRACT NO.4897 9� �C cil SIDE DRIVE um CL[ID ElE J Q t�Z U a � PAflX AK 1 RUN E ® WlLJ ® L1J1Ll PROJECT LOCATION CRYSTAL AVE SAND GROIN