HomeMy WebLinkAbout17 - 19th Street Bridgep SEW PART
CITY OF
NE;1IV/ SORT REA CH
City Council Staff Report
Agenda Item No. 17
February 28, 2012
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM:' City Manager's Office
Dave Kiff, City Manager
949 - 644 -3002, dkiff @newportbeachca.gov
PREPARED BY: Dave Kiff, City Manager
APPROVED: "/l.nlh
vl
TITLE: 19`h Street Bridge: Request for a SARX Study Update
ABSTRACT:
Council Member Daigle has asked the City to consider sending a letter to the Orange
County Transportation Authority (OCTA) asking OCTA to work with the City's Public
Works staff to summarize recommended mitigation measures to local traffic if the 19th
Street Bridge over the Santa Ana River was removed from the Master Plan of Arterial
Highways (MPAH) and the City's General Plan.
RECOMMENDATION:
Authorize Mayor Gardner to send the attached letter to OCTA.
FUNDING REQUIREMENTS:
There is no fiscal impact related to this specific letter, but depending on the detail of the
study update, additional resources may be required.
DISCUSSION:
The ,19th Street Bridge" would link the end of 191h Street at the edge of Newport Beach
and Costa Mesa to Huntington Beach, crossing the Santa Ana River (see attached
diagram). The bridge has been envisioned in both the Master Plan of Arterial Highways
(MPAH) as well as the City's General Plan. A meeting on January 5, 2012 in
Huntington Beach has renewed interest in the bridge — more specifically, interest in
deleting the bridge from the MPAH — but doing so would have its own impacts for
Newport Beach.
In the mid 1990s, OCTA teamed with the cities of Costa Mesa, Fountain Valley,
Huntington Beach and Newport Beach, to prepare a cooperative study of the missing
MPAH river crossings (this was called the Santa Ana River Crossing or "SARX" Study).
The SARX Study spelled out several mitigation options which would allow the
19th Street Bridge: Request for a SARX Study Update
February 28, 2012
Page 2
successful deletion of these crossings from the MPAH. The status of the Gisler Avenue
crossing between Costa Mesa and Fountain Valley was resolved, but the 19th Street
crossing remains unresolved.
To better understand "where we left off`with the SARX Study, as well as the impacts of
removing the 191h Street Bridge crossing from the MPAH, Council Member Daigle has
asked the City to work with OCTA to provide an update of the SARX study — primarily to
identify recommended measures to mitigate the transportation /traffic impacts of deleting
the bridge from the MPAH.
If that issue is being examined, Public Works staff suggests that at some point in time,
the City, neighboring communities, and OCTA may want to examine Newport Beach
traffic impacts in a broader context that considers all of the possible and /or pending
changes to the MPAH, including but not limited to:
• The 55 extension (cut and cover tunnel) through Costa Mesa;
• The elimination or modification of one or both of the planned arterial connections to
West Coast Highway through Newport Banning Ranch;
• The elimination of the planned arterial connections between 191h and Victoria along
the Santa Ana River.
This agenda item does not bind the City of Newport Beach to remove the 19`h Street
Bridge from the MPAH.
Diagram 1 — Location of Proposed 191" Street Bridge
a
19th Street Bridge: Request for a SARX Study Update
February 28, 2012
Page 3
ENVIRONMENTAL REVIEW:
While future steps relating to the 1g`h Street Bridge are certainly likely to involve CEQA
review, sending this letter does not. Therefore, staff recommends the City Council find
this action is not subject to the California Environmental Quality Act ( "CEQA ") pursuant
to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable
indirect physical change in the environment) and 15060(c)(3) (the activity is not a
project as defined in Section 15378) of the CEQA Guidelines, California Code of
Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical
change to the environment, directly or indirectly.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
Submitted by:
Lk-n
Dav Kiff
City Manager
Attachments: A. Proposed Letter to OCTA
3
19th Street Bridge: Request for a SARX Study Update
February 28, 2012
Page 4
February 29, 2012
Mr. Will Kempton, CEO
Orange County Transportation Authority (OCTA)
P.O. Box 14184
Orange, CA 92863 -1584
RE: Analysis of Impacts relating to the MPAH and the 19`h Street Bridge
Dear Mr. Kempton:
This letter respectfully requests your staff's assistance in working with our Public Works
Department to conduct an update of the Santa Ana River Crossings (SARX) study
which would summarize where we last left off in identifying mitigation measures for the
traffic - related impacts on Newport Beach should the proposed 191h Street Bridge over
the Santa Ana River be removed from the Orange County Master Plan of Arterial
Highways (MPAH). The update need not be exhaustive, but it should effectively
summarize the mitigation measures, options and alternatives available to us should the
Bridge be deleted from the MPAH.
Likely not a part of this specific update, but similarly important, OCTA and the SARX
cities might also want to review other possible changes to the MPAH that may be under
consideration, including but not limited to:
The 55 extension through Costa Mesa;
The elimination or modification of one or both of the planned arterial connections to
West Coast Highway through Newport Banning Ranch; and
The elimination of the planned arterial connections between 191h and Victoria along
the Santa Ana River.
We welcome the participation of other neighboring communities in this effort should that
be desirable by OCTA and those cities.
We look forward to working with your staff in this regard.
Sincerely,
NANCY GARDNER
Mayor of Newport Beach
cc: Members of the Newport Beach City Council
The Honorable Paul Glaab, Chairman of OCTA
The Honorable John M. W. Moorlach, Supervisor, District #2
Mayor
Nancy Gardner
Mayor Pro Tern
Keith D. Curry
Council Members
Leslie J. Daigle
Michael F. Henn
Rush N. Hill, II
Steven J. Rosansky
Edward D. Selich
CITY OF NEWPORT BEACH
OFFICE OF THE MAYOR
February 29, 2012
Mr. Will Kempton, CEO
Orange County Transportation Authority (OCTA)
P.O. Box 14184
Orange, CA 92863 -1584
RE: Analysis of Impacts relating to the MPAH and the 19th Street Bridge
Dear Mr. Kempton:
This letter respectfully requests your staff's assistance in working with our Public Works
Department to conduct an update of the Santa Ana River Crossings (SARX) study
which would summarize where we last left off in identifying mitigation measures for the
traffic- related impacts on Newport Beach should the proposed 19th Street Bridge over
the Santa Ana River be removed from the Orange County Master Plan of Arterial
Highways (MPAH). The update need not be exhaustive, but it should effectively
summarize the mitigation measures, options and alternatives available to us should the
Bridge be deleted from the MPAH.
Likely not a part of this specific update, but similarly important, OCTA and the SARX
cities might also want to review other possible changes to the MPAH that may be under
consideration, including but not limited to:
• The 55 extension through Costa Mesa;
• The elimination or modification of one or both of the planned arterial connections to
West Coast Highway through Newport Banning Ranch; and
• The elimination of the planned arterial connections between 19th and Victoria along
the Santa Ana River.
We welcome the participation of other neighboring communities in this effort should that
be desirable by OCTA and those cities.
We look forward to working with your staff in this regard.
Mayor of/Newport Beach
cc: Members of the Newport Beach City Council
The Honorable Paul Glaab, Chairman of OCTA
The Honorable John M. W. Moorlach, Supervisor, District #2
City Hall • 3300 Newport Boulevard • Post Office Box 1768
Newport Beach, California 92658 -8915 • www.newportbeachca.gov
(949) 644 -3004